RFI 59 Electrical DWG.pdf

PDF 3 MB Posted

Attached to
Y1DZ--675-106 Expand Radiology & Oncology Minor Construction - Lake Nona
Solicitation number
36C77626R0035
Issued by

About this file

This document is a set of architectural and engineering power plans for Level 2, Area D of a new hospital facility being constructed for the VA Medical Center (VAMC) in Orlando, Florida. The drawings are designated as H-EP1.2FD4, H-EP1.2FD5-A, H-EP1.2FD6, H-EP1.2ND, and H-EP1.2ND relate to power distribution systems across multiple zones.

The plans detail electrical infrastructure including power distribution to hospital departments such as pathology, histology, cytology, laboratory services, administrative offices, data processing, safety offices, medical records, and various clinical areas. Key electrical components shown include panelboards, busways (rated at various amperage levels for Life Safety, Equipment, Critical, and Normal circuits at 480/277V), circuit breakers, motor starters, receptacles, and conduit routing. The drawings specify connections for specialized medical equipment including walk-in refrigeration units, pneumatic tube transfer systems, sterilization equipment, flow cytometry devices, and automation track systems. Conduit sizes, wire gauges, control connections, and mounting requirements are detailed throughout, with references to motor starter schedules and riser diagrams for comprehensive power design. The document confirms the building is fully sprinklered and includes revision history dating from 2011 to 2013, prepared by architectural/engineering consultants RLF.

View the file

Other files

File Type Posted
RFI 59 Mechanical DWG.pdf PDF
RFI 59 Plumbing DWG.pdf PDF
RFI 59 Piping DWG.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-27-26.docx DOCX document
36C77626R0035 0009.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-24-26.docx DOCX document
36C77626R0035 0008.pdf PDF
675-106 Addendum 02.pdf PDF
RFI 59 Plumbing Drawing.pdf PDF
RFI 59 Electrical Drawing.pdf PDF
RFI 59 Mechanical Drawing.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-22-26.docx DOCX document
36C77626R0035 0007.pdf PDF
CON-100 INSTRUCTIONS - Tradeoffs.docx DOCX document
36C77626R0035 0006.pdf PDF
36C77626R0035 0005.pdf PDF
36C77626R0035 0004.pdf PDF
Sign-in Sheet - Lake Nona.pdf PDF
36C77626R0035 0003.pdf PDF
36C77626R0035 0002.pdf PDF
Attachment 9 - PPQ.docx DOCX document
Attachment 6 - Construction Wage Rates - Orange - 01-02-26.pdf PDF
Attachment 8 - Site Visit Instructions.pdf PDF
Attachment 11 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 1 - Specifications.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 5 - Brand Name Justification - Redacted.pdf PDF
Attachment 10 - Project Information Sheet for Contractors.docx DOCX document
36C77626R0035.pdf PDF
Attachment 3 - Specs REV_02-26-2026.pdf PDF
Attachment 4 - PCRA and ICRA.pdf PDF
Attachment 7 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

J

J

J

J J

J

J J

J

J

J

J

J

JJ

JJ J JJ J

J

C

.W

24 24

ED

P-

FL

IP

PE

R

D

IS

PL

A

Y S

H E

LF

EDP-FLIPPER DISPLAY SHELF

ED

P-

FL

IP

PE

R

D

IS

PL

A

Y S

H E

LF

EDP-FLIPPERDISPLAY SHELF

ED

P-FLIP

PE

R

ED

P-

FL

IP

PE

R

D

IS

PL

A

Y S

H E

LF

ED

P-

FL

IP

PE

R

D

IS

PL

A

Y S

H E

LF

ED

P-

FL

IP

PE

R

ED

P-FLIP

PE

R

ED

P-FLIP

PE

R

ED

P-

FL

IP

PE

R

ED

P-FLIP

PE

R

ED

P-

FL

IP

PE

R

ED

P-

FL

IP

PE

R

ED

P-

FL

IP

PE

R

ED

P-

FL

IP

PE

R

D

IS

PL

A

Y S

H E

LF

ED

P-

FL

IP

PE

R D

IS

PL

A Y

S H

E

LF

ED

P-FLIP

PE

R

D

IS

PLA

Y S

H E

LF

ED

P-FLIP

PE

R D

IS

PLA

Y S H

E

LF

ED

P-FLIP

PE

R

D

IS

PLA

Y S

H E

LF

ED

P-FLIP

PE

R D

IS

PLA

Y S H

E

LF

DISPLAY SHELF EDP-O

ED

P-FLIP

PE

R

DISPEDPDISPLAY SHELFEDP-FLIPPER

EDP-FLIPPER

DISPEDPDISPLAY SHELFEDP-FLIPPER

EDP-FLIPPER

DISEDPDISPLAY SHELFEDP-FLIPPER

EDP-FLIPPER

ED

P-

FL

IP

PE

R

D

IS

PL

A

Y S

H E

LF

ED

P-

FL

IP

PE

R

ED

P-

FL

IP

PE

R

JJ

PATH

TEACHING

2J504

HISTOLOGY

LAB

2J711b

CUTTING

ROOM

2J711a

COMM

2J901

ELEC

2J903

TOILET

2J701

TOILET

2J703

STERILIZATION

2J705

SLIDE, BLOCK

& RECORDS

FILES

2J704

G

H-EP4.002

CORRIDOR

2JC02

REF. STORAGE

2J708

H2D4LN1- 9

H2D4LN1- 12,10

H2D4LC1- 18

H2D4LN1- 5,7H2D4LN1- 14

H2D4LN1- 11

H2D4LN1- 13H2D4LC1- 22

CORRIDOR

2JC05

H2D4LN1- 4

G

H2D4LC1- 3

SEC. OFFICE

2J206

CHIEF OFFICE

2J204

PATH OFFICE

2J212

SEC. OFFICE

2J206

H2D4LN1- 18,20

H2D4LC1- 9

H2D4LE1- 3,1

H2D4LN2- 10

H2D4LC1- 10

H 2D

1U P

S

- 3

H 2D

4L N

2-

H2D4LN2- 7

H2D1UPS 2- 4

H2D4LN2- 13

H2D1UPS 2- 18

H-EP1.2FD4

H-EP1.2FD1

H-EP1.2FE1

H-EP1.2FD4

H -E

P 1.

2F D

5- A

H -E

P 1.

