S02_Specs - Volume 1 revised.pdf
PDF 5 MB Posted
- Solicitation number
- 36C26322R0065
About this file
This notice announces a forthcoming solicitation for construction services. The Department of Veterans Affairs, Nebraska-Western Iowa Health Care System is seeking bids to construct a new chiller plant adjacent to the existing boiler plant at the Omaha VA Medical Center campus. The project involves building a new facility to house two centrifugal chillers and relocate a temporary chiller, with the option to expand in the future. One existing metal storage shed will be removed. The estimated cost of construction is between $10-20 million. The solicitation number will be 36C26318B0065 and will be posted to FedBizOpps on February 8th, 2022. An organized site visit will be held prior to the request for proposal due date of March 8th, 2022. The construction period of performance is 550 calendar days from notice to proceed. This opportunity is set aside for service-disabled veteran-owned small businesses under Public Law 109-461.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26322R0065 0004.docx | DOCX document | |
| 36C26322R0065 0003.docx | DOCX document | |
| Addendum Plan SheetsPart-4.pdf | ||
| Addendum specs 040822.pdf | ||
| Addendum Plan SheetsPart-2.pdf | ||
| Addendum Plan SheetsPart-6.pdf | ||
| Addendum Plan SheetsPart-1.pdf | ||
| Addendum 040822.pdf | ||
| Addendum Plan SheetsPart-7.pdf | ||
| Addendum Plan SheetsPart-3.pdf | ||
| Addendum Plan SheetsPart-8.pdf | ||
| Addendum Plan SheetsPart-5.pdf | ||
| Geotechnical Report Terracon no 05215161R01.pdf | ||
| HMS VA Omaha 103119.pdf | ||
| S02_ATTACH - Specs - Volume 2 (1376 pages).pdf | ||
| Omaha VA Chiller photos.pdf | ||
| S02_ATTACH - Drawings (132 pages).pdf | ||
| 36C26322R0065 0002.docx | DOCX document | |
| 36C26322R0065 Final.docx | DOCX document | |
| Site Vist Sign In sheet.pdf | ||
| 36C26322R0065 0001.docx | DOCX document | |
| 36C26322R0065.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
Combined Energy Plant Phase 1 (Chiller Plant) Omaha VA Medical Center, Omaha, NE Project 636-18-304
Construction Bid Documents Specifications Vol. 1 30 November 2021
Prime Contractor: Health Facilities Solutions, 8718 Botts Ln., San Antonio, TX 78217
COMBINED ENERGY PLANT PHASE I (CHILLER PLANT)
PROJECT 636-18-304
OMAHA VA MEDICAL CENTER 11-30-21
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 10 Table of Contents 11-21 00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 01-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 13.13 Glovebag Asbestos Abatement 01-21
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18 05 31 00 Steel Decking 01-21 05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
OMAHA VA MEDICAL CENTER 11-30-21
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 00 Facility Exterior Closure Commissioning 01-21 07 11 13 Bituminous Dampproofing 01-21 07 18 13 Pedestrian Traffic Coatings 01-21 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 24 00 Exterior Insulation and Finish Systems 01-21 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21 07 56 00 Fluid-Applied Roofing 01-21 07 57 13 Sprayed Polyurethane Foam Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 33 00 Coiling Doors and Grilles 01-21 08 71 00 Door Hardware 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 21 13 Toilet Compartments 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17
DIVISION 21- FIRE SUPPRESSION
OMAHA VA MEDICAL CENTER 11-30-21
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 05 33 Heat Tracing for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 13 23 Sanitary Waste Interceptors 09-20 22 14 36 Packaged, Submersible, Drainage Pump Units 09-15 22 33 00 Electric Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 02-20
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 09-11 23 10 00 Facility Fuel Systems 04-20 23 21 13 Hydronic Piping 02-20 23 21 13.13 Underground Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 37 00 Air Outlets and Inlets 02-20 23 40 00 HVAC Air Cleaning Devices 03-20 23 65 00 Cooling Towers 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 82 16 Air Coils 03-20
