HMS VA Omaha 103119.pdf

PDF 4 MB Posted

Attached to
Y1DZ--PN: 636-18-304, Construct Combined Energy Plant Phase 1 (OM)
Solicitation number
36C26322R0065
Issued by

About this file

This document provides details for a federal construction contract opportunity for the Department of Veterans Affairs. The project involves constructing a new chiller plant adjacent to the existing boiler plant at the Omaha VA Medical Center in Omaha, Nebraska. The chiller plant will house two centrifugal chillers and relocate a temporary chiller from the existing plant. It will also be constructed to be expandable for future campus growth. The estimated construction cost is between $10-20 million. Deductive bid alternates are included. The solicitation number for this opportunity is 36C26322R0065 and will be posted on February 8, 2022 to FedBizOpps. The request for proposal due date is March 8, 2022. The successful bidder must provide performance and payment bonds or an irrevocable letter of credit within 10 days of award. The period of performance is 550 calendar days from the notice to proceed date. This opportunity is set aside for service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
36C26322R0065 0004.docx DOCX document
36C26322R0065 0003.docx DOCX document
Addendum Plan SheetsPart-4.pdf PDF
Addendum specs 040822.pdf PDF
Addendum Plan SheetsPart-2.pdf PDF
Addendum Plan SheetsPart-6.pdf PDF
Addendum Plan SheetsPart-1.pdf PDF
Addendum 040822.pdf PDF
Addendum Plan SheetsPart-7.pdf PDF
Addendum Plan SheetsPart-3.pdf PDF
Addendum Plan SheetsPart-8.pdf PDF
Addendum Plan SheetsPart-5.pdf PDF
Geotechnical Report Terracon no 05215161R01.pdf PDF
S02_Specs - Volume 1 revised.pdf PDF
S02_ATTACH - Specs - Volume 2 (1376 pages).pdf PDF
Omaha VA Chiller photos.pdf PDF
S02_ATTACH - Drawings (132 pages).pdf PDF
36C26322R0065 0002.docx DOCX document
36C26322R0065 Final.docx DOCX document
Site Vist Sign In sheet.pdf PDF
36C26322R0065 0001.docx DOCX document
36C26322R0065.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hazardous Building Materials

Inspection Report

Omaha VA Medical Center A/E Design to Construct

Combined Energy Plant Phase I (Chiller Plant)

Omaha, Nebraska

VA Project No: 636-18-304

Prepared for HFS Company by:

DESERT CONCEPTS ENERGY & ENVIRONMENTAL, INC and AMI

Environmental Team

18102 Talavera Ridge, Suite 2416

San Antonio, TX 78257

October 22, 2019

HAZARDOUS BUILDING MATERIALS

INSPECTION REPORT

Omaha VA Medical Center

A/E Design to Construct Combined

Energy Plant Phase I (Chiller Plant)

VA Project No: 636-18-304

October 29, 2019

Prepared for:

Veterans Affairs Medical Center

Desert Concepts Energy & Environmental Inc.

18102 Talavera Ridge #2416

San Antonio, TX 78257

Prepared by:

AMI Environmental

8802 South 135th Street, Suite 100 Omaha, Nebraska 68138

AMIE # 19-00268

TABLE OF CONTENTS

1. SURVEY OVERVIEW

1.1. Purpose and Scope

1.1.1. Inspection Area

1.1.2. Limitations

1.2. Regulatory Reference

2. BUILDING INFORMATION

2.1. General Construction

2.2. Pre-Existing Information

3. INSPECTION METHODOLOGIES

3.1. Asbestos Inspection

3.1.1. Key Definitions

3.1.2. Homogenous Material Numbering Convention

3.1.3. Bulk Sampling

3.2. Lead-Based Paint Inspection

3.2.1. Key Definitions

3.2.2. Homogenous Paint Applications Numbering Convention

3.2.3. Paint Chip Sampling

4. SUMMARY OF INSPECTION FINDINGS

4.1. Asbestos Inspection Findings

4.2. Lead Paint Inspection Findings

5. RISKS AND HAZARDS

5.1. Asbestos

5.2. Lead-Based Paint

6. RECOMMENDATIONS

6.1. General Recommendations

6.1.1. Asbestos

6.1.2. Lead-Based Paint

6.2. Hazardous Conditions Recommendations

6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations

7. REGULATORY REQUIREMENTS

7.1. Asbestos-Containing Materials

7.1.1. Notification Requirements

7.1.2. Asbestos Removal Requirements

7.1.3. OSHA Regulation of <1 Percent Asbestos

7.1.4. Asbestos Removal Regulations

7.2. Lead-Based Paint

7.2.1. Disposal Requirements

7.2.2. Construction Requirements

APPENDIX A: Tables

APPENDIX B: Photo Logs

APPENDIX C: Schematics

APPENDIX D: Analytical Results

APPENDIX E: Inspectors Credentials

HAZARDOUS MATERIALS INSPECTION REPORT

Chiller Improvements

Veterans Affairs Medical Center

1. SURVEY OVERVIEW

On September 19, 2019, Chiller locations in Buildings 1, 2, and 17 at the Veterans Affairs Medical Center, Omaha, Nebraska, were inspected for asbestos-containing material (ACM) and lead-based paint (LBP) by a representative of AMI Environmental (AMIE) and Desert Concepts Energy and Environment, Inc.

The hazardous building materials inspection was conducted in preparation for a A/E Design to Construct

Combined Energy Plant Phase I (Chiller Plant)Project. The A/E Design to Construct Combined Energy

Plant Phase I (Chiller Plant) Project is hereinafter referred to as The Project. The inspection was initiated at the request of Mr. Darren Knight of Desert Concepts Energy and Environment Inc., on behalf of the

VA Medical Center.

The inspection was performed by Mr. Dustin Wessel, in accordance with regulatory requirements and generally accepted industry methods. Mr. Wessel was assisted by Mr. Knight. Copies of applicable requisite training certificates for Mr. Wessel are provided in Appendix E.

1.1. Purpose and Scope

The purpose and scope of the inspection was to identify and sample suspect ACMs, LBPs or other lead containing building materials present in the project area that may be impacted by The Project.

1.1.1. Inspection Area

The hazardous building materials inspection of the limited project area included all impacted materials for The Project. Mr. Darren Knight accompanied AMI during the inspection to identify the impacted piping and painted materials. The above described areas are hereinafter referred to collectively as the Inspection Area.

1.1.2. Limitations

Nondestructive sampling protocols prevented inspection and sampling of materials inside metal jacketed pipes, and within chillers. Pipes may have non-asbestos containing insulation covering asbestos containing insulation.

It is recommended that prior to or during construction that any new suspect materials discovered in the demolition process be tested or assumed as ACM.

Sampling of these materials may not be necessary if, in the case of suspect ACM, the materials are assumed to be ACM or if they are determined by a licensed asbestos inspector to be homogenous to other materials that were sampled.

Hazardous Building Materials Inspection Report AMI Project No. 19-00268

Omaha VA Medical Center October 29, 2019

Chiller Improvement Project

4101 Woolworth Ave. Omaha, NE Page of 10

1.2. Regulatory Reference

The asbestos inspection was conducted in accordance with USEPA National Emission Standard for

Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing building materials that may be impacted by planned renovation activities; applicable protocols established by the Asbestos Hazard Emergency Response Act

(AHERA) (ref.: 40 CFR 763). There is also no licensing requirement for lead paint sampling in non-

HUD facilities.