2F D

H2D4LN1- 6,8

H2D4LN1- 2

H2D4LN1- 1

H2D4LN1- 3

H2D4LE1- 4

H2D4LE1- 2H2D4LC1- 5

H2D4LE1- 5

H2D4LE1- 7

H2D4LC1- 7

G

TV

H2D4LC1- 19

CORRIDOR

2JC09

STAIR

2ES04

PATH OFFICE

2J210

SPECIAL

CHEMISTRY

2J211

H2D1UPS 2- 27

3738394041

2.2

C

D

E

F

G

2.0

D.9

F.4

E.4

G.4

E.6

39.7

G

OC

+48" +48"

+66" D

+48"

G +48"

G

G

G+48"

H2D4LE1- 18

H2D4LC1- 8

12 12 12

20 20 20

181818

5 5 7

3 1

6 6

8 8

D

3' - 6 1/2"

5' - 11 1/2"

6' - 6"

8' - 0"

8' - 1 1/2"

13' - 4 1/2"

8' - 3 1/2"

H2D4LN1- 21

ADMIN OFFICE

2J907

CHIEF MED

TECH

2J905

HISTOLOGY

SUPERVISOR

2J706

H2D4LN1- 15

H2D4LN2- 8

H2D4LC1- 20

H-EP4.012

OC

OC

H2D4LE1- 20

OC

H2D1UPS 2- 15

H2D4LE1- 22

H 2D

4L C

1-

,2

H 2D

4L N

2- 3, H 2D

1U P

S 2-

6, H 2D

1U P

S 2-

9, H 2D

4L N

2- 2, H 2D

4L C

1-

,2

H2D4LC1-11,13

H2D1UPS2-13,16

H2D4LN2-11,12

H2D4LC1-25,27,29

H-EP10.0037 6 H-EP10.0035 4 H-EP10.0051

H-EP10.006

+37"

H2D4LC1- 15

OC OC OC O

C

OC

O C

OC

H2D4LC1- 12,14

OCOC

OCOC

TV

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950Professional Seals:

EB / RLF of04 JUNE, 2010

BUILDING IS FULLY SPRINKLERED

01 AND 02

HOSPITAL / CLINIC

H-EP1.2FD4

LEVEL 2, AREA D, ZONE 4

POWER PLAN

SIN 3866

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

AREA D, ZONE 4

D2

D5 D6

E1 E3

D1

D7

CLINIC

HOSPITAL

P-W P-E

A4

E4

W

NOTES:

1 CONNECTION TO POWER RECEPTACLES MOUNTED IN MODULAR FURNITURE

RACEWAY, VIA FLOOR ENTRY PANEL, PROVIDED WITH FURNITURE. REFER TO

ELEVATION AS INDICATED. PROVIDE ALL CONDUCTORS, CONDUIT, JUNCTION BOXES,

CONNECTORS, FITTINGS, ETC. REQUIRED FOR PROPER CONNECTION. COORDINATE

ROUGH-IN REQUIREMENTS WITH MODULAR FURNITURE SUPPLIER.

2 PROVIDE POWER TO FLOOR MOUNTED JUNCTION BOX FOR WIREMOLD

CONNECTIONS TO THE LAB DESK. FOR LOCATION AND DETAiLS REFER TO HERMAN

MILLER DETAIL DRAWINGS. DUPLEX RECEPTACLE MOUNT AT EVERY 4'-0" ON CENTER.

3 NOT USED.

4 NOT USED.

5 CONNECTION TO POWER RECEPTACLES MOUNTED IN MODULAR FURNITURE

RACEWAY, VIA FLOOR ENTRY JUNCTION BOX AND MODULAR FURNITURE CHASE.

REFER TO ELEVATION AS INDICATED. PROVIDE ALL CONDUCTORS, CONDUIT,

JUNCTION BOXES, CONNECTORS, FITTINGS, ETC. REQUIRED FOR PROPER

CONNECTION. COORDINATE ROUGH-IN REQUIREMENTS WITH MODULAR FURNITURE

SUPPLIER. FLOOR ENTRY POINT SHALL BE COMPLETELY CONCEALED FROM VIEW.

6 SEE SHEET H-EP1.2FD5-A FOR CONTINUATION.

7 CONNECTION TO POWER RECEPTACLES MOUNTED IN MODULAR FURNITURE

RACEWAY. REFER TO ELEVATION AS INDICATED. PROVIDE ALL CONDUCTORS,

CONDUIT, JUNCTION BOXES, CONNECTORS, FITTINGS, ETC. REQUIRED FOR PROPER

CONNECTION. COORDINATE ROUGH-IN REQUIREMENTS WITH MODULAR FURNITURE

SUPPLIER.

8 PROVIDE 600V, 3 POLE, 60A DISCONNECT SWITCH IN NEMA 3R ENCLOSURE FOR MRI

1E202 CHILLER. SURFACE MOUNT ON WALL AT 72"AFF TO TOP.

9 PROVIDE 600V, 3 POLE, 60A DISCONNECT SWITCH IN NEMA 3R ENCLOSURE FOR MRI

1E206 CHILLER. SURFACE MOUNT ON WALL AT 72"AFF TO TOP.

10 SEE H-EP9.010-E FOR CIRCUIT INFORMATION.

11 SEE H-EP9.011-E FOR CIRCUIT INFORMATION.

12 CONNECTION TO MRI 1E202 CHILLER CONTROL PANEL. PROVIDE ALL CONDUCTORS,

CONDUIT, FLEXIBLE CONDUIT, JUNCTION BOXES, CONNECTORS, FITTINGS, ETC.

REQUIRED FOR PROPER CONNECTION.

13 CONNECTION TO MRI 1E206 CHILLER CONTROL PANEL. PROVIDE ALL CONDUCTORS,

CONDUIT, FLEXIBLE CONDUIT, JUNCTION BOXES, CONNECTORS, FITTINGS, ETC.

REQUIRED FOR PROPER CONNECTION.

GENERAL NOTES

1. ALL HOMERUNS SHALL BE ROUTED FROM THE DEVICE OR FIXTURE

INDICATED UP TO THE BRANCH CONDUIT RACK LOCATED IN THE "S4" ZONE

OF INTERSTITIAL SPACE. EXTEND CONDUIT ALONG THE RACK IN THE "S4"

ZONE AND THEN TRANSITION UP THE MAIN DISTRIBUTION WIREWAYS TO THE

PANELBOARD LOCATED IN THE ELECTRICAL ROOM. SEE H-EP-5.504 FOR

DETAIL REFERENCE.

2. COORDINATE THE LOCATION AND MOUNTING HEIGHT OF ALL DEVICES

WITH ARCHITECTURAL AND INTERIOR ELEVATION

3. PROVIDE GFI RECEPTACLES WITH 6'FT OF WATER SOURCE IN LAB AREA

WIREMOLDS.

4. PROVIDE A SEPARATE NEUTRAL FOR ALL 120V CIRCUITS. SHARING OF

NEUTRAL CONDUCTOR IS NOT ALLOWED.

5. PROVIDE 1'-1/4" CONDUIT FOR DATA ROUTE FROM FLOOR BOX AS SHOWN.

TURN UP CONDUITS IN NEAREST WALL AND STUB UP TO ABOVE CEILING.

COORDINATE WITH H-ET SERIES DRAWINGS (TELECOMMUNICATION) PRIOR

TO ROUGH IN.

6. COORDINATE ALL MODULAR FURNITURE ELECTRICAL WORK WITH

MODULAR FURNITURE SUPPLIER.

No. Description Date

5 CPR 068 07/08/2011

6 CPR 132 10/17/2011

7 CPR 166 02/07/2012

8 CPR 236 03/09/2012

9 CPR 242 03/14/2012

10 CPR 302 (VOIDED) 07/11/2012

11 CPR 302R1 09/24/2012

12 CPR 402 07/03/2013

UP

J

J J J

J

J

J

J

J J

J

J

J

J

JJ

J

J

J J

J

JJ

J

J

J J

J J

J J

J

J

PP

P P

J

JJ

J

J

J

J

J

J

J

J

J

J

J

J J J

J

J

J

J

J

J

J

J

J

J

JJJJ

JJ

J J

J

J

JJ

J J

J

H2D5LN5- 1

H2D5LN5- 15

H2E2LC1- 18

H2D5LC1- 6

H2D5LC1- 13

H2D5LE1- 8,10

H2D5LC2- 2,4 H2D5LE1- 5

H2D5LC2- 1,3

H2D5LN1- 2,4

H2D5LN3- 11

H2D5LN3- 16,18

H2D5LN4- 3,5

H2D5LC2- 9

H2D5LN5- 16

G

H2D5LN1- 7

G

H2D5LN1- 10

H2D5LN1- 16

H2D5LN5- 4

H2D5LN5- 2,6

H2D5LN5- 3,5

H2D5LN3- 2,4

H2D5LN3- 3,1

H2D5LN3- 5

H2D5LN3- 6,8 H2D5LN3- 7,9

TV

+66"

H2D5LN3-

17,19,21

H2D5LN4- 1

H2D5LN3- 13,15

H2D5LN3- 10

H2D5LN3- 12,14

H2D5LN4- 16

TV

+60"

TV

H2D5LC2- 6,8

H2D5LC1- 8,10,12

H2D5LN1- 9 H2D5LC1- 5 H2D5LN1- 8

H2D5LN1- 18

H2D1UPS 2- 23 H

2D

5L N

1-

H2D5LC1- 18

H 2D

5L C

1-

H 2D

5L N

1-

H2D5LN1- 21

H 2D

1U P

S

- 1

H 2D

1U P

S

- 2

H 2D

5L N

1-

H 2D

5L N

1-

H2D5LN1- 30

OFFICE

2F807

OFFICE

2F811

CORRIDOR

2FC08

OFFICE

2F808

OFFICE

2F806

OFFICE

2F810

OFFICE

2F812

OFFICE

2F813

MULTIPURPOSE

RM

2F805

H -E

P 1.

2F D

5- A

H -E

P 1.

2F D

H2D5LN3- 24

H 2D

5L N

6-

H

2D 5L

N 6-

H2D5LN6- 11,9

H2D5LN6- 10,8

H-EP1.2FE2-A

H-EP1.2FD5-A H

-E

P 1.

2F D

H -E

P 1.

2F D

5- A

H2D5LE1- 7

H2D1UPS 4- 16

H2D5LN2- 1

H 2D

1U P

S

- 2

H2D5LN1- 23

H2D5LN1- 20

H2D1UPS 2- 26

H2D1UPS 3- 23

H2D1UPS 4- 9

H2D1UPS 4- 20

H2D1UPS 4- 21

H2D1UPS 4- 14

H2D1UPS 3- 8

H2D1UPS 1- 22

H2D1UPS 1- 20

H2D5LE1- 18

H2D5LE1- 19

H2D1UPS 4- 17,19

H2D5LN1- 14

H2D5LN1- 10,12

H2D5LN1- 1

H2D5LN5- 19

H 2D

5L N

6-

303136

7.12.2

D.2 D.1

1.2 8.1

C

D

E

F

G

2.0 7.3

D.9

30.235.2

F.4

E.4

E.6

1.4

32333435 A7

7.7

32.532.7

33.6

NEMA 6-20R

H2D5LE1- 13

H2D5LN5- 8

H2D5LN5- 10,12

H2D5LN5- 14

H2D5LN5- 17

H2D5LN5- 21,23 H2D5LN5- 24,26

H2D5LN5- 25,27

+42"

H2D5LN6- 1,3

H2D5LN6- 5,7

H2D5LN6-

6,4,2

H2D5LN6- 12

H2D5LN6- 20

H2D5LN6- 19

H2D5LN6- 21

H2D5LN6- 22

H2D5LN6- 18

OC

OC

OC

+63"

+66"

OC,G

OC

IRRIGATION

CONTROLLER H

H2D5LN3- 26

H2D5LN3- 20,22

D D

D D

DD

D D

H2D5LN1- 29

G +48"

G +48"

D

D

D

D

D

7' - 11 1/2"

11' - 4"

7' - 6"

2' - 6"

10' - 5 1/2"

15' - 5" 22' - 9"

8' - 3 1/2"

11' - 3"

16' - 4"

5' - 8"

10' - 7 1/2"

15' - 1"

4' - 3"

9' - 8"

H-EP1.2FD5-A

H-EP1.2FD2

D

H2D5LN4- 19 5

H2D5LN4- 18,20

H2D5LC2- 18

H2D5LN2- 8

20 20

6 2

6 6

4 4

2 2

5 7 7

7 9

222020

13 13

15 15

OFFICE

2F809

H2D1UPS 4- 7

H2D1UPS 2- 21

H2D1UPS 4- 13,15

H2D1UPS 4- 18

DD

4' - 8 1/2"

H2D5HE1- 2,4,6

D

H 2D

5L N

5-

1, TR

H2D5LN2-13

16 16

H2D5LS1-318

H-EP4.002

H2D5LN6- 15,17

H 2D

5L N

6-

H

2D 5L

N 6-

H2D5LN5- 29

H2D5LN5- 20,22

H 2D

5L N

5-

13012

13012

13012

13012

13012

22 13012

13012

13012

H-EP4.012

H-EP4.012

H2D1UPS 4- 22,24

H2D5LN1- 35

H2D5LC1- 35

H2D5LC1- 33H

2D

5L N

1-

G

OC

H2D1UPS 2- 25

H2D1UPS1-28,29

H2D1UPS1-25,26

H2D5LC1-19,20

H 2D

5L N

1-

,2

H2D1UPS 2- 14

H-EP10.002

H-EP10.003

H-EP10.003

3 H-EP10.006 1011

H-EP10.00613 14

H-EP10.00616

H2D5LN1- 32

H-EP10.006 3

H2D5LN3- 28 H2D5LN3- 30

H2D4LE1- 6

G

G 29

H2D5LN6- 26

12 12

H2D5LN5- 30

H 2D

5L N

4-

H2D5LN4-6,26

H2D5LN4-2,4

H2D5LN4-12,14 1

OC OC OC

OC

H2D4LE1-9,11,13

H 2D

4L E

1- 8, ,1

H2D4LE1- 14

H 2D

5L S

1- 2, H2D5LS1-1,5

OFFICE

2E204

OFFICE

2E205

STORAGE

2E902

CLERICAL

2E806

OFFICE

2E806a

CORRIDOR

2EC08

OFFICE

2E207

OFFICE

2E206

OFFICE

2E213

OFFICE

2E211

OFFICE

2E209

OFFICE

2E212

OFFICE

2E210

OFFICE

2E208

MATERIAL

HANDLING

TERMINAL

(SOILED)

2F302

CORRIDOR

2FC03

MATERIAL

HANDLING

TERMINAL

(CLEAN)

2F301

CORRIDOR

2KC09

ISO OFFICE

2K706

DATA

2K920a

CODING

2K516b

CODING

2K516d

CODING

2K516f

CODING

2K516h

HAC

2P920a

PERSONAL ID

VERIFICATION

2K502

OFFICE

2K502a

CORRIDOR

2JC08

PAYROLL

SUPV

2K202

DSS

2K901b

AISLEWAY

2KC02

ADPAC

2K901a

DSS

2K901c

OFFICE

2K702d

ISO OFFICE

2K704

DSS SUPV

2K407

DSS SUPV

2K405

DSS

2K403

DSS

2K401

SAFETY

OFFICE

2K602a

ELEC

2K508

COMM

2K510

SAFETY

OFFICE

2K602c

SAFETY

OFFICE

2K602d

SAFETY

STORAGE

2K602b

BULK

STORAGE

2J715

ELEC

2J720

COMM

2J718

CYTOLOGY--CLEAN

2J711ePREP/REC'G

2J711

ELEC

2E808

HOOD ROOM

2J711c

CYTOLOGY--DIRTY

2J711d

STAIR

2JS01

CODING

2K922a

AISLEWAY

2KC04

CORRIDOR

2PC09

HAC

2P908

CORRIDOR

2EC01

OFFICE

2E806b

ELEV. LOBBY

2FC04

EQ. ALCOVE

2FC04a

EQ. ALCOVE

2FC04b

EQ. ALCOVE

2EC01a

ELEVATOR

2EE02

CORRIDOR

2JC01

OFFICE

2K605

OFFICE

2K603

OFFICE

2K601

EQ. ALCOVE

2KC05a

OFFICE

2K702c

CONFERENCE

2K702

WORK ROOM

2K602 CORRIDOR

2KC06

CHECK IN &

OUT/BLOOD

BANK/TRANSFUSION

2J510a

STAFF

LOUNGE

2J722

STAFF

LOCKERS

2J521

REF. STORAGE

2J708

FLOW

CYTOMETRY

2J513

CORRIDOR

2JC07

OFFICE

2F902

OFFICE

2E807

STORAGE

2F904a

STUDENT

WORKROOM

2F904

WORK ROOM

2F906

CORRIDOR

2FC06

CLASSROOM &

STORAGE

2F908

STAIR

2ES01

ELEVATOR

2FE03

ELEVATOR

2FE02

ELEVATOR

2FE01

CORRIDOR

2FC01

ELEVATOR

2EE01

OFFICE

2K708

AISLEWAY

2K516

URINALYSIS/SEROLOGY

2J506

AUTOMATION

TRACK

SYSTEM

2N912

ELEV. LOBBY

2EC04

PAYROLL

2KC02a

PAYROLL

SUPV

2K204

PAYROLL

2KC02b

PAYROLL

2KC02c

CODING

2K920c

CODING

2K922c

CODING

2K922b

SPARE

2K701

SPARE

2K703

OFFICE

2J508c

LAB

REF/FREEZER

ALCOVE

2J510

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950Professional Seals:

EB / RLF of04 JUNE, 2010

BUILDING IS FULLY SPRINKLERED

01 AND 02

HOSPITAL / CLINIC

H-EP1.2FD5-A

LEVEL 2, AREA D, ZONE 5

POWER PLAN BID ALTERNATE NO. 1

SIN 3868

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

AREA D, ZONE 5

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

D7

CLINIC

HOSPITAL

P-W P-E

A4

E4

W

GENERAL NOTES

1. ALL HOMERUNS SHALL BE ROUTED FROM THE DEVICE OR FIXTURE INDICATED UP TO THE BRANCH CONDUIT RACK LOCATED IN THE "S4" ZONE OF INTERSTITIAL SPACE. EXTEND CONDUIT ALONG THE RACK IN THE "S4" ZONE AND THEN TRANSITION UP THE MAIN DISTRIBUTION WIREWAYS TO THE PANELBOARD LOCATED IN THE ELECTRICAL ROOM. SEE H-EP-5.504 FOR DETAIL

REFERENCE.

2. COORDINATE THE LOCATION AND MOUNTING HEIGHT OF ALL DEVICES WITH ARCHITECTURAL AND INTERIOR ELEVATION.

3. PROVIDE GFI RECEPTACLES WITH 6FT OF WATER SOURCE IN LAB AREA WIREMOLDS.

4. PROVIDE A SEPARATE NEUTRAL FOR ALL 120V CIRCUITS. SHARING OF NEUTRAL CONDUCTOR IS NOT ALLOWED.

5. PROVIDE 1'-1/4" CONDUIT FOR DATA ROUTE FROM FLOOR BOX AS SHOWN. TURN UP CONDUITS IN NEAREST WALL AND STUB UP TO ABOVE CEILING. COORDINATE WITH H-ET SERIES DRAWINGS (TELECOMMUNICATION) PRIOR TO ROUGH IN.

6. COORDINATE ALL MODULAR FURNITURE ELECTRICAL WORK WITH MODULAR FURNITURE SUPPLIER.

NOTES:

No. Description Date

13 CPR 301 07/06/2012

14 CPR 302 (VOIDED) 07/11/2012

15 CPR 336 09/21/2012

16 CPR 377 02/15/2013

17 CPR 395 05/24/2013

18 CPR 399 06/28/2013

19 CPR 401 07/10/2013

20 CPR 403 07/19/2013

35 CONNECTION TO WALK-IN REFRIGERATOR

CONDENSATE PUMP. PROVIDE ALL

CONDUCTORS, CONDUIT, FLEXIBLE CONDUIT,

JUNCTION BOXES, CONNECTORS, FITTINGS,

ETC. REQUIRED FOR PROPER CONNECTION.

PROVIDE 20A, 120V, 1HP MOTOR-RATED

TOGGLE SWITCH ADJACENT TO PUMP.

36 PROVIDE 3/4" CONDUIT WITH TWO #8 AWG AND

ONE #10 AWG GROUND.

32 PROVIDE 3/4" CONDUIT WITH CONTROL CABLE

AS REQUIRED.

33 3/4" CONDUIT - 3 #12 AWG + 1 #12 AWG

GROUND.

34 PROVIDE 20A, 3-POLE, 240V ENCLOSED CIRCUIT

BREAKER, WITH AN INTERRUPTING RATING OF

22,000A AND NEMA-1 ENCLOSURE, TO SERVE

WALK-IN COOLER REFRIGERATION UNIT.

FLUSH MOUNT AT 72" AFF TO TOP. PROVIDE

IDENTIFICATION ON BREAKER INDICATING

EQUIPMENT SERVED.

29 DEDICATED RECEPTACLE FOR USE WITH

COFFEE MAKER.

30 PROVIDE DUPLEX RECEPTACLE IN DISPATCH

TERMINAL ENCLOSURE. COORDINATE EXACT

MOUNTING REQUIREMENTS WITH SWISSLOG.

31 CONTROL CONNECTION FOR "WITT" COOLING

UNIT. PROVIDE ALL CONDUCTORS, CONDUIT,

FLEXIBLE CONDUIT, JUNCTION BOXES,

CONNECTORS, FITTINGS, ETC. REQUIRED FOR

PROPER CONNECTION.

8 PROVIDE FLOOR MOUNTED COMBINATION

JUNCTION BOX POWER AND COMMUNICATION.

PROVIDE AT LEAST 1 DUPLEX RECEPTACLES

(NEMA 5-20R) AND 1 SPECIAL RECEPTACLES

(NEMA 6-20R) . FOR LOCATION AND DETAILS

COORDINATE WITH ARCHITECT AT SITE.

10 SEE SHEET H-EP1.2FD2 FOR CONTINUATION.

11 SEE SHEET H-EP1.2FD6 FOR CONTINUATION.

12 SEE SHEET H-EP1.2FE2-A FOR CONTINUATION.

13 SEE SHEET H-EP1.2FD4 FOR CONTINUATION.

15 MOUNT RECEPTACLES ON COMMUNICATION

RACKS IN EACH COMMUNICATION ROOM.

REFER TO SHEETS H-ET4.001 THRU H-ET4.008

FOR RACK LOCATION.

16 20A, 125V DUPLEX RECEPTACLE MOUNTED IN

DEMOUNTABLE PARTITION. COORDINATE WITH

MANUFACTURERS REQUIREMENTS FOR

BACKBOX AND RACEWAY.

17 CONNECTION TO AUTODOOR OPERATOR.

PROVIDE CONDUIT, JUNCTION BOXES AND

WIRING PER MANUFACTURER REQUIREMENTS.

18 3/4" CONDUIT FOR LOW VOLTAGE WIRING.

19 PROVIDE BACK BOX AS REQUIRED FOR

MOTORIZED SHADE CONTROL UNITS,

PROVIDED BY MANUFACTURER. MOUNT AT 48"

AFF TO CENTER. VERIFY BOX SIZE WITH SHADE

MANUFACTURER.

20 CONNECTION TO MOTORIZED SHADE.

PROVIDE ALL CONDUCTORS, CONDUIT,

FLEXIBLE CONDUIT, JUNCTION BOXES,

CONNECTORS, FITTINGS, ETC. REQUIRED FOR

PROPER CONNECTION. MOUNT ABOVE

FINISHED ACCESSIBLE CEILING.

21 PROVIDE 3/4" CONDUIT WITH MOTORIZED

SHADE CONTROL CABLE AS REQUIRED BY

MANUFACTURER.

22 MOTORIZED WINDOW SHADE EQUIPMENT

CABINET PROVIDED WITH MOTORIZED WINDOW

SHADE SYSTEM. MOUNT ABOVE FINISHED

ACCESSIBLE CEILING.

23 CONNECTION TO POWER RECEPTACLES

MOUNTED IN MODULAR FURNITURE RACEWAY,

VIA MODULAR FURNITURE CHASE. REFER TO

ELEVATION AS INDICATED. PROVIDE ALL

CONDUCTORS, CONDUIT, JUNCTION BOXES,

CONNECTORS, FITTINGS, ETC. REQUIRED FOR

PROPER CONNECTION. COORDINATE

ROUGH-IN REQUIREMENTS WITH MODULAR

FURNITURE SUPPLIER.

24 CONNECTION TO POWER RECEPTACLES

MOUNTED IN MODULAR FURNITURE RACEWAY.

REFER TO ELEVATION AS INDICATED. PROVIDE

ALL CONDUCTORS, CONDUIT, JUNCTION

BOXES, CONNECTORS, FITTINGS, ETC.

REQUIRED FOR PROPER CONNECTION.

COORDINATE ROUGH-IN REQUIREMENTS WITH

MODULAR FURNITURE SUPPLIER.

25 REFER TO 12/H-EP10.006 FOR ELEVATION.

26 REFER TO 13/H-EP10.006 FOR ELEVATION.

27 REFER TO 14/H-EP10.006 FOR ELEVATION.

28 CONNECTION FOR WALK-IN COOLER

REFRIGERATION UNIT. PROVIDE ALL

CONDUCTORS, CONDUIT, FLEXIBLE CONDUIT,

JUNCTION BOXES, CONNECTORS, FITTINGS,

ETC. REQUIRED FOR PROPER CONNECTION.

1 PROVIDE 4 11/16" SQUARE BY 2 1/8" DEEP

FLUSH-MOUNTED BOX WITH TWO-GANG

PLASTER RING AND STAINLESS STEEL COVER

PLATE FOR BASE POWER "INFEED"

CONNECTION TO THE MODULAR FURNITURE

SYSTEM WIRE CHASE RAIL. MOUNT AT 8" AFF

TO BOTTOM. PUNCH THE STAINLESS STEEL

COVER PLATE TO ACCEPT THE INFEED

CONNECTOR ASEMBLY. PROVIDE 90-DEGREE

FLEXIBLE CONDUIT FITTINGS AS REQUIRED

FOR FINAL CONNECTIONS. THE MODULAR

FURNITURE SYSTEM WILL BE PROVIDED WITH

A BASE INFEED CONNECTOR CONSISTING OF A

56" LONG FLEXIBLE CONDUIT AND PIG TAIL

ASSEMBLY FOR CONNECTION TO THE

WALL-MOUNTED JUNCTION BOX. THIS

ASSEMBLY INCLUDES A "4+4+2" ELECTRICAL

HARNESS WHICH PROVIDES CAPACITY FOR UP

TO FOUR 120V CIRCUITS WITH FOUR

DEDICATED NEUTRALS AND TWO EQUIPMENT

GROUNDING CONDUCTORS. NOT ALL OF THE

FOUR CIRCUITS WILL BE USED IN EVERY

LOCATION. PROVIDE FINAL CONNECTIONS TO

THE MODULAR FURNITURE INFEED

CONNECTOR ASSEMBLY AS REQUIRED. REFER

TO 5/H-EP5.003A FOR DETAIL. COORDINATE

EXACT REQUIREMENTS WITH FURNITURE

MANUFACTURER.

2 CONNECTION TO POWER RECEPTACLES

MOUNTED IN MODULAR FURNITURE RACEWAY,

VIA FLOOR ENTRY JUNCTION BOX AND

MODULAR FURNITURE CHASE. PROVIDE ALL

CONDUCTORS, CONDUIT, JUNCTION BOXES,

CONNECTORS, FITTINGS, ETC. REQUIRED FOR

PROPER CONNECTION. COORDINATE

ROUGH-IN REQUIREMENTS WITH MODULAR

FURNITURE SUPPLIER. FLOOR ENTRY POINT

SHALL BE COMPLETELY CONCEALED FROM

VIEW.

3 CONNECTION TO POWER RECEPTACLES

MOUNTED IN MODULAR FURNITURE RACEWAY,

VIA FLOOR ENTRY PANEL PROVIDED WITH

FURNITURE. REFER TO ELEVATION AS

INDICATED. PROVIDE ALL CONDUCTORS,

CONDUIT, JUNCTION BOXES, CONNECTORS,

FITTINGS, ETC. REQUIRED FOR PROPER

CONNECTION. COORDINATE ROUGH-IN

REQUIREMENTS WITH MODULAR FURNITURE

SUPPLIER.

4 DUMBWAITER MOTOR, 2HP/480V/3 PHASE/60HZ.

PROVIDE A FUSED DISCONNECT, 30/20/3 WITH

3-#12+1-#12 GND IN 3/4" CONDUIT.

5 CONNECTIONS FOR FIRE ALARM SYSTEM

COMPONENTS. PROVIDE ALL CONDUCTORS,

CONDUIT, FLEXIBLE CONDUIT, JUNCTION

BOXES, CONNECTORS, FITTINGS, ETC.

REQUIRED FOR PROPER CONNECTION. REFER

TO FIRE ALARM RISER DIAGRAM ON SHEET

H-FA6.001 FOR FURTHER INFORMATION.

6 CONNECTION FOR COOLER CONTROL PANEL.

PROVIDE ALL CONDUCTORS, CONDUIT,

FLEXIBLE CONDUIT, JUNCTION BOXES,

CONNECTORS, FITTINGS, ETC. REQUIRED FOR

PROPER CONNECTION.

7 PROVIDE FLOOR MOUNTED COMBINATION

JUNCTION BOX POWER AND COMMUNICATION.

PROVIDE AT LEAST 2 DUPLEX RECEPTACLES

(NEMA 5-20R). FOR LOCATION AND DETAILS

COORDINATE WITH ARCHITECT AT SITE.

NOTES CONTINUED: 12

13 13

14 14

J

J

J

J J

JJ

J

TRAINING

2L811

TRAINING

2L809

ADP

2L807

ADP

2L805

ADP

2L803

AA

2L801

CHIEF

2L903

CHIEF

2L901

CORRIDOR

2LC09

MAA

2L802

MAA

2L804

MAA

2L806

MAA

2L808

MAA

2L810

ENGINEERING

STORAGE

2L203

EMS STORAGE

2L205

COMM

2K222

ELEC

2K520

DATA SUPV

2K801

MIS WORK

ROOM

2K803

CLASSROOM/CONFERENCE

2Q909

HIMS/MIS

CHIEF

2K805a

SECRETARY

2K805

SCANNING

2K525

ROI

2K521

CORRIDOR

2KC09

ISO OFFICE

2K706

DATA

2K920a

SPARE

2K705

OFFICE

2K702a

CODING SUPV

2K808

DATA

2KC08c

DATA

2KC08b

DATA

2KC08a

CODING

2K516a

CODING

2K516c

CODING

2K516e

CODING

2K516g

CODING

2K516b

CODING

2K516d

CODING

2K516f

CODING

2K516h

H-EP4.002

CORRIDOR

2QC09

HALLWAY

2KC05

CORRIDOR

2KC08

HAC

2L206

SECRETARY

2L812

EQ. ALCOVE

2KC05a

AISLEWAY

2K516

STAIR

2PS01

CODING

2K516i

H2D5LN4- 11

H2D6LN1- 19,21

H2D6LN1- 22

H2D6LN1- 18

H2D6LN1- 23

H2D6LN2- 9

H2D6LE1- 8

H2D5LN3- 7,9

H2D5LN3- 23,25

H2D6LN1- 12

H2D6LN1- 13

H2D6LN1- 25,24

H2D6LE1- 10

H2D6LN1- 15,17

H2D6LN1- 10

H2D6LN1- 8

G

H2D6LN1- 16

H-EP1.2FD6

H-EP1.2FD3

H-EP1.2FE3

H-EP1.2FD6

H2D6LN2- 2,4

H2D6LN2- 1,3

H2D6LN2- 6

H2D6LN2- 11,13

H2D6LN2- 8,10

H2D6LN2- 5,7

H2D6LN2- 12

H2D6LN1- 27

H2D5LN4- 7

H2D6LN1- 29,31

TV

H2D6LN1- 30

H2D6LN1- 1,5,3

OFFICE

2K601

OFFICE

2K603

OFFICE

2K605

CORRIDOR

2QC09a

H -E

P 1.

2F D

H -E

P 1.

2F D

5- A

G

CORRIDOR

2LC02

ELEVATOR

LOBBY

2LC05

ROOM

2PE01 ROOM

2PE02

DATA

2K920b

SPARE

2K703

AISLEWAY

2KC07

OFFICE

2K708

WAITING

2L814

2627282930

C

D

E

F

G

7.3

D.9

30.2

F.4

E.4

26.427.7 27.5

E.5

OC

+72"

D

1 1

25 25

3 3

5 51

29 31 31

15 15

D

D

D

D

D

D

H2D6LN1- 14

2' - 1 1/2"

1' - 10 1/2"

16' - 6 1/2" 12' - 0 1/2"

7' - 6 1/2"

6' - 11" 5' - 0 1/2"

5' - 10"

6' - 11"

D

H2D5LC2- 5

OC

OC OC

3 H-EP4.012

H2D5LN4-13,15

H2D6LN2-14,16

H2D6LN2-18,22

H2D6LN2-17,19

H2D6LN1-6,32

H 2D

6L N

1- 2, H2D6LN1-7,9

H2D6LN1-11,34

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950Professional Seals:

EB / RLF of04 JUNE, 2010

BUILDING IS FULLY SPRINKLERED

01 AND 02

HOSPITAL / CLINIC

H-EP1.2FD6

LEVEL 2, AREA D, ZONE 6

POWER PLAN

SIN 3869

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

AREA D, ZONE 6

D7

CLINIC

HOSPITAL

P-W P-E

A4

E4

W

1 PROVIDE 4 11/16" SQUARE BY 2 1/8" DEEP

FLUSH-MOUNTED BOX WITH TWO-GANG PLASTER

RING AND STAINLESS STEEL COVER PLATE FOR

BASE POWER "INFEED" CONNECTION TO THE

MODULAR FURNITURE SYSTEM WIRE CHASE RAIL.

MOUNT AT 8" AFF TO BOTTOM. PUNCH THE

STAINLESS STEEL COVER PLATE TO ACCEPT THE

INFEED CONNECTOR ASEMBLY. PROVIDE 90-DEGREE

FLEXIBLE CONDUIT FITTINGS AS REQUIRED FOR

FINAL CONNECTIONS. THE MODULAR FURNITURE

SYSTEM WILL BE PROVIDED WITH A BASE INFEED

CONNECTOR CONSISTING OF A 56" LONG FLEXIBLE

CONDUIT AND PIG TAIL ASSEMBLY FOR CONNECTION

TO THE WALL-MOUNTED JUNCTION BOX. THIS

ASSEMBLY INCLUDES A "4+4+2" ELECTRICAL

HARNESS WHICH PROVIDES CAPACITY FOR UP TO

FOUR 120V CIRCUITS WITH FOUR DEDICATED

NEUTRALS AND TWO EQUIPMENT GROUNDING

CONDUCTORS. NOT ALL OF THE FOUR CIRCUITS

WILL BE USED IN EVERY LOCATION. PROVIDE FINAL

CONNECTIONS TO THE MODULAR FURNITURE INFEED

CONNECTOR ASSEMBLY AS REQUIRED. REFER TO

5/H-EP5.003A FOR DETAIL. COORDINATE EXACT

REQUIREMENTS WITH FURNITURE MANUFACTURER.

2 SEE SHEET H-EP1.2FD3 FOR CONTINUATION.

3 SEE SHEET H-EP1.2FD5-A FOR CONTINUATION.

4 MOUNT RECEPTACLES ON COMMUNICATION RACKS

IN EACH COMMUNICATION ROOM. REFER TO SHEETS

H-ET4.001 THRU H-ET4.008 FOR RACK LOCATION.

NOTES:

GENERAL NOTES

1. ALL HOMERUNS SHALL BE ROUTED FROM THE DEVICE OR FIXTURE INDICATED

UP TO THE BRANCH CONDUIT RACK LOCATED IN THE "S4" ZONE OF INTERSTITIAL

SPACE. EXTEND CONDUIT ALONG THE RACK IN THE "S4" ZONE AND THEN

TRANSITION UP THE MAIN DISTRIBUTION WIREWAYS TO THE PANELBOARD

LOCATED IN THE ELECTRICAL ROOM. SEE H-EP-5.504 FOR DETAIL REFERENCE.

2. COORDINATE THE LOCATION AND MOUNTING HEIGHT OF ALL DEVICES WITH

ARCHITECTURAL AND INTERIOR ELEVATION.

3. PROVIDE A SEPARATE NEUTRAL FOR ALL 120V CIRCUITS. SHARING OF

NEUTRAL CONDUCTOR IS NOT ALLOWED.

4. PROVIDE 1'-1/4" CONDUIT FOR DATA ROUTE FROM FLOOR BOX AS SHOWN.

TURN UP CONDUITS IN NEAREST WALL AND STUB UP TO ABOVE CEILING.

COORDINATE WITH H-ET SERIES DRAWINGS (TELECOMMUNICATION) PRIOR TO

ROUGH IN.

No. Description Date

1 CPR 035 2/25/11

2 CPR 039R1 06/07/2011

3 CPR 047 03/25/11

4 CPR 132 10/17/2011

5 CPR 302 (VOIDED) 07/11/2012

6 CPR 336 09/21/2012

7 CPR 377 02/15/2013

DN DN

DN

UP

DN

UP

DN

UP

UP

DNUP

M M M

M

M

M

M

M M

M

M M

M M

M

J

J

H-FCU-2.12

H-FCU-2.11

H-FCU-2.10

H-FCU-2.5

H-FCU-2.3

H-FCU-2.1

H-FCU-2.4 H-FCU-2.2

H-FCU-2.6

H-FCU-2.7

ELEC

2M104

ELEC

2N506

ELEC

2P121b

ELEC

2Q101

ELEC

2Q811

ELEC

2Q809

ELEC

2K520

ELEC

2J720

ELEC

2J903

3 1

6 2

CB-H2D1HC1 CB-H2D1HN1

CB-H2D2HN2

CB-H2D2HE1

CB-H2D3HN1

CB-H2D3HC1

C B-

H 2D

3H S1

CB-H2D4HC1

CB-H2D4HN1CB-H2D4HE1

CB-H2D6HE2

CB-H2D6HN1

CB-H2D5HS1

CB-H2D5HN2

C B-

H 2D

5H E2

C B-

H 2D

5H N

CB-H2D5HN1 CB-H2D5HE1

CB-H1D1HC1

H2D1LN2-18

H2D4LN1-19

H2D4LN1-17 H2D5LN1-15

H2D5LN5-18

H2D5LN4-9

H2D5LN4-10

H2D2LN1-30 H2D2LN3-6

H2D3LN2-3

H2D6LN2-15

C B-

H 2D

2H S1

C B-

H 2D

2H C

CB-H2D2HN1

8 8

H-BCU-2.1 H-BCU-2.2

H-BCU-2.3 H-BCU-2.4

(7) 4" CONDUITS

(5) 4" CONDUITS

26272829303136373839

D.2 D.1

1.2 8.1

C

D

E

F

G

H

J

K

L

2.0 7.3

D.9

35.2

AS

38.4 37.4 29.4 28.4 27.6

J.6

H.7

G.7

F.4

E.4

G.4

26.839.8

1.4

32333435 A7

7.7

26.4

39.7

27.5

C.81

C.91

32.532.7

E.5

33.6

K.6

ST-H-FCU-2.6

ST-H-FCU-2.7

ST-H-FCU-2.4

ST-H-FCU-2.2

ST-H-BCU-2.1 ST-H-BCU-2.2

ST-H-BCU-2.4ST-H-BCU-2.3

ST-H-FCU-2.1

ST-H-FCU-2.3

ST-H-FCU-2.11

ST-H-FCU-2.5

ST-H-FCU-2.12

H-BCU-2.5

ST-H-BCU-2.5

H2D2LE2- 29

K.7

8 8 8

ST-H-FCU-2.10

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950Professional Seals:

EB / RLF of04 JUNE, 2010

BUILDING IS FULLY SPRINKLERED

01 AND 02

HOSPITAL / CLINIC

H-EP1.2ND

LEVEL 2, AREA D

POWER INTERSTITIAL PLAN

SIN 3877

1/16" = 1'-0" GRAPHIC SCALE

8' 16' 48'32'

N

A

KEY PLAN

C

B

AREA D

E

D

CLINIC

HOSPITAL

P-W P-E

W

NOTES:

1 LIFE SAFETY #2-1 BUSWAY (225A, 480/277V). REFER

TO POWER RISER DIAGRAM FOR ADDITIONAL

INFORMATION.

2 EQUIPMENT #2-3 BUSWAY (800A, 480/277V). REFER

TO POWER RISER DIAGRAM FOR ADDITIONAL

INFORMATION.

3 CRITICAL #2-1 BUSWAY (800A, 480/277V). REFER TO

POWER RISER DIAGRAM FOR ADDITIONAL

INFORMATION.

4 CRITICAL #2-2 BUSWAY (400A, 480/277V). REFER TO

POWER RISER DIAGRAM FOR ADDITIONAL

INFORMATION.

5 NORMAL #2-2 BUSWAY (800A, 480/277V). REFER TO

POWER RISER DIAGRAM FOR ADDITIONAL

INFORMATION.

6 NORMAL #2-3 BUSWAY (400A, 480/277V). REFER TO

POWER RISER DIAGRAM FOR ADDITIONAL

INFORMATION.

7 NORMAL #2-4 BUSWAY (400A, 480/277V). REFER TO

POWER RISER DIAGRAM FOR ADDITIONAL

INFORMATION.

8 REFER TO MOTOR STARTER SCHEDULE ON SHEET

H-EP7.001 FOR FEEDER INFORMATION.

9 REFER TO ELEC. RM 3N314 ON H-EP4.003 FOR

ADDITIONAL INFORMATION.

10 CONNECTION TO PNEUMATIC TUBE TRANSFER UNIT.

PROVIDE ALL CONDUCTORS, CONDUIT, FLEXIBLE

CONDUIT, JUNCTION BOXES, CONNECTORS,

FITTINGS, ETC. REQUIRED FOR PROPER

CONNECTION. REFER TO PNEUMATIC TUBE SYSTEM

(H-VT SERIES DRAWINGS, VOLUME 6) FOR

ADDITIONAL REQUIREMENTS AND COORDINATION.

GENERAL NOTES

1. ALL HOMERUNS SHALL BE ROUTED FROM THE DEVICE OR FIXTURE INDICATED UP

TO THE BRANCH CONDUIT RACK LOCATED IN THE "S4" ZONE OF INTERSTITIAL SPACE.

EXTEND CONDUIT ALONG THE RACK IN THE "S4" ZONE AND THEN TRANSITION UP THE

MAIN DISTRIBUTION WIREWAYS TO THE PANELBOARD LOCATED IN THE ELECTRICAL

ROOM. SEE H-EP-5.504 FOR DETAIL REFERENCE.

2. ALL BUSDUCT CIRCUIT BREAKERS SHALL BE ELECTRONIC TRIP TYPE.

No. Description Date

1 RFI #: 0290 1/12/11

2 CPR 047 03/25/11

3 CPR 068 07/08/2011

4 CPR 115 07/20/2011

5 CPR 212 12/30/2011

6 CPR 292 08/17/2012

7 CPR 389 04/30/2013

File details come from the government source that posted it. Updated .