Site Visit Instructions.pdf

PDF 3 MB Posted

Attached to
Y1DB--675-100 Expand Primary Care Minor Construction at Lake Nona (East)
Solicitation number
36C77624B0016
Issued by

About this file

This document contains site visit instructions for Project 675-100: Expand Primary Care at Lake Nona (East), a minor construction project at the Orlando VA Medical Center. The site visit is scheduled for June 11, 2024 at 2:00 PM (ET) at the Orlando VA Medical Center, with participants meeting at the south employee/contractor entrance and designated parking in the west or east parking garages. Attendees will proceed to Conference Room 5 in Building 1 (Clinic Building), Fourth Floor.

The related federal contract opportunity is Solicitation Number 36C77624B0016 for Project 675-100 Expand Primary Care Minor Construction at Lake Nona (East). This is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with the contractor required to provide all tools, equipment, materials, labor, and supervision to complete the construction project in accordance with the attached specifications and drawings. The project location is the Orlando VA Medical Center Lake Nona Campus.

View the file

Other files

File Type Posted
36C77624B0016 0007.pdf PDF
36C77624B0016 0006.pdf PDF
36C77624B0016 0005.pdf PDF
Bid opening info.pdf PDF
Construction Wage Rates - Orange 7-12-2024.pdf PDF
09 22 16 Non-Struct Met Frames 100Pct FINAL.pdf PDF
A-621 Precast Section Details-A-621.pdf PDF
A-200 3rd Flr Pln - RCP-A-200.pdf PDF
SnS Transmittal Addendum 2.pdf PDF
A-202 4th Flr Pln - RCP-A-202.pdf PDF
SnS Transmittal Addendum 1.pdf PDF
A-400 Bldg Sec-A-400.pdf PDF
S-501.pdf PDF
A-402 Bldg Sec-A-402.pdf PDF
RFI Responses SOLICITATION 36C77624B0016 Project 675-100.pdf PDF
36C77624B0016 0004.pdf PDF
Pre-Cast Architectural Concrete-Area B Shop Dwgs.pdf PDF
A-109 5th Flr Pln - Dim-A-109.pdf PDF
AD-104 5th Flr Pln - Demo-AD-104.pdf PDF
11 73 00 Ceiling Mtd Patient Lift 100Pct FINAL - REV ADD 2.pdf PDF
S-405.pdf PDF
Additional Lay- Down Area Requirements.pdf PDF
A-108 5th Flr Pln - Arch-A-108.pdf PDF
36C77624B0016 0003.pdf PDF
Lake Nona PC Volume 01 Set - Sealed - 2022-01-11.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
Lake Nona PC Volume 02 Set - Sealed - 2022-01-11.pdf PDF
36C77624B0016 0002.pdf PDF
Addendum 5-21-04 REV 6-04-24.pdf PDF
08 00 01 Blast Requirements- Ammendment to IFB.pdf PDF
Supplement to General Requirements Spec - R2 6-6-24.pdf PDF
36C77624B0016 0001.pdf PDF
Revised sheets 2024-05-28.pdf PDF
Specifications Vol Set 01- 5-23-24.pdf PDF
Construction Wage Rates - Orange 5-10-2024.pdf PDF
IFB 36C77624B0016.pdf PDF
Revised sheets 2024-05-21.pdf PDF
Supplement to General Requirements Spec - R1 4-16-24.pdf PDF
Drawings PC Volume 02 Set - Sealed - 2022-01-11 reduced.pdf PDF
Addendum 2 place holder.pdf PDF
Brand Name Justification - Lake Nona Primary Care.pdf PDF
VAAR 852.219-75 Limitations on Subcontracting.docx DOCX document
Addendum 1 5-21-24.pdf PDF
Specifications Vol Set 02- 3-5-24.pdf PDF
Drawings PC Volume 01 Set - Sealed - 2022-01-11 reduced.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 675-100: Expand Primary Care at Lake Nona (East)– Site Visit

An organized site visit has been scheduled for:

Tuesday – June 11, 2024 at 2:00 PM (ET)

Participants will meet at:

Orlando VA Medical Center

13800 Veterans Way

Orlando, FL 32827

The current entrance is:

The South Employee/Contractor Entrance shall be used to enter the facility. Designated parking shall be used in the west or east parking garages on levels 2 or above.

All attendees shall report to:

Conference Room 5 in Building 1 (Clinic Building), Fourth Floor. Use Entrances from parking garages to reach main elevator lobby.

If further direction is needed, please call Engineering at 407-583-9124.

VHAORLRiqueD Oval

VHAORLRiqueD Oval

VHAORLRiqueD Line

VHAORLRiqueD Line

VHAORLRiqueD Text Box East Parking Garage

VHAORLRiqueD Text Box Employee/Contractor Entrance

VHAORLRiqueD Oval

VHAORLRiqueD Text Box Main Lobby Elevators

VHAORLRiqueD Line

VHAORLRiqueD Oval

VHAORLRiqueD Text Box Conference Room 5 on 4th floor

VHAORLRiqueD Line

VHAORLRiqueD Text Box West Parking Garage

VHAORLRiqueD Line

VHAORLRiqueD Oval

Pencil

H-AE2.101

1H-AE3.101

H-AE3.103

H-AE3.103

FUTURE

EXPANSION

1st Floor

Elevator Lobby

East Parking Garage-

PARKING GARAGE

Park on Lvl 2 or above West Parking Garage- Parking on Level

PARKING GARAGE

2 and above ONLY

H-AE2.101

H-AE2.102

H-AE3.101

H-AE3.103

H-AE3.103

FUTURE VERTICAL

EXPANSION

FUTURE

VERTICAL

EXPANSION

FUTURE VERTICAL

EXPANSION

H-AE3.102

West Parking Garage- Parking

PARKING GARAGE

on Level 2 and above ONLY East Parking Garage-

PARKING GARAGE

Park on Lvl 2 or above

Elevator Lobby

Floors 2-4

VHAORLRiqueD Inserted Text

DN

UP

DN

UP

UP

UP

UP

UP

1 H R

1 HRFS

2 HRFS

2 HRFS

AUDITORIUM

4F301A

PANTRY

4F903

CONTROLS

4F301B

STORAGE

4F917

STORAGE

4F301C

TLT

4F909

TLT

4F911

VEST

4F301

INSTR STORAGE

4F812

TLT

4F923

TLT

4F921

PAT ED CLASSROOM

4F106

PAT ED CLASSROOM

4F116

STORAGE

4G110C

SIMULATION LAB

4G110B

SIMULATION LAB

4G110A

OFFICE

4H213D OFFICE

4H811

COPIER/SUPPLY

4H213G

CAC SHARED OFC

4H817

OFFICE

4H809

OFFICE

4H805

OFFICE

4H801

DEO

4H201

STU/TRAINEE

4H816

OFFICE

4H813

OFFICE

4H803

SECRETARY

4H203A

OFFICE

4H213E

OFFICE

4H807

OFFICE

4H815

OFFICE

4H213F

OFFICE

4H213B

TRAINEE LCKR/LOUNGE

4H217

OFFICE

4H213C

TLT

4H215

SECURE FILE STOR

4H213A

CORR

4HC01

CORR

4HC08A

CORR

4HC08

STAFF LOUNGE

4G908

OPEN OFFICE

4H213

RECEPTION / WAIT

4H203

SIMULATION LAB

4G110D

SIMULATION LAB

4G110

1 HRFS

1 H

RF

S

1 HRFS

1 H

RF

S

1HRFS

1 HRFS

1 HRFS1 HRFS 1 HRFS

1 H

RF

S

DA1

DA2DA3

AB

AC

AE

AH

PE3

PE2

PE4

AJ

AG

H-LS1.4FA

H-LS1.4FB

H-LS1.4FC

H-LS1.4FA

OPEN TO LEVEL1 BELOW

4EE02C

ELEV CP 2

4EE04C

ELEV CP 4

4EE06C

ELEV CP 6

4EE01C

ELEV CP 1

4EE03C

ELEV CP 3

4EE05C

ELEV CP 5

KC04

ORR

4KC06

CORR

ROOF BELOW

ROOF BELOW

ROOF AT LEVEL 3 BELOW

4E111

LOBBY

FEC

FEC

FEC FEC FEC FEC

FEC

FEC

AD

AE.3

AE.57

1 HRFS D15.2

D14.4

2 HRFS

4KC09

CORR

4ES01

STAIR 4AST3

4EC01

CORR

FHV

1 H

RF

S

1 H

RF

S

1 H

RF

S 1 H

RF

S

1 HRFS

1 HRFS

2 HRFS

A11.2

FEC

FEC

CONFERENCE

4F918

ELEC

4F112 ELEC

4G106

COMM

4F110

ELEC

4F916 ELEC

4G906

ELEC

4H901

HAC

4F901

STUDIO

4H214

PROP STOR

4H218

STUDIO

4H216

ARCHIVE STOR

4H214B

STORAGE

4G204

COLOR REPRO

4G206

AV EQUIP CHECK-OUT

4G208

CLIENT REVIEW

4G207

CHIEF, MEDIA

4G205

CONFERENCE

4F914

TLT

4G907

TLT

4G909

CONFERENCE

4F912 ELEV.LOBBY

4G902

CORR

4GC09

CORR

4FC03

CORR

4FC01

CORR

4FC09

CORR

4FC08

CORR

4HC02

WOMEN'S TOILETS

4E803

MEN'S TOILETS

4E801

ILLUSTRATION

4G202

CORR

4GC02

CONTROL

4H214A

STAIR 4BST1

4FS01

MECH SHAFT

STAIR 4BST4

4HS01

ELEV LOBBY

4GC07

ELEV BS 2

4HE01C

STAIR 4BST2

4HS02

SECRETARY

4G209

ELEV BS 1

4GE01D

IRMS CLASSROOM

4F102

CORR

4GC01

C P=

2"

TD= 138' - 10"

TD= 149' - 1"

TD= 161' - 9"

TD= 169' - 2"

TD= 156' - 9"

DOOR 33 0.2 165 145

STAIR 46 0.3 153 145 DOOR 33 0.2 165 145

STAIR 46 0.3 153 145

STAIR 70 0.3 233 200

H.E. 40 0.2 200 180

H.E. 68 0.2 340 310

DOOR 60 0.2 300 200

Elevator Lobby

Conference Room 55

VHAORLRiqueD Line

Line

File details come from the government source that posted it. Updated .