RFI 59 Piping DWG.pdf

PDF 1 MB Posted

Attached to
Y1DZ--675-106 Expand Radiology & Oncology Minor Construction - Lake Nona
Solicitation number
36C77626R0035
Issued by

About this file

This document is a set of architectural piping plan drawings for a hospital/clinic facility. The drawings depict Level 0, Area D piping systems for a new hospital located in Orlando, Florida, prepared by the Office of Facilities Management.

The plans illustrate comprehensive heating and cooling water distribution systems, including chilled water (CH/CHR) and hot water heating (HWH/HWHR) piping networks. Key components shown include pipe racks, expansion loops, pipe guides, and anchors positioned at standard 20-foot intervals with 6-foot and 7-foot spacing between support elements. The piping systems range from 1-inch to 18-inch diameter lines, with detailed specifications for high-pressure steam (HPS) at 90# pressure, low-pressure return (LPR), condensate (PC), and various heating/cooling circuits. The drawings include multiple detailed cross-sections, notes specifying pipe support details with reference to Section 5 of MH3.505 specifications, and connections to various spaces including storage areas and corridors. The document indicates the building features full sprinkler protection and was last revised on June 17, 2011. Professional seals are included from the architect/engineers and project director, confirming the design authority for this hospital/clinic infrastructure project.

View the file

Other files

File Type Posted
RFI 59 Electrical DWG.pdf PDF
RFI 59 Mechanical DWG.pdf PDF
RFI 59 Plumbing DWG.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-27-26.docx DOCX document
36C77626R0035 0009.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-24-26.docx DOCX document
36C77626R0035 0008.pdf PDF
675-106 Addendum 02.pdf PDF
RFI 59 Plumbing Drawing.pdf PDF
RFI 59 Electrical Drawing.pdf PDF
RFI 59 Mechanical Drawing.pdf PDF
Technical Questions Spreadsheet - Lake Nona - 4-22-26.docx DOCX document
36C77626R0035 0007.pdf PDF
CON-100 INSTRUCTIONS - Tradeoffs.docx DOCX document
36C77626R0035 0006.pdf PDF
36C77626R0035 0005.pdf PDF
36C77626R0035 0004.pdf PDF
Sign-in Sheet - Lake Nona.pdf PDF
36C77626R0035 0003.pdf PDF
36C77626R0035 0002.pdf PDF
Attachment 9 - PPQ.docx DOCX document
Attachment 1 - Specifications.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 5 - Brand Name Justification - Redacted.pdf PDF
Attachment 10 - Project Information Sheet for Contractors.docx DOCX document
Attachment 6 - Construction Wage Rates - Orange - 01-02-26.pdf PDF
Attachment 8 - Site Visit Instructions.pdf PDF
Attachment 11 - Division Cost Breakdown.xlsx XLSX spreadsheet
36C77626R0035.pdf PDF
Attachment 3 - Specs REV_02-26-2026.pdf PDF
Attachment 4 - PCRA and ICRA.pdf PDF
Attachment 7 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C C

D D

E E

F F

G G

D.7 D.7

F.4 F.4

E.4 E.4

C.7 C.7

40.6

40.6

C.81 C.81

H-FCU-0.3

H -M

P

.0 F

D

H -M

P

.0 F

D

H -M

P

.0 F

D

H -M

P

.0 F

D

STORAGE

0H001

CORRIDOR

0HC01

CORRIDOR

0HC02

1"ø CHR 1"ø CH

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB/RLF

NOTES:

01 AND 02

of 4322P.G./J.I.

LEVEL 0, AREA D, ZONE 4

PIPING PLAN

HOSPITAL / CLINIC

H-MP1.0FD4

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

AREA D, ZONE 4

D2

D5 D6

E1 E3

D1

No. Description Date

SPECIFIC NOTES

SEE H-PL1.0FD4 FOR CONDENSATE DRAINAGE OF FAN COIL UNIT.1

1 1/2"ø CHR 1 1/2"ø CH

H-FCU-0.2

18"Ø CH/CHR

(UNDER HWH/HWHR)

8"ø HWH 8"ø HWHR

HWH/HWHR EXPANSION LOOP.

REFER TO MH3.505 SECTION 5.

6' - 0"

4' - 0"

PIPE SUPPORT (TYPICAL).

REFER TO MH3.505 SECTION 5.

H-MP1.0FD5

H-MP1.0FD2

H -M

P .0

F D

H -M

P .0

F D

H -M

P .0

F D

H -M

P .0

F D

H -M

P .0

F D

H -M

P .0

F D

H -M

P .0

F D

H -M

P .0

F D

H-MP1.0FD5

H-MP1.0FD2

1 1/4"ø CHR

1 1/4"ø CH

Space

4C3327

Space

4C3328 Space

4C3329

Space

4C3330

20' - 0" (MIN)

HWH/HWHR PIPE ANCHOR (TYPICAL)

1.2

C

D

E

F

G

D.9

35.2

D.7

F.4

E.4

C.7

32333435 A7

C.81

C.91

32.532.7

33.6

1.2

1.2

C C

D D

E E

F F

G G

D.9 D.9

35.2

35.2

D.7 D.7

F.4 F.4

E.4 E.4

C.7 C.7

34.5

34.5

34.2

34.2

32.4

32.4

32.2

32.2

A7

A7

A2

A2

30.5

30.5

F.3 F.3

F.1 F.1

34.4

34.4

C.81 C.81

C.91 C.91

32.5

32.5

32.7

32.7

A4.5

A4.5

33.6

33.6

33.4

33.4

H.348 H.348

D.9 D.9 E E

F F

G G

D D

C C

A4.5

A4.5 A6

A6

A6.2

A6.2

35.2

35.2

8.1

8.1

C C

D D

E E

F F

G G

D.9 D.9

35.2

35.2

D.7 D.7

F.4 F.4

E.4 E.4

C.7 C.7

34.5

34.5

34.2

34.2

32.4

32.4

32.2

32.2

A7

A7

A2

A2

30.5

30.5

F.3 F.3

F.1 F.1

34.4

34.4

C.81 C.81

C.91 C.91

C.01C.01

32.5

32.5

32.7

32.7

J.14 J.14

J.12

J.12

36 35.235 34 33 A7 32 31

G

F.4

F

E.4

E D.9

D.7

D

C.7

C

1.2

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB/RLF

NOTES:

01 AND 02

of 4322P.G./J.I.