The State of Nebraska licenses asbestos inspectors to perform asbestos inspections in the State of

Nebraska.

2. BUILDING INFORMATION

2.1. General Construction

This project involves Chiller Improvements at the Omaha VA Health Care System.

2.2. Pre-Existing Information

Information on previous surveys or sampling for lead-based paint or asbestos sampling on piping impacted by the project was not provided.

3. INSPECTION METHODOLOGIES

3.1. Asbestos Inspection

The inspection and sampling were conducted in accordance with the USEPA National Emission

Standard for Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing. building materials that may be impacted by planned renovation. Additional aspects of the inspection methodology are discussed below.

3.1.1. Key Definitions

3.1.1.1. Homogenous Material

Homogenous materials are unique applications of building materials uniform in color and texture. The homogeneity of a material can be further defined by area(s) of application. Bulk sampling is conducted to determine the asbestos content of a homogenous material.

3.1.1.2. Asbestos-Containing Material (ACM)

The Environmental Protection Agency (EPA) and the Occupational Safety and Health

Administration (OSHA) define ACMs as any material that contains greater than one percent asbestos, as determined by visual area estimation (microscopic analysis). The

State of Nebraska follows the EPA standard. Some materials contain one percent or less asbestos. While these materials are not ACMs, by definition, they are still regulated by

OSHA, for worker exposure.

3.1.1.3. Friable/Non-Friable ACM

Friable ACMs are materials that contain more than one percent asbestos and, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure, thereby releasing fibers into the air more readily. In contrast, non-friable ACMs are ACMs that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Non-friable ACMs are grouped into two categories: Category I and Category

II.

3.1.1.4. Regulated Asbestos-Containing Materials (RACM)

Regulated Asbestos-Containing Materials (RACM) include friable ACMs and non-friable ACMs that, depending on their category, have become friable, have been subjected to specific forms of impact damage, have a high probability of becoming friable, and/or may become friable during removal.

3.1.2. Homogenous Material Numbering Convention

All suspect asbestos materials are assigned a unique homogeneous material number. AHERA identifies three basic material types: Surfacing Materials (SM), which include spray and trowel applied materials, such as fireproofing, ceiling texture, plaster, etc.; Thermal System Insulation

(TSI), which includes insulating materials applied to mechanical and plumbing components for temperature preservation and condensation prevention purposes; and Miscellaneous

Materials (MM), which includes all other materials, such as floor coverings and mastics, roofing materials, asbestos cement products, and many others. When a homogenous material has multiple layers, individual layers are identified and analyzed separately by laboratory analysis.

3.1.3. Bulk Sampling

Bulk sampling must be performed to determine whether suspect building material contains asbestos. Asbestos bulk sampling for the inspection was conducted in accordance with protocols established by the Asbestos Hazard Emergency Response Act (AHERA) (ref.: 40

CFR 763). Friability of the suspect asbestos-containing materials was determined by touching and/or sampling of the material.

3.1.3.1. Bulk Sample Numbering Convention

Bulk samples are given a sequence number when collected.

3.1.3.2. Polarized Light Microscopy Analysis (PLM)

Bulk samples collected during the inspection were submitted to an EPA accredited laboratory, EMSL Analytical, Inc. (EMSL), located at 200 Route 130 North, Cinnaminson, New Jersey. EMSL was instructed to perform Polarized Light

Microscopy (PLM) analysis, utilizing dispersion staining techniques (ref: EPA

Method 600/M4-82-020). PLM analysis is the least expensive and most commonly used visual estimate method. While PLM analysis is acceptable to EPA, OSHA, and most states for determining asbestos content, some states now require more sophisticated methods when analyzing certain types of materials.

A total of thirty (30) asbestos bulk samples were collected and submitted for laboratory analysis. PLM Analysis was performed on the 30 samples collected, including fourteen (14) additional distinct layers (e.g. mastic). Heterogeneous applications are individual layers of different materials contained within a single bulk sampled, each of which must be analyzed individually to determine its asbestos content (e.g. vinyl floor tiles and mastic; cove base and mastic; etc.). Table 1 lists all samples collected and analyzed in the current survey.

Some samples and/or heterogeneous applications may not have been analyzed by the lab if a positive result was obtained from a sample that is among a group of samples representing a suspect material. This process, known as stop on first positive, is followed because if a single sample is found to be positive, that material is determined to be ACM, thus making it unnecessary to analyze any additional samples in the sampling group.

Please refer to the Table 1– Asbestos Material Sampling Table in Appendix A for a complete listing of all materials sampled. The laboratory analytical reports may be found in Appendix D for the current inspection.

3.1.3.3. Quantification Method Analysis

EPA regulations allow materials determined to contain less than 10 percent asbestos utilizing a visual estimate quantification method, such as PLM analysis, to be treated as non-asbestos containing if the material is re-analyzed using one of two quantification methods and determined to contain one percent or less of asbestos. The two acceptable quantification methods are point count analysis and TEM Chatfield analysis.

Quantification methods are more time-consuming and more expensive analytical procedures that are occasionally used to more accurately determine the amount of asbestos in certain samples. Because of their higher cost and the acceptable accuracy of the less expensive visual estimation method, laboratories do not typically perform quantification analyses unless specifically requested.

The quantification method known as point count analysis is used for most ACM types, except floor tile. The organic matrix composition of floor tile precludes the use of point count analysis to more accurately determine asbestos amounts within a sample.

Therefore, TEM Chatfield analysis—which effectively removes all organic materials, leaving only asbestos behind—is necessary to provide a more precise percentage of asbestos content in floor tile.

Please refer to section 6.0 Recommendations, for recommendations concerning supplemental analysis.

3.2. Lead-Based Paint Inspection

The LBP inspection included visual identification of homogenous paint applications and paint chip sampling of the paint(s). While the U. S. Department of Housing and Urban Development (HUD) promulgates guidelines for LBP inspections in child occupied facilities, there are no formal guidelines for non-HUD regulated inspections. Thus, the LBP inspection was conducted in accordance with generally accepted industry standards and practices. Additional aspects of the inspection methodology are discussed below.

3.2.1. Key Definitions

3.2.1.1. Homogenous Paint Applications

Homogenous paint applications are significant paint applications that are visually distinct by their color and uniformity. Significant paint applications do not include incidental occurrences of paint such as isolated occurrences of accent trim, artistic paints, etc. While visual inspection alone cannot generally identify sub-layers of paint, these applications are often identified in the XRF analysis.

3.2.1.2. Lead-Based Paint (LBP)

Pursuant to Federal Register, Vol. 61, No. 169, LBP is defined as paint or other surface coatings equal to or greater than 0.5 percent lead by weight or equal to or greater than 1 mg/cm2.

3.2.2. Homogenous Paint Applications Numbering Convention

Homogenous paints and coatings are assigned a unique homogeneous material number (HM#).

The HM# is referenced throughout the report to uniquely identify each paint application.

3.2.3. Lead-based Paint and Lead Containing Materials Sampling

Sampling of suspected lead-based paint or other suspected lead containing materials was conducted using paint chip sampling for the paint applications and materials identified. A total of 6 paint chip samples were taken to determine the lead content of materials or painted surfaces.

