A08 - CASQA Detail - WM-8.pdf

PDF 60 KB Posted

Attached to
Z1QA--892-036 - Miramar National Cemetery Expansion
Solicitation number
36C78620B0015
Issued by

About this file

This document provides best management practices for concrete waste management on construction projects. It describes procedures for conducting concrete washout onsite or offsite in a designated area. It applies to projects using concrete as a construction material or involving concrete demolition. The document recommends employee and subcontractor training, and describes the need to prevent concrete waste from raising pH levels in stormwater runoff outside of permitted ranges. It provides guidance on suitable applications and targeted constituents for concrete waste management techniques.

The related federal contract opportunity is a solicitation for expansion work at the Miramar National Cemetery in San Diego, California. The project involves construction of additional columbarium niches and in-ground cremains areas. The solicitation number is 36C78620B0015 and the project number is 892-036. The contracting agency is the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

File Type Posted
Attachment 01 - Storm Drain Responses.pdf PDF
Attachment 02 - Water Responses.pdf PDF
S06 - A0004 - 36C78620B0015.docx DOCX document
Attachment 02 - NPDES Permit_NOI- WDID 937C356920.pdf PDF
Attachment 01 - 1999 const permit 99-08-DWQ.pdf PDF
S06 - A0003 - 36C78620B0015.docx DOCX document
ATTACHMENT 05 - Cost Estimate Worksheet - Miramar.xlsx XLSX spreadsheet
A04 - 892CM3036 - Bid Documents Plans - V-001.pdf PDF
A06 - CASQA Detail - SE-10.pdf PDF
S06 - A0002 - 36C78620B0015.docx DOCX document
A02 - 892CM3036 - Bid Documents Plans - A-101 - A-301.pdf PDF
A01 - 892CM2022 - Miramar Phase 1 Record Drawings - E-104.pdf PDF
A03 - 892CM3036 - Bid Documents Plans - C-201.pdf PDF
A11 - Digital Repeater - Equipment Specs.pdf PDF
A12 - Digital Repeater Picture 1.jpeg JPEG file
A07 - CASQA Detail - TC-1 and TC-3.pdf PDF
A05 - CASQA Detail - SE-1.pdf PDF
A13 - Digital Repeater Picture 2.jpeg JPEG file
A09 - 892CM3036 - BD - Geotech Report.pdf PDF
A10 - 892CM3036 - Miramar NC - Bidders Questions.xlsx XLSX spreadsheet
P09 - Scope of Work - FINAL.pdf PDF
S02 - 892CM3036 - Binder 9 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 6 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 5 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 1 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 7 of 9 Miramar.pdf PDF
S02 - 36C786-20-B-0015 - Solicitation.pdf PDF
S02 - 892CM3036 - Binder 2 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 4 of 9 Miramar.pdf PDF
S02 - Specifications.pdf PDF
S02 - 892CM3036 - Binder 8 of 9 Miramar.pdf PDF
P07 - WD - CA20200001 - 07.24.2020.pdf PDF
S02 - 892CM3036 - Binder 3 of 9 Miramar.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Concrete Waste Management WM-8

July 2012 California Stormwater BMP Handbook 1 of 7 Construction www.casqa.org

Description and Purpose Prevent the discharge of pollutants to stormwater from concrete waste by conducting washout onsite or offsite in a designated area, and by employee and subcontractor training.

The General Permit incorporates Numeric Action Levels (NAL) for pH (see Section 2 of this handbook to determine your project’s risk level and if you are subject to these requirements).

Many types of construction materials, including mortar, concrete, stucco, cement and block and their associated wastes have basic chemical properties that can raise pH levels outside of the permitted range. Additional care should be taken when managing these materials to prevent them from coming into contact with stormwater flows and raising pH to levels outside the accepted range.

Suitable Applications Concrete waste management procedures and practices are implemented on construction projects where:

Concrete is used as a construction material or where concrete dust and debris result from demolition activities.

Slurries containing portland cement concrete (PCC) are generated, such as from saw cutting, coring, grinding, grooving, and hydro-concrete demolition.

Concrete trucks and other concrete-coated equipment are washed onsite.

Categories

EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control

NS Non-Stormwater Management Control

WM Waste Management and Materials Pollution Control

Legend:

Primary Category

Secondary Category

Targeted Constituents

Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics

Potential Alternatives

None

If User/Subscriber modifies this fact sheet in any way, the CASQA name/logo and footer below must be removed from each page and not appear on the modified version.

File details come from the government source that posted it. Updated .