RFI 59 Piping DWG.pdf
PDF 1 MB Posted
- Solicitation number
- 36C77626R0035
About this file
This document is a set of architectural piping plan drawings for a hospital/clinic facility. The drawings depict Level 0, Area D piping systems for a new hospital located in Orlando, Florida, prepared by the Office of Facilities Management.
The plans illustrate comprehensive heating and cooling water distribution systems, including chilled water (CH/CHR) and hot water heating (HWH/HWHR) piping networks. Key components shown include pipe racks, expansion loops, pipe guides, and anchors positioned at standard 20-foot intervals with 6-foot and 7-foot spacing between support elements. The piping systems range from 1-inch to 18-inch diameter lines, with detailed specifications for high-pressure steam (HPS) at 90# pressure, low-pressure return (LPR), condensate (PC), and various heating/cooling circuits. The drawings include multiple detailed cross-sections, notes specifying pipe support details with reference to Section 5 of MH3.505 specifications, and connections to various spaces including storage areas and corridors. The document indicates the building features full sprinkler protection and was last revised on June 17, 2011. Professional seals are included from the architect/engineers and project director, confirming the design authority for this hospital/clinic infrastructure project.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C C
D D
E E
F F
G G
D.7 D.7
F.4 F.4
E.4 E.4
C.7 C.7
40.6
40.6
C.81 C.81
H-FCU-0.3
H -M
P
.0 F
D
H -M
P
.0 F
D
H -M
P
.0 F
D
H -M
P
.0 F
D
STORAGE
0H001
CORRIDOR
0HC01
CORRIDOR
0HC02
1"ø CHR 1"ø CH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB/RLF
NOTES:
01 AND 02
of 4322P.G./J.I.
LEVEL 0, AREA D, ZONE 4
PIPING PLAN
HOSPITAL / CLINIC
H-MP1.0FD4
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
AREA D, ZONE 4
D2
D5 D6
E1 E3
D1
No. Description Date
SPECIFIC NOTES
SEE H-PL1.0FD4 FOR CONDENSATE DRAINAGE OF FAN COIL UNIT.1
1 1/2"ø CHR 1 1/2"ø CH
H-FCU-0.2
18"Ø CH/CHR
(UNDER HWH/HWHR)
8"ø HWH 8"ø HWHR
HWH/HWHR EXPANSION LOOP.
REFER TO MH3.505 SECTION 5.
6' - 0"
4' - 0"
PIPE SUPPORT (TYPICAL).
REFER TO MH3.505 SECTION 5.
H-MP1.0FD5
H-MP1.0FD2
H -M
P .0
F D
H -M
P .0
F D
H -M
P .0
F D
H -M
P .0
F D
H -M
P .0
F D
H -M
P .0
F D
H -M
P .0
F D
H -M
P .0
F D
H-MP1.0FD5
H-MP1.0FD2
1 1/4"ø CHR
1 1/4"ø CH
Space
4C3327
Space
4C3328 Space
4C3329
Space
4C3330
20' - 0" (MIN)
HWH/HWHR PIPE ANCHOR (TYPICAL)
1.2
C
D
E
F
G
D.9
35.2
D.7
F.4
E.4
C.7
32333435 A7
C.81
C.91
32.532.7
33.6
1.2
1.2
C C
D D
E E
F F
G G
D.9 D.9
35.2
35.2
D.7 D.7
F.4 F.4
E.4 E.4
C.7 C.7
34.5
34.5
34.2
34.2
32.4
32.4
32.2
32.2
A7
A7
A2
A2
30.5
30.5
F.3 F.3
F.1 F.1
34.4
34.4
C.81 C.81
C.91 C.91
32.5
32.5
32.7
32.7
A4.5
A4.5
33.6
33.6
33.4
33.4
H.348 H.348
D.9 D.9 E E
F F
G G
D D
C C
A4.5
A4.5 A6
A6
A6.2
A6.2
35.2
35.2
8.1
8.1
C C
D D
E E
F F
G G
D.9 D.9
35.2
35.2
D.7 D.7
F.4 F.4
E.4 E.4
C.7 C.7
34.5
34.5
34.2
34.2
32.4
32.4
32.2
32.2
A7
A7
A2
A2
30.5
30.5
F.3 F.3
F.1 F.1
34.4
34.4
C.81 C.81
C.91 C.91
C.01C.01
32.5
32.5
32.7
32.7
J.14 J.14
J.12
J.12
36 35.235 34 33 A7 32 31
G
F.4
F
E.4
E D.9
D.7
D
C.7
C
1.2
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB/RLF
NOTES:
01 AND 02
of 4322P.G./J.I.