4. SUMMARY OF INSPECTION FINDINGS

Key findings of the hazardous building materials inspection are summarized below. Please refer to the

Appendices for complete details of the inspection findings and supporting documentation.

4.1. Asbestos Inspection Findings

Below is a summary of the Asbestos Containing Material (ACM) findings of the asbestos inspection:

Building 1 – Basement Chiller Room (adjacent to Building 17)

• 8-inch Chilled Water Pipe Thermal System Insulation (TSI) – Sample 03 (6% Chrysotile)

• 12-inch Chilled Water Supply Pipe Thermal System Insulation (TSI) – Sample 08 (6%

Chrysotile)

• 4-inch Glycol Supply TSI – Sample 23 (6% Chrysotile)

• 8-inch Glycol Return TSI – Sample 24 (6% Chrysotile)

ACM Quantities – Estimated 75 fittings in this area contain ACM Wrap/Mastic as depicted in photos. Photo 24A shows close-up example of this ACM covering end runs, seams, and fittings of fiberglass insulation.

Building 1 – Upstairs in Basement Chiller Room (adjacent to Building 17)

• 4-inch Chilled Water Return Pipe Wrap – Sample 10 (2% Chrysotile)

• 4-inch Chilled Water Supply Pipe Wrap – Sample 11 (3% Chrysotile)

ACM Quantities – Estimated 12 fittings in this area contain ACM Wrap/Mastic as depicted in photos. Photo 10A shows close-up example of this ACM covering end runs, seams, and fittings of fiberglass insulation. This ACM is homogeneous with ACM described above in Chiller Room.

ACM Quantities – Estimated 13 fittings in Pipe Chase accessed from Upstairs Chiller Room.

ACM Wrap as depicted in Photo 11.

Building 2 – Tunnel Entrance

• 8-inch TSI Pipe Wrap Marked “A” – Sample 15 (30% Amosite/10% Chrysotile)

• 4-inch TSI Pipe Wrap Marked “A” – Sample 16 (40% Amosite/10% Chrysotile)

ACM Quantities - ACM sampled in tunnel entrance only (not quantified)

Building 1 – Tunnel Entrance

• 8-inch TSI Pipe Wrap Marked “A” – Sample 25 (40% Amosite/10% Chrysotile)

• 8-inch Pipe Fitting Marked “A” – Sample 26 (2% Chrysotile)

• 4-inch TSI Pipe Wrap Marked “A” – Sample 28 (15% Amosite/10% Chrysotile)

• 6-inch Pipe Mudded Fitting Marked “A” Domestic Water – Sample 29 (40% Chrysotile)

ACM Quantities - ACM sampled in tunnel entrance only (not quantified)

Please refer to Table 1 – Asbestos Sampling Table in Appendix A for a complete listing of all asbestos sampling.

4.2. Lead Paint Inspection Findings

Below is a summary of the findings of the lead-based paint inspection:

• None of the paint samples were found to be lead-based paint (LBP). All samples were found to be paint containing lead (See Section 6.1.2 for more information).

Please refer to Table 2 – Lead Paint Sampling Table in Appendix A for a complete listing of all lead-based paint sampling.

5. RISKS AND HAZARDS

5.1. Asbestos

To be a significant health concern, asbestos fibers must be inhaled. When asbestos fibers are inhaled, they become lodged in the lung tissue or alveoli. Here they clog and scar the tissues, causing the walls of the alveoli to lose their elasticity and useful function in respiration. Asbestosis (scarring of the lung), lung cancer, and Mesothelioma (cancer of the lining of the chest or lining of the abdominal wall) are diseases associated with asbestos exposure. Risks and hazards increase with increased exposure. ACM condition, proximity to building occupants, building use, and other factors can influence the potential for asbestos fibers to become airborne, and therefore increase exposure risks.

5.2. Lead-Based Paint

Inhalation and ingestion are the major routes of lead exposure. Once in the body, lead is distributed via the bloodstream to red blood cells, soft-tissue and bone. The kidneys and gastrointestinal (GI) tract eliminate lead in the body very slowly, while minute amounts are lost through perspiration.

Lead in the body can cause serious damage to the central and peripheral nervous system, the cardiovascular system, and the kidneys. Exposure to high concentrations of lead can cause retardation, convulsions, coma, and sometimes death. Children are especially vulnerable and susceptible to lead poisoning. Even low levels of exposure persisting during childhood are known to slow a child’s normal development and cause learning and behavioral problems. Exposure to lead can result from deteriorating surfaces and activities mechanically impacting lead surfaces. Preventing exposure requires proper work practices, monitoring, disposal and personal protective equipment during demolition, alteration and friction producing activities.

6. RECOMMENDATIONS

The purpose of this section is to interpret survey findings and provide preliminary recommendations that may be relevant and appropriate at this time. Because this document is a presentation of investigative findings, recommendations related to future construction activities are inherently general in nature. More specific determinations concerning hazardous building materials to be impacted by construction should be made during the abatement project design process.

6.1. General Recommendations

6.1.1. Asbestos

State and/or federal regulations require that ACMs be removed prior to demolition or renovation activities that will impact the ACMs. Depending on the specific renovation work to be performed, certain ACMs may not require removal if they will not be disturbed and do not pose a risk to building occupants or construction trade workers. However, to ensure worker safety and to eliminate future asbestos-related maintenance and management costs and risks, AMIE recommends removal of all identified ACMs in the areas to be renovated. While partial abatement may be technically possible, it is often impractical and not cost-effective.

ACMs not impacted by renovation or demolition activities should be inspected annually and maintained in good condition. ACMs deemed to be in less than good condition (damaged or significantly damaged) should be repaired or removed and replaced. Such repairs should be performed by qualified persons and in accordance with regulatory guidelines.

6.1.2. Lead-Based Paint and Lead Containing Materials

Facility owners are ultimately liable for their lead-containing hazardous waste from cradle to grave. EPA regulations provide two ways to determine whether a waste stream, such as demolition debris containing LBP, must be classified as hazardous waste. Waste generators can either test the waste using an approved testing method (Toxicity Characteristic Leaching

Procedure [TCLP]), or they can apply knowledge of the hazardous characteristic of the waste.

Based on the initial lead paint testing results, AMIE recommends TCLP testing be conducted on the existing building materials, painted and unpainted, prior to the start of renovation or demolition activity. In addition, trade contractors who work in the facility should also be notified of the presence of lead so that they can appropriately monitor and protect their workers against lead exposure.

Any lead-based painted building components not removed during renovation should be considered for inclusion in a facility management plan that maintains potential exposure below

OSHA action levels and ensures the material will be handled properly and in accordance with applicable regulations.

6.2. Hazardous Conditions Recommendations

No hazardous conditions, from hazardous materials, were observed in the building during the inspection.

6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations

AMIE does not recommend Point Count or TEM Chatfield analysis of any of the ACMs identified.

7. REGULATORY REQUIREMENTS

7.1. Asbestos-Containing Materials

The removal and disposal of ACMs is regulated at the federal, state, and, sometimes, local level. While some states have developed their own regulatory standards for the various asbestos disciplines, many states have adopted the federal standards but have established licensing requirements and enforcement authority at the state level.