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
OMAHA VA MEDICAL CENTER 11-30-21
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 01-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 11 16 Secondary Unit Substations 01-18 26 13 16 Medium-Voltage Fusible Interrupter Switches 01-17 26 22 00 Low-Voltage Transformers 01-18 26 23 00 Low-Voltage Switchgear 01-17 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 36 23 Automatic Transfer Switches 01-17 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 51 16 Public Address and Mass Notification Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
OMAHA VA MEDICAL CENTER 11-30-21
00 01 10-5
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 07-16 31 23 23.33 Flowable Fill 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 31 13 Chain Link Fences and Gates 06-18 32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 11-16 33 10 00 Water Utilities 03-17 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 12-17 33 51 00 Natural-Gas Distribution 10-11 33 63 00 Steam Energy Distribution 09-17
Marzieh Jafary Stamp
Department of Veterans Affairs – Omaha VA Medical Center Construct Combined Energy Plant Phase 1
Project #636-18-304 100% Construction Documents – 11-30-2021
STRUCTURAL SPECIFICATIONS
DIVISION / SECTION TITLE PAGE
DIVISION 3 CONCRETE
Section 03 30 53 Cast-In-Place Concrete 03 30 53 - 1 thru 03 30 53 - 13
DIVISION 5 STRUCTURAL STEEL
Section 05 12 00 Structural Steel Framing 05 12 00 - 1 thru 05 12 00 - 6 Section 05 31 00 Steel Decking 05 31 00 - 1 thru 05 31 00 - 6
STRUCTURAL ENGINEER
R-S-C-R, INC.
Consulting Engineers 1950 La Manda Blvd.
San Antonio, Texas 78201 P: (210) 340-7973 F: (210) 366-2324
TBPE Registration No. F-2181
CONSTRUCT COMBINED ENERGY PLANT PHASE 1
PROJECT #636-18-304
OMAHA VA MEDICAL CENTER 11-30-21
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWINGS
Drawings listed below accompanying this specification form part of the contract
Drawing No. Title
GENERAL
GI-000 Cover Sheet
GI-001 Index of Drawings
GI-002 General Information, Symbols, and Location Map
GI-003 Abbreviations
GI-004 Accessibility Standards
GI-005 Accessibility Standards
GI-006 Accessibility Standards
GI-007 Accessibility Standards
GI-008 Accessibility Standards
SITE SURVEY
VF-100 Site – Topographical Survey
CIVIL
C-100 General Notes, Symbols & Legend
CD-100 Site Plan – Overall Demolition
CD-110 Site Plan – Demolition Site Area 1
CD-111 Site Plan – Demolition Site Area 2
CD-120 Site Plan – Demolition Utilities Area 1
CD-121 Site Plan – Demolition Utilities Area 2
CG-110 Site Plan – Grading Area 1
CP-110 Site Plan – Dimensional Area 1
CS-310 Site Plan – Drainage Area 1
CS-400 Erosion Control – Overall
CS-410 Erosion Control – Area 1
CS-411 Erosion Control – Area 2
CS-412 Erosion Control – Area 3
CS-413 Erosion Control – Area 4
CU-110 Utilities – Area 1
CU-111 Utilities – Area 2
00 01 15 - 2
CU-112 Utilities – Area 3
CU-113 Utilities – Area 4
C-500 Utility Details - 1
C-501 Utility Details – 2
C-502 Utility Details – 3
C-503 Utility Details – 4
C-504 Utility Details – 5
C-505 Utility Details – 6
C-506 Utility Details – 7
STRUCTURAL
S-1.1 General Notes
S-1.2 Typical Details
S-2.1 Pier Plan, Foundation & Framing Plan, Relocated Chiller
Foundation, Framing Plan
S-2.2 Mezzanine, Roof, Roof Platform Framing Plans & Cooling
Tower Framing Plan & Cooling Tower Platform Railing Plan
S-3.1 Sections
S-3.2 Sections
S-3.3 Sections
S-3.4 Sections & Details
S-3.5 Sections & Details
S-4.1 Schedules & Details
ARCHITECTURAL
AI-000 Phasing Plan
AI-100 Life Safety Plans
AD-100 Existing Metal Building – Demolition
AS-100 Site Plan – New Building X
AS-200 Floor Plan – Existing Building Basement
AS-210 Floor Plan – Ground Level
AS-211 Floor Plan – Mezzanine Level
AS-220 Reflected Ceiling Plans
AS-230 Roof Plan
