Site Visit Instructions.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77624B0016
About this file
This document contains site visit instructions for Project 675-100: Expand Primary Care at Lake Nona (East), a minor construction project at the Orlando VA Medical Center. The site visit is scheduled for June 11, 2024 at 2:00 PM (ET) at the Orlando VA Medical Center, with participants meeting at the south employee/contractor entrance and designated parking in the west or east parking garages. Attendees will proceed to Conference Room 5 in Building 1 (Clinic Building), Fourth Floor.
The related federal contract opportunity is Solicitation Number 36C77624B0016 for Project 675-100 Expand Primary Care Minor Construction at Lake Nona (East). This is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with the contractor required to provide all tools, equipment, materials, labor, and supervision to complete the construction project in accordance with the attached specifications and drawings. The project location is the Orlando VA Medical Center Lake Nona Campus.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project 675-100: Expand Primary Care at Lake Nona (East)– Site Visit
An organized site visit has been scheduled for:
Tuesday – June 11, 2024 at 2:00 PM (ET)
Participants will meet at:
Orlando VA Medical Center
13800 Veterans Way
Orlando, FL 32827
The current entrance is:
The South Employee/Contractor Entrance shall be used to enter the facility. Designated parking shall be used in the west or east parking garages on levels 2 or above.
All attendees shall report to:
Conference Room 5 in Building 1 (Clinic Building), Fourth Floor. Use Entrances from parking garages to reach main elevator lobby.
If further direction is needed, please call Engineering at 407-583-9124.
VHAORLRiqueD Oval
VHAORLRiqueD Oval
VHAORLRiqueD Line
VHAORLRiqueD Line
VHAORLRiqueD Text Box East Parking Garage
VHAORLRiqueD Text Box Employee/Contractor Entrance
VHAORLRiqueD Oval
VHAORLRiqueD Text Box Main Lobby Elevators
VHAORLRiqueD Line
VHAORLRiqueD Oval
VHAORLRiqueD Text Box Conference Room 5 on 4th floor
VHAORLRiqueD Line
VHAORLRiqueD Text Box West Parking Garage
VHAORLRiqueD Line
VHAORLRiqueD Oval
Pencil
H-AE2.101
1H-AE3.101
H-AE3.103
H-AE3.103
FUTURE
EXPANSION
1st Floor
Elevator Lobby
East Parking Garage-
PARKING GARAGE
Park on Lvl 2 or above West Parking Garage- Parking on Level
PARKING GARAGE
2 and above ONLY
H-AE2.101
H-AE2.102
H-AE3.101
H-AE3.103
H-AE3.103
FUTURE VERTICAL
EXPANSION
FUTURE
VERTICAL
EXPANSION
FUTURE VERTICAL
EXPANSION
H-AE3.102
West Parking Garage- Parking
PARKING GARAGE
on Level 2 and above ONLY East Parking Garage-
PARKING GARAGE
Park on Lvl 2 or above
Elevator Lobby
Floors 2-4
VHAORLRiqueD Inserted Text
DN
UP
DN
UP
UP
UP
UP
UP
1 H R
1 HRFS
2 HRFS
2 HRFS
AUDITORIUM
4F301A
PANTRY
4F903
CONTROLS
4F301B
STORAGE
4F917
STORAGE
4F301C
TLT
4F909
TLT
4F911
VEST
4F301
INSTR STORAGE
4F812
TLT
4F923
TLT
4F921
PAT ED CLASSROOM
4F106
PAT ED CLASSROOM
4F116
STORAGE
4G110C
SIMULATION LAB
4G110B
SIMULATION LAB
4G110A
OFFICE
4H213D OFFICE
4H811
COPIER/SUPPLY
4H213G
CAC SHARED OFC
4H817
OFFICE
4H809
OFFICE
4H805
OFFICE
4H801
DEO
4H201
STU/TRAINEE
4H816
OFFICE
4H813
OFFICE
4H803
SECRETARY
4H203A
OFFICE
4H213E
OFFICE
4H807
OFFICE
4H815
OFFICE
4H213F
OFFICE
4H213B
TRAINEE LCKR/LOUNGE
4H217
OFFICE
4H213C
TLT
4H215
SECURE FILE STOR
4H213A
CORR
4HC01
CORR
4HC08A
CORR
4HC08
STAFF LOUNGE
4G908
OPEN OFFICE
4H213
RECEPTION / WAIT
4H203
SIMULATION LAB
4G110D
SIMULATION LAB
4G110
1 HRFS
1 H
RF
S
1 HRFS
1 H
RF
S
1HRFS
1 HRFS
1 HRFS1 HRFS 1 HRFS
1 H
RF
S
DA1
DA2DA3
AB
AC
AE
AH
PE3
PE2
PE4
AJ
AG
H-LS1.4FA
H-LS1.4FB
H-LS1.4FC
H-LS1.4FA
OPEN TO LEVEL1 BELOW
4EE02C
ELEV CP 2
4EE04C
ELEV CP 4
4EE06C
ELEV CP 6
4EE01C
ELEV CP 1
4EE03C
ELEV CP 3
4EE05C
ELEV CP 5
KC04
ORR
4KC06
CORR
ROOF BELOW
ROOF BELOW
ROOF AT LEVEL 3 BELOW
4E111
LOBBY
FEC
FEC
FEC FEC FEC FEC
FEC
FEC
AD
AE.3
AE.57
1 HRFS D15.2
D14.4
2 HRFS
4KC09
CORR
4ES01
STAIR 4AST3
4EC01
CORR
FHV
1 H
RF
S
1 H
RF
S
1 H
RF
S 1 H
RF
S
1 HRFS
1 HRFS
2 HRFS
A11.2
FEC
FEC
CONFERENCE
4F918
ELEC
4F112 ELEC
4G106
COMM
4F110
ELEC
4F916 ELEC
4G906
ELEC
4H901
HAC
4F901
STUDIO
4H214
PROP STOR
4H218
STUDIO
4H216
ARCHIVE STOR
4H214B
STORAGE
4G204
COLOR REPRO
4G206
AV EQUIP CHECK-OUT
4G208
CLIENT REVIEW
4G207
CHIEF, MEDIA
4G205
CONFERENCE
4F914
TLT
4G907
TLT
4G909
CONFERENCE
4F912 ELEV.LOBBY
4G902
CORR
4GC09
CORR
4FC03
CORR
4FC01
CORR
4FC09
CORR
4FC08
CORR
4HC02
WOMEN'S TOILETS
4E803
MEN'S TOILETS
4E801
ILLUSTRATION
4G202
CORR
4GC02
CONTROL
4H214A
STAIR 4BST1
4FS01
MECH SHAFT
STAIR 4BST4
4HS01
ELEV LOBBY
4GC07
ELEV BS 2
4HE01C
STAIR 4BST2
4HS02
SECRETARY
4G209
ELEV BS 1
4GE01D
IRMS CLASSROOM
4F102
CORR
4GC01
C P=
2"
TD= 138' - 10"
TD= 149' - 1"
TD= 161' - 9"
TD= 169' - 2"
TD= 156' - 9"
DOOR 33 0.2 165 145
STAIR 46 0.3 153 145 DOOR 33 0.2 165 145
STAIR 46 0.3 153 145
STAIR 70 0.3 233 200
H.E. 40 0.2 200 180
H.E. 68 0.2 340 310
DOOR 60 0.2 300 200
Elevator Lobby
Conference Room 55
VHAORLRiqueD Line
Line
File details come from the government source that posted it. Updated .