RFI 59 Mechanical Drawing.pdf
PDF 1 MB Posted
- Solicitation number
- 36C77626R0035
About this file
These are architectural plumbing plans for a new hospital/clinic facility located in Orlando, Florida, prepared by RLF Architects/Engineers. The documents consist of multiple plumbing system drawings for different areas and zones of Level 1 of the hospital, including detailed floor plans showing the routing and specifications for water supply, waste, vent, gas, and drainage systems throughout the building.
The drawings illustrate comprehensive plumbing infrastructure including domestic water lines (hot and cold water in various sizes from 1/2" to 3/4"), sanitary and storm drainage systems (ranging from 3" to 15" diameter), gas lines (2.5" to supply meter), specialized medical gas systems, and fixture details. Key systems documented include secondary roof drainage, decontamination tank vents, backflow prevention, water meter installation, and multiple floor drains and cleanout locations marked throughout the facility. The plans reference numerous fixture locations across clinical areas (exam rooms, treatment areas, patient toilets, staff facilities), diagnostic departments (radiology, cardiology, laboratory), and support spaces (kitchens, laundry, storage), with each area identified by room number. Revision notes indicate multiple drawing updates between April 2011 and December 2012 (CPR dates 051-361), and the building is noted as fully sprinklered with professional seals indicating architecture/engineering firm approval and Department of Veterans Affairs oversight.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOOR
C.O.
FLOOR C.O.
FLOOR C.O.
3" AW UP &
DN (28 FU)
3" AV UP & DN
4" VENT UP & DN
6" SAN UP & DN
6" SAN UP &
DN (141 FU)
4" VENT
UP & DN
P-528
P-528AP-528A
P-528
P-528
P-401
P-502
P-528A
P-528A
P-528A
P-528A
P-528A
P-401
P-401 P-401
P-528
P-528
P-401
P-401
P-202P-404
P-201
P-701
P-702
P-404
P-702
P-404
P-502
P-528
P-102
P-101 P-101
P-102
P-102 P-102
P-102
P-101
P-102
P-102
P-102
FLOOR C.O.
FLOOR
C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
3" SIDE OUTLET
AD TYPE A
P-102 P-528A
P-701
P-609
P-404
P-404
P-404
FLOOR
C.O.
2" W UP & DN
1 1/2" V UP
2" W UP & DN
FD-D
(TYP OF 3)
P-702
FLOOR C.O.
H-PL1.1FD5-A
H-PL1.1FD2-A
H -P
L
.1 F
D
-A
H -P
L
.1 F
D
-A
H -P
L
.1 F
D
-A
H -P
L
.1 F
D
-A
H-PL1.1FD5-A
H-PL1.1FD2-A
CLOSET
1C106
CLOSET
1C104
RAD/FLOURO
1M710
CONTROL
1M710a
1 1/2" V UP & DN
STAIR
1ES01
ELEVATOR
1EE02
ELEVATOR
1EE01
ELEVATOR
1FE02
ELEVATOR
1FE01
WAIT
1M702
BIO MED OFFICE
1M204
WAITING
1G404
OFFICE (PVA)
1N404
OFFICE
(FDVA/STATE)
1N203
RECEP(FDVA/STATE)
1N201
