RFI 59 Plumbing Drawing.pdf

PDF 1 MB Posted

Attached to
Y1DZ--675-106 Expand Radiology & Oncology Minor Construction - Lake Nona
Solicitation number
36C77626R0035
Issued by

About this file

These are architectural plumbing plan drawings for a new hospital facility at the VA Medical Center (VAMC) in Orlando, Florida, designated as Project Number 673-950. The drawings, prepared by the Office of Facilities Management and dated June 4, 2010, depict Bid Alternate No. 3 for Hospital/Clinic Level 1, encompassing Areas D and Zone 4-5 plumbing systems.

The plumbing plans illustrate comprehensive water supply, drainage, and vent piping systems throughout the medical facility. Key components include hot and cold water (HW/CW) supply lines ranging from 1/2" to 3/4" diameter, sanitary (SAN) and vent piping up to 6" diameter, roof drainage systems (both primary and secondary) with 8" to 15" diameter rainwater (RW) lines, and specialty connections for medical equipment including MRI rooms, imaging facilities, nuclear medicine areas, and CT scan units. The drawings specify floor-mounted air conditioning units for humidifiers with 3/4" cold water supply connections and condensate routing to floor drains with maintained 2" air gaps. Four Change Request (CPR) modifications are documented: CPR 122 (09/16/11), CPR 234 (02/16/12), CPR 236 (03/09/12), and CPR 382 (03/15/13). The facility is noted as fully sprinklered. Drawings reference related plumbing drawing sheets (H-PL1.1FD4-A, H-PL1.1FD5-A, H-PL1.1FE1, H-PL1.1FE2-A) and coordination with civil drawings for mobile MRI vehicle water supply connections.

View the file

Other files

File Type Posted
RFI 59 Electrical DWG.pdf PDF
RFI 59 Mechanical DWG.pdf PDF
RFI 59 Plumbing DWG.pdf PDF
RFI 59 Piping DWG.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-27-26.docx DOCX document
36C77626R0035 0009.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-24-26.docx DOCX document
36C77626R0035 0008.pdf PDF
675-106 Addendum 02.pdf PDF
RFI 59 Electrical Drawing.pdf PDF
RFI 59 Mechanical Drawing.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-22-26.docx DOCX document
36C77626R0035 0007.pdf PDF
CON-100 INSTRUCTIONS - Tradeoffs.docx DOCX document
36C77626R0035 0006.pdf PDF
36C77626R0035 0005.pdf PDF
36C77626R0035 0004.pdf PDF
Sign-in Sheet - Lake Nona.pdf PDF
36C77626R0035 0003.pdf PDF
36C77626R0035 0002.pdf PDF
Attachment 9 - PPQ.docx DOCX document
Attachment 6 - Construction Wage Rates - Orange - 01-02-26.pdf PDF
Attachment 8 - Site Visit Instructions.pdf PDF
Attachment 11 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 1 - Specifications.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 5 - Brand Name Justification - Redacted.pdf PDF
Attachment 10 - Project Information Sheet for Contractors.docx DOCX document
36C77626R0035.pdf PDF
Attachment 3 - Specs REV_02-26-2026.pdf PDF
Attachment 4 - PCRA and ICRA.pdf PDF
Attachment 7 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM

C

PM

C

15" SECONDARY

ROOF DRIANAGE.

24" ABOVE

FINISHED GRADE

(39170 S.F.)

15" RW UP &

DN (39170 S.F.)

8" RW UP &

DN (9705 S.F.)

15" SRW UP

(39170 S.F.)

P-528

P-528

P-528

P-401

P-528

P-401

P-401

P-701 P-401

P-401

P-528B P-505

P-528

P-528

P-528

P-560C

P-401

P-102

P-102

P-102

P-102

FLOOR

C.O.

FLOOR

C.O.

FLOOR

C.O.

FLOOR

C.O.

P-528

P-528

P-560C

P-803

P-803

6" CD UP & DN

FLOOR C.O.