7.1.1. Notification Requirements

EPA’s NESHAP regulation, 40 CFR, Subpart M, 61.145, Standard for Demolition and

Renovation, stipulates that an owner of a facility submit proper notification with either the

EPA’s regional office and/or the state and local regulatory agency of intention to demolish or renovate. Notifications must be received by the appropriate regulatory agencies 10 working days prior to commencement of asbestos stripping or removal, or other site work. If the demolition or renovation date changes, or the scope of work is increased, another notification is required.

7.1.2. Asbestos Removal Requirements

Asbestos removal must be performed by a licensed abatement contractor. The contractor should follow all work practices, worker protection, and disposal requirements set forth in the contract specifications and by the Occupational Safety and Health Administration (OSHA) and the EPA. Key federal regulations concerning asbestos include 29 CFR 1910.1001, 29 CFR

1926.1101, 40 CFR Part 61, Subpart M, and 40 CFR 763.

7.1.3. OSHA Regulation of ≤ 1 Percent Asbestos

While EPA and many states do not regulate materials containing one percent or less asbestos, OSHA regulates materials containing any amount of asbestos. (Ref. OSHA Construction

Industry Standard, 29 CFR 1926.1101(a)(3))

7.1.4. State of Nebraska Asbestos Removal Regulations

Asbestos Containing Building Material (ACBM) should only be removed by licensed and accredited contractors in the State of Nebraska.

7.2. Lead Waste

7.2.1. Disposal Requirements

The Resource Conservation and Recovery Act (RCRA) classifies lead-containing waste streams as hazardous materials if TCLP levels exceed five parts per million. If TCLP leachable lead levels exceed that threshold, EPA regulations (40 CFR 261) require the waste stream to be handled and disposed of as a hazardous waste. Waste streams containing less the five parts per million of leachable lead are classified as non-hazardous waste and can be disposed of in a construction and demolition landfill.

7.2.2. Construction Requirements

OSHA’s 29 CFR 1926.62 regulates worker exposure to lead during construction activities that include demolition or salvage of structures where lead or materials containing lead are present, as well as removal or encapsulation of lead-containing materials. The standard establishes maximum limits of exposure to lead, including a permissible exposure limit and action level, and should be adhered to during construction and demolition activities.

APPENDIX A

Tables

Table 1 – Asbestos Materials Sampling Table

Table 2 – Lead Paint Sampling Table www.amienvironmental.com

8802 South 135th Street, Suite 100 • Omaha, NE 68138

800.828.8487 • 402.397.5001 • 402.397.3313 (fax http://www.amienvironmental.com/

Table 1 – Asbestos Material Sampling Table

Homogeneous

Area

Sample

No.

Photo

No.

Description Color Material Location Asbestos Content

Estimated

Quantity Comments

1 01 1 Tank Wrap White Bldg. 1 Chiller Room

Adjacent to Bldg. 17

None Detected

2 02 2 Chilled Water Return

8” Pipe White

Bldg. 1 Chiller Room

3 03 3/3A 12-inch Pipe Wrap

Thermal System

Insulation (TSI)

White

Bldg. 1 Chiller Room

6% Chrysotile

4 04 4 Chilled Water Supply

4” Pipe Wrap White

Bldg. 1 Chiller Room

5 04A 4

4” Pipe TSI Yellow

Bldg. 1 Chiller Room

6 05 5 Chilled Hot Water

Fitting 4” Pipe Black

Bldg. 1 Chiller Room

7 06 6

12” Pipe TSI White

Bldg. 1 Chiller Room

8 07 7

12” Pipe Wrap

White/

Yellow

Bldg. 1 Chiller Room

9 07A 7

12” Pipe TSI Yellow

Bldg. 1 Chiller Room

7 08 8/8A

12” Pipe TSI

White/

Yellow

Bldg. 1 Chiller Room

10 09 9

1” Mudded Fitting

Wrap

White Bldg. 1 Chiller Room

11 09A 9

1” Mudded Fitting

TSI

Yellow Bldg. 1 Chiller Room

12 10 10/10A Chilled Water Return

4” Pipe Mastic White

Bldg. 1 Chiller Room

13 10A

10/10A Chilled Water Return

4” Pipe Wrap White

Upstairs in Basement

Chiller Room

Adjacent to Building 17

2% Chrysotile

Table 1. Asbestos Material Sampling Results Asbestos Containing Materials (ACM) = >1% Asbestos

Sample

No.

Photo

No.

Description Color Material Location Asbestos Content

Estimated

Quantity Comments

14 11 11/11A Chilled Water Return

4” Pipe Wrap White

Upstairs in Basement

Chiller Room

Adjacent to Building 17

3% Chrysotile

15 11A 11/11A Chilled Water Return

4” Pipe TSI

Yellow Bldg. 1 Chiller Room

Upstairs, room off stairs.

16 12 12

4” Pipe Wrap

White/

Silver

Bldg. 1 Chiller Room

Upstairs, room off stairs.

Adjacent to Bldg. 17

None Detected

Damaged

17 13BF 13BF Chilled Water Supply Black TRANE Temp Chiller None Detected

18 13A 13 Chilled Water Supply

Wrap White Building 2 Tunnel Entrance

Located on Left

Side of Tunnel

19 13B 13 Chilled Water Supply

TSI

Yellow

Building 2 Tunnel Entrance None Detected

20 14 14 6” Pipe Wrap

Marked “A”

Brown/

White Building 2 Tunnel Entrance

21 15 15

8” Pipe Wrap

Marked “A”

Gray/

White

Building 2 Tunnel Entrance 30% Amosite

10% Chrysotile

Located on

Right Side of

Tunnel

22 16 16

4” Pipe Wrap

Marked “A”

Gray/

White

Building 2 Tunnel Entrance 40% Amosite

10% Chrysotile

Located on

Right Side of

Tunnel

21 17 17

8” Pipe Wrap

Marked “A” Wrap

White Building 2 Tunnel Entrance None Detected

Located on

Right Side of

Tunnel

22 17A 17

8” Pipe Wrap

Marked “A” TSI White

Tunnel

23 18 18

1” Pipe Wrap – End

White

Tunnel

24 19 19

4” Pipe Wrap

Marked “A” White Building 2 Tunnel Entrance

Tunnel

25 20 20 Chilled Water Supply

Pipe Seam TSI White B024

Sample

No.

Photo

No.

Description Color Material Location Asbestos Content

Estimated

Quantity Comments

26 21 21 Chilled Water

8” Fitting TSI Yellow B024

27 21A 21 Chilled Water

8” Fitting Mastic White B024

28 22 22 Pink Firestop

Chilled Water Pipe Brown B024

29 23 23/23A Glycol Supply 4”

Pipe Wrap TSI White

Bldg. 1 Chiller Room

Adjacent to Bldg. 17 6% Chrysotile

30 24 24/24A Glycol Return 8”

Pipe Wrap TSI White

Bldg. 1 Chiller Room

Adjacent to Bldg. 17 6% Chrysotile

31 25 25 8” Pipe Wrap

Marked “A” White Building 1 Tunnel Entrance

40% Amosite

10% Chrysotile

32 26 26 8” Pipe Fitting

Marked “A” Wrap White

Building 1 Tunnel Entrance 2% Chrysotile

33 26A 26 8” Pipe Fitting

Marked “A” TSI Brown

Building 1 Tunnel Entrance None Detected

34 27 27 6” Pipe Wrap White/

Yellow

Building 1 Tunnel Entrance None Detected

35 28 28 4” Pipe Wrap

Marked “A”

Brown/

White

Building 1 Tunnel Entrance 15% Amosite

10% Chrysotile

36 29 29 6” Pipe Wrap

Marked “A” Gray

Building 1 Tunnel Entrance

Domestic Water

40% Chrysotile

37 30 30 6” Pipe Wrap Tan/

White

Building 1 Tunnel Entrance

GHS

38 30A 30 6” Pipe TSI

Yellow Building 1 Tunnel Entrance

GHS

Table 2 – Lead Sampling Table

Sample

No.

