A07 - CASQA Detail - TC-1 and TC-3.pdf

PDF 617 KB Posted

Attached to
Z1QA--892-036 - Miramar National Cemetery Expansion
Solicitation number
36C78620B0015
Issued by

About this file

This document contains technical specifications for best management practices related to construction site runoff. It provides guidance for stabilized construction entrances and exits (TC-1) and tire wash areas (TC-3) to help prevent sediment and mud from being tracked off construction sites by vehicles. For stabilized entrances and exits, it recommends using aggregate over geotextile fabric, with a minimum length of 12 times the diameter of the largest tire. Tire wash areas should be level if possible, constructed of coarse aggregate no smaller than 3 inches, and be able to support anticipated traffic loads. Proper implementation of these measures can help reduce sediment discharge from construction sites by containing soil and mud on construction vehicles to keep public roads clean.

View the file

Other files

File Type Posted
Attachment 01 - Storm Drain Responses.pdf PDF
Attachment 02 - Water Responses.pdf PDF
S06 - A0004 - 36C78620B0015.docx DOCX document
Attachment 02 - NPDES Permit_NOI- WDID 937C356920.pdf PDF
Attachment 01 - 1999 const permit 99-08-DWQ.pdf PDF
S06 - A0003 - 36C78620B0015.docx DOCX document
ATTACHMENT 05 - Cost Estimate Worksheet - Miramar.xlsx XLSX spreadsheet
A04 - 892CM3036 - Bid Documents Plans - V-001.pdf PDF
A06 - CASQA Detail - SE-10.pdf PDF
S06 - A0002 - 36C78620B0015.docx DOCX document
A02 - 892CM3036 - Bid Documents Plans - A-101 - A-301.pdf PDF
A01 - 892CM2022 - Miramar Phase 1 Record Drawings - E-104.pdf PDF
A03 - 892CM3036 - Bid Documents Plans - C-201.pdf PDF
A11 - Digital Repeater - Equipment Specs.pdf PDF
A08 - CASQA Detail - WM-8.pdf PDF
A12 - Digital Repeater Picture 1.jpeg JPEG file
A05 - CASQA Detail - SE-1.pdf PDF
A13 - Digital Repeater Picture 2.jpeg JPEG file
A09 - 892CM3036 - BD - Geotech Report.pdf PDF
A10 - 892CM3036 - Miramar NC - Bidders Questions.xlsx XLSX spreadsheet
P09 - Scope of Work - FINAL.pdf PDF
S02 - 892CM3036 - Binder 9 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 6 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 5 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 1 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 7 of 9 Miramar.pdf PDF
S02 - 36C786-20-B-0015 - Solicitation.pdf PDF
S02 - 892CM3036 - Binder 2 of 9 Miramar.pdf PDF
S02 - 892CM3036 - Binder 4 of 9 Miramar.pdf PDF
S02 - Specifications.pdf PDF
S02 - 892CM3036 - Binder 8 of 9 Miramar.pdf PDF
P07 - WD - CA20200001 - 07.24.2020.pdf PDF
S02 - 892CM3036 - Binder 3 of 9 Miramar.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stabilized Construction Entrance/Exit TC-1

July 2012 California Stormwater BMP Handbook 5 of 6 Construction www.casqa.org

50’ Typical

(1) Length should be extended to 12 times the diameter of the largest construction vehicle tire.

(2) On small sites length should be the maximum allowed by site.

Stabilized Construction Entrance/Exit TC-1

July 2012 California Stormwater BMP Handbook 6 of 6 Construction www.casqa.org

50’ Typical

(1) Length should be extended to 12 times the diameter of the la rgest construction vehicle tire.

(2) On small sites length should be the maximum a llowed by site.

Entrance/Outlet Tire Wash TC-3

January 2011 California Stormwater BMP Handbook 1 of 3

Construction www.casqa.org

Description and Purpose

A tire wash is an area located at stabilized construction access points to remove sediment from tires and under carriages and to prevent sediment from being transported onto public roadways.

Suitable Applications

Tire washes may be used on construction sites where dirt and mud tracking onto public roads by construction vehicles may occur.

Limitations

The tire wash requires a supply of wash water.

A turnout or doublewide exit is required to avoid having entering vehicles drive through the wash area.

Do not use where wet tire trucks leaving the site leave the road dangerously slick.

Implementation

Incorporate with a stabilized construction entrance/exit.

See TC-1, Stabilized Construction Entrance/Exit.

Construct on level ground when possible, on a pad of coarse aggregate greater than 3 in. but smaller than 6 in. A geotextile fabric should be placed below the aggregate.

Wash rack should be designed and constructed/manufactured for anticipated traffic loads.

Categories

EC Erosion Control

SE Sediment Control

TC Tracking Control

WE Wind Erosion Control

NS

Non-Stormwater Management Control

WM

Waste Management and Materials Pollution Control

Legend:

Primary Objective

Secondary Objective

Targeted Constituents

Sediment

Nutrients

Trash

Metals

Bacteria

Oil and Grease

Organics

Potential Alternatives

TC-1 Stabilized Construction Entrance/Exit