FLOOR C.O.

2" W UP

& DN

1 1/2" V

UP & DN

1 1/2" V

UP & DN

H -P

L1 .1

FD

5-

A

H -P

L1 .1

FD

4-

A

H -P

L1 .1

FD

5-

A

H -P

L1 .1

FD

4-

A

C.T. (ED)

1E702

IMAGING RM-2

1K505c-2

MRI EQUIP

1E206a

HAC

1A609

WAIT

1M702

BIO MED OFFICE

1M204

NUC MED WAIT

1K510

VEST

1F201

CLEAN SUPPLY

1E604

NURSE

1F212

NURSE

1F214

IV PREP

1E304

STORAGE

1E402

ECG CUBICLE

1F404

ECG: CUBICLE

1F408

ECG CUBICLE

1F406

STRETCHER

HOLD

1E301

RECEPTION

1E305

MRI WAIT

1E501

STAFF PHYSICIAN

1K802

STAFF PHYSICIAN

1K804

STAFF PHYSICIAN

1K806

C.T. (#2)

1E605

C.T.

1E601

NURSE

1F206

NURSE

1F204

NURSE

1F202

NURSE

1F208

NURSE

1F210

CORRIDOR

1MC02

COMPUTER

EQUIPMENT

1E201

CLEAN SUPPLY

1E205

SOILED UTILITY

1E203

PHYSICIAN

1F301

CORRIDOR

1EC07

CONTROL RM

1E603

NURSE

PRACTIONER

1K705

TLT

1E404

DRESS

1E403

DRESS

1E401

CORRIDOR

1EC03

CLEAN SUPPLY

1K203

PATIENT DOSE

1K205

READING/CONSULT

1K502

RECEPTION

1K508

RSO/PHYSICIST

OFFICE

1K504

EXAM RM

1K509

TLT

1K511

PASSAGE

1KC08

CHIEF NUC MED

OFFICE

1K807

PROFESS

NON-PHYSICIAN

1K805

STAFF PHYSICIAN

1K803

CORRIDOR

1EC05

CHEST RM

1M206

COMMON

VIEWING RM

1K801

STAFF TLT

1F402

ENTRY

1K505

THYROID UPTAKE

1K503

TECH WORK

AREA

1K505d

CORRIDOR

1KC05

TLT

1K513

CORRIDOR

1KC06

ELEC

1E610

CORRIDOR

1EC06

CORRIDOR

1KC07

EQUIP

1KC06a

CORRIDOR

1FC02

IMAGING RM

1K505a

IMAGING RM

1K505b

CORRIDOR

1EC04

CRASH CART

1E306

WHEELCHAIR &

STRETCHER

WAITING

1E608

MRI ROOM

1E202

MRI CONTROL

1E302

MRI CONTROL

1E204

CORRIDOR

1EC02

MRI ROOM

1E206

NUC WASTE STOR

1K202

IV PREP

1K214a

PET SIM UPTAKE

1K212

PET UPTAKE

1K210

UPTAKE

1K208

UPTAKE

1K206

CORRIDOR

1KC02

CORRIDOR

1EC01

10" SECONDARY ROOF DRIANAGE. 24"

ABOVE FINISHED GRADE (18616 SF)

3" RW UP & DN (1297 S.F.)

3" V UP & DN

P-806

MOUNT 1'-6" O.C. ABOVE

ASSOCIATED LEVEL.

1" CW DN

1" CW DN

FLOOR C.O.

FLOOR C.O.

FOR EXACT LOCATION

OF 3/4" CW UP TO

YARD HYDRANT FOR

MOBILE MRI VECHICLE

SEE CIVIL DRAWING

WALL C.O.