LEVEL 0, AREA D, ZONE 5
PIPING PLAN
HOSPITAL / CLINIC
H-MP1.0FD5
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
AREA D, ZONE 5
C1
D3
D4
E2
A2 A3
B1 B2
D2
D5 D6
E1 E3
D1
SPECIFIC NOTES
NOT USED.
PIPE ANCHOR (TYPICAL)
SEE H-PL1.0FD5 FOR CONDENSATE DRAINAGE OF FAN COIL UNIT.
No. Description Date
1 CPR 098 06/17/2011
"ø
H
W H
R
H-FCU-0.1
10" HPS (90#) SHUTOFF VALVE
2" HPS (90#) BYPASS VALVE
10"Ø HPS (90#) UP
18"Ø CH/CHR UP
8"Ø HWH/HWHR UP
18"Ø CH/CHR, 12"Ø HPS (90#),
& 6"Ø PC TO PLANT. SEE
MS4.005 OF PACKAGE 1 FOR
CONTINUATION.
18" CH/CHR CROSS-CONNECT VALVES
H-FM-4
/2
C
/2
R
R
P S
P
1 1/2"ø CHR 1 1/2"ø CH
H-CP-1
4"Ø CONDENSATE
RECEIVER VENT UP
H-FCU-0.4
8"ø HWHR 8"ø HWH
4' - 0"
6' - 0" 7
PIPE RACK (TYP). REFER TO
MH3.505 SECTION 5.
HWH/HWHR EXPANSION LOOP.
REFER TO MH3.505 SECTION 5.
6' - 0"
4' - 0"
H -M
P .0
F D
H -M
P .0
F D
H -M
P .0
F D
H -M
P .0
F D
2"ø CHR
2"ø CH
H-TP-0.1
H-TP-0.2
H-CP-2
4"ø PC
H-TP-0.6
H-TP-0.4
H-TP-0.5
6"ø PC
3"ø PC 3"ø LPR
6"ø CH 6"ø CHR
6"ø CHR 6"ø CH
(2) 6"Ø CH/CHR UP
TO PUMP ROOM
6"Ø CH/CHR UP
(TO H-ACRCU-1)
6"Ø CHR UP
(TO H-ACRCU-2)
6"Ø CH UP
(TO H-BFT-1)
H-TP-0.3
2"ø LPR
2"ø LPR
(3) 2"Ø LPR UP
3"ø LPR
4"Ø CONDENSATE
RECEIVER VENT
2"Ø HPR UP
2"Ø LPR UP
(2) 1"Ø CH/CHR
DRAIN PIPING
HWH/HWHR PIPING
ANCHOR (TYPICAL)
Space
4C3337
Space
4C3338
Space
4C3339
W H
R
HWH/HWHR PIPE GUIDE (TYPICAL)
20' - 0" 20' - 0" (MIN) 20' - 0" (MIN)
2627282930
8.1
C
D
E
F
G
D.9
30.2
D.7
F.4
E.4
C.7
7.7
B.7
26.427.727.5
E.5
8.1
8.1
C C
D D
E E
F F
G G
D.9 D.9
30.2
30.2
D.7 D.7
F.4 F.4
E.4 E.4
C.7 C.7
7.7
7.7
B.7 B.7
26.4
26.4
27.7
27.7
30.5
30.5
F.3 F.3
F.1 F.1
27.5
27.5
E.5 E.5
33.18
33.18
H.348 H.348
D.9 D.9 E E
F F
G G
D D
C C
30.2
30.2
8.1
8.1
C C
D D
E E
F F
G G
D.9 D.9
30.2
30.2
D.7 D.7
F.4 F.4
E.4 E.4
C.7 C.7
7.7
7.7
B.7 B.7
26.4
26.4
27.7
27.7
30.5
30.5
F.3 F.3
F.1 F.1
27.5
27.5
E.5 E.5
J.14 J.14
J.12
J.12
30.230 29 28 27.727.5 27 26.4 26
G
F.4
F
E.5
E.4
E D.9
D.7
D
C.7
C
B.7
7.78.1
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB/RLF
NOTES:
01 AND 02
of 4322P.G./J.I.
LEVEL 0, AREA D, ZONE 6
PIPING PLAN
HOSPITAL / CLINIC
H-MP1.0FD6
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
D2
D5 D6
E1 E3
D1
AREA D, ZONE 6
GENERAL NOTES
1. PITCH STEAM AND CONDENSATE DOWNWARD 1 INCH PER 40 FEET.
SPECIFIC NOTES
6"Ø CH/CHR CONTINUED ON H-MP4.001.
NOT USED.
PIPE ANCHOR (TYPICAL)
SEE H-PL1.0FD6 FOR CONDENSATE DRAINAGE OF FAN COIL UNITS.
No. Description Date
1 CPR 051 04/07/2011
2 CPR 098 06/17/2011
File details come from the government source that posted it. Updated .