OFFICE
1H202
OFFICE
1H204
PASSAGE
1HC02
CHIEF
NON-INVASIVE
1F203
VEST
1F201
OFFICE
(FDVA/STATE)
1N204
OFFICE (DAV)
1N403
OFFICE
1N405
PHYSICIAN
1F303
CHIEF OF
CARDIOLOGY
1M715
ECG CUBICLE
1F404
STRESS
LAB/ECHO
1F602
STRESS
LAB/ECHO
1F604
STORAGE
1F101
ECG: CUBICLE
1F408
ECG CUBICLE
1F406
TLT
1F403
ELEC
1N601a
CORRIDOR
1FC04
CHIEF
1G403
PACEMAKER/HOLTER
MONITOR ROOM
1F307
CORRIDOR
1FC05
HAC
1F401
CORRIDOR
1FC03
Space
2C558
ECG/ECHO
READING
1F601
ECHO ROOM
1F605
CORRIDOR
1FC06
STRESS LAB
1F607
STRETCHER
ALCOVE
1FC04a
ECG CUBICLE
1F104
CORRIDOR
1FC01
OFFICE
(FDVA/STATE)
1N206
PASSAGE
1NC02
OFFICE
(FAVA/STATE)
1N205
CORRIDOR
1NC04
OFFICE (PVA)
1N406
LOCKERS MALE
1G302a
COMM
1N601b
CANTEEN RETAIL
1N601
POLICE TRAINING
ROOM
1H206
HAC
1G305
EVIDENCE STOR
1H206a
TLT & SHWR
FEMALE
1G303b
VESTIBULE
1G303
TRAINING ROOM
1G408
LOCKERS
FEMALE
1G303a
STORAGE
1G410
OFFICE(COUNTY)
1G101b
OFFICE(COUNTY)
1G101a
CO-ORDINATOR
1G406
OFFICE/ADMIN(DAV)
1N401
TLT & SHWR
MALE
1G302b
VESTIBULE
1G302
ENTRY
1GC04
SECRETARY
1G402
SERVICE OFFICER
1G401
PHYSICIAN
1F301 CARDIAC NUC
IMAGING
1F309
DRESS
1M704
PACS OFFICE
1M406
ADPAC OFFICE
1M404
DRESS
1M714
RAD/FLOURO
1M148
CHEST RM
1M206
CONTROL
1M206a
TLT
1M304
TLT
1M302
CORRIDOR
1MC03
WORK
1F808a
STAFF TLT
1F402
ECG ROOM
1F106
RADIOLOGY
LOCKERS AND
TOILETS
1M303
PASSAGE
1MC04
CONFERENCE
1M718
COMM
1M403
EMPLOYEE
BIO-SAFETY
1M307
ELEC
1M307a
ELEVATOR
LOBBY
1F716
CORRIDOR
1FC07
Space
2C933
TECH WORK
1M210
SOILED HOLD
1M306
RF TLT
1M706
RF TLT
1M712
PATIENT REP
1F804
ELEC
1F802
SECRETARY
1M717
OFFICE (VFW)
1N202
OFFICE/RECEP(PVA)
1N402
CORRIDOR
1GC01
PATIENT REP
1F806
PATIENT
STORAGE
1F716a
ELEV LOBBY
1GC02
WAITING/LOUNGE
1G101
COFFEE SHOP
1F808
CORRIDOR
1HC09
CORRIDOR
1MC08
ELEVATOR
1FE03
CHIEF TECH
OFFICE
1M402
PUBLIC TLT
1F808b
3/4" FW
1/2" CW
1/2" HW
3/4" 3/4"
3/4" 1/2" HW
1/2" FW
1/2"
1/2"
1"
HW & CW UP
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
CW UP
CW & HW UP
FLOOR C.O.
WALL C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
P-528A
H-PL4.001
H-PL4.001
H-PL1.1FE2-A
H-PL1.1FD5-A
H-PL1.1FE2-A
H-PL1.1FD5-A
H -P
L
.1 F
D
H -P
L
.1 F
D
-A
H -P
L
.1 F
D
H -P
L
.1 F
D
-A
H -P
L
.1 F
E
-A
H -P
L
.1 F
E
P-811
1.2
C
D
E
F
G
D.9
35.2
D.7
F.4
E.4
C.7
32333435 A7
C.81
C.91
32.532.7
33.6
P-811
P-811
P-811 P-811
P-811
FD-C
FD-C
P-528
1 1/2"
2"FD-C WITH
FUNNEL
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
AREA D, ZONE 5
C1
D3
D4
E2
A2 A3
B1 B2
D2
D5 D6
E1 E3
D1
1. 1/2" SAN UP.
2. 1/2" HW FROM SINK TO DISHWASHER. 1 1/2" DRAIN
FROM DISHWASHER TO SINK TAILPIECE.
3. NOTE NOT USED.
4. REFER TO KITCHEN CONSULTANT HQ-F SERIES
DRAWINGS FOR DRAIN LOCATIONS.