LEVEL 0, AREA D, ZONE 5

PIPING PLAN

HOSPITAL / CLINIC

H-MP1.0FD5

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

AREA D, ZONE 5

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

SPECIFIC NOTES

NOT USED.

PIPE ANCHOR (TYPICAL)

SEE H-PL1.0FD5 FOR CONDENSATE DRAINAGE OF FAN COIL UNIT.

No. Description Date

1 CPR 098 06/17/2011

"ø

H

W H

R

H-FCU-0.1

10" HPS (90#) SHUTOFF VALVE

2" HPS (90#) BYPASS VALVE

10"Ø HPS (90#) UP

18"Ø CH/CHR UP

8"Ø HWH/HWHR UP

18"Ø CH/CHR, 12"Ø HPS (90#),

& 6"Ø PC TO PLANT. SEE

MS4.005 OF PACKAGE 1 FOR

CONTINUATION.

18" CH/CHR CROSS-CONNECT VALVES

H-FM-4

/2

C

/2

R

R

P S

P

1 1/2"ø CHR 1 1/2"ø CH

H-CP-1

4"Ø CONDENSATE

RECEIVER VENT UP

H-FCU-0.4

8"ø HWHR 8"ø HWH

4' - 0"

6' - 0" 7

PIPE RACK (TYP). REFER TO

MH3.505 SECTION 5.

HWH/HWHR EXPANSION LOOP.

REFER TO MH3.505 SECTION 5.

6' - 0"

4' - 0"

H -M

P .0

F D

H -M

P .0

F D

H -M

P .0

F D

H -M

P .0

F D

2"ø CHR

2"ø CH

H-TP-0.1

H-TP-0.2

H-CP-2

4"ø PC

H-TP-0.6

H-TP-0.4

H-TP-0.5

6"ø PC

3"ø PC 3"ø LPR

6"ø CH 6"ø CHR

6"ø CHR 6"ø CH

(2) 6"Ø CH/CHR UP

TO PUMP ROOM

6"Ø CH/CHR UP

(TO H-ACRCU-1)

6"Ø CHR UP

(TO H-ACRCU-2)

6"Ø CH UP

(TO H-BFT-1)

H-TP-0.3

2"ø LPR

2"ø LPR

(3) 2"Ø LPR UP

3"ø LPR

4"Ø CONDENSATE

RECEIVER VENT

2"Ø HPR UP

2"Ø LPR UP

(2) 1"Ø CH/CHR

DRAIN PIPING

HWH/HWHR PIPING

ANCHOR (TYPICAL)

Space

4C3337

Space

4C3338

Space

4C3339

W H

R

HWH/HWHR PIPE GUIDE (TYPICAL)

20' - 0" 20' - 0" (MIN) 20' - 0" (MIN)

2627282930

8.1

C

D

E

F

G

D.9

30.2

D.7

F.4

E.4

C.7

7.7

B.7

26.427.727.5

E.5

8.1

8.1

C C

D D

E E

F F

G G

D.9 D.9

30.2

30.2

D.7 D.7

F.4 F.4

E.4 E.4

C.7 C.7

7.7

7.7

B.7 B.7

26.4

26.4

27.7

27.7

30.5

30.5

F.3 F.3

F.1 F.1

27.5

27.5

E.5 E.5

33.18

33.18

H.348 H.348

D.9 D.9 E E

F F

G G

D D

C C

30.2

30.2

8.1

8.1

C C

D D

E E

F F

G G

D.9 D.9

30.2

30.2

D.7 D.7

F.4 F.4

E.4 E.4

C.7 C.7

7.7

7.7

B.7 B.7

26.4

26.4

27.7

27.7

30.5

30.5

F.3 F.3

F.1 F.1

27.5

27.5

E.5 E.5

J.14 J.14

J.12

J.12

30.230 29 28 27.727.5 27 26.4 26

G

F.4

F

E.5

E.4

E D.9

D.7

D

C.7

C

B.7

7.78.1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

04 JUNE, 2010

Professional Seals:

EB/RLF

NOTES:

01 AND 02

of 4322P.G./J.I.

LEVEL 0, AREA D, ZONE 6

PIPING PLAN

HOSPITAL / CLINIC

H-MP1.0FD6

N

1/8" = 1'-0" GRAPHIC SCALE

4' 8' 24'16'

A1

C2

KEY PLAN

C1

D3

D4

E2

A2 A3

B1 B2

D2

D5 D6

E1 E3

D1

AREA D, ZONE 6

GENERAL NOTES

1. PITCH STEAM AND CONDENSATE DOWNWARD 1 INCH PER 40 FEET.

SPECIFIC NOTES

6"Ø CH/CHR CONTINUED ON H-MP4.001.

NOT USED.

PIPE ANCHOR (TYPICAL)

SEE H-PL1.0FD6 FOR CONDENSATE DRAINAGE OF FAN COIL UNITS.

No. Description Date

1 CPR 051 04/07/2011

2 CPR 098 06/17/2011

File details come from the government source that posted it. Updated .