AS-310 Building Elevations
AS-400 Building Sections
00 01 15 - 3
AS-410 Wall Sections
AS-411 Wall Sections
AS-420 Stair Sections
AS-510 Interior Elevations
AS-600 Section Details
AS-601 Section Details
AS-610 Roof Details
AS-611 Roof Details
AS-650 Plan Details
AS-651 Plan Details
AS-652 Plan Details
AS-700 Schedules, Door Types, Frame Types, & Louvers
AS-710 Door Details
AS-711 Window & Louver Details
AS-720 Room Finish Schedule & Material Schedule
Fire Protection
0-FP-000 Fire Sprinkler General Notes & Symbol Key
0-FP-001 Fire Sprinkler Site Plan
XX-FP-101 Fire Sprinkler Plan
Plumbing
0-P-000 Plumbing Symbols & Abbreviations
XX-P-101 Plumbing Ground Floor Plan
XX-P-102 Plumbing Mezzanine Plan
XX-P-103 Plumbing Roof Plan
XX-P-401 Plumbing Enlarged Plans
XX-P-501 Plumbing Details
XX-P-502 Plumbing Details
XX-P-601 Plumbing Schedules
Mechanical
0-M-000 Mechanical Symbols & Abbreviations
0-M-001 Mechanical Phasing Plan
0-MSD001 Mechanical Site Demolition Plan
0-MS-001 Mechanical Site Plan
0-MS-002 Mechanical Site Plan – Enlarged
00 01 15 - 4
02-MPD-101 Mechanical Piping Demolition Plan – Partial Boiler Plant
02-MP-101 Mechanical Piping Design Plan – Partial Boiler Plant
17-MPD100 Mechanical Piping Demolition Plan – B17 Basement Mechanical
Room
17-MP-100 Mechanical Piping Design Plan – B17 Basement Mechanical
Room
XX-M-103 Mechanical Design Plan – Chiller Plan Roof
XX-MH-101 Mechanical HVAC Design Plan – Chiller Plant Ground Floor
XX-MH-102 Mechanical HVAC Design Plan – Chiller Plant Mezzanine
XX-MP-101 Mechanical Piping Design Plan – Chiller Plant Ground Floor
XX-MP-102 Mechanical Piping Design Plan – Chiller Plant Mezzanine
0-MD-201 Mechanical Flow Diagrams – Chilled Water Demo
0-M-201 Mechanical Flow Diagrams – Chilled Water Modifications
0-M-301 Mechanical Sections
0-M-401 Mechanical Enlarged Plan – Existing Chiller
0-M-501 Mechanical Details
0-M-502 Mechanical Details
0-M-503 Mechanical Details
0-M-504 Mechanical Details
0-M-601 Mechanical Schedules
0-M-602 Mechanical Schedules
0-M-701 Mechanical Controls
0-M-702 Mechanical Controls
0-M-703 Mechanical Controls
0-M-704 Mechanical Controls
Electrical
0-E-000 Electrical Legend
0-ESD101 Electrical Demolition Site Plan
0-ES-101 Electrical Site Plan
1/17-ED100 Main Hospital/Chiller Plant, Buildings 1/17 – Basement
Electrical Demolition Plan
XX-EL-101 New Chiller Plant, Building XX – First Floor Lighting Plan
XX-EP-101 New Chiller Plant, Building XX – First Floor Power Plan
XX-E-102 New Chiller Plant, Building XX – Roof Electrical Plan
XX-E-501 Electrical Details
XX-E-502 Electrical Details
00 01 15 - 5
XX-E-601 New Chiller Plant, Building XX – Electrical One-Line
Diagram
XX-E-602 New Chiller Plant, Building XX – Electrical Schedules
XX-E-603 New Chiller Plant, Building XX – Electrical Schedules
Technology
0-T-000 Technology Legend
0-TS-101 Technology Site Plan
XX-TN-101 New Chiller Plant, Building XX – First Floor Communications
Plan
XX-TY-101 New Chiller Plant, Building XX – First Floor Security Plan
XX-T-401 New Chiller Plant, Building XX – Enlarged Technology Floor
Plans and Elevations
XX-T-501 New Chiller Plant, Building XX – Technology Details
XX-T-601 New Chiller Plant, Building XX – Technology Riser Diagrams
Fire Alarm
XX-FA-000 Fire Alarm Legend
XX-FA-101 New Chiller Plant, Building XX – First Floor Fire Alarm
Plan
XX-FA-601 New Chiller Plant, Building XX – Fire Alarm Riser Diagram
- - - E N D - - -
00 01 15 - 6
This page intentionally left blank.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Section 01 35 26, SAFETY REQUIREMENTS for safety/infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition, removal of existing structures, furnish labor/materials, and perform work for Construct Combined Energy
Plant Phase 1 project as required by drawings and specifications.
B. Visits to site by Bidders may be made only by appointment with the Engineering Officer.
C. Offices of HFS Company, San Antonio, TX 78216, as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and not construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or the duly authorized representative.
D. Before placement/installation of work subject by testing laboratory retained by Department of Veterans Affairs, Contractor shall notify COR in sufficient time to enable testing laboratory personnel to be present at site in time for proper taking/testing of specimens and field inspection. Such prior notice shall be not less than 3-workdays unless otherwise designated by the COR.
E. All employees of Contractor and subcontractors shall comply with
VA security management program and obtain permission of VA police, be identified by project and employer, and restricted from unauthorized access.
F. Contractor Working Hours:
1. Normal working hours for this contract will be from 7:00 a.m.
to 4:30 p.m. (local time) Monday through Friday except for weekends and established Federal holidays.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -2
2. Performing on-site work outside normal working hours will require approval from Contacting Officer and COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government.
Approvals are subject to the availability of on-site staff.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID. Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. Defines both physical/administrative security procedures that will remain effective for the entire duration of the project.
2. Contractor is responsible assuring subcontractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. Contractor’s employees shall not enter project site without appropriate badge. They may also be subject to inspection of personal effects when entering or leaving the project site.
2. Before starting work the Contractor shall give 1-week notice to Contracting Officer so security escort arrangements can be provided. This notice is separate from notices required for utility shutdown described later in this section.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -3
3. No photography of VA premises is allowed without written permission of Contracting Officer. Patients/staff are not to be photographed at any time.
4. VA reserves the right to shut down the project site and order
General Contractor’s employees off the premises in the event of a national emergency. Contractor may return to site only with the written approval of Contracting Officer.
C. Key Control:
1. Contractor shall provide duplicate keys/lock combinations to
COR for the purpose of security inspections of every area of project including toolboxes/parked machines and take any emergency action.
2. Contractor shall install all permanent cores at completion of the work turn over all permanent lock cylinders to VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting work, Contractor/subcontractors shall submit an electronic security memorandum describing the approach to following goals/maintaining confidentiality of “sensitive information”.
2. Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers. Limit access to those who will need it for the project. Return the information to COR upon request.
4. Security documents shall not be removed/transmitted from the project site without written approval of Contracting Officer.
5. All paper waste or electronic media (CD’s and diskettes) shall be shredded/destroyed in a manner acceptable to the VA.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -4
6. Notify Contracting Officer and Site Security Officer when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
a) Security, access, and maintenance of project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. Limited number of (2 to 5) permits shall be issued for
Contractor and their employees for parking in designated areas only. Contractor to coordinate with VA Facility Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized/approved by the COR. Contractor shall hold/save the Government, officers, and agents free and harmless from liability of any nature occasioned by Contractor's performance.
B. Temporary buildings (storage sheds, shops, offices) and utilities may be erected by Contractor only with the COR’s approval and built with labor and materials furnished by Contractor without expense to the Government. Temporary buildings/utilities shall remain Contractor’s property and removed at Contractor’s expense upon completion of the work. With written consent of the COR, the buildings and utilities may be abandoned and need not be removed.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -5
C. Contractor shall, under regulations prescribed by the COR, use only established roadways or temporary roadways constructed by
Contractor when authorized by the COR. When materials are transported in the work, vehicles shall not be loaded beyond loading capacity recommended by manufacturer of the vehicle or prescribed by any Federal, State, or regulation. When necessary to cross curbs/sidewalks, Contractor shall protect them from damage. Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as shown on the drawings, as determined by COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment, and vehicles
G. Execute work to interfere as little as possible with normal functioning of Medical Center, including utility services, fire protection systems/existing equipment, and work being done by others. Use of equipment/tools that transmit vibrations and noises thru the building structure, are not permitted in occupied buildings, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials/equipment in other than assigned areas
2. Schedule delivery of materials/equipment to immediate construction working areas within buildings in use by VA in quantities sufficient for not more than 2-workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -6
H. Utilities Services: where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown/in absence of such indication, where directed by COR. All such actions shall be coordinated with COR or Utility Company:
1. Whenever required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the
Government and not the Contractor.
I. Phasing:
1. Medical Center must maintain its operation 24 hours/day 7 days/week. Therefore, any interruption in service must be scheduled/coordinated with COR to ensure no lapses in operation occur. It is Contractor’s responsibility to develop a work plan/schedule detailing, at a minimum, procedures to be employed, equipment/materials to be used, interim life safety measure to be used during the work, and a schedule defining duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify COR 2-weeks in advance of proposed starting date in each specific area of site, building or portion thereof.
Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center
Director, COR, and Contractor:
3. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust/debris, so equipment/affected areas to be used in the Medical Centers
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -7 operations will not be hindered. Contractor shall permit access to VA personnel and patients through other construction areas serving as access routes to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by VA so Medical Center operations will continue during the construction period.
4. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
J. Construction Fence: before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m
(7’) min. height, around construction area indicated on the drawings. Provide gates as required for access with necessary hardware. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at max. 375mm (15”). Bottom of fences shall extend to 25mm
(1”) above grade. Remove the fence when directed by COR.
K. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C
(40 degrees F), except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall arrange for pre-inspection of site with Fire Department or Company (VA or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
L. Utilities Services: maintain existing Medical Center utility services. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -8 services. Where necessary to cut existing water, steam, gases, sewer/air pipes, conduits, wires, cables, etc. of utility services or fire protection and communications systems (including telephone), they shall be cut and capped at suitable places where shown or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR, Chief Engineer and Chief of Facilities Management. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical
Center Director’s prior knowledge and written approval. Refer to Sections 26 05 11 REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS and 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC
SAFETY & SECURITY
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7-days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -9
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government (not the Contractor).
M. Abandoned Lines: all service lines such as wires, cables, conduits, ducts, pipes, and hangers/supports, shall be removed back to their source. Those noted to be abandoned but not required to be entirely removed, shall be sealed, capped, or plugged at the main, branch or panel they originate from. Lines shall not be capped in finished areas, but removed, sealed, capped, or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls/partitions completely behind the finished surfaces.
N. Minimize interference of construction activities with flow of
Medical Center traffic:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris, standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least 1-lane must be always open to traffic.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: before work started, Contractor shall make a thorough survey with COR and a representative of VA Supply Service of building areas in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both to COR. This report shall list by rooms and spaces:
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -10
1. Existing condition and types of resilient flooring, doors, windows, walls, and other surfaces not required to be altered throughout affected building areas.
2. Existence/conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc. required by drawings to be reused, relocated, or both.
3. Note any discrepancies between drawings/existing conditions.
4. Designate areas for working space, materials storage, and access routes to areas within buildings where alterations occur, and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be reused/relocated or both, found during survey to be nonexistent, or in opinion of COR and/or Supply Representative, in such condition their use is impossible/impractical, shall be furnished and/or replaced by
Contractor with new items per specifications which will be furnished by Government. Provided contract work is changed by reason of this subparagraph B, contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: 30-days before expected partial or final inspection date, Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls, and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures and form basis for determining extent of repair work required of Contractor to restore damage caused by
Contractor's workers in executing work of this contract.
D. Protection: provide the following protective measures:
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -11
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, handled materials and equipment moved and/or relocated.
3. Protect interior of existing structures from damage, dust, and weather inclemency. Wherever work performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings/structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of Government are identified by attached tags, noted on drawings or in specifications as items to be stored. Items that remain property of Government shall be removed/dislodged from present locations in a manner as to prevent damage detrimental to re-installation /reuse. Store such items when directed by COR.
2. Items not reserved shall become property of and removed by
Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms/spaces are vacated by VA during alteration period, such items not required by drawings and specifications to be relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. PCB Transformers and Capacitors: Contractor shall be responsible for disposal of Polychlorinated Biphenyl (PCB) transformers and capacitors taken out of service and handled per procedures of the EPA and DOT as outlined in Code of
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -12
Federal Regulation (CFR), Titled 40 and 49 respectively. EPA's
Toxic Substance Control Act (TSCA) Compliance Program Policy
Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, "originator" copy of
Uniform Hazardous Waste Manifest (EPA Form 8700-22), along with Uniform Hazardous Waste Manifest Continuation Sheet (EPA
Form 8700-22A) shall be returned to COR who will annotate contract file and transmit Manifest to Medical Center Chief.
a) Copies of the following CFR titles may be obtained from
Government Printing Office:
40 CFR 261 ......Identification & Listing of Hazardous Waste
40 CFR 262 ......Standards Applicable to Generators of
Hazardous Waste
40 CFR 263 ......Standards Applicable to Transporters of
Hazardous Waste
40 CFR 761 ......PCB Manufacturing, Processing, Distribution in Commerce, & use Prohibitions
49 CFR 172 ......Hazardous Material Tables & Hazardous
Material Communications Regulations
49 CFR 173 ......Shippers General Requirements for Shipments and Packaging
49 CRR 173 ......Subpart A General
49 CFR 173 ......Subpart B Preparation of Hazardous Material for Transportation
49 CFR 173 ......Subpart J Other Regulated Material;
Definitions and Preparation
TSCA ............Compliance Program Policy Nos. 6-PCB-6 and
6-PCB-7
1.9 PROTECTION EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, &
IMPROVEMENTS (FAR 52.236-9)
A. Contractor shall preserve/protect structures, equipment, and vegetation (trees, shrubs, and grass) on/adjacent to work site, not to be removed and do not interfere with the work required
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -13 under this contract. Contractor shall only remove trees when specifically authorized to do so and avoid damaging vegetation to remain in place. If any limbs/branches of trees are broken during contract performance, careless operation of equipment, or by workers, Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils, and environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. National Pollutant
Discharge Elimination System (NPDES) permit is required for this project. Contractor is considered an "operator" under the permit with extensive responsibility complying with permit requirements.
Apparent low bidder, Contractor and subcontractors shall furnish information and certifications required to comply with permit process and permit requirements. Many permit requirements will be satisfied by completing construction as shown/specified. Some requirements involve Contractor's method of operations and operations planning and Contractor is responsible for employing
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -14 best management practices. Affected activities often include, but not limited to:
1. Designating areas for equipment maintenance and repair
2. Providing waste receptacles at convenient locations & provide regular collection of wastes
3. Locating equipment wash down areas on site & provide appropriate control of wash-waters
4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials
5. Providing adequately maintained sanitary facilities
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as shown/specified, do not cut, alter, or remove any structural work. Do not disturb any ducts, plumbing, steam, gas, or electric work without approval of
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, roads, walks, etc.) disturbed or removed performing required new work, shall be patched, repaired, reinstalled/replaced, refinished, and left in as good condition as existed before commencing work.
C. At Contractor's expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -15 adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"
(FAR 52.236-2).
1.11 PHYSICAL DATA – SOIL CONDITIONS
A. Data and information furnished/referred to below is for the
Contractor's information. Government shall not be responsible for any interpretation of or conclusion drawn from data/information by the Contractor.
1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations
B. Subsurface conditions developed by core borings and test pits.
Logs of subsurface exploration are shown diagrammatically on drawings.
C. A copy of soil report will be made available for inspection by bidders upon request to Engineering Officer at VA Medical Center and considered part of the contract documents.
D. Government does not guarantee other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to VA, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A. Registered professional land surveyor/registered civil engineer whose services are retained and paid for by Contractor shall perform services specified herein and in other specification sections. Contractor shall certify the land surveyor/civil engineer is not a regular employee of Contractor and has no financial interest in this contract.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -16
1.13 LAYOUT OF WORK
A. Contractor shall lay out the work from Government established base lines and benchmarks indicated on the drawings and shall be responsible for all measurements in connection with the layout.
Contractor shall furnish, at Contractor's expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the COR. Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by
Contractor or thru Contractor's negligence before removal is authorized, the COR may replace them and deduct expense of the replacement from any amounts due or become due to Contractor.
B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, parking lots per lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish, and plainly mark
(thru use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities, and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -17 floor slabs, columns, walls, utilities, and other major controlling features) is placed.
D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall also furnish to COR certificates from a registered land surveyor/civil engineer that the following work is complete in every respect as required by contract drawings.
1. Lines of each building and/or addition.
2. Elevations of bottoms of footings and tops of floors of each building and/or addition.
3. Lines and elevations of sewers and of all outside distribution systems.
4. Lines of elevations of all swales and interment areas.
5. Lines and elevations of roads, streets, and parking lots.
E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
F. Upon completion of the work, Contractor shall furnish the COR one electronic copy and reproducible drawings at scale of contract drawings, showing finished grade on the grid developed for constructing the work, including burial monuments and 50’ stationing along new road centerlines. These drawings shall bear the seal of a registered land surveyor/civil engineer.
G. Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services"
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -18
1.14 AS-BUILT DRAWINGS
A. Contractor shall maintain 2-full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications, and clarifications.
B. All variations shall be shown in same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for COR review, as often as requested.
C. Contractor shall deliver 2 approved completed sets of as-built drawings in electronic version (scanned PDF) to COR, Chief
Engineer, and Chief of Facilities Management within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 WARRANTY MANAGEMENT
A. Develop a warranty management plan containing information relevant to FAR 52.246-21 Warranty of Construction in min. 30-days before planned pre-warranty conference, submit 4-sets of the warranty management plan. Include all required actions/documents to assure the Government receives all warranties to which it is entitled. Plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term
“status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period.
A joint 4-month and 9-month warranty inspection will be conducted, measured from time of acceptance, by Contactor and
Contracting Officer. Include in the plan, but not limited to:
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -19
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of Contractor, subcontractors, manufacturers, or suppliers involved.
2. Furnish with each warranty the name, address, and telephone number of each guarantor representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include 1-year overall warranty of construction with starting date of warranty of construction. Items with extended warranties must be noted with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and
Maintenance manuals.
k. Organizations, names, and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
OMAHA VA MEDICAL CENTER 11-30-21
01 00 00 -20
5. Plans for attendance at the 4-month and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance & Payment Bonds must remain effective throughout the construction period.
1. In the event Contractor fails to commence and diligently pursue any construction warranty work required, the COR will have the work performed by others, and after completion of the work,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .