These are plumbing plan drawings for a new hospital construction project at the VA Medical Center (VAMC) in Orlando, Florida. The drawings are part of Bid Alternate No. 3 for Hospital/Clinic Level 1, Areas D, Zone 4, Zone 5, and Zone 6, associated with project number 673-950 dated June 4, 2010. The drawings were prepared by RLF Architects/Engineers and approved by the Office of Facilities Management.

The plumbing plans detail comprehensive water supply, drainage, and sanitary systems throughout multiple zones of the hospital facility. Key systems shown include: 15-inch and 12-inch rainwater (RW) piping up and down with secondary roof drainage 24 inches above finished grade; 6-inch and 8-inch sanitary (SAN) piping; cold water (CW) and hot water (HW) supply lines ranging from 1/2 inch to 6 inches in diameter; vent (V) piping; and condensate drainage from air conditioning units. The plans specify numerous fixture connections, floor drains, and coordinate with mechanical systems including HVAC units (H-CRAC models 12-14) and medical gas systems. Additional details include provisions for a mobile MRI vehicle water supply connection to a yard hydrant, floor-mounted air conditioning unit humidifier supply, and a 3/4-inch cold water supply line. The drawings incorporate multiple revision dates (CPR 60 through CPR 382) spanning from April 2011 through March 2013, indicating ongoing design modifications during the project development phase.

View the file

Other files

File Type Posted
RFI 59 Electrical DWG.pdf PDF
RFI 59 Mechanical DWG.pdf PDF
RFI 59 Plumbing DWG.pdf PDF
RFI 59 Piping DWG.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-27-26.docx DOCX document
36C77626R0035 0009.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-24-26.docx DOCX document
36C77626R0035 0008.pdf PDF
RFI 59 Mechanical Drawing.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-22-26.docx DOCX document
36C77626R0035 0007.pdf PDF
675-106 Addendum 02.pdf PDF
RFI 59 Plumbing Drawing.pdf PDF
36C77626R0035 0006.pdf PDF
CON-100 INSTRUCTIONS - Tradeoffs.docx DOCX document
36C77626R0035 0005.pdf PDF
36C77626R0035 0004.pdf PDF
Sign-in Sheet - Lake Nona.pdf PDF
36C77626R0035 0003.pdf PDF
36C77626R0035 0002.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 5 - Brand Name Justification - Redacted.pdf PDF
Attachment 10 - Project Information Sheet for Contractors.docx DOCX document
Attachment 6 - Construction Wage Rates - Orange - 01-02-26.pdf PDF
Attachment 8 - Site Visit Instructions.pdf PDF
Attachment 11 - Division Cost Breakdown.xlsx XLSX spreadsheet
36C77626R0035.pdf PDF
Attachment 3 - Specs REV_02-26-2026.pdf PDF
Attachment 4 - PCRA and ICRA.pdf PDF
Attachment 7 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 9 - PPQ.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM

C

PM

C

15" SECONDARY

ROOF DRIANAGE.

24" ABOVE

FINISHED GRADE

(39170 S.F.)

15" RW UP &

DN (39170 S.F.)

8" RW UP &

DN (9705 S.F.)

15" SRW UP

(39170 S.F.)

P-528

P-528

P-528

P-401

P-528

P-401

P-401

P-701 P-401

P-401

P-528B P-505

P-528

P-528

P-528

P-560C

P-401

P-102

P-102

P-102

P-102

FLOOR

C.O.

FLOOR

C.O.

FLOOR

C.O.

FLOOR

C.O.

P-528

P-528

P-560C

P-803

P-803

6" CD UP & DN

FLOOR C.O.

FLOOR C.O.

2" W UP

& DN

1 1/2" V

UP & DN

1 1/2" V

UP & DN

H -P

L1 .1

FD

5-

A

H -P

L1 .1

FD

4-

A

H -P

L1 .1

FD

5-

A

H -P

L1 .1

FD

4-

A

C.T. (ED)

1E702

IMAGING RM-2

1K505c-2

MRI EQUIP

1E206a

HAC

1A609

WAIT

1M702

BIO MED OFFICE

1M204

NUC MED WAIT

1K510

VEST

1F201

CLEAN SUPPLY

1E604

NURSE

1F212

NURSE

1F214

IV PREP

1E304

STORAGE

1E402

ECG CUBICLE

1F404

ECG: CUBICLE

1F408

ECG CUBICLE

1F406

STRETCHER

HOLD

1E301

RECEPTION

1E305

MRI WAIT

1E501

STAFF PHYSICIAN

1K802

STAFF PHYSICIAN

1K804

STAFF PHYSICIAN

1K806

C.T. (#2)

1E605

C.T.

1E601

NURSE

1F206

NURSE

1F204

NURSE

1F202

NURSE

1F208

NURSE

1F210

CORRIDOR

1MC02

COMPUTER

EQUIPMENT

1E201

CLEAN SUPPLY

1E205

SOILED UTILITY

1E203

PHYSICIAN

1F301

CORRIDOR

1EC07

CONTROL RM

1E603

NURSE

PRACTIONER

1K705

TLT

1E404

DRESS

1E403

DRESS

1E401

CORRIDOR

1EC03

CLEAN SUPPLY

1K203

PATIENT DOSE

1K205

READING/CONSULT

1K502

RECEPTION

1K508

RSO/PHYSICIST

OFFICE

1K504

EXAM RM

1K509

TLT

1K511

PASSAGE

1KC08

CHIEF NUC MED

OFFICE

1K807

PROFESS

NON-PHYSICIAN

1K805

STAFF PHYSICIAN

1K803

CORRIDOR

1EC05

CHEST RM

1M206

COMMON

VIEWING RM

1K801

STAFF TLT

1F402

ENTRY

1K505

THYROID UPTAKE

1K503

TECH WORK

AREA

1K505d

CORRIDOR

1KC05

TLT

1K513

CORRIDOR

1KC06

ELEC

1E610

CORRIDOR

1EC06

CORRIDOR

1KC07

EQUIP

1KC06a

CORRIDOR

1FC02

IMAGING RM

1K505a

IMAGING RM

1K505b

CORRIDOR

1EC04

CRASH CART

1E306

WHEELCHAIR &

STRETCHER

WAITING

1E608

MRI ROOM

1E202

MRI CONTROL

1E302

MRI CONTROL

1E204

CORRIDOR

1EC02

MRI ROOM

1E206

NUC WASTE STOR

1K202

IV PREP

1K214a

PET SIM UPTAKE

1K212

PET UPTAKE

1K210

UPTAKE

1K208

UPTAKE

1K206

CORRIDOR

1KC02

CORRIDOR

1EC01

10" SECONDARY ROOF DRIANAGE. 24"

ABOVE FINISHED GRADE (18616 SF)

3" RW UP & DN (1297 S.F.)

3" V UP & DN

P-806

MOUNT 1'-6" O.C. ABOVE

ASSOCIATED LEVEL.

1" CW DN

1" CW DN

FLOOR C.O.

FLOOR C.O.

FOR EXACT LOCATION

OF 3/4" CW UP TO

YARD HYDRANT FOR

MOBILE MRI VECHICLE

SEE CIVIL DRAWING

WALL C.O.

FD-V

H-PL1.1FE1

H-PL1.1FD4-A

H-PL1.1FE1

H-PL1.1FD4-A

H-PL1.1FD4-A

H-PL1.1FD1

H-PL1.1FD4-A

H-PL1.1FD1

H -P

L1 .1

FE

2-

A

H -P

L1 .1

FE

3738394041

C

D

E

F

G

D.9

D.7

F.4

E.4

C.7

E.6

D.6

40.6 39.440.5

37.2

39.7

H-CRAC-12

H-CRAC-13

H-CRAC-14

FOR EXACT LOCATION

OF 3/4" CW UP TO

YARD HYDRANT FOR

MOBILE MRI VECHICLE

SEE CIVIL DRAWING

FD-C

FD-C

FLOOR

C.O.

ROUTE CONDENSATE

TO FLOOR DRAIN

MAINTAIN 2" AIR GAP

ROUTE

CONDENSATE TO

FLOOR DRAIN

MAINTAIN 2" AIR GAP

FLOOR

CO

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

AREA D, ZONE 4

D2

D5 D6

E1 E3

D1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne f oo t

B

A

C

D

E

F th re e in ch es o ne f oo t

6"

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

ZONE 4 PLUMBING PLAN

BID ALTERNATE NO. 3

HOSPITAL/CLINIC LEVEL 1, AREA D,

H-PL1.1FD4-A

1. 1" PUMPED CONDENSATE TO PLUMBING DRAIN

LOCATED IN INTERSTITIAL SPACE BY

MECHANICAL.

2. 3/4" COLD WATER SUPPLY TO FLOOR MOUNTED

AIR CONDITIONING UNIT FOR HUMIDIFIERS.

No. Description Date

1 CPR 122 09/16/11

2 CPR 234 02/16/12

3 CPR 236 03/09/12

4 CPR 382 03/15/13

PM

C

PM

C

15" SECONDARY

ROOF DRIANAGE.

24" ABOVE

FINISHED GRADE

(39170 S.F.)

15" RW UP &

DN (39170 S.F.)

8" RW UP &

DN (9705 S.F.)

15" SRW UP

(39170 S.F.)

P-528

P-528

P-528

P-401

P-528

P-401

P-401

P-701 P-401

P-401

P-528B P-505

P-528

P-528

P-528

P-560C

P-401

P-102

P-102

P-102

P-102

FLOOR

C.O.

FLOOR

C.O.

FLOOR

C.O.

FLOOR

C.O.

P-528

P-528

P-560C

P-803

P-803

6" CD UP & DN

FLOOR C.O.

FLOOR C.O.

2" W UP

& DN

1 1/2" V

UP & DN

1 1/2" V

UP & DN

H -P

L1 .1

FD

5-

A

H -P

L1 .1

FD

4-

A

H -P

L1 .1

FD

5-

A

H -P

L1 .1

FD

4-

A

C.T. (ED)

1E702

IMAGING RM-2

1K505c-2

MRI EQUIP

1E206a

HAC

1A609

WAIT

1M702

BIO MED OFFICE

1M204

NUC MED WAIT

1K510

VEST

1F201

CLEAN SUPPLY

1E604

NURSE

1F212

NURSE

1F214

IV PREP

1E304

STORAGE

1E402

ECG CUBICLE

1F404

ECG: CUBICLE

1F408

ECG CUBICLE

1F406

STRETCHER

HOLD

1E301

RECEPTION

1E305

MRI WAIT

1E501

STAFF PHYSICIAN

1K802

STAFF PHYSICIAN

1K804

STAFF PHYSICIAN

1K806

C.T. (#2)

1E605

C.T.

1E601

NURSE

1F206

NURSE

1F204

NURSE

1F202

NURSE

1F208

NURSE

1F210

CORRIDOR

1MC02

COMPUTER

EQUIPMENT

1E201

CLEAN SUPPLY

1E205

SOILED UTILITY

1E203

PHYSICIAN

1F301

CORRIDOR

1EC07

CONTROL RM

1E603

NURSE

PRACTIONER

1K705

TLT

1E404

DRESS

1E403

DRESS

1E401

CORRIDOR

1EC03

CLEAN SUPPLY

1K203

PATIENT DOSE

1K205

READING/CONSULT

1K502

RECEPTION

1K508

RSO/PHYSICIST

OFFICE

1K504

EXAM RM

1K509

TLT

1K511

PASSAGE

1KC08

CHIEF NUC MED

OFFICE

1K807

PROFESS

NON-PHYSICIAN

1K805

STAFF PHYSICIAN

1K803

CORRIDOR

1EC05

CHEST RM

1M206

COMMON

VIEWING RM

1K801

STAFF TLT

1F402

ENTRY

1K505

THYROID UPTAKE

1K503

TECH WORK

AREA

1K505d

CORRIDOR

1KC05

TLT

1K513

CORRIDOR

1KC06

ELEC

1E610

CORRIDOR

1EC06

CORRIDOR

1KC07

EQUIP

1KC06a

CORRIDOR

1FC02

IMAGING RM

1K505a

IMAGING RM

1K505b

CORRIDOR

1EC04

CRASH CART

1E306

WHEELCHAIR &

STRETCHER

WAITING

1E608

MRI ROOM

1E202

MRI CONTROL

1E302

MRI CONTROL

1E204

CORRIDOR

1EC02

MRI ROOM

1E206

NUC WASTE STOR

1K202

IV PREP

1K214a

PET SIM UPTAKE

1K212

PET UPTAKE

1K210

UPTAKE

1K208

UPTAKE

1K206

CORRIDOR

1KC02

CORRIDOR

1EC01

10" SECONDARY ROOF DRIANAGE. 24"

ABOVE FINISHED GRADE (18616 SF)

3" RW UP & DN (1297 S.F.)

3" V UP & DN

P-806

MOUNT 1'-6" O.C. ABOVE

ASSOCIATED LEVEL.

1" CW DN

1" CW DN

FLOOR C.O.

FLOOR C.O.

FOR EXACT LOCATION

OF 3/4" CW UP TO

YARD HYDRANT FOR

MOBILE MRI VECHICLE

SEE CIVIL DRAWING

WALL C.O.

FD-V

H-PL1.1FE1

H-PL1.1FD4-A

H-PL1.1FE1

H-PL1.1FD4-A

H-PL1.1FD4-A

H-PL1.1FD1

H-PL1.1FD4-A

H-PL1.1FD1

H -P

L1 .1

FE

2-

A

H -P

L1 .1

FE

3738394041

C

D

E

F

G

D.9

D.7

F.4

E.4

C.7

E.6

D.6

40.6 39.440.5

37.2

39.7

H-CRAC-12

H-CRAC-13

H-CRAC-14

FOR EXACT LOCATION

OF 3/4" CW UP TO

YARD HYDRANT FOR

MOBILE MRI VECHICLE

SEE CIVIL DRAWING

FD-C

FD-C

FLOOR

C.O.

ROUTE CONDENSATE

TO FLOOR DRAIN

MAINTAIN 2" AIR GAP

ROUTE

CONDENSATE TO

FLOOR DRAIN

MAINTAIN 2" AIR GAP

FLOOR

CO

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

AREA D, ZONE 4

D2

D5 D6

E1 E3

D1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne f oo t

B

A

C

D

E

F th re e in ch es o ne f oo t

6"

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

ZONE 4 PLUMBING PLAN

BID ALTERNATE NO. 3

HOSPITAL/CLINIC LEVEL 1, AREA D,

H-PL1.1FD4-A

1. 1" PUMPED CONDENSATE TO PLUMBING DRAIN

LOCATED IN INTERSTITIAL SPACE BY

MECHANICAL.

2. 3/4" COLD WATER SUPPLY TO FLOOR MOUNTED

AIR CONDITIONING UNIT FOR HUMIDIFIERS.

No. Description Date

1 CPR 122 09/16/11

2 CPR 234 02/16/12

3 CPR 236 03/09/12

4 CPR 382 03/15/13

FLOOR

C.O.

FLOOR C.O.

FLOOR C.O.

3" AW UP &

DN (28 FU)

3" AV UP & DN

4" VENT UP & DN

6" SAN UP & DN

6" SAN UP &

DN (141 FU)

4" VENT

UP & DN

P-528

P-528AP-528A

P-528

P-528

P-401

P-502

P-528A

P-528A

P-528A

P-528A

P-528A

P-401

P-401 P-401

P-528

P-528

P-401

P-401

P-202P-404

P-201

P-701

P-702

P-404

P-702

P-404

P-502

P-528

P-102

P-101 P-101

P-102

P-102 P-102

P-102

P-101

P-102

P-102

P-102

FLOOR C.O.

FLOOR

C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

3" SIDE OUTLET

AD TYPE A

P-102 P-528A

P-701

P-609

P-404

P-404

P-404

FLOOR

C.O.

2" W UP & DN

1 1/2" V UP

2" W UP & DN

FD-D

(TYP OF 3)

P-702

FLOOR C.O.

H-PL1.1FD5-A

H-PL1.1FD2-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H-PL1.1FD5-A

H-PL1.1FD2-A

CLOSET

1C106

CLOSET

1C104

RAD/FLOURO

1M710

CONTROL

1M710a

1 1/2" V UP & DN

STAIR

1ES01

ELEVATOR

1EE02

ELEVATOR

1EE01

ELEVATOR

1FE02

ELEVATOR

1FE01

WAIT

1M702

BIO MED OFFICE

1M204

WAITING

1G404

OFFICE (PVA)

1N404

OFFICE

(FDVA/STATE)

1N203

RECEP(FDVA/STATE)

1N201

OFFICE

1H202

OFFICE

1H204

PASSAGE

1HC02

CHIEF

NON-INVASIVE

1F203

VEST

1F201

OFFICE

(FDVA/STATE)

1N204

OFFICE (DAV)

1N403

OFFICE

1N405

PHYSICIAN

1F303

CHIEF OF

CARDIOLOGY

1M715

ECG CUBICLE

1F404

STRESS

LAB/ECHO

1F602

STRESS

LAB/ECHO

1F604

STORAGE

1F101

ECG: CUBICLE

1F408

ECG CUBICLE

1F406

TLT

1F403

ELEC

1N601a

CORRIDOR

1FC04

CHIEF

1G403

PACEMAKER/HOLTER

MONITOR ROOM

1F307

CORRIDOR

1FC05

HAC

1F401

CORRIDOR

1FC03

Space

2C558

ECG/ECHO

READING

1F601

ECHO ROOM

1F605

CORRIDOR

1FC06

STRESS LAB

1F607

STRETCHER

ALCOVE

1FC04a

ECG CUBICLE

1F104

CORRIDOR

1FC01

OFFICE

(FDVA/STATE)

1N206

PASSAGE

1NC02

OFFICE

(FAVA/STATE)

1N205

CORRIDOR

1NC04

OFFICE (PVA)

1N406

LOCKERS MALE

1G302a

COMM

1N601b

CANTEEN RETAIL

1N601

POLICE TRAINING

ROOM

1H206

HAC

1G305

EVIDENCE STOR

1H206a

TLT & SHWR

FEMALE

1G303b

VESTIBULE

1G303

TRAINING ROOM

1G408

LOCKERS

FEMALE

1G303a

STORAGE

1G410

OFFICE(COUNTY)

1G101b

OFFICE(COUNTY)

1G101a

CO-ORDINATOR

1G406

OFFICE/ADMIN(DAV)

1N401

TLT & SHWR

MALE

1G302b

VESTIBULE

1G302

ENTRY

1GC04

SECRETARY

1G402

SERVICE OFFICER

1G401

PHYSICIAN

1F301 CARDIAC NUC

IMAGING

1F309

DRESS

1M704

PACS OFFICE

1M406

ADPAC OFFICE

1M404

DRESS

1M714

RAD/FLOURO

1M148

CHEST RM

1M206

CONTROL

1M206a

TLT

1M304

TLT

1M302

CORRIDOR

1MC03

WORK

1F808a

STAFF TLT

1F402

ECG ROOM

1F106

RADIOLOGY

LOCKERS AND

TOILETS

1M303

PASSAGE

1MC04

CONFERENCE

1M718

COMM

1M403

EMPLOYEE

BIO-SAFETY

1M307

ELEC

1M307a

ELEVATOR

LOBBY

1F716

CORRIDOR

1FC07

Space

2C933

TECH WORK

1M210

SOILED HOLD

1M306

RF TLT

1M706

RF TLT

1M712

PATIENT REP

1F804

ELEC

1F802

SECRETARY

1M717

OFFICE (VFW)

1N202

OFFICE/RECEP(PVA)

1N402

CORRIDOR

1GC01

PATIENT REP

1F806

PATIENT

STORAGE

1F716a

ELEV LOBBY

1GC02

WAITING/LOUNGE

1G101

COFFEE SHOP

1F808

CORRIDOR

1HC09

CORRIDOR

1MC08

ELEVATOR

1FE03

CHIEF TECH

OFFICE

1M402

PUBLIC TLT

1F808b

3/4" FW

1/2" CW

1/2" HW

3/4" 3/4"

3/4" 1/2" HW

1/2" FW

1/2"

1/2"

1"

HW & CW UP

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

CW UP

CW & HW UP

FLOOR C.O.

WALL C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

P-528A

H-PL4.001

H-PL4.001

H-PL1.1FE2-A

H-PL1.1FD5-A

H-PL1.1FE2-A

H-PL1.1FD5-A

H -P

L

.1 F

D

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

H -P

L

.1 F

D

-A

H -P

L

.1 F

E

-A

H -P

L

.1 F

E

P-811

1.2

C

D

E

F

G

D.9

35.2

D.7

F.4

E.4

C.7

32333435 A7

C.81

C.91

32.532.7

33.6

P-811

P-811

P-811 P-811

P-811

FD-C

FD-C

P-528

1 1/2"

2"FD-C WITH

FUNNEL

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

AREA D, ZONE 5

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

1. 1/2" SAN UP.

2. 1/2" HW FROM SINK TO DISHWASHER. 1 1/2" DRAIN

FROM DISHWASHER TO SINK TAILPIECE.

3. NOTE NOT USED.

4. REFER TO KITCHEN CONSULTANT HQ-F SERIES

DRAWINGS FOR DRAIN LOCATIONS.

5. 1/2" CW FROM TRAP PRIMER TO FD-C.

6. 1 1/2" VENT FROM BELOW CONNECTION TO VENT

FROM URINAL P-201.

7. 1 1/2" VENT FROM BELOW CONNECTION TO VENT

FROM WATER CLOSET P-101.

8. EXTEND 1 1/2" SANITARY DRAIN FROM RELOCATED

P-528 SINK AND CONNECT TO EXISTING 2" VERTICAL

SANITARY DRAIN THAT CONTINUES DOWN THRU FLOOR.

9. PROVIDE CW, HW, VENT AND DRAIN STUB OUT FOR

FUTURE P-528A IN-COUNTER SINK INSTALLATION.

10. 1-1/2" VENT UP IN WALL TO INTERSTITIAL SPACE.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

ZONE 5 PLUMBING PLAN

BID ALTERNATE NO. 3

HOSPITAL/CLINIC LEVEL 1, AREA D,

H-PL1.1FD5-A

No. Description Date

1 CPR 078 05-12-11

2 CPR 128 08/04/11

3 CPR 160 10/14/11

4 CPR 236 03/09/12

5 CPR 272 04/30/12

C.O.

FLOOR C.O.

FLOOR C.O.

3" AW UP &

DN (28 FU)

3" AV UP & DN

4" VENT UP & DN

6" SAN UP & DN

6" SAN UP &

DN (141 FU)

4" VENT

UP & DN

P-528

P-528AP-528A

P-528

P-528

P-401

P-502

P-528A

P-528A

P-528A

P-528A

P-528A

P-401

P-401 P-401

P-528

P-528

P-401

P-401

P-202P-404

P-201

P-701

P-702

P-404

P-702

P-404

P-502

P-528

P-102

P-101 P-101

P-102

P-102 P-102

P-102

P-101

P-102

P-102

P-102

FLOOR C.O.

FLOOR

C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

3" SIDE OUTLET

AD TYPE A

P-102 P-528A

P-701

P-609

P-404

P-404

P-404

FLOOR

C.O.

2" W UP & DN

1 1/2" V UP

2" W UP & DN

FD-D

(TYP OF 3)

P-702

FLOOR C.O.

H-PL1.1FD5-A

H-PL1.1FD2-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

-A

H-PL1.1FD5-A

H-PL1.1FD2-A

CLOSET

1C106

CLOSET

1C104

RAD/FLOURO

1M710

CONTROL

1M710a

1 1/2" V UP & DN

STAIR

1ES01

ELEVATOR

1EE02

ELEVATOR

1EE01

ELEVATOR

1FE02

ELEVATOR

1FE01

WAIT

1M702

BIO MED OFFICE

1M204

WAITING

1G404

OFFICE (PVA)

1N404

OFFICE

(FDVA/STATE)

1N203

RECEP(FDVA/STATE)

1N201

OFFICE

1H202

OFFICE

1H204

PASSAGE

1HC02

CHIEF

NON-INVASIVE

1F203

VEST

1F201

OFFICE

(FDVA/STATE)

1N204

OFFICE (DAV)

1N403

OFFICE

1N405

PHYSICIAN

1F303

CHIEF OF

CARDIOLOGY

1M715

ECG CUBICLE

1F404

STRESS

LAB/ECHO

1F602

STRESS

LAB/ECHO

1F604

STORAGE

1F101

ECG: CUBICLE

1F408

ECG CUBICLE

1F406

TLT

1F403

ELEC

1N601a

CORRIDOR

1FC04

CHIEF

1G403

PACEMAKER/HOLTER

MONITOR ROOM

1F307

CORRIDOR

1FC05

HAC

1F401

CORRIDOR

1FC03

Space

2C558

ECG/ECHO

READING

1F601

ECHO ROOM

1F605

CORRIDOR

1FC06

STRESS LAB

1F607

STRETCHER

ALCOVE

1FC04a

ECG CUBICLE

1F104

CORRIDOR

1FC01

OFFICE

(FDVA/STATE)

1N206

PASSAGE

1NC02

OFFICE

(FAVA/STATE)

1N205

CORRIDOR

1NC04

OFFICE (PVA)

1N406

LOCKERS MALE

1G302a

COMM

1N601b

CANTEEN RETAIL

1N601

POLICE TRAINING

ROOM

1H206

HAC

1G305

EVIDENCE STOR

1H206a

TLT & SHWR

FEMALE

1G303b

VESTIBULE

1G303

TRAINING ROOM

1G408

LOCKERS

FEMALE

1G303a

STORAGE

1G410

OFFICE(COUNTY)

1G101b

OFFICE(COUNTY)

1G101a

CO-ORDINATOR

1G406

OFFICE/ADMIN(DAV)

1N401

TLT & SHWR

MALE

1G302b

VESTIBULE

1G302

ENTRY

1GC04

SECRETARY

1G402

SERVICE OFFICER

1G401

PHYSICIAN

1F301 CARDIAC NUC

IMAGING

1F309

DRESS

1M704

PACS OFFICE

1M406

ADPAC OFFICE

1M404

DRESS

1M714

RAD/FLOURO

1M148

CHEST RM

1M206

CONTROL

1M206a

TLT

1M304

TLT

1M302

CORRIDOR

1MC03

WORK

1F808a

STAFF TLT

1F402

ECG ROOM

1F106

RADIOLOGY

LOCKERS AND

TOILETS

1M303

PASSAGE

1MC04

CONFERENCE

1M718

COMM

1M403

EMPLOYEE

BIO-SAFETY

1M307

ELEC

1M307a

ELEVATOR

LOBBY

1F716

CORRIDOR

1FC07

Space

2C933

TECH WORK

1M210

SOILED HOLD

1M306

RF TLT

1M706

RF TLT

1M712

PATIENT REP

1F804

ELEC

1F802

SECRETARY

1M717

OFFICE (VFW)

1N202

OFFICE/RECEP(PVA)

1N402

CORRIDOR

1GC01

PATIENT REP

1F806

PATIENT

STORAGE

1F716a

ELEV LOBBY

1GC02

WAITING/LOUNGE

1G101

COFFEE SHOP

1F808

CORRIDOR

1HC09

CORRIDOR

1MC08

ELEVATOR

1FE03

CHIEF TECH

OFFICE

1M402

PUBLIC TLT

1F808b

3/4" FW

1/2" CW

1/2" HW

3/4" 3/4"

3/4" 1/2" HW

1/2" FW

1/2"

1/2"

1"

HW & CW UP

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

CW UP

CW & HW UP

FLOOR C.O.

WALL C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

P-528A

H-PL4.001

H-PL4.001

H-PL1.1FE2-A

H-PL1.1FD5-A

H-PL1.1FE2-A

H-PL1.1FD5-A

H -P

L

.1 F

D

H -P

L

.1 F

D

-A

H -P

L

.1 F

D

H -P

L

.1 F

D

-A

H -P

L

.1 F

E

-A

H -P

L

.1 F

E

P-811

1.2

C

D

E

F

G

D.9

35.2

D.7

F.4

E.4

C.7

32333435 A7

C.81

C.91

32.532.7

33.6

P-811

P-811

P-811 P-811

P-811

FD-C

FD-C

P-528

1 1/2"

2"FD-C WITH

FUNNEL

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

AREA D, ZONE 5

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

1. 1/2" SAN UP.

2. 1/2" HW FROM SINK TO DISHWASHER. 1 1/2" DRAIN

FROM DISHWASHER TO SINK TAILPIECE.

3. NOTE NOT USED.

4. REFER TO KITCHEN CONSULTANT HQ-F SERIES

DRAWINGS FOR DRAIN LOCATIONS.

5. 1/2" CW FROM TRAP PRIMER TO FD-C.

6. 1 1/2" VENT FROM BELOW CONNECTION TO VENT

FROM URINAL P-201.

7. 1 1/2" VENT FROM BELOW CONNECTION TO VENT

FROM WATER CLOSET P-101.

8. EXTEND 1 1/2" SANITARY DRAIN FROM RELOCATED

P-528 SINK AND CONNECT TO EXISTING 2" VERTICAL

SANITARY DRAIN THAT CONTINUES DOWN THRU FLOOR.

9. PROVIDE CW, HW, VENT AND DRAIN STUB OUT FOR

FUTURE P-528A IN-COUNTER SINK INSTALLATION.

10. 1-1/2" VENT UP IN WALL TO INTERSTITIAL SPACE.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

ZONE 5 PLUMBING PLAN

BID ALTERNATE NO. 3

HOSPITAL/CLINIC LEVEL 1, AREA D,

H-PL1.1FD5-A

No. Description Date

1 CPR 078 05-12-11

2 CPR 128 08/04/11

3 CPR 160 10/14/11

4 CPR 236 03/09/12

5 CPR 272 04/30/12

UP

C.O.

GAS METER

BY OTHERS

(2889 MBH)

2 1/2" GAS

UP & DN

BACKFLOW

PREVENTER

HOSPITAL

WATER

METER

8" RW DN

(5184 S.F.)

8" SECONDARY

ROOF DRIANAGE.

24" ABOVE

FINISHED GRADE

(5184 S.F.)

C.O.

FLOOR

C.O.

2 1/2" GAS UP

TO METER

15" RW UP &

DN (52068 S.F.)

12" RW UP &

DN (23935 S.F.)

8" RW UP

(5184 S.F.)

6" CW UP

12" SRW UP

(23935 S.F.)

P-401

P-701

P-701

P-401

P-548 P-555

P-102

P-102

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR

C.O.

P-502

AISLE

1PC01

OFFICE

1H202

OFFICE

1H204

PASSAGE

1HC02

OFFICE

1H203

CLEANING EQUIP

1P606

MANIFOLD RM

1H307

MANIFOLD ROOM

1H309

CHIEF CANTEEN

1P106

ELEC

1V703

STOR

1H107b

PATH OFFICE

1H608

VIEWING

1H407

DIET TECHS

1PC01b

COMM

1V705

POLICE TRAINING

ROOM

1H206

CORRIDOR

1HC04

EVIDENCE STOR

1H206a

DETECTIVE

OFFICE

1H410

OFFICE

1H107c

BIO MED

ENGINEERING

REPAIR

1H107

PUMP ROOM

1H301

CHIEF FNS

1P107

NUTRITION

THERAPY

1P105

SANITARY

SUPPLY

1P602

SECRETARY/WAIT

1PC01a

PROGRAM

MANAGER

1P103

RETAIL STORAGE

1G304

CORRIDOR

1GC03

OFFICE

1H107a

TLT/SHWR

1H603

PASSAGE

1HC06

TLT/SHWR

1H605

Space

2C696

CLERICAL

1H201

ELEC

1H918

COMM

1H916

HAC

1G304a

CORRIDOR

1PC02

COORDINATION

CENTER

1PC01c

TRAY CART

1V701

AUTOPSY

1H601

COLD ROOM

1H407a

CORRIDOR

1HC01

CORRIDOR

1PC06

DISHWASH

1P601

ELEVATOR

1PE02

HAC

1P608

ELEV LOBBY

1PC06a

AISLE

1VC07

CART/CAN WASH

1P601a

EXTRACTOR

1V721

CLEAN DISH

STORAGE

1P601b

SANITARY

SUPPLY

1P601c

CORRIDOR

1HC09

CORRIDOR

1HC03

P-502

2"

H-PL4.003

H-PL1.1FD6

H-PL1.1FD3

H-PL1.1FE3

H-PL1.1FD6

H -P

L

.1 F

D

H -P

L

.1 F

D

H -P

L

.1 F

D

H -P

L

.1 F

D

H-PL1.1FD6

H-PL1.1FD3

H-PL1.1FE3

H-PL1.1FD6

FD-V

FD-V

6" WIDE TRENCH DRAIN

APPROXIMATELY 30'-0" LONG.

4" WIDE APRON ON BOTH

SIDES. APRON TO START 1'-0"

AWAY FROM HOSPITAL WALL.

FD-S

FD-C

2"

TO HEATING

WATER FILL

P-528G

FD-C

FD-S

FD-C

FD-S

FD-S

FD-S

FD-S

FD-S

FD-C

FD-S

3" V

FD-C

3" V

FD-C

FD-C

1-1/2" V

CO

1-1/2" V

FD-C

2" V UP

FD-F

FLOOR C.O.

P-806

MOUNT 1'-6" O.C. ABOVE

ASSOCIATED LEVEL.

P-806

MOUNT 1'-6" O.C. ABOVE

ASSOCIATED LEVEL.

3/4" CW UP

3/4" CW UP

1 1/2" V UP

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

2" W DN

FLOOR C.O.

FLOOR C.O.

2" W CAP 0'-8"

ABOVE FLOOR SLAB

FLOOR C.O.

6" RW DN

6" RW UP

(1825 SF)

RW

CO

3" RW DN 3" RW UP

(710 SF)

CO

FLOOR C.O.

FLOOR C.O.

FLOOR C.O.

2627282930

C

D

E

F

G

D.9

30.2

D.7

F.4

E.4

C.7

B.7

26.427.727.5

E.5

1/2"

1/2"

1/2"

1/2"

2" V DN THRU

FLOOR

3" FLUSHING

RIM FD (TYPE "J")

SEE DETAIL #8

ON DWG H-PL5.104

1" HW

1" CW

1/2" CW DOWN

THRU SLAB

FD-S

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

AREA D, ZONE 6

1. 3/4" HW, CW & 1-1/2" ISLAND VENT FOR AUTOPSY

TABLE. HW & CW SERVED FROM BELOW. STUB 2" W

12" AFF AND CAP. ISLAND VENT.

2. SEE FOOD SERVICE DRAWINGS FOR FIXTURE,

EQUIPTMENT OR DRAIN CALL OUT NUMBER.

3. NOT USED.

4. REFER TO KITCHEN CONSULTANT HQ-F SERIES

DRAWINGS FOR DRAIN LOCATIONS.

5. REFER TO KITCHEN CONSULTANT DRAWINGS FOR

WATER SUPPLY.

6. 1/2" CW UP & DN.

7. 1/2" CW FROM TRAP PRIMER TO FD.

8. CONNECT 1" HW AND 1" CW TO 1/2" HW AND 1/2" CW

PLUMBING FACTORY INSTALLED IN PEDESTAL OF

AUTOPSY TABLE. STUBB UP HARD COPPER PIPE FOR

HOT AND COLD WATER 6" MIN. ABOVE FINISHED

FLOOR. TERMINATE WITH SHUT-OFF VALVES FOR

FUTURE CONNECTION TO AUTOPSY TABLE. AND

COORDINATE WITH NEW EXHAUST DUCT BY HVAC.

9. CONNECT 1 1/2" COPPER SANITARY DRAIN FROM

AUTOPSY TABLE TO 2" SANITARY DRAIN WITH

P-TRAP. STUBB UP SANITARY DRAIN 6" ABOVE

FINISHED FLOOR AND PROVIDE ISLAND 2" VENT PER

IPC.

10. CONNECT 1/2" CW FOR AUTOPSY FLOOR DRAIN TO

1" CW IN WALL. PROVIDE MANUAL FLUSH VALVE AND

VACUUM BREAKER FOR FLUSHING RIM FD.

GENERAL NOTE:

A. REFER TO KITCHEN CONSULTANT DRAWINGS FOR

EQUIPMENT PIPING.

B. REFER TO CORRESPONDING INTERSTITIAL SPACE

PLUMBING PLAN FOR KITCHEN EQUIPMENT

PLUMBING CONNECTIONS.

C. COORDINATE CONNECTION, FINAL LOCATION,

SERVICE/PIPING REQUIRED WITH KITCHEN

EQUIPMENT PROVIDER AND KITCHEN CONSULTANT

CONSTRUCTION DOCUMENTS. PROVIDE ADAPTORS,

CONNECTORS, UNIONS, BACKFLOW PREVENTERS,

VACUUM BREAKERS AND ALL OTHER APPURTENANCES

TO PROVIDE A COMPLETE, OPERATING AND

FUNCTIONAL SYSTEM. WHERE PARTIAL GRATE,

FUNNEL DRAIN OR SIMILAR ACCESSORY IS REQUIRED,

COORDINATE DISCHARGE AND OPEN AREA TO

TERMINATE IN COMMON.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB / RLF

NOTES:

SHEET NOTES:

01 AND 02

4322Dwg. ofGO/PPG

LEVEL 1, AREA D, ZONE 6

PLUMBING PLAN

HOSPITAL/CLINIC

H-PL1.1FD6

No. Description Date

1 CPR 060 04-18-11

2 CPR 078 05-12-11

3 CPR 160 10/14/11

4 CPR 195 12/16/11

5 CPR 220 02/06/12

6 CPR 230 02/23/12

7 CPR 293 06/08/12

8 CPR 361 12/07/12