5. 1/2" CW FROM TRAP PRIMER TO FD-C.
6. 1 1/2" VENT FROM BELOW CONNECTION TO VENT
FROM URINAL P-201.
7. 1 1/2" VENT FROM BELOW CONNECTION TO VENT
FROM WATER CLOSET P-101.
8. EXTEND 1 1/2" SANITARY DRAIN FROM RELOCATED
P-528 SINK AND CONNECT TO EXISTING 2" VERTICAL
SANITARY DRAIN THAT CONTINUES DOWN THRU FLOOR.
9. PROVIDE CW, HW, VENT AND DRAIN STUB OUT FOR
FUTURE P-528A IN-COUNTER SINK INSTALLATION.
10. 1-1/2" VENT UP IN WALL TO INTERSTITIAL SPACE.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
NOTES:
SHEET NOTES:
01 AND 02
4322Dwg. ofGO/PPG
ZONE 5 PLUMBING PLAN
BID ALTERNATE NO. 3
HOSPITAL/CLINIC LEVEL 1, AREA D,
H-PL1.1FD5-A
No. Description Date
1 CPR 078 05-12-11
2 CPR 128 08/04/11
3 CPR 160 10/14/11
4 CPR 236 03/09/12
5 CPR 272 04/30/12
UP
FLOOR
C.O.
GAS METER
BY OTHERS
(2889 MBH)
2 1/2" GAS
UP & DN
BACKFLOW
PREVENTER
HOSPITAL
WATER
METER
8" RW DN
(5184 S.F.)
8" SECONDARY
ROOF DRIANAGE.
24" ABOVE
FINISHED GRADE
(5184 S.F.)
C.O.
FLOOR
C.O.
2 1/2" GAS UP
TO METER
15" RW UP &
DN (52068 S.F.)
12" RW UP &
DN (23935 S.F.)
8" RW UP
(5184 S.F.)
6" CW UP
12" SRW UP
(23935 S.F.)
P-401
P-701
P-701
P-401
P-548 P-555
P-102
P-102
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR
C.O.
P-502
AISLE
1PC01
OFFICE
1H202
OFFICE
1H204
PASSAGE
1HC02
OFFICE
1H203
CLEANING EQUIP
1P606
MANIFOLD RM
1H307
MANIFOLD ROOM
1H309
CHIEF CANTEEN
1P106
ELEC
1V703
STOR
1H107b
PATH OFFICE
1H608
VIEWING
1H407
DIET TECHS
1PC01b
COMM
1V705
POLICE TRAINING
ROOM
1H206
CORRIDOR
1HC04
EVIDENCE STOR
1H206a
DETECTIVE
OFFICE
1H410
OFFICE
1H107c
BIO MED
ENGINEERING
REPAIR
1H107
PUMP ROOM
1H301
CHIEF FNS
1P107
NUTRITION
THERAPY
1P105
SANITARY
SUPPLY
1P602
SECRETARY/WAIT
1PC01a
PROGRAM
MANAGER
1P103
RETAIL STORAGE
1G304
CORRIDOR
1GC03
OFFICE
1H107a
TLT/SHWR
1H603
PASSAGE
1HC06
TLT/SHWR
1H605
Space
2C696
CLERICAL
1H201
ELEC
1H918
COMM
1H916
HAC
1G304a
CORRIDOR
1PC02
COORDINATION
CENTER
1PC01c
TRAY CART
1V701
AUTOPSY
1H601
COLD ROOM
1H407a
CORRIDOR
1HC01
CORRIDOR
1PC06
DISHWASH
1P601
ELEVATOR
1PE02
HAC
1P608
ELEV LOBBY
1PC06a
AISLE
1VC07
CART/CAN WASH
1P601a
EXTRACTOR
1V721
CLEAN DISH
STORAGE
1P601b
SANITARY
SUPPLY
1P601c
CORRIDOR
1HC09
CORRIDOR
1HC03
P-502
2"
H-PL4.003
H-PL1.1FD6
H-PL1.1FD3
H-PL1.1FE3
H-PL1.1FD6
H -P
L
.1 F
D
H -P
L
.1 F
D
H -P
L
.1 F
D
H -P
L
.1 F
D
H-PL1.1FD6
H-PL1.1FD3
H-PL1.1FE3
H-PL1.1FD6
FD-V
FD-V
6" WIDE TRENCH DRAIN
APPROXIMATELY 30'-0" LONG.
4" WIDE APRON ON BOTH
SIDES. APRON TO START 1'-0"
AWAY FROM HOSPITAL WALL.
FD-S
FD-C
2"
TO HEATING
WATER FILL
P-528G
FD-C
FD-S
FD-C
FD-S
FD-S
FD-S
FD-S
FD-S
FD-C
FD-S
3" V
FD-C
3" V
FD-C
FD-C
1-1/2" V
CO
1-1/2" V
FD-C
2" V UP
FD-F
FLOOR C.O.
P-806
MOUNT 1'-6" O.C. ABOVE
ASSOCIATED LEVEL.
P-806
MOUNT 1'-6" O.C. ABOVE
ASSOCIATED LEVEL.
3/4" CW UP
3/4" CW UP
1 1/2" V UP
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
2" W DN
FLOOR C.O.
FLOOR C.O.
2" W CAP 0'-8"
ABOVE FLOOR SLAB
FLOOR C.O.
6" RW DN
6" RW UP
(1825 SF)
RW
CO
3" RW DN 3" RW UP
(710 SF)
CO
FLOOR C.O.
FLOOR C.O.
FLOOR C.O.
2627282930
C
D
E
F
G
D.9
30.2
D.7
F.4
E.4
C.7
B.7
26.427.727.5
E.5
1/2"
1/2"
1/2"
1/2"
2" V DN THRU
FLOOR
3" FLUSHING
RIM FD (TYPE "J")
SEE DETAIL #8
ON DWG H-PL5.104
1" HW
1" CW
1/2" CW DOWN
THRU SLAB
FD-S
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
D2
D5 D6
E1 E3
D1
AREA D, ZONE 6
1. 3/4" HW, CW & 1-1/2" ISLAND VENT FOR AUTOPSY
TABLE. HW & CW SERVED FROM BELOW. STUB 2" W
12" AFF AND CAP. ISLAND VENT.
2. SEE FOOD SERVICE DRAWINGS FOR FIXTURE,
EQUIPTMENT OR DRAIN CALL OUT NUMBER.
3. NOT USED.
4. REFER TO KITCHEN CONSULTANT HQ-F SERIES
DRAWINGS FOR DRAIN LOCATIONS.
5. REFER TO KITCHEN CONSULTANT DRAWINGS FOR
WATER SUPPLY.
6. 1/2" CW UP & DN.
7. 1/2" CW FROM TRAP PRIMER TO FD.
8. CONNECT 1" HW AND 1" CW TO 1/2" HW AND 1/2" CW
PLUMBING FACTORY INSTALLED IN PEDESTAL OF
AUTOPSY TABLE. STUBB UP HARD COPPER PIPE FOR
HOT AND COLD WATER 6" MIN. ABOVE FINISHED
FLOOR. TERMINATE WITH SHUT-OFF VALVES FOR
FUTURE CONNECTION TO AUTOPSY TABLE. AND
COORDINATE WITH NEW EXHAUST DUCT BY HVAC.
9. CONNECT 1 1/2" COPPER SANITARY DRAIN FROM
AUTOPSY TABLE TO 2" SANITARY DRAIN WITH
P-TRAP. STUBB UP SANITARY DRAIN 6" ABOVE
FINISHED FLOOR AND PROVIDE ISLAND 2" VENT PER
IPC.
10. CONNECT 1/2" CW FOR AUTOPSY FLOOR DRAIN TO
1" CW IN WALL. PROVIDE MANUAL FLUSH VALVE AND
VACUUM BREAKER FOR FLUSHING RIM FD.
GENERAL NOTE:
A. REFER TO KITCHEN CONSULTANT DRAWINGS FOR
EQUIPMENT PIPING.
B. REFER TO CORRESPONDING INTERSTITIAL SPACE
PLUMBING PLAN FOR KITCHEN EQUIPMENT
PLUMBING CONNECTIONS.
C. COORDINATE CONNECTION, FINAL LOCATION,
SERVICE/PIPING REQUIRED WITH KITCHEN
EQUIPMENT PROVIDER AND KITCHEN CONSULTANT
CONSTRUCTION DOCUMENTS. PROVIDE ADAPTORS,
CONNECTORS, UNIONS, BACKFLOW PREVENTERS,
VACUUM BREAKERS AND ALL OTHER APPURTENANCES
TO PROVIDE A COMPLETE, OPERATING AND
FUNCTIONAL SYSTEM. WHERE PARTIAL GRATE,
FUNNEL DRAIN OR SIMILAR ACCESSORY IS REQUIRED,
COORDINATE DISCHARGE AND OPEN AREA TO
TERMINATE IN COMMON.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
NOTES:
SHEET NOTES:
01 AND 02
4322Dwg. ofGO/PPG
LEVEL 1, AREA D, ZONE 6
PLUMBING PLAN
HOSPITAL/CLINIC
H-PL1.1FD6
No. Description Date
1 CPR 060 04-18-11
2 CPR 078 05-12-11
3 CPR 160 10/14/11
4 CPR 195 12/16/11
5 CPR 220 02/06/12
6 CPR 230 02/23/12
7 CPR 293 06/08/12
8 CPR 361 12/07/12
C
M S
S
C
FLOOR
C.O.
6" SECONDARY ROOF
DRIANAGE. 24" ABOVE FINISHED
GRADE (4789 SF)
FLOOR
C.O.
8" SAN UP &
DN (624 FU)
4" VENT
UP & DN
10" RW UP &
DN (9705 S.F.)
6" SRW UP
(3390 SF)
P-560B
P-560B
P-560B
P-560B
P-560B
P-120
P-701
P-707
P-701 P-707
P-560B P-401
P-401 P-560B
P-560B
P-560B
P-560B
P-560B
P-560B
P-560B P-560B
P-560B
P-519
P-401
P-528
P-401
P-505 P-528
P-528A
P-560B
P-502
P-401
P-702
P-528E
P-528E
P-102
P-102
P-120
P-102
P-102
P-102
P-102
FLOOR C.O.
FLOOR C.O.
STAIR
1AS01
EQ. ALCOVE
1AC07b
DECON
1A702a
EQ. ALCOVE
1AC01b
EXAM/TREAT
1A705
EXAM/TREAT
1A707
EXAM/TREAT
1A709
EXAM/TREAT
1A711
EXAM/TREAT
1A713
EXAM/TREAT
1A715
PHYSICIAN
1F501
HAC
1A609
CHIEF
NON-INVASIVE
1F203
VEST
1F201
GYN EXAM/
TREAT
1A122
STAFF TLT
1A608
EXAM/TREAT
1A110
EXAM/TREAT
1A106
BIO-TERRORISM
STORE
1A701
SECLUSION RM
1A703
EQ. ALCOVE
1AC07a
EQ. ALCOVE
1AC01a
CORRIDOR
1AC01
PATIENT TLT
1A105
EXAM/TREAT
1A109a
EXAM/TREAT
1A109b
PATIENT TLT
1A115
PATIENT TLT
1A714
EXAM/TREAT
1A109d
EXAM/TREAT
1A109c
MEDS
1A409
O2 STOR
1A411
NOURISH
1A413
STAFF
LKRS/LOUNGE
1A610
SHOWER
1A702b
LIFE SUPPORT
UNIT
1A112
CLEAN SUPPLY
1A408
ON-CALL ROOM
1A607
PHYSICIAN
1F503
GYN EXAM/
TREAT
1A120
CONFERENCE
1A610a
SOILED UTILITY
1A412
COMMUNICATION
STATION
1A109
CORRIDOR
1AC06
EXAM/TREAT
1A116
PATIENT TLT
1A704
CORRIDOR
1AC04
NURSE
1F202
COMPUTER
EQUIPMENT
1E201
CORRIDOR
1EC07
MONITORED BEDS
1A104
MONITORED BEDS
1A108
CORRIDOR
1AC07
CORRIDOR
1AC02
COMMUNICATION
STATION
1A103
ELEC
1A702d
VESTIBULE
1A702
EXAM/TREAT
1A101
EXAM/TREAT
1A102
PLUMB CLOS
1A733
STORAGE
1A731
COMM
1A702c
ENT
EXAM/TREATMENT
1A118
BATHROOM
1A607a
3" SHOWER
DRAIN
3" SHOWER
DRAIN
FD-Y TO
DECONTAMINATION
TANK
3" V UP & DN
FD-C
ROUTE 1" CONDENSATE
TO FLOOR DRAIN
MAINTAIN 2" AIR GAP
2" W UP & DN
3" W UP
& DN
3" DECONTAMINATION TANK VENT
UP TO 2ND FLOOR ROOF.
TERMINATE AT 2ND FLOOR ROOF.
FLOOR
C.O.
FLOOR
C.O.
H-PL1.1FE1
H-PL1.1FD4
H-PL1.1FE1
H-PL1.1FD4
H -P
L
.1 F
E
H -P
L
.1 F
E
H -P
L
.1 F
E
H -P
L
.1 F
E
MANHOLE COVER FOR
DECONTAMINATION TANK
FD-V
FD-V
FD-V
FD-Y TO
STORM
FD-Y TO
DECONTAMINATION
TANK
FD-Y TO
DECONTAMINATION
TANK
FD-Y TO
DECONTAMINATION
TANK
FD-Y TO
DECONTAMINATION
TANK
FD-Y TO
DECONTAMINATION
TANK
FD-Y TO
STORM
FD-Y TO
STORM
FD-Y TO
STORM
3"
3"
3"
3"
3"
3"
3"
3"
3"
RW
RW
R W
S R
W
SRW
RW
P-806
MOUNT 1'-6" O.C. ABOVE
ASSOCIATED LEVEL.
P-806
MOUNT 1'-6" O.C. ABOVE
ASSOCIATED LEVEL.
3/4" CW UP
3/4" CW UP
3" SECONDARY ROOF DRIANAGE. 24"
ABOVE FINISHED GRADE (1297 SF)
3" RW UP & DN (1297 S.F.)
3" RW DN
(1399 SF)
3" UP TO RD-1
3" UP TO RD-2
3" UP TO RD-1
3" UP TO RD-2
3" RD DN
FLOOR
C.O.
FLOOR C.O.
FLOOR
C.O.
FLOOR C.O.
WALL C.O.
P-401
P-401
3" SRW UP
(1399 SF)
6" RW UP
(3390 SF)
(4) P-805
MOUNT 4'-0"A.F.F.
P-811
3738394041
8.2 7.2
6.2
5.2
4.2
3.2
2.2
C.2
A.2
D.2
B.2
B.4
A
C
B
2.0
40.6 39.4
7.8
6.8
5.8
4.8
3.8
2.8
C.4
C.8
A.10
C.85
A.01
40.5
37.2
D.3
5.0
39.7
P-811
P-811
P-811
10" SECONDARY ROOF DRAINAGE.
TERMINATE 24" ABOVE FINISHED
GRADE (18616 SF)
T.E. (-2.5")
T.E. (-2.5")
TOP ELEVATION (T.E.)
FLUSH WITH SLAB
T.E. (-2.5")
T.E. (-2.5")
HIGH LEVEL
ALARM FOR
DECONTAMINATION
TANK
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
AREA E, ZONE 1
D2
D5 D6
E1 E3
D1
1. 1/2" CW UP.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
NOTES:
SHEET NOTES:
01 AND 02
4322Dwg. ofGO/PPG
LEVEL 1, AREA E, ZONE 1
PLUMBING PLAN
HOSPITAL/CLINIC
H-PL1.1FE1
No. Description Date
1 CPR 051 04-07-11
2 CPR 066 04-28-11
3 CPR 078 05-12-11
4 CPR 128 08/04/11
5 CPR 269 04/13/12
6 CPR 323 08/16/12
7 CPR 356 11/16/12