FD-V

H-PL1.1FE1

H-PL1.1FD4-A

H-PL1.1FE1

H-PL1.1FD4-A

H-PL1.1FD4-A

H-PL1.1FD1

H-PL1.1FD4-A

H-PL1.1FD1

H -P

L1 .1

FE

2-

A

H -P

L1 .1

FE

3738394041

C

D

E

F

G

D.9

D.7

F.4

E.4

C.7

E.6

D.6

40.6 39.440.5

37.2

39.7

H-CRAC-12

H-CRAC-13

H-CRAC-14

FOR EXACT LOCATION

OF 3/4" CW UP TO

YARD HYDRANT FOR

MOBILE MRI VECHICLE

SEE CIVIL DRAWING

FD-C

FD-C

FLOOR

C.O.

ROUTE CONDENSATE

TO FLOOR DRAIN

MAINTAIN 2" AIR GAP

ROUTE

CONDENSATE TO

FLOOR DRAIN

MAINTAIN 2" AIR GAP

FLOOR

CO

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

AREA D, ZONE 4

D2

D5 D6

E1 E3

D1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne f oo t

B

A

C

D

E

F th re e in ch es o ne f oo t

6"

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

ZONE 4 PLUMBING PLAN

BID ALTERNATE NO. 3

HOSPITAL/CLINIC LEVEL 1, AREA D,

H-PL1.1FD4-A

1. 1" PUMPED CONDENSATE TO PLUMBING DRAIN

LOCATED IN INTERSTITIAL SPACE BY

MECHANICAL.

2. 3/4" COLD WATER SUPPLY TO FLOOR MOUNTED

AIR CONDITIONING UNIT FOR HUMIDIFIERS.

No. Description Date

1 CPR 122 09/16/11

2 CPR 234 02/16/12

3 CPR 236 03/09/12

4 CPR 382 03/15/13

PM

C

PM

C

15" SECONDARY

ROOF DRIANAGE.

24" ABOVE

FINISHED GRADE

(39170 S.F.)

15" RW UP &

DN (39170 S.F.)

8" RW UP &

DN (9705 S.F.)

15" SRW UP

(39170 S.F.)

P-528

P-528

P-528

P-401

P-528

P-401

P-401

P-701 P-401

P-401

P-528B P-505

P-528

P-528

P-528

P-560C

P-401

P-102

P-102

P-102

P-102

FLOOR

C.O.

FLOOR

C.O.

FLOOR

C.O.

FLOOR

C.O.

P-528

P-528

P-560C

P-803

P-803

6" CD UP & DN

FLOOR C.O.

FLOOR C.O.

2" W UP

& DN

1 1/2" V

UP & DN

1 1/2" V

UP & DN

H -P

L1 .1

FD

5-

A

H -P

L1 .1

FD

4-

A

H -P

L1 .1

FD

5-

A

H -P

L1 .1

FD

4-

A

C.T. (ED)

1E702

IMAGING RM-2

1K505c-2

MRI EQUIP

1E206a

HAC

1A609

WAIT

1M702

BIO MED OFFICE

1M204

NUC MED WAIT

1K510

VEST

1F201

CLEAN SUPPLY

1E604

NURSE

1F212

NURSE

1F214

IV PREP

1E304

STORAGE

1E402

ECG CUBICLE

1F404

ECG: CUBICLE

1F408

ECG CUBICLE

1F406

STRETCHER

HOLD

1E301

RECEPTION

1E305

MRI WAIT

1E501

STAFF PHYSICIAN

1K802

STAFF PHYSICIAN

1K804

STAFF PHYSICIAN

1K806

C.T. (#2)

1E605

C.T.

1E601

NURSE

1F206

NURSE

1F204

NURSE

1F202

NURSE

1F208

NURSE

1F210

CORRIDOR

1MC02

COMPUTER

EQUIPMENT

1E201

CLEAN SUPPLY

1E205

SOILED UTILITY

1E203

PHYSICIAN

1F301

CORRIDOR

1EC07

CONTROL RM

1E603

NURSE

PRACTIONER

1K705

TLT

1E404

DRESS

1E403

DRESS

1E401

CORRIDOR

1EC03

CLEAN SUPPLY

1K203

PATIENT DOSE

1K205

READING/CONSULT

1K502

RECEPTION

1K508

RSO/PHYSICIST

OFFICE

1K504

EXAM RM

1K509

TLT

1K511

PASSAGE

1KC08

CHIEF NUC MED

OFFICE

1K807

PROFESS

NON-PHYSICIAN

1K805

STAFF PHYSICIAN

1K803

CORRIDOR

1EC05

CHEST RM

1M206

COMMON

VIEWING RM

1K801

STAFF TLT

1F402

ENTRY

1K505

THYROID UPTAKE

1K503

TECH WORK

AREA

1K505d

CORRIDOR

1KC05

TLT

1K513

CORRIDOR

1KC06

ELEC

1E610

CORRIDOR

1EC06

CORRIDOR

1KC07

EQUIP

1KC06a

CORRIDOR

1FC02

IMAGING RM

1K505a

IMAGING RM

1K505b

CORRIDOR

1EC04

CRASH CART

1E306

WHEELCHAIR &

STRETCHER

WAITING

1E608

MRI ROOM

1E202

MRI CONTROL

1E302

MRI CONTROL

1E204

CORRIDOR

1EC02

MRI ROOM

1E206

NUC WASTE STOR

1K202

IV PREP

1K214a

PET SIM UPTAKE

1K212

PET UPTAKE

1K210

UPTAKE

1K208

UPTAKE

1K206

CORRIDOR

1KC02

CORRIDOR

1EC01

10" SECONDARY ROOF DRIANAGE. 24"

ABOVE FINISHED GRADE (18616 SF)

3" RW UP & DN (1297 S.F.)

3" V UP & DN

P-806

MOUNT 1'-6" O.C. ABOVE

ASSOCIATED LEVEL.

1" CW DN

1" CW DN

FLOOR C.O.

FLOOR C.O.

FOR EXACT LOCATION

OF 3/4" CW UP TO

YARD HYDRANT FOR

MOBILE MRI VECHICLE

SEE CIVIL DRAWING

WALL C.O.

FD-V

H-PL1.1FE1

H-PL1.1FD4-A

H-PL1.1FE1

H-PL1.1FD4-A

H-PL1.1FD4-A

H-PL1.1FD1

H-PL1.1FD4-A

H-PL1.1FD1

H -P

L1 .1

FE

2-

A

H -P

L1 .1

FE

3738394041

C

D

E

F

G

D.9

D.7

F.4

E.4

C.7

E.6

D.6

40.6 39.440.5

37.2

39.7

H-CRAC-12

H-CRAC-13

H-CRAC-14

FOR EXACT LOCATION

OF 3/4" CW UP TO

YARD HYDRANT FOR

MOBILE MRI VECHICLE

SEE CIVIL DRAWING

FD-C

FD-C

FLOOR

C.O.

ROUTE CONDENSATE

TO FLOOR DRAIN

MAINTAIN 2" AIR GAP

ROUTE

CONDENSATE TO

FLOOR DRAIN

MAINTAIN 2" AIR GAP

FLOOR

CO

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

AREA D, ZONE 4

D2

D5 D6

E1 E3

D1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne f oo t

B

A

C

D

E

F th re e in ch es o ne f oo t

6"

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

ZONE 4 PLUMBING PLAN

BID ALTERNATE NO. 3

HOSPITAL/CLINIC LEVEL 1, AREA D,

H-PL1.1FD4-A

1. 1" PUMPED CONDENSATE TO PLUMBING DRAIN

LOCATED IN INTERSTITIAL SPACE BY

MECHANICAL.

2. 3/4" COLD WATER SUPPLY TO FLOOR MOUNTED

AIR CONDITIONING UNIT FOR HUMIDIFIERS.

No. Description Date

1 CPR 122 09/16/11

2 CPR 234 02/16/12

3 CPR 236 03/09/12

4 CPR 382 03/15/13

FLOOR

C.O.

FLOOR C.O.

FLOOR C.O.

3" AW UP &

DN (28 FU)

3" AV UP & DN

4" VENT UP & DN

6" SAN UP & DN

6" SAN UP &

DN (141 FU)

4" VENT

UP & DN

P-528

P-528AP-528A

P-528

P-528

P-401

P-502

P-528A

P-528A

P-528A

P-528A

P-528A

P-401

P-401 P-401

P-528

P-528

P-401

P-401

P-202P-404

P-201

P-701

P-702

P-404

P-702

P-404

P-502

P-528

P-102

P-101 P-101

P-102

P-102 P-102

P-102

P-101

P-102

P-102

P-102

FLOOR C.O.

FLOOR

C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

3" SIDE OUTLET

AD TYPE A

P-102 P-528A

P-701

P-609

P-404

P-404

P-404

FLOOR

C.O.

2" W UP & DN

1 1/2" V UP

2" W UP & DN

FD-D

(TYP OF 3)

P-702

FLOOR C.O.

H-PL1.1FD5-A

H-PL1.1FD2-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H-PL1.1FD5-A

H-PL1.1FD2-A

CLOSET

1C106

CLOSET

1C104

RAD/FLOURO

1M710

CONTROL

1M710a

1 1/2" V UP & DN

STAIR

1ES01

ELEVATOR

1EE02

ELEVATOR

1EE01

ELEVATOR

1FE02

ELEVATOR

1FE01

WAIT

1M702

BIO MED OFFICE

1M204

WAITING

1G404

OFFICE (PVA)

1N404

OFFICE

(FDVA/STATE)

1N203

RECEP(FDVA/STATE)

1N201

OFFICE

1H202

OFFICE

1H204

PASSAGE

1HC02

CHIEF

NON-INVASIVE

1F203

VEST

1F201

OFFICE

(FDVA/STATE)

1N204

OFFICE (DAV)

1N403

OFFICE

1N405

PHYSICIAN

1F303

CHIEF OF

CARDIOLOGY

1M715

ECG CUBICLE

1F404

STRESS

LAB/ECHO

1F602

STRESS

LAB/ECHO

1F604

STORAGE

1F101

ECG: CUBICLE

1F408

ECG CUBICLE

1F406

TLT

1F403

ELEC

1N601a

CORRIDOR

1FC04

CHIEF

1G403

PACEMAKER/HOLTER

MONITOR ROOM

1F307

CORRIDOR

1FC05

HAC

1F401

CORRIDOR

1FC03

Space

2C558

ECG/ECHO

READING

1F601

ECHO ROOM

1F605

CORRIDOR

1FC06

STRESS LAB

1F607

STRETCHER

ALCOVE

1FC04a

ECG CUBICLE

1F104

CORRIDOR

1FC01

OFFICE

(FDVA/STATE)

1N206

PASSAGE

1NC02

OFFICE

(FAVA/STATE)

1N205

CORRIDOR

1NC04

OFFICE (PVA)

1N406

LOCKERS MALE

1G302a

COMM

1N601b

CANTEEN RETAIL

1N601

POLICE TRAINING

ROOM

1H206

HAC

1G305

EVIDENCE STOR

1H206a

TLT & SHWR

FEMALE

1G303b

VESTIBULE

1G303

TRAINING ROOM

1G408

LOCKERS

FEMALE

1G303a

STORAGE

1G410

OFFICE(COUNTY)

1G101b

OFFICE(COUNTY)

1G101a

CO-ORDINATOR

1G406

OFFICE/ADMIN(DAV)

1N401

TLT & SHWR

MALE

1G302b

VESTIBULE

1G302

ENTRY

1GC04

SECRETARY

1G402

SERVICE OFFICER

1G401

PHYSICIAN

1F301 CARDIAC NUC

IMAGING

1F309

DRESS

1M704

PACS OFFICE

1M406

ADPAC OFFICE

1M404

DRESS

1M714

RAD/FLOURO

1M148

CHEST RM

1M206

CONTROL

1M206a

TLT

1M304

TLT

1M302

CORRIDOR

1MC03

WORK

1F808a

STAFF TLT

1F402

ECG ROOM

1F106

RADIOLOGY

LOCKERS AND

TOILETS

1M303

PASSAGE

1MC04

CONFERENCE

1M718

COMM

1M403

EMPLOYEE

BIO-SAFETY

1M307

ELEC

1M307a

ELEVATOR

LOBBY

1F716

CORRIDOR

1FC07

Space

2C933

TECH WORK

1M210

SOILED HOLD

1M306

RF TLT

1M706

RF TLT

1M712

PATIENT REP

1F804

ELEC

1F802

SECRETARY

1M717

OFFICE (VFW)

1N202

OFFICE/RECEP(PVA)

1N402

CORRIDOR

1GC01

PATIENT REP

1F806

PATIENT

STORAGE

1F716a

ELEV LOBBY

1GC02

WAITING/LOUNGE

1G101

COFFEE SHOP

1F808

CORRIDOR

1HC09

CORRIDOR

1MC08

ELEVATOR

1FE03

CHIEF TECH

OFFICE

1M402

PUBLIC TLT

1F808b

3/4" FW

1/2" CW

1/2" HW

3/4" 3/4"

3/4" 1/2" HW

1/2" FW

1/2"

1/2"

1"

HW & CW UP

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

CW UP

CW & HW UP

FLOOR C.O.

WALL C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

P-528A

H-PL4.001

H-PL4.001

H-PL1.1FE2-A

H-PL1.1FD5-A

H-PL1.1FE2-A

H-PL1.1FD5-A

H -P

L

.1 F

D

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

H -P

L

.1 F

D

-A

H -P

L

.1 F

E

-A

H -P

L

.1 F

E

P-811

1.2

C

D

E

F

G

D.9

35.2

D.7

F.4

E.4

C.7

32333435 A7

C.81

C.91

32.532.7

33.6

P-811

P-811

P-811 P-811

P-811

FD-C

FD-C

P-528

1 1/2"

2"FD-C WITH

FUNNEL

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

AREA D, ZONE 5

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

1. 1/2" SAN UP.

2. 1/2" HW FROM SINK TO DISHWASHER. 1 1/2" DRAIN

FROM DISHWASHER TO SINK TAILPIECE.

3. NOTE NOT USED.

4. REFER TO KITCHEN CONSULTANT HQ-F SERIES

DRAWINGS FOR DRAIN LOCATIONS.

5. 1/2" CW FROM TRAP PRIMER TO FD-C.

6. 1 1/2" VENT FROM BELOW CONNECTION TO VENT

FROM URINAL P-201.

7. 1 1/2" VENT FROM BELOW CONNECTION TO VENT

FROM WATER CLOSET P-101.

8. EXTEND 1 1/2" SANITARY DRAIN FROM RELOCATED

P-528 SINK AND CONNECT TO EXISTING 2" VERTICAL

SANITARY DRAIN THAT CONTINUES DOWN THRU FLOOR.

9. PROVIDE CW, HW, VENT AND DRAIN STUB OUT FOR

FUTURE P-528A IN-COUNTER SINK INSTALLATION.

10. 1-1/2" VENT UP IN WALL TO INTERSTITIAL SPACE.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

ZONE 5 PLUMBING PLAN

BID ALTERNATE NO. 3

HOSPITAL/CLINIC LEVEL 1, AREA D,

H-PL1.1FD5-A

No. Description Date

1 CPR 078 05-12-11

2 CPR 128 08/04/11

3 CPR 160 10/14/11

4 CPR 236 03/09/12

5 CPR 272 04/30/12

File details come from the government source that posted it. Updated .