Photo

No.

Substrate Description Location Color Lead Content Condition

Estimated

Quantity

L-1 Metal Paint on A/C Plant “Absorber” Mech Rm Green <0.028 Fair

L-2 Metal Paint on A/C Plant Pipe Elbow Mech Rm Red <0.042 Fair

L-3 Metal Paint on A/C Unit B024 Gray <0.0080 Fair

L-4 Metal Paint on Condensate Water Return Pipe B024 White <0.019 Fair

L-5 Metal Paint on Pipe Cooling Tower 16 Blue 0.017 Poor

L-6 Metal Paint on Support Cooling Tower 16 Blue <0.0080 Poor

Table 2. Lead-Based Paint/Lead Material Content Lead-Based Paint = ≥ 0.5% by weight

APPENDIX B

Photo Logs

Asbestos Photo Log

Lead-Based Paint Photo Log www.amienvironmental.com

8802 South 135th Street, Suite 100 • Omaha, NE 68138

800.828.8487 • 402.397.5001 • 402.397.3313 (fax) http://www.amienvironmental.com/

Asbestos Photo Log

PHOTO 1

Chiller Room Building 1 (Adj. to 17) Chilled water

Tank wrap.

PHOTO 2

Chilled Water Return 8” – Chiller Room Bldg. 1

(Adj. to 17) a

PHOTO 3

Chiller Rm Bldg. 1. Chilled Water Fitting 8” fitting- Wrap ACM 6% Chrysotile. Insulation Non-

ACM

PHOTO 3A

Sample location detail of Photo 3 (Sample 03).

Wrap ACM 6% Chrysotile. Insulation Non-ACM

PHOTO 4

Chiller Rm Bldg. 1. Chilled Water Supply 4” Pipe

Seam.

PHOTO 5

Chiller Rm Bldg. 1. Chilled Hot Water 4” Pipe

Fitting.

PHOTO 6

Chiller Rm Bldg. 1- Chilled Water Supply 12” Pipe

Seam.

PHOTO 7

Chiller Rm Bldg. 1. Chilled Water Supply 4”

Yellow Seam

PHOTO 8

Chiller Rm Bldg. 1- Chilled Water Supply 12”

Pipe Seam- ACM 6% Chrysotile

PHOTO 8A

Chiller Rm Bldg. 1- Chilled Water Supply 12”

Pipe Seam- ACM 6% Chrysotile

PHOTO 9

Chiller Rm Bldg. 1. Chilled Water 1” Mudded

Fitting.

PHOTO 10

Chiller Rm Bldg. 1 Upstairs- Chilled Water Return

4” Pipe Wrap- 2% Chrysotile. Mastic Non-ACM

PHOTO 10A

Chiller Rm Bldg. 1 Upstairs- Chilled Water Return

4” Pipe Wrap- 2% Chrysotile. Mastic Non-ACM

PHOTO 11

Chiller Rm Bldg. 1 Upstairs (Rm off Stairs)-

Chilled Water Supply 4” Fitting Pipe Wrap – 3%

Chrysotile. Insulation Non-ACM

PHOTO 11A

Chiller Rm Bldg. 1 Upstairs (Rm off Stairs)-

Chilled Water Supply 4” Fitting Pipe Wrap – 3%

Chrysotile. Insulation Non-ACM

PHOTO 12

Chiller Rm Bldg 1 Upstairs (Rm off Stairs)-

CH/H.K. Supply 4” Pipe Wrap

PHOTO 13 BF

Trane Temp Chiller- Chilled Water Supply Black

Foam.

PHOTO 13

Building 2 Tunnel. 2” Wrap and fitting

PHOTO 14

Building 2 Tunnel. 6” Pipe Wrap “A” on pipe. PHOTO 15

Building 2 Tunnel 8” Pipe wrap and insulation.

30% Amosite. 10% Chrysotile

PHOTO 16

Building 2 Tunnel 4” Pipe wrap and insulation.

40% Amosite. 10% Chrysotile

PHOTO 17

Building 2 Tunnel 8” Pipe wrap and insulation

PHOTO 18

Building 2 Tunnel 1” Pipe wrap end. PHOTO 19

Building 2 Tunnel 4” pipe wrap and insulation

PHOTO 20

B024- Chilled Water Supply 8” pipe seam mastic and insulation

PHOTO 21

B024- Chilled Water 8’ Fitting- mastic and insulation.

PHOTO 22

B024- Pink wall penetration caulk. PHOTO 23

Chiller Rm Bldg. 1- Glycol Supply 4” pipe fitting.

PHOTO 23A

Chiller Rm Bldg. 1- Glycol Supply 4” pipe fitting.

PHOTO 24

Chiller Rm Bldg. 1- Glycol Supply 6” pipe fitting.

PHOTO 24A

Chiller Rm Bldg. 1- Glycol Supply 6” pipe fitting.

PHOTO 25

Building 1 Tunnel Entrance-8” Pipe Wrap Marked

“A”. ACM 40% Amosite 10% Chrysotile

PHOTO 26

Building 1 Tunnel- 8” Pipe Wrap Marked “A”.

Wrap ACM 2% Chrysotile. Insulation Non-ACM

PHOTO 27

Building 1 Tunnel- 6” pipe wrap.

PHOTO 28

Building 1 Tunnel- 4” Return Condensate wrap and insulation “A”. 15% Amosite. 10% Chrysotile

PHOTO 29

Building 1 Tunnel- Domestic water 6” pipe fitting.

40% Chrysotile.

PHOTO 30 Building 1 Tunnel- 6” pipe wrap and fiberglass.

Lead-Based Paint Photo Log

PHOTO 1

Green Paint on Absorber- Chiller Room Bldg. 1

Non-Lead-based Paint (LBP) (<0.028% Lead)

PHOTO 2

Red Pipe Elbow – Chiller Room Bldg. 1 (Adj. to

17) Non-LBP (<0.042% Lead)

PHOTO 3

Gray Paint on AC Unit-Room inside B024

Non-LBP (0.0080% Lead)

PHOTO 4

White on Iron Condenser Water return pipe- Room inside B024. Non-LBP (<0.019% Lead)

PHOTO 5

Gray/Blue paint on iron pipe – Cooling Tower 16.

Non-LBP (0.17% Lead)

PHOTO 6

Gray/Blue paint on iron support beam – Cooling

Tower 16.Non-LBP (<0.0080% Lead)

APPENDIX C

Schematics

Plot Plan of Veteran’s Affairs

Medical Center Omaha

AutoCAD SHX Text

42 ND STREET

AutoCAD SHX Text

CENTER STREET

AutoCAD SHX Text

41ST. STREET

AutoCAD SHX Text

40TH. STREET

AutoCAD SHX Text

AVENUE

AutoCAD SHX Text

PINE STREET

AutoCAD SHX Text

HICKORY STREET

AutoCAD SHX Text

WALNUT STREET

AutoCAD SHX Text

SHIRLEY STREET

AutoCAD SHX Text

EISENHOWER

AutoCAD SHX Text

DRIVE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 1

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 2

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 2

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WOOLWORTH

AutoCAD SHX Text

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 4

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 3

AutoCAD SHX Text utility

AutoCAD SHX Text tunnel

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PULLER DRIVE

AutoCAD SHX Text

NIMITZ DRIVE

AutoCAD SHX Text

WAESCHE DRIVE

AutoCAD SHX Text utility easement .85 acres

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 5

AutoCAD SHX Text licensed utility

AutoCAD SHX Text easement .02 acreas

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Plotplan.dwg 10-21-2010

AutoCAD SHX Text

SIGN (VA)

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text

LOT 9

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 7

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 8

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 10

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

39TH. STREET

AutoCAD SHX Text

38TH. STREET

AutoCAD SHX Text

CABLE

AutoCAD SHX Text

PARKING LOTS(TYP)

AutoCAD SHX Text 4-#4/0

AutoCAD SHX Text

WSTGHS GLASS REF

AutoCAD SHX Text

12" STORM DRAIN

AutoCAD SHX Text

CW

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text

6"FM

AutoCAD SHX Text

CCTV

AutoCAD SHX Text

30" DEEP

AutoCAD SHX Text 10"

AutoCAD SHX Text

BRIDGE

AutoCAD SHX Text

16" MAIN-HI-PRESSURE 10O PSI

AutoCAD SHX Text 4"%%c

AutoCAD SHX Text

4 #4RWG

AutoCAD SHX Text 2"C

AutoCAD SHX Text 1 1/4"%%c STM RET

AutoCAD SHX Text

1 1/4"%%C STM

AutoCAD SHX Text

DRAIN 6"

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text 4"%%C

AutoCAD SHX Text

2"WATER

AutoCAD SHX Text T

AutoCAD SHX Text G

AutoCAD SHX Text

FH#7

AutoCAD SHX Text G

AutoCAD SHX Text 6"

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text

FH#9

AutoCAD SHX Text

8"FM

AutoCAD SHX Text

FH8

AutoCAD SHX Text 3"%%C

AutoCAD SHX Text

CW

AutoCAD SHX Text

8"FM

AutoCAD SHX Text E

AutoCAD SHX Text

MH#7

AutoCAD SHX Text T@12"

AutoCAD SHX Text

15KV

AutoCAD SHX Text

TEL.

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

7-250 MCM

AutoCAD SHX Text G

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text 4"%%C

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text

FA

AutoCAD SHX Text 2"%%c GAS

AutoCAD SHX Text T

AutoCAD SHX Text

3#0 DIRECT BURIAL CABLE

AutoCAD SHX Text

1 #1 STRANDED GROUND WIRE

AutoCAD SHX Text G

AutoCAD SHX Text 3"%%C

AutoCAD SHX Text

3"%%C 480V TO 1ST

AutoCAD SHX Text

PULL BOX

AutoCAD SHX Text

10"FM

AutoCAD SHX Text G

AutoCAD SHX Text

12"X12"X8"PULL BOX

AutoCAD SHX Text 3"%%C

AutoCAD SHX Text G

AutoCAD SHX Text 3"%%C

AutoCAD SHX Text

12"%%C WATER MAIN

AutoCAD SHX Text

8"FM

AutoCAD SHX Text

480V ST. LTS.

AutoCAD SHX Text

CENTRAL

AutoCAD SHX Text

OXYGEN

AutoCAD SHX Text 12"

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text E

AutoCAD SHX Text

15KV

AutoCAD SHX Text

#6 DIRECT BURIAL CABLE

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text 15"

AutoCAD SHX Text

DOMESTIC CW

AutoCAD SHX Text

10"FM

AutoCAD SHX Text

15KV-E

AutoCAD SHX Text

SPLICE KIT

AutoCAD SHX Text

480V ST. LTS.

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

FH#6

AutoCAD SHX Text

FM

AutoCAD SHX Text

CIRCUIT #3

AutoCAD SHX Text 480V 1

AutoCAD SHX Text

AutoCAD SHX Text

#8 STRANDED GROUND WIRE

AutoCAD SHX Text

480V ST. LTS.

AutoCAD SHX Text

MERC. VAPOR LUM 480V

AutoCAD SHX Text

#6 DIRECT BURIAL CABLE

AutoCAD SHX Text

#8 STRANDED GROUND WIRE

AutoCAD SHX Text

480V ST. LTS.

AutoCAD SHX Text 480V 1"%%C

AutoCAD SHX Text

ROADWAY(TYP)

AutoCAD SHX Text

175W H39-22KC C/DX

AutoCAD SHX Text

MERC. VAPOR LULM 480V

AutoCAD SHX Text

1000W H34-12GW/DX

AutoCAD SHX Text

TIG-CLAE-3DA

AutoCAD SHX Text

480V ST. LTS.

AutoCAD SHX Text 480V

AutoCAD SHX Text

ST. LTS.

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

10"FM

AutoCAD SHX Text

MH#1

AutoCAD SHX Text

AutoCAD SHX Text A/C

AutoCAD SHX Text

FH#10

AutoCAD SHX Text

10" SEWER

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

6"FM

AutoCAD SHX Text

CHW 5'-0" DEEP

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

8"FM

AutoCAD SHX Text

2 WAY DUCT BANK

AutoCAD SHX Text

8"WM

AutoCAD SHX Text

6"WM

AutoCAD SHX Text S

AutoCAD SHX Text

12"VT SEWER

AutoCAD SHX Text 10"

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text 480V

AutoCAD SHX Text

ST.LTS.

AutoCAD SHX Text

FH#5

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

10"FM

AutoCAD SHX Text

2 1/2"%%C CW

AutoCAD SHX Text

2"%%C STM

AutoCAD SHX Text

1 1/2"%%C STM RET

AutoCAD SHX Text

4-#1 CABLE

AutoCAD SHX Text 6"

AutoCAD SHX Text

DR

AutoCAD SHX Text

TEL

AutoCAD SHX Text E

AutoCAD SHX Text 480V

AutoCAD SHX Text

ST.LTS

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text U

AutoCAD SHX Text

FH#4

AutoCAD SHX Text

MH#3

AutoCAD SHX Text

FH#2

AutoCAD SHX Text

MH#6

AutoCAD SHX Text

MH#5

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

MH#4

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 8"

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text 10"

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

TEL

AutoCAD SHX Text

ELEC

AutoCAD SHX Text #4/0

AutoCAD SHX Text

AutoCAD SHX Text

CABLE

AutoCAD SHX Text

10"FM

AutoCAD SHX Text

2 1/2"%%C CW

AutoCAD SHX Text

1 1/2"%%C STM RET

AutoCAD SHX Text 2"%%c STM

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

TEL

AutoCAD SHX Text 6"

AutoCAD SHX Text

CABLE

AutoCAD SHX Text

TEL

AutoCAD SHX Text

SPLICES

AutoCAD SHX Text

1 1/4"%%C STM RET

AutoCAD SHX Text

1 1/2" CW

AutoCAD SHX Text

1 1/4" STM

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text 10"

AutoCAD SHX Text 6"

AutoCAD SHX Text 8"

AutoCAD SHX Text 6"

AutoCAD SHX Text D

AutoCAD SHX Text

FH#1

AutoCAD SHX Text D

AutoCAD SHX Text

CIRCUIT #2

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

12" VT SEWER

AutoCAD SHX Text

V.A.SIGN

AutoCAD SHX Text

V.A.SIGN

AutoCAD SHX Text

480V.ST. LTS.

AutoCAD SHX Text

10"FM

AutoCAD SHX Text

10"FM

AutoCAD SHX Text 6"

AutoCAD SHX Text

MH

AutoCAD SHX Text

FH#3

AutoCAD SHX Text

MH#2

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text 6"

AutoCAD SHX Text T

AutoCAD SHX Text 6"

AutoCAD SHX Text T

AutoCAD SHX Text

%%UPLOT PLAN

AutoCAD SHX Text

AutoCAD SHX Text

TEL

AutoCAD SHX Text

TEL

AutoCAD SHX Text

TEL

AutoCAD SHX Text

AutoCAD SHX Text

7 FLAG POLE

AutoCAD SHX Text

13 UNDERGROUND TUNNEL

AutoCAD SHX Text

23 WEATHER SHELTER

AutoCAD SHX Text

21 OXYGEN STORAGE PAD

AutoCAD SHX Text

18 COOLING TOWER I.C.U.

AutoCAD SHX Text

17 AIR COND. BUILDING

AutoCAD SHX Text

15 RESEARCH ADDITION

AutoCAD SHX Text

14 EQUIPMENT STORAGE

AutoCAD SHX Text

10 OIL STORAGE TANKS

AutoCAD SHX Text

9 GARAGE AND LAUNDRY

AutoCAD SHX Text

8 DAY HOSPITAL CARE

AutoCAD SHX Text

16 COOLING TOWER CENTRAL AIR COND.

AutoCAD SHX Text

24 HIGH VOLTAGE SWITCHING STATION

AutoCAD SHX Text

22 T BUILDING

AutoCAD SHX Text

19 WELDING SHOP

AutoCAD SHX Text

12 STORAGE

AutoCAD SHX Text

11 STORAGE

AutoCAD SHX Text

SYMBOL TYPE ACREAGE

AutoCAD SHX Text

HELIPORT AREA

AutoCAD SHX Text

UTILITY EASEMENT

AutoCAD SHX Text

LICENSED UTILITY EASEMENT

AutoCAD SHX Text

BRIDGE REPLACEMENT EASEMENT

AutoCAD SHX Text

TOTAL MEDICAL FACILITY ACREAGE

AutoCAD SHX Text

LAND ACREAGE USAGE SCHEDULE

AutoCAD SHX Text

PARKING AREA AND ROADS

AutoCAD SHX Text

HOSPITAL AND ADMINISTRATION

AutoCAD SHX Text

PATIENT RECREATION

AutoCAD SHX Text 0.02

AutoCAD SHX Text 0.15

AutoCAD SHX Text 34.55

AutoCAD SHX Text 0.85

AutoCAD SHX Text 1.11

AutoCAD SHX Text 4.48

AutoCAD SHX Text 10.44

AutoCAD SHX Text 17.50

AutoCAD SHX Text

BUILDING SCHEDULE

AutoCAD SHX Text

3 ENGINEERING SERVICE

AutoCAD SHX Text

2 CENTRAL HEATING PLANT

AutoCAD SHX Text

1 MAIN HOSPITAL BUILDING

AutoCAD SHX Text

4 RESIDENT ENGINEER, UNION OFFICE

AutoCAD SHX Text

6 DENTAL

AutoCAD SHX Text

5 MENTAL HYGIENE

AutoCAD SHX Text

NO. BUILDING

AutoCAD SHX Text

25 OUTPATIENT CLINIC

AutoCAD SHX Text

MH

AutoCAD SHX Text

FA

AutoCAD SHX Text

TRASH

AutoCAD SHX Text

COMPACTOR

AutoCAD SHX Text

1 1/2" %%C OXYGEN

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text

MH#8

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

MH#11

AutoCAD SHX Text S

AutoCAD SHX Text 400W

AutoCAD SHX Text E

AutoCAD SHX Text

CAMERA

AutoCAD SHX Text

CAMERA

AutoCAD SHX Text

2#8, 1#8 GRD- 3/4" C

AutoCAD SHX Text

PL

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text

NATURAL GAS PIPING

AutoCAD SHX Text

NAT. GAS METER STA.

AutoCAD SHX Text G

AutoCAD SHX Text M

AutoCAD SHX Text

ELEC. STREET LIGHT MERC VAPOR

AutoCAD SHX Text

LUMINAIRE 480V

AutoCAD SHX Text

MAN HOLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

FIRE MAIN PIPE

AutoCAD SHX Text

TELEPHONE CABLE

AutoCAD SHX Text

TRANSFORMER ON CONC.PAD

AutoCAD SHX Text

ELECTRIC MANHOLE

AutoCAD SHX Text

SIAMESE FIRE HYDRANTS

AutoCAD SHX Text

CLOSED CIRCUIT TV CABLE

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

CCTV

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text

MH

AutoCAD SHX Text

FH

AutoCAD SHX Text

FM

AutoCAD SHX Text T

AutoCAD SHX Text

EXH

AutoCAD SHX Text E

AutoCAD SHX Text

TANK

AutoCAD SHX Text N

AutoCAD SHX Text

NEW LITES WITH OPC

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text

FA

AutoCAD SHX Text

FA

AutoCAD SHX Text

AutoCAD SHX Text

480V ST. LT.

AutoCAD SHX Text

12"X12"X8"PULL BOX

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text 1000W

AutoCAD SHX Text N

AutoCAD SHX Text

2 #8, 1 #8 GRD-3/4" C (TYP)

AutoCAD SHX Text

CAMERA

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text 1000W

AutoCAD SHX Text N

AutoCAD SHX Text 1000W

AutoCAD SHX Text N

AutoCAD SHX Text

MH#10

AutoCAD SHX Text E

AutoCAD SHX Text 1000W

AutoCAD SHX Text E

AutoCAD SHX Text

MH#9

AutoCAD SHX Text

CAMERA

AutoCAD SHX Text

MH

AutoCAD SHX Text

8" SAN

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

6" FOUNDATION

AutoCAD SHX Text

DRAIN

AutoCAD SHX Text

ABANDONED STORM SEWER

AutoCAD SHX Text

STORM

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

ABANDONED

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

21" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

MH

AutoCAD SHX Text

24" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

12" ST

AutoCAD SHX Text

12" ST

AutoCAD SHX Text

12" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

MH

AutoCAD SHX Text

27" ST

AutoCAD SHX Text

27" ST

AutoCAD SHX Text

27" ST

AutoCAD SHX Text

30" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

18" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

MH

AutoCAD SHX Text

30" ST

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

30" ST

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text 1" W

AutoCAD SHX Text 3" W

AutoCAD SHX Text

18" CWS

AutoCAD SHX Text

18" CWR

AutoCAD SHX Text

18" CWR

AutoCAD SHX Text

18" CWS

AutoCAD SHX Text 3" W

AutoCAD SHX Text 1" W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

ABANDON 12" ST

AutoCAD SHX Text

24" ST

AutoCAD SHX Text 1000W

AutoCAD SHX Text

24" ST

AutoCAD SHX Text

15" ST

AutoCAD SHX Text

ABANDON 15" ST

AutoCAD SHX Text

AUTOMATIC

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

VALVES

AutoCAD SHX Text

POWER SUPPLY TO GATE

AutoCAD SHX Text

26 SMOKE SHELTER

AutoCAD SHX Text

ACESS ROAD FOR HEAVY EQUIPMENT.

AutoCAD SHX Text

4' WIDE/EAST-WEST SHEET PILING 30 FEET DEEP LOCATED HERE

AutoCAD SHX Text

4" PVC QWEST FIBER OPTIC CONDUIT

AutoCAD SHX Text 36"deep

AutoCAD SHX Text 18feet deep

AutoCAD SHX Text 12 feet deep

AutoCAD SHX Text 8'6" deep

AutoCAD SHX Text 4"deep

AutoCAD SHX Text 48 fiber

AutoCAD SHX Text US West Fiber Manhole

AutoCAD SHX Text US West Copper

AutoCAD SHX Text Manhole

AutoCAD SHX Text 42" deep

AutoCAD SHX Text 8' deep

AutoCAD SHX Text 8' deep

AutoCAD SHX Text 8' deep

AutoCAD SHX Text 8'-4" deep

AutoCAD SHX Text 9' deep

AutoCAD SHX Text 7'-2"deep

AutoCAD SHX Text 6'6"deep

AutoCAD SHX Text 5'deep

AutoCAD SHX Text splice pit

AutoCAD SHX Text 42" deep

AutoCAD SHX Text 8' deep

AutoCAD SHX Text 8'deep

AutoCAD SHX Text 8'deep

AutoCAD SHX Text 8'deep

AutoCAD SHX Text 8'deep

AutoCAD SHX Text 6'deep

AutoCAD SHX Text 6'deep

AutoCAD SHX Text 6'deep

AutoCAD SHX Text 4'deep

AutoCAD SHX Text manhole

AutoCAD SHX Text 4"PVC conduit

AutoCAD SHX Text with 3 inner ducts

AutoCAD SHX Text with 3 innerducts

AutoCAD SHX Text approximate location of

AutoCAD SHX Text fiber optic bored conduit

AutoCAD SHX Text from University to VA

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text 2"%%c GAS

AutoCAD SHX Text 2"%%c GAS

AutoCAD SHX Text G

AutoCAD SHX Text

ABANDONED 2" GAS LINE

AutoCAD SHX Text

FROM MUD ON 42ND STREET

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text abandon

AutoCAD SHX Text 2"

AutoCAD SHX Text yellow

AutoCAD SHX Text plastic

AutoCAD SHX Text steel

AutoCAD SHX Text pipe north

AutoCAD SHX Text plastic

AutoCAD SHX Text pipe south

AutoCAD SHX Text B535A

AutoCAD SHX Text

COLD ROOM

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text B540A

AutoCAD SHX Text @18"

AutoCAD SHX Text @7"

AutoCAD SHX Text @21"

AutoCAD SHX Text

480V ST. LTS.

AutoCAD SHX Text

400W PER LIGHT BULB

AutoCAD SHX Text

HIGH PRESSURE SODIUM

AutoCAD SHX Text

12"X12"X8"PULL BOX

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

A WELLNESS FACILITY

AutoCAD SHX Text

B EMS/SAFETY/

AutoCAD SHX Text

C CONTRACTING/FINANCE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT 11

AutoCAD SHX Text

MV

AutoCAD SHX Text

MV

AutoCAD SHX Text

MV

AutoCAD SHX Text

COMMUNICATIONS PULL BOX

AutoCAD SHX Text

HIGH VOLTAGE PULL BOX

AutoCAD SHX Text

COMMUNICATIONS PULL BOX

AutoCAD SHX Text

COMM.

AutoCAD SHX Text

PULL BOX

AutoCAD SHX Text

COMM.

AutoCAD SHX Text

PULL BOX

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

MV

AutoCAD SHX Text

SAN

AutoCAD SHX Text

SAN

AutoCAD SHX Text

SAN

AutoCAD SHX Text

SAN

AutoCAD SHX Text

SAN

AutoCAD SHX Text

SAN

AutoCAD SHX Text

AutoCAD SHX Text

SAN

AutoCAD SHX Text

AutoCAD SHX Text

DCW

AutoCAD SHX Text

SAN

AutoCAD SHX Text

SANITARY STORM "Y" 15' DEEP

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

AMI ENVIRONMENTAL

AutoCAD SHX Text

8802 SOUTH 135TH STREET, SUITE 100

AutoCAD SHX Text

OMAHA, NEBRASKA, 68138

AutoCAD SHX Text

PH: (402) 397-3313

AutoCAD SHX Text A/E Design to Construct Combined Energy Plant Phase I (Chiller Plant)

AutoCAD SHX Text 8718 Botts Ln, San Antonio, TX 78217 Tel 210.881.9714 Fax 210.881.6808

AutoCAD SHX Text

HAZARDOUS MATERIALS ASSESMENT

AutoCAD SHX Text

HA-100

AutoCAD SHX Text

MET

AutoCAD SHX Text

WHC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Omaha

AutoCAD SHX Text 10/29/19

AutoCAD SHX Text

ONE

AutoCAD SHX Text 636-18-304

APPENDIX D

Analytical Results

Asbestos Analysis Laboratory Report

Lead Results

Lead Analysis Laboratory Report

Client Sample Description ConcentrationLab ID Analyzed Weight Lead

Collected

EMSL Analytical, Inc.

200 Route 130 North, Cinnaminson, NJ 08077 Phone/Fax: (856) 303-2500 / (856) 786-5974 http://www.EMSL.com cinnaminsonleadlab@emsl.com

Attn: Dustin Wessel AMI Group, Inc.

8802 South 135th Street Suite 100 Omaha, NE 68138-6511

Received: 09/23/19 10:20 AM

19-00268 / VA Omaha Chiller Piping

Fax: (402) 397-3313 Phone: (402) 397-5001

Project:

9/19/2019Collected:

Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*

201910091 CustomerID: AMI50 CustomerPO: 19-00268 ProjectID:

EMSL Order:

0.0709 Site: A/C Plant "Absorber"

201910091-0001L-1 <0.028 % wt9/23/2019 g9/19/2019

0.2614 Site: Room Inside B024

201910091-0003L-3 <0.0080 % wt9/23/2019 g9/19/2019

0.1066 Site: Condenser Water Return Pipe in Room Inside B024

201910091-0004L-4 <0.019 % wt9/23/2019 g9/19/2019

0.2583 Site: Cooling Tower 16

201910091-0005L-5 0.17 % wt9/23/2019 g9/19/2019

0.2514 Site: Cooling Tower 16

201910091-0006L-6 <0.0080 % wt9/23/2019 g9/19/2019

Phillip Worby, Lead Laboratory Manager or other approved signatory

Test Report ChmSnglePrm/nQC-7.32.3 Printed: 9/24/2019 12:06:08 PM

*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .