SnS Transmittal Addendum 2.pdf
PDF 32 KB Posted
- Solicitation number
- 36C77624B0016
About this file
This document is an Addendum #2 for the VA Project No. 675-100 Expand Primary Care at Lake Nona (East). The addendum provides revisions to several drawings, including structural, architectural, and framing details. It also includes revisions to two specification sections - Section 11 73 00 Ceiling Mounted Patient Lift System and Section 09 22 16 Non-Structural Metal Framing.
The key changes are the inclusion of a sole source manufacturer for the ceiling-mounted patient lift system and clarification of the architectural and structural details for the penthouse structural and metal stud framing. The addendum also clarifies that the general contractor will purchase and install the patient lift systems. This addendum is being issued in support of the federal contract opportunity Solicitation Number 36C77624B0016 for the Expand Primary Care Minor Construction at Lake Nona (East) project, which is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract to be awarded by the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
strollo & strollo
July 22, 2024
RE: ADDENDUM #2
VA PROJECT NO. 675-100
EXPAND PRIMARY CARE AT LAKE NONA (EAST)
1. TRANSMITTAL: JULY 22, 2024
2. REVISED DRAWINGS IN PDF AND AUTOCAD FORMATS:
a. S-405 WITH REVISION DELTA 2 DATED 07-15-2024
b. S-501 WITH REVISION DELTA 2 DATED 07-15-2024
c. A-108 WITH REVISION DELTA 2 DATED 07-22-2024
d. A-109 WITH REVISION DELTA 2 DATED 07-22-2024
e. A-200 WITH REVISION DELTA 2 DATED 07-22-2024
f. A-202 WITH REVISION DELTA 2 DATED 07-22-2024
g. A-621 WITH REVISION DELTA 2 DATED 07-22-2024
3. REVISED SPECIFICATIONS IN WORD AND PDF FORMATS:
a. SECTION 11 73 00 – CEILING MOUNTED PATIENT LIFT SYSTEM
b. SECTION 09 22 16 – NON-STRUCTURAL METAL FRAMING
RATIONALE FOR ADDENDUM #2:
1. Inclusion of sole source manufacturer of Ceiling Mounted Patient Lift System in specification Section 11 73 00, to coincide with hospital-wide replacement units. Also clarified that the GC will purchase and install patient lift systems.
2. Provide consistent and clarified architectural and structural details of Penthouse structural and metal stud framing for the new and re-used exterior wall paneling and louvers, spec section 09 22 16 NON-STRUCTURAL METAL FRAMING.
END OF ADDENDUM #2.
Sincerely, Ken Strong, Architect kstrong@strolloarchitects.com
Strollo & Strollo
718 Virginia Drive
Orlando, FL 32803
Telephone (407) 423-5355
(Architects of Record for this Project) mailto:kstrong@strolloarchitects.com
File details come from the government source that posted it. Updated .