This document provides details for a federal construction contract opportunity for the Department of Veterans Affairs. The project involves constructing a new chiller plant adjacent to the existing boiler plant at the Omaha VA Medical Center in Omaha, Nebraska. The chiller plant will house two centrifugal chillers and relocate a temporary chiller from the existing plant. It will also be constructed to be expandable for future campus growth. The estimated construction cost is between $10-20 million. Deductive bid alternates are included. The solicitation number for this opportunity is 36C26322R0065 and will be posted on February 8, 2022 to FedBizOpps. The request for proposal due date is March 8, 2022. The successful bidder must provide performance and payment bonds or an irrevocable letter of credit within 10 days of award. The period of performance is 550 calendar days from the notice to proceed date. This opportunity is set aside for service-disabled veteran-owned small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26322R0065 0004.docx | DOCX document | |
| 36C26322R0065 0003.docx | DOCX document | |
| Addendum Plan SheetsPart-4.pdf | ||
| Addendum specs 040822.pdf | ||
| Addendum Plan SheetsPart-2.pdf | ||
| Addendum Plan SheetsPart-6.pdf | ||
| Addendum Plan SheetsPart-1.pdf | ||
| Addendum 040822.pdf | ||
| Addendum Plan SheetsPart-7.pdf | ||
| Addendum Plan SheetsPart-3.pdf | ||
| Addendum Plan SheetsPart-8.pdf | ||
| Addendum Plan SheetsPart-5.pdf | ||
| Geotechnical Report Terracon no 05215161R01.pdf | ||
| S02_Specs - Volume 1 revised.pdf | ||
| S02_ATTACH - Specs - Volume 2 (1376 pages).pdf | ||
| Omaha VA Chiller photos.pdf | ||
| S02_ATTACH - Drawings (132 pages).pdf | ||
| 36C26322R0065 0002.docx | DOCX document | |
| 36C26322R0065 Final.docx | DOCX document | |
| Site Vist Sign In sheet.pdf | ||
| 36C26322R0065 0001.docx | DOCX document | |
| 36C26322R0065.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hazardous Building Materials
Inspection Report
Omaha VA Medical Center A/E Design to Construct
Combined Energy Plant Phase I (Chiller Plant)
Omaha, Nebraska
VA Project No: 636-18-304
Prepared for HFS Company by:
DESERT CONCEPTS ENERGY & ENVIRONMENTAL, INC and AMI
Environmental Team
18102 Talavera Ridge, Suite 2416
San Antonio, TX 78257
October 22, 2019
HAZARDOUS BUILDING MATERIALS
INSPECTION REPORT
Omaha VA Medical Center
A/E Design to Construct Combined
Energy Plant Phase I (Chiller Plant)
VA Project No: 636-18-304
October 29, 2019
Prepared for:
Veterans Affairs Medical Center
Desert Concepts Energy & Environmental Inc.
18102 Talavera Ridge #2416
San Antonio, TX 78257
Prepared by:
AMI Environmental
8802 South 135th Street, Suite 100 Omaha, Nebraska 68138
AMIE # 19-00268
TABLE OF CONTENTS
1. SURVEY OVERVIEW
1.1. Purpose and Scope
1.1.1. Inspection Area
1.1.2. Limitations
1.2. Regulatory Reference
2. BUILDING INFORMATION
2.1. General Construction
2.2. Pre-Existing Information
3. INSPECTION METHODOLOGIES
3.1. Asbestos Inspection
3.1.1. Key Definitions
3.1.2. Homogenous Material Numbering Convention
3.1.3. Bulk Sampling
3.2. Lead-Based Paint Inspection
3.2.1. Key Definitions
3.2.2. Homogenous Paint Applications Numbering Convention
3.2.3. Paint Chip Sampling
4. SUMMARY OF INSPECTION FINDINGS
4.1. Asbestos Inspection Findings
4.2. Lead Paint Inspection Findings
5. RISKS AND HAZARDS
5.1. Asbestos
5.2. Lead-Based Paint
6. RECOMMENDATIONS
6.1. General Recommendations
6.1.1. Asbestos
6.1.2. Lead-Based Paint
6.2. Hazardous Conditions Recommendations
6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations
7. REGULATORY REQUIREMENTS
7.1. Asbestos-Containing Materials
7.1.1. Notification Requirements
7.1.2. Asbestos Removal Requirements
7.1.3. OSHA Regulation of <1 Percent Asbestos
7.1.4. Asbestos Removal Regulations
7.2. Lead-Based Paint
7.2.1. Disposal Requirements
7.2.2. Construction Requirements
APPENDIX A: Tables
APPENDIX B: Photo Logs
APPENDIX C: Schematics
APPENDIX D: Analytical Results
APPENDIX E: Inspectors Credentials
HAZARDOUS MATERIALS INSPECTION REPORT
Chiller Improvements
Veterans Affairs Medical Center
1. SURVEY OVERVIEW
On September 19, 2019, Chiller locations in Buildings 1, 2, and 17 at the Veterans Affairs Medical Center, Omaha, Nebraska, were inspected for asbestos-containing material (ACM) and lead-based paint (LBP) by a representative of AMI Environmental (AMIE) and Desert Concepts Energy and Environment, Inc.
The hazardous building materials inspection was conducted in preparation for a A/E Design to Construct
Combined Energy Plant Phase I (Chiller Plant)Project. The A/E Design to Construct Combined Energy
Plant Phase I (Chiller Plant) Project is hereinafter referred to as The Project. The inspection was initiated at the request of Mr. Darren Knight of Desert Concepts Energy and Environment Inc., on behalf of the
VA Medical Center.
The inspection was performed by Mr. Dustin Wessel, in accordance with regulatory requirements and generally accepted industry methods. Mr. Wessel was assisted by Mr. Knight. Copies of applicable requisite training certificates for Mr. Wessel are provided in Appendix E.
1.1. Purpose and Scope
The purpose and scope of the inspection was to identify and sample suspect ACMs, LBPs or other lead containing building materials present in the project area that may be impacted by The Project.
1.1.1. Inspection Area
The hazardous building materials inspection of the limited project area included all impacted materials for The Project. Mr. Darren Knight accompanied AMI during the inspection to identify the impacted piping and painted materials. The above described areas are hereinafter referred to collectively as the Inspection Area.
1.1.2. Limitations
Nondestructive sampling protocols prevented inspection and sampling of materials inside metal jacketed pipes, and within chillers. Pipes may have non-asbestos containing insulation covering asbestos containing insulation.
It is recommended that prior to or during construction that any new suspect materials discovered in the demolition process be tested or assumed as ACM.
Sampling of these materials may not be necessary if, in the case of suspect ACM, the materials are assumed to be ACM or if they are determined by a licensed asbestos inspector to be homogenous to other materials that were sampled.
Hazardous Building Materials Inspection Report AMI Project No. 19-00268
Omaha VA Medical Center October 29, 2019
Chiller Improvement Project
4101 Woolworth Ave. Omaha, NE Page of 10
1.2. Regulatory Reference
The asbestos inspection was conducted in accordance with USEPA National Emission Standard for
Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing building materials that may be impacted by planned renovation activities; applicable protocols established by the Asbestos Hazard Emergency Response Act
(AHERA) (ref.: 40 CFR 763). There is also no licensing requirement for lead paint sampling in non-
HUD facilities.
The State of Nebraska licenses asbestos inspectors to perform asbestos inspections in the State of
Nebraska.
2. BUILDING INFORMATION
2.1. General Construction
This project involves Chiller Improvements at the Omaha VA Health Care System.
2.2. Pre-Existing Information
Information on previous surveys or sampling for lead-based paint or asbestos sampling on piping impacted by the project was not provided.
3. INSPECTION METHODOLOGIES
3.1. Asbestos Inspection
The inspection and sampling were conducted in accordance with the USEPA National Emission
Standard for Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing. building materials that may be impacted by planned renovation. Additional aspects of the inspection methodology are discussed below.
3.1.1. Key Definitions
3.1.1.1. Homogenous Material
Homogenous materials are unique applications of building materials uniform in color and texture. The homogeneity of a material can be further defined by area(s) of application. Bulk sampling is conducted to determine the asbestos content of a homogenous material.
3.1.1.2. Asbestos-Containing Material (ACM)
The Environmental Protection Agency (EPA) and the Occupational Safety and Health
Administration (OSHA) define ACMs as any material that contains greater than one percent asbestos, as determined by visual area estimation (microscopic analysis). The
State of Nebraska follows the EPA standard. Some materials contain one percent or less asbestos. While these materials are not ACMs, by definition, they are still regulated by
OSHA, for worker exposure.
3.1.1.3. Friable/Non-Friable ACM
Friable ACMs are materials that contain more than one percent asbestos and, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure, thereby releasing fibers into the air more readily. In contrast, non-friable ACMs are ACMs that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Non-friable ACMs are grouped into two categories: Category I and Category
II.
3.1.1.4. Regulated Asbestos-Containing Materials (RACM)
Regulated Asbestos-Containing Materials (RACM) include friable ACMs and non-friable ACMs that, depending on their category, have become friable, have been subjected to specific forms of impact damage, have a high probability of becoming friable, and/or may become friable during removal.
3.1.2. Homogenous Material Numbering Convention
All suspect asbestos materials are assigned a unique homogeneous material number. AHERA identifies three basic material types: Surfacing Materials (SM), which include spray and trowel applied materials, such as fireproofing, ceiling texture, plaster, etc.; Thermal System Insulation
(TSI), which includes insulating materials applied to mechanical and plumbing components for temperature preservation and condensation prevention purposes; and Miscellaneous
Materials (MM), which includes all other materials, such as floor coverings and mastics, roofing materials, asbestos cement products, and many others. When a homogenous material has multiple layers, individual layers are identified and analyzed separately by laboratory analysis.
3.1.3. Bulk Sampling
Bulk sampling must be performed to determine whether suspect building material contains asbestos. Asbestos bulk sampling for the inspection was conducted in accordance with protocols established by the Asbestos Hazard Emergency Response Act (AHERA) (ref.: 40
CFR 763). Friability of the suspect asbestos-containing materials was determined by touching and/or sampling of the material.
3.1.3.1. Bulk Sample Numbering Convention
Bulk samples are given a sequence number when collected.
3.1.3.2. Polarized Light Microscopy Analysis (PLM)
Bulk samples collected during the inspection were submitted to an EPA accredited laboratory, EMSL Analytical, Inc. (EMSL), located at 200 Route 130 North, Cinnaminson, New Jersey. EMSL was instructed to perform Polarized Light
Microscopy (PLM) analysis, utilizing dispersion staining techniques (ref: EPA
Method 600/M4-82-020). PLM analysis is the least expensive and most commonly used visual estimate method. While PLM analysis is acceptable to EPA, OSHA, and most states for determining asbestos content, some states now require more sophisticated methods when analyzing certain types of materials.
A total of thirty (30) asbestos bulk samples were collected and submitted for laboratory analysis. PLM Analysis was performed on the 30 samples collected, including fourteen (14) additional distinct layers (e.g. mastic). Heterogeneous applications are individual layers of different materials contained within a single bulk sampled, each of which must be analyzed individually to determine its asbestos content (e.g. vinyl floor tiles and mastic; cove base and mastic; etc.). Table 1 lists all samples collected and analyzed in the current survey.
Some samples and/or heterogeneous applications may not have been analyzed by the lab if a positive result was obtained from a sample that is among a group of samples representing a suspect material. This process, known as stop on first positive, is followed because if a single sample is found to be positive, that material is determined to be ACM, thus making it unnecessary to analyze any additional samples in the sampling group.
Please refer to the Table 1– Asbestos Material Sampling Table in Appendix A for a complete listing of all materials sampled. The laboratory analytical reports may be found in Appendix D for the current inspection.
3.1.3.3. Quantification Method Analysis
EPA regulations allow materials determined to contain less than 10 percent asbestos utilizing a visual estimate quantification method, such as PLM analysis, to be treated as non-asbestos containing if the material is re-analyzed using one of two quantification methods and determined to contain one percent or less of asbestos. The two acceptable quantification methods are point count analysis and TEM Chatfield analysis.
Quantification methods are more time-consuming and more expensive analytical procedures that are occasionally used to more accurately determine the amount of asbestos in certain samples. Because of their higher cost and the acceptable accuracy of the less expensive visual estimation method, laboratories do not typically perform quantification analyses unless specifically requested.
The quantification method known as point count analysis is used for most ACM types, except floor tile. The organic matrix composition of floor tile precludes the use of point count analysis to more accurately determine asbestos amounts within a sample.
Therefore, TEM Chatfield analysis—which effectively removes all organic materials, leaving only asbestos behind—is necessary to provide a more precise percentage of asbestos content in floor tile.
Please refer to section 6.0 Recommendations, for recommendations concerning supplemental analysis.
3.2. Lead-Based Paint Inspection
The LBP inspection included visual identification of homogenous paint applications and paint chip sampling of the paint(s). While the U. S. Department of Housing and Urban Development (HUD) promulgates guidelines for LBP inspections in child occupied facilities, there are no formal guidelines for non-HUD regulated inspections. Thus, the LBP inspection was conducted in accordance with generally accepted industry standards and practices. Additional aspects of the inspection methodology are discussed below.
3.2.1. Key Definitions
3.2.1.1. Homogenous Paint Applications
Homogenous paint applications are significant paint applications that are visually distinct by their color and uniformity. Significant paint applications do not include incidental occurrences of paint such as isolated occurrences of accent trim, artistic paints, etc. While visual inspection alone cannot generally identify sub-layers of paint, these applications are often identified in the XRF analysis.
3.2.1.2. Lead-Based Paint (LBP)
Pursuant to Federal Register, Vol. 61, No. 169, LBP is defined as paint or other surface coatings equal to or greater than 0.5 percent lead by weight or equal to or greater than 1 mg/cm2.
3.2.2. Homogenous Paint Applications Numbering Convention
Homogenous paints and coatings are assigned a unique homogeneous material number (HM#).
The HM# is referenced throughout the report to uniquely identify each paint application.
3.2.3. Lead-based Paint and Lead Containing Materials Sampling
Sampling of suspected lead-based paint or other suspected lead containing materials was conducted using paint chip sampling for the paint applications and materials identified. A total of 6 paint chip samples were taken to determine the lead content of materials or painted surfaces.
4. SUMMARY OF INSPECTION FINDINGS
Key findings of the hazardous building materials inspection are summarized below. Please refer to the
Appendices for complete details of the inspection findings and supporting documentation.
4.1. Asbestos Inspection Findings
Below is a summary of the Asbestos Containing Material (ACM) findings of the asbestos inspection:
Building 1 – Basement Chiller Room (adjacent to Building 17)
• 8-inch Chilled Water Pipe Thermal System Insulation (TSI) – Sample 03 (6% Chrysotile)
• 12-inch Chilled Water Supply Pipe Thermal System Insulation (TSI) – Sample 08 (6%
Chrysotile)
• 4-inch Glycol Supply TSI – Sample 23 (6% Chrysotile)
• 8-inch Glycol Return TSI – Sample 24 (6% Chrysotile)
ACM Quantities – Estimated 75 fittings in this area contain ACM Wrap/Mastic as depicted in photos. Photo 24A shows close-up example of this ACM covering end runs, seams, and fittings of fiberglass insulation.
Building 1 – Upstairs in Basement Chiller Room (adjacent to Building 17)
• 4-inch Chilled Water Return Pipe Wrap – Sample 10 (2% Chrysotile)
• 4-inch Chilled Water Supply Pipe Wrap – Sample 11 (3% Chrysotile)
ACM Quantities – Estimated 12 fittings in this area contain ACM Wrap/Mastic as depicted in photos. Photo 10A shows close-up example of this ACM covering end runs, seams, and fittings of fiberglass insulation. This ACM is homogeneous with ACM described above in Chiller Room.
ACM Quantities – Estimated 13 fittings in Pipe Chase accessed from Upstairs Chiller Room.
ACM Wrap as depicted in Photo 11.
Building 2 – Tunnel Entrance
• 8-inch TSI Pipe Wrap Marked “A” – Sample 15 (30% Amosite/10% Chrysotile)
• 4-inch TSI Pipe Wrap Marked “A” – Sample 16 (40% Amosite/10% Chrysotile)
ACM Quantities - ACM sampled in tunnel entrance only (not quantified)
Building 1 – Tunnel Entrance
• 8-inch TSI Pipe Wrap Marked “A” – Sample 25 (40% Amosite/10% Chrysotile)
• 8-inch Pipe Fitting Marked “A” – Sample 26 (2% Chrysotile)
• 4-inch TSI Pipe Wrap Marked “A” – Sample 28 (15% Amosite/10% Chrysotile)
• 6-inch Pipe Mudded Fitting Marked “A” Domestic Water – Sample 29 (40% Chrysotile)
ACM Quantities - ACM sampled in tunnel entrance only (not quantified)
Please refer to Table 1 – Asbestos Sampling Table in Appendix A for a complete listing of all asbestos sampling.
4.2. Lead Paint Inspection Findings
Below is a summary of the findings of the lead-based paint inspection:
• None of the paint samples were found to be lead-based paint (LBP). All samples were found to be paint containing lead (See Section 6.1.2 for more information).
Please refer to Table 2 – Lead Paint Sampling Table in Appendix A for a complete listing of all lead-based paint sampling.
5. RISKS AND HAZARDS
5.1. Asbestos
To be a significant health concern, asbestos fibers must be inhaled. When asbestos fibers are inhaled, they become lodged in the lung tissue or alveoli. Here they clog and scar the tissues, causing the walls of the alveoli to lose their elasticity and useful function in respiration. Asbestosis (scarring of the lung), lung cancer, and Mesothelioma (cancer of the lining of the chest or lining of the abdominal wall) are diseases associated with asbestos exposure. Risks and hazards increase with increased exposure. ACM condition, proximity to building occupants, building use, and other factors can influence the potential for asbestos fibers to become airborne, and therefore increase exposure risks.
5.2. Lead-Based Paint
Inhalation and ingestion are the major routes of lead exposure. Once in the body, lead is distributed via the bloodstream to red blood cells, soft-tissue and bone. The kidneys and gastrointestinal (GI) tract eliminate lead in the body very slowly, while minute amounts are lost through perspiration.
Lead in the body can cause serious damage to the central and peripheral nervous system, the cardiovascular system, and the kidneys. Exposure to high concentrations of lead can cause retardation, convulsions, coma, and sometimes death. Children are especially vulnerable and susceptible to lead poisoning. Even low levels of exposure persisting during childhood are known to slow a child’s normal development and cause learning and behavioral problems. Exposure to lead can result from deteriorating surfaces and activities mechanically impacting lead surfaces. Preventing exposure requires proper work practices, monitoring, disposal and personal protective equipment during demolition, alteration and friction producing activities.
6. RECOMMENDATIONS
The purpose of this section is to interpret survey findings and provide preliminary recommendations that may be relevant and appropriate at this time. Because this document is a presentation of investigative findings, recommendations related to future construction activities are inherently general in nature. More specific determinations concerning hazardous building materials to be impacted by construction should be made during the abatement project design process.
6.1. General Recommendations
6.1.1. Asbestos
State and/or federal regulations require that ACMs be removed prior to demolition or renovation activities that will impact the ACMs. Depending on the specific renovation work to be performed, certain ACMs may not require removal if they will not be disturbed and do not pose a risk to building occupants or construction trade workers. However, to ensure worker safety and to eliminate future asbestos-related maintenance and management costs and risks, AMIE recommends removal of all identified ACMs in the areas to be renovated. While partial abatement may be technically possible, it is often impractical and not cost-effective.
ACMs not impacted by renovation or demolition activities should be inspected annually and maintained in good condition. ACMs deemed to be in less than good condition (damaged or significantly damaged) should be repaired or removed and replaced. Such repairs should be performed by qualified persons and in accordance with regulatory guidelines.
6.1.2. Lead-Based Paint and Lead Containing Materials
Facility owners are ultimately liable for their lead-containing hazardous waste from cradle to grave. EPA regulations provide two ways to determine whether a waste stream, such as demolition debris containing LBP, must be classified as hazardous waste. Waste generators can either test the waste using an approved testing method (Toxicity Characteristic Leaching
Procedure [TCLP]), or they can apply knowledge of the hazardous characteristic of the waste.
Based on the initial lead paint testing results, AMIE recommends TCLP testing be conducted on the existing building materials, painted and unpainted, prior to the start of renovation or demolition activity. In addition, trade contractors who work in the facility should also be notified of the presence of lead so that they can appropriately monitor and protect their workers against lead exposure.
Any lead-based painted building components not removed during renovation should be considered for inclusion in a facility management plan that maintains potential exposure below
OSHA action levels and ensures the material will be handled properly and in accordance with applicable regulations.
6.2. Hazardous Conditions Recommendations
No hazardous conditions, from hazardous materials, were observed in the building during the inspection.
6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations
AMIE does not recommend Point Count or TEM Chatfield analysis of any of the ACMs identified.
7. REGULATORY REQUIREMENTS
7.1. Asbestos-Containing Materials
The removal and disposal of ACMs is regulated at the federal, state, and, sometimes, local level. While some states have developed their own regulatory standards for the various asbestos disciplines, many states have adopted the federal standards but have established licensing requirements and enforcement authority at the state level.
7.1.1. Notification Requirements
EPA’s NESHAP regulation, 40 CFR, Subpart M, 61.145, Standard for Demolition and
Renovation, stipulates that an owner of a facility submit proper notification with either the
EPA’s regional office and/or the state and local regulatory agency of intention to demolish or renovate. Notifications must be received by the appropriate regulatory agencies 10 working days prior to commencement of asbestos stripping or removal, or other site work. If the demolition or renovation date changes, or the scope of work is increased, another notification is required.
7.1.2. Asbestos Removal Requirements
Asbestos removal must be performed by a licensed abatement contractor. The contractor should follow all work practices, worker protection, and disposal requirements set forth in the contract specifications and by the Occupational Safety and Health Administration (OSHA) and the EPA. Key federal regulations concerning asbestos include 29 CFR 1910.1001, 29 CFR
1926.1101, 40 CFR Part 61, Subpart M, and 40 CFR 763.
7.1.3. OSHA Regulation of ≤ 1 Percent Asbestos
While EPA and many states do not regulate materials containing one percent or less asbestos, OSHA regulates materials containing any amount of asbestos. (Ref. OSHA Construction
Industry Standard, 29 CFR 1926.1101(a)(3))
7.1.4. State of Nebraska Asbestos Removal Regulations
Asbestos Containing Building Material (ACBM) should only be removed by licensed and accredited contractors in the State of Nebraska.
7.2. Lead Waste
7.2.1. Disposal Requirements
The Resource Conservation and Recovery Act (RCRA) classifies lead-containing waste streams as hazardous materials if TCLP levels exceed five parts per million. If TCLP leachable lead levels exceed that threshold, EPA regulations (40 CFR 261) require the waste stream to be handled and disposed of as a hazardous waste. Waste streams containing less the five parts per million of leachable lead are classified as non-hazardous waste and can be disposed of in a construction and demolition landfill.
7.2.2. Construction Requirements
OSHA’s 29 CFR 1926.62 regulates worker exposure to lead during construction activities that include demolition or salvage of structures where lead or materials containing lead are present, as well as removal or encapsulation of lead-containing materials. The standard establishes maximum limits of exposure to lead, including a permissible exposure limit and action level, and should be adhered to during construction and demolition activities.
APPENDIX A
Tables
Table 1 – Asbestos Materials Sampling Table
Table 2 – Lead Paint Sampling Table www.amienvironmental.com
8802 South 135th Street, Suite 100 • Omaha, NE 68138
800.828.8487 • 402.397.5001 • 402.397.3313 (fax http://www.amienvironmental.com/
Table 1 – Asbestos Material Sampling Table
Homogeneous
Area
Sample
No.
Photo
No.
Description Color Material Location Asbestos Content
Estimated
Quantity Comments
1 01 1 Tank Wrap White Bldg. 1 Chiller Room
Adjacent to Bldg. 17
None Detected
2 02 2 Chilled Water Return
8” Pipe White
Bldg. 1 Chiller Room
3 03 3/3A 12-inch Pipe Wrap
Thermal System
Insulation (TSI)
White
Bldg. 1 Chiller Room
6% Chrysotile
4 04 4 Chilled Water Supply
4” Pipe Wrap White
Bldg. 1 Chiller Room
5 04A 4
4” Pipe TSI Yellow
Bldg. 1 Chiller Room
6 05 5 Chilled Hot Water
Fitting 4” Pipe Black
Bldg. 1 Chiller Room
7 06 6
12” Pipe TSI White
Bldg. 1 Chiller Room
8 07 7
12” Pipe Wrap
White/
Yellow
Bldg. 1 Chiller Room
9 07A 7
12” Pipe TSI Yellow
Bldg. 1 Chiller Room
7 08 8/8A
12” Pipe TSI
White/
Yellow
Bldg. 1 Chiller Room
10 09 9
1” Mudded Fitting
Wrap
White Bldg. 1 Chiller Room
11 09A 9
1” Mudded Fitting
TSI
Yellow Bldg. 1 Chiller Room
12 10 10/10A Chilled Water Return
4” Pipe Mastic White
Bldg. 1 Chiller Room
13 10A
10/10A Chilled Water Return
4” Pipe Wrap White
Upstairs in Basement
Chiller Room
Adjacent to Building 17
2% Chrysotile
Table 1. Asbestos Material Sampling Results Asbestos Containing Materials (ACM) = >1% Asbestos
Sample
No.
Photo
No.
Description Color Material Location Asbestos Content
Estimated
Quantity Comments
14 11 11/11A Chilled Water Return
4” Pipe Wrap White
Upstairs in Basement
Chiller Room
Adjacent to Building 17
3% Chrysotile
15 11A 11/11A Chilled Water Return
4” Pipe TSI
Yellow Bldg. 1 Chiller Room
Upstairs, room off stairs.
16 12 12
4” Pipe Wrap
White/
Silver
Bldg. 1 Chiller Room
Upstairs, room off stairs.
Adjacent to Bldg. 17
None Detected
Damaged
17 13BF 13BF Chilled Water Supply Black TRANE Temp Chiller None Detected
18 13A 13 Chilled Water Supply
Wrap White Building 2 Tunnel Entrance
Located on Left
Side of Tunnel
19 13B 13 Chilled Water Supply
TSI
Yellow
Building 2 Tunnel Entrance None Detected
20 14 14 6” Pipe Wrap
Marked “A”
Brown/
White Building 2 Tunnel Entrance
21 15 15
8” Pipe Wrap
Marked “A”
Gray/
White
Building 2 Tunnel Entrance 30% Amosite
10% Chrysotile
Located on
Right Side of
Tunnel
22 16 16
4” Pipe Wrap
Marked “A”
Gray/
White
Building 2 Tunnel Entrance 40% Amosite
10% Chrysotile
Located on
Right Side of
Tunnel
21 17 17
8” Pipe Wrap
Marked “A” Wrap
White Building 2 Tunnel Entrance None Detected
Located on
Right Side of
Tunnel
22 17A 17
8” Pipe Wrap
Marked “A” TSI White
Tunnel
23 18 18
1” Pipe Wrap – End
White
Tunnel
24 19 19
4” Pipe Wrap
Marked “A” White Building 2 Tunnel Entrance
Tunnel
25 20 20 Chilled Water Supply
Pipe Seam TSI White B024
Sample
No.
Photo
No.
Description Color Material Location Asbestos Content
Estimated
Quantity Comments
26 21 21 Chilled Water
8” Fitting TSI Yellow B024
27 21A 21 Chilled Water
8” Fitting Mastic White B024
28 22 22 Pink Firestop
Chilled Water Pipe Brown B024
29 23 23/23A Glycol Supply 4”
Pipe Wrap TSI White
Bldg. 1 Chiller Room
Adjacent to Bldg. 17 6% Chrysotile
30 24 24/24A Glycol Return 8”
Pipe Wrap TSI White
Bldg. 1 Chiller Room
Adjacent to Bldg. 17 6% Chrysotile
31 25 25 8” Pipe Wrap
Marked “A” White Building 1 Tunnel Entrance
40% Amosite
10% Chrysotile
32 26 26 8” Pipe Fitting
Marked “A” Wrap White
Building 1 Tunnel Entrance 2% Chrysotile
33 26A 26 8” Pipe Fitting
Marked “A” TSI Brown
Building 1 Tunnel Entrance None Detected
34 27 27 6” Pipe Wrap White/
Yellow
Building 1 Tunnel Entrance None Detected
35 28 28 4” Pipe Wrap
Marked “A”
Brown/
White
Building 1 Tunnel Entrance 15% Amosite
10% Chrysotile
36 29 29 6” Pipe Wrap
Marked “A” Gray
Building 1 Tunnel Entrance
Domestic Water
40% Chrysotile
37 30 30 6” Pipe Wrap Tan/
White
Building 1 Tunnel Entrance
GHS
38 30A 30 6” Pipe TSI
Yellow Building 1 Tunnel Entrance
GHS
Table 2 – Lead Sampling Table
Sample
No.
Photo
No.
Substrate Description Location Color Lead Content Condition
Estimated
Quantity
L-1 Metal Paint on A/C Plant “Absorber” Mech Rm Green <0.028 Fair
L-2 Metal Paint on A/C Plant Pipe Elbow Mech Rm Red <0.042 Fair
L-3 Metal Paint on A/C Unit B024 Gray <0.0080 Fair
L-4 Metal Paint on Condensate Water Return Pipe B024 White <0.019 Fair
L-5 Metal Paint on Pipe Cooling Tower 16 Blue 0.017 Poor
L-6 Metal Paint on Support Cooling Tower 16 Blue <0.0080 Poor
Table 2. Lead-Based Paint/Lead Material Content Lead-Based Paint = ≥ 0.5% by weight
APPENDIX B
Photo Logs
Asbestos Photo Log
Lead-Based Paint Photo Log www.amienvironmental.com
8802 South 135th Street, Suite 100 • Omaha, NE 68138
800.828.8487 • 402.397.5001 • 402.397.3313 (fax) http://www.amienvironmental.com/
Asbestos Photo Log
PHOTO 1
Chiller Room Building 1 (Adj. to 17) Chilled water
Tank wrap.
PHOTO 2
Chilled Water Return 8” – Chiller Room Bldg. 1
(Adj. to 17) a
PHOTO 3
Chiller Rm Bldg. 1. Chilled Water Fitting 8” fitting- Wrap ACM 6% Chrysotile. Insulation Non-
ACM
PHOTO 3A
Sample location detail of Photo 3 (Sample 03).
Wrap ACM 6% Chrysotile. Insulation Non-ACM
PHOTO 4
Chiller Rm Bldg. 1. Chilled Water Supply 4” Pipe
Seam.
PHOTO 5
Chiller Rm Bldg. 1. Chilled Hot Water 4” Pipe
Fitting.
PHOTO 6
Chiller Rm Bldg. 1- Chilled Water Supply 12” Pipe
Seam.
PHOTO 7
Chiller Rm Bldg. 1. Chilled Water Supply 4”
Yellow Seam
PHOTO 8
Chiller Rm Bldg. 1- Chilled Water Supply 12”
Pipe Seam- ACM 6% Chrysotile
PHOTO 8A
Chiller Rm Bldg. 1- Chilled Water Supply 12”
Pipe Seam- ACM 6% Chrysotile
PHOTO 9
Chiller Rm Bldg. 1. Chilled Water 1” Mudded
Fitting.
PHOTO 10
Chiller Rm Bldg. 1 Upstairs- Chilled Water Return
4” Pipe Wrap- 2% Chrysotile. Mastic Non-ACM
PHOTO 10A
Chiller Rm Bldg. 1 Upstairs- Chilled Water Return
4” Pipe Wrap- 2% Chrysotile. Mastic Non-ACM
PHOTO 11
Chiller Rm Bldg. 1 Upstairs (Rm off Stairs)-
Chilled Water Supply 4” Fitting Pipe Wrap – 3%
Chrysotile. Insulation Non-ACM
PHOTO 11A
Chiller Rm Bldg. 1 Upstairs (Rm off Stairs)-
Chilled Water Supply 4” Fitting Pipe Wrap – 3%
Chrysotile. Insulation Non-ACM
PHOTO 12
Chiller Rm Bldg 1 Upstairs (Rm off Stairs)-
CH/H.K. Supply 4” Pipe Wrap
PHOTO 13 BF
Trane Temp Chiller- Chilled Water Supply Black
Foam.
PHOTO 13
Building 2 Tunnel. 2” Wrap and fitting
PHOTO 14
Building 2 Tunnel. 6” Pipe Wrap “A” on pipe. PHOTO 15
Building 2 Tunnel 8” Pipe wrap and insulation.
30% Amosite. 10% Chrysotile
PHOTO 16
Building 2 Tunnel 4” Pipe wrap and insulation.
40% Amosite. 10% Chrysotile
PHOTO 17
Building 2 Tunnel 8” Pipe wrap and insulation
PHOTO 18
Building 2 Tunnel 1” Pipe wrap end. PHOTO 19
Building 2 Tunnel 4” pipe wrap and insulation
PHOTO 20
B024- Chilled Water Supply 8” pipe seam mastic and insulation
PHOTO 21
B024- Chilled Water 8’ Fitting- mastic and insulation.
PHOTO 22
B024- Pink wall penetration caulk. PHOTO 23
Chiller Rm Bldg. 1- Glycol Supply 4” pipe fitting.
PHOTO 23A
Chiller Rm Bldg. 1- Glycol Supply 4” pipe fitting.
PHOTO 24
Chiller Rm Bldg. 1- Glycol Supply 6” pipe fitting.
PHOTO 24A
Chiller Rm Bldg. 1- Glycol Supply 6” pipe fitting.
PHOTO 25
Building 1 Tunnel Entrance-8” Pipe Wrap Marked
“A”. ACM 40% Amosite 10% Chrysotile
PHOTO 26
Building 1 Tunnel- 8” Pipe Wrap Marked “A”.
Wrap ACM 2% Chrysotile. Insulation Non-ACM
PHOTO 27
Building 1 Tunnel- 6” pipe wrap.
PHOTO 28
Building 1 Tunnel- 4” Return Condensate wrap and insulation “A”. 15% Amosite. 10% Chrysotile
PHOTO 29
Building 1 Tunnel- Domestic water 6” pipe fitting.
40% Chrysotile.
PHOTO 30 Building 1 Tunnel- 6” pipe wrap and fiberglass.
Lead-Based Paint Photo Log
PHOTO 1
Green Paint on Absorber- Chiller Room Bldg. 1
Non-Lead-based Paint (LBP) (<0.028% Lead)
PHOTO 2
Red Pipe Elbow – Chiller Room Bldg. 1 (Adj. to
17) Non-LBP (<0.042% Lead)
PHOTO 3
Gray Paint on AC Unit-Room inside B024
Non-LBP (0.0080% Lead)
PHOTO 4
White on Iron Condenser Water return pipe- Room inside B024. Non-LBP (<0.019% Lead)
PHOTO 5
Gray/Blue paint on iron pipe – Cooling Tower 16.
Non-LBP (0.17% Lead)
PHOTO 6
Gray/Blue paint on iron support beam – Cooling
Tower 16.Non-LBP (<0.0080% Lead)
APPENDIX C
Schematics
Plot Plan of Veteran’s Affairs
Medical Center Omaha
AutoCAD SHX Text
42 ND STREET
AutoCAD SHX Text
CENTER STREET
AutoCAD SHX Text
41ST. STREET
AutoCAD SHX Text
40TH. STREET
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
PINE STREET
AutoCAD SHX Text
HICKORY STREET
AutoCAD SHX Text
WALNUT STREET
AutoCAD SHX Text
SHIRLEY STREET
AutoCAD SHX Text
EISENHOWER
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 1
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 2
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 2
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 6
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WOOLWORTH
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 4
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 3
AutoCAD SHX Text utility
AutoCAD SHX Text tunnel
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PULLER DRIVE
AutoCAD SHX Text
NIMITZ DRIVE
AutoCAD SHX Text
WAESCHE DRIVE
AutoCAD SHX Text utility easement .85 acres
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 5
AutoCAD SHX Text licensed utility
AutoCAD SHX Text easement .02 acreas
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Plotplan.dwg 10-21-2010
AutoCAD SHX Text
SIGN (VA)
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text
LOT 9
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 7
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 8
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 10
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
39TH. STREET
AutoCAD SHX Text
38TH. STREET
AutoCAD SHX Text
CABLE
AutoCAD SHX Text
PARKING LOTS(TYP)
AutoCAD SHX Text 4-#4/0
AutoCAD SHX Text
WSTGHS GLASS REF
AutoCAD SHX Text
12" STORM DRAIN
AutoCAD SHX Text
CW
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text
6"FM
AutoCAD SHX Text
CCTV
AutoCAD SHX Text
30" DEEP
AutoCAD SHX Text 10"
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
16" MAIN-HI-PRESSURE 10O PSI
AutoCAD SHX Text 4"%%c
AutoCAD SHX Text
4 #4RWG
AutoCAD SHX Text 2"C
AutoCAD SHX Text 1 1/4"%%c STM RET
AutoCAD SHX Text
1 1/4"%%C STM
AutoCAD SHX Text
DRAIN 6"
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text 4"%%C
AutoCAD SHX Text
2"WATER
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text
FH#7
AutoCAD SHX Text G
AutoCAD SHX Text 6"
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
FH#9
AutoCAD SHX Text
8"FM
AutoCAD SHX Text
FH8
AutoCAD SHX Text 3"%%C
AutoCAD SHX Text
CW
AutoCAD SHX Text
8"FM
AutoCAD SHX Text E
AutoCAD SHX Text
MH#7
AutoCAD SHX Text T@12"
AutoCAD SHX Text
15KV
AutoCAD SHX Text
TEL.
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
7-250 MCM
AutoCAD SHX Text G
AutoCAD SHX Text M
AutoCAD SHX Text G
AutoCAD SHX Text 4"%%C
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text
FA
AutoCAD SHX Text 2"%%c GAS
AutoCAD SHX Text T
AutoCAD SHX Text
3#0 DIRECT BURIAL CABLE
AutoCAD SHX Text
1 #1 STRANDED GROUND WIRE
AutoCAD SHX Text G
AutoCAD SHX Text 3"%%C
AutoCAD SHX Text
3"%%C 480V TO 1ST
AutoCAD SHX Text
PULL BOX
AutoCAD SHX Text
10"FM
AutoCAD SHX Text G
AutoCAD SHX Text
12"X12"X8"PULL BOX
AutoCAD SHX Text 3"%%C
AutoCAD SHX Text G
AutoCAD SHX Text 3"%%C
AutoCAD SHX Text
12"%%C WATER MAIN
AutoCAD SHX Text
8"FM
AutoCAD SHX Text
480V ST. LTS.
AutoCAD SHX Text
CENTRAL
AutoCAD SHX Text
OXYGEN
AutoCAD SHX Text 12"
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text E
AutoCAD SHX Text
15KV
AutoCAD SHX Text
#6 DIRECT BURIAL CABLE
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text 15"
AutoCAD SHX Text
DOMESTIC CW
AutoCAD SHX Text
10"FM
AutoCAD SHX Text
15KV-E
AutoCAD SHX Text
SPLICE KIT
AutoCAD SHX Text
480V ST. LTS.
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
FH#6
AutoCAD SHX Text
FM
AutoCAD SHX Text
CIRCUIT #3
AutoCAD SHX Text 480V 1
AutoCAD SHX Text
AutoCAD SHX Text
#8 STRANDED GROUND WIRE
AutoCAD SHX Text
480V ST. LTS.
AutoCAD SHX Text
MERC. VAPOR LUM 480V
AutoCAD SHX Text
#6 DIRECT BURIAL CABLE
AutoCAD SHX Text
#8 STRANDED GROUND WIRE
AutoCAD SHX Text
480V ST. LTS.
AutoCAD SHX Text 480V 1"%%C
AutoCAD SHX Text
ROADWAY(TYP)
AutoCAD SHX Text
175W H39-22KC C/DX
AutoCAD SHX Text
MERC. VAPOR LULM 480V
AutoCAD SHX Text
1000W H34-12GW/DX
AutoCAD SHX Text
TIG-CLAE-3DA
AutoCAD SHX Text
480V ST. LTS.
AutoCAD SHX Text 480V
AutoCAD SHX Text
ST. LTS.
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
10"FM
AutoCAD SHX Text
MH#1
AutoCAD SHX Text
AutoCAD SHX Text A/C
AutoCAD SHX Text
FH#10
AutoCAD SHX Text
10" SEWER
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
6"FM
AutoCAD SHX Text
CHW 5'-0" DEEP
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
8"FM
AutoCAD SHX Text
2 WAY DUCT BANK
AutoCAD SHX Text
8"WM
AutoCAD SHX Text
6"WM
AutoCAD SHX Text S
AutoCAD SHX Text
12"VT SEWER
AutoCAD SHX Text 10"
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text 480V
AutoCAD SHX Text
ST.LTS.
AutoCAD SHX Text
FH#5
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
10"FM
AutoCAD SHX Text
2 1/2"%%C CW
AutoCAD SHX Text
2"%%C STM
AutoCAD SHX Text
1 1/2"%%C STM RET
AutoCAD SHX Text
4-#1 CABLE
AutoCAD SHX Text 6"
AutoCAD SHX Text
DR
AutoCAD SHX Text
TEL
AutoCAD SHX Text E
AutoCAD SHX Text 480V
AutoCAD SHX Text
ST.LTS
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text U
AutoCAD SHX Text
FH#4
AutoCAD SHX Text
MH#3
AutoCAD SHX Text
FH#2
AutoCAD SHX Text
MH#6
AutoCAD SHX Text
MH#5
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
MH#4
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text 10"
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
TEL
AutoCAD SHX Text
ELEC
AutoCAD SHX Text #4/0
AutoCAD SHX Text
AutoCAD SHX Text
CABLE
AutoCAD SHX Text
10"FM
AutoCAD SHX Text
2 1/2"%%C CW
AutoCAD SHX Text
1 1/2"%%C STM RET
AutoCAD SHX Text 2"%%c STM
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
TEL
AutoCAD SHX Text 6"
AutoCAD SHX Text
CABLE
AutoCAD SHX Text
TEL
AutoCAD SHX Text
SPLICES
AutoCAD SHX Text
1 1/4"%%C STM RET
AutoCAD SHX Text
1 1/2" CW
AutoCAD SHX Text
1 1/4" STM
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text D
AutoCAD SHX Text
FH#1
AutoCAD SHX Text D
AutoCAD SHX Text
CIRCUIT #2
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
12" VT SEWER
AutoCAD SHX Text
V.A.SIGN
AutoCAD SHX Text
V.A.SIGN
AutoCAD SHX Text
480V.ST. LTS.
AutoCAD SHX Text
10"FM
AutoCAD SHX Text
10"FM
AutoCAD SHX Text 6"
AutoCAD SHX Text
MH
AutoCAD SHX Text
FH#3
AutoCAD SHX Text
MH#2
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text 6"
AutoCAD SHX Text T
AutoCAD SHX Text 6"
AutoCAD SHX Text T
AutoCAD SHX Text
%%UPLOT PLAN
AutoCAD SHX Text
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
AutoCAD SHX Text
7 FLAG POLE
AutoCAD SHX Text
13 UNDERGROUND TUNNEL
AutoCAD SHX Text
23 WEATHER SHELTER
AutoCAD SHX Text
21 OXYGEN STORAGE PAD
AutoCAD SHX Text
18 COOLING TOWER I.C.U.
AutoCAD SHX Text
17 AIR COND. BUILDING
AutoCAD SHX Text
15 RESEARCH ADDITION
AutoCAD SHX Text
14 EQUIPMENT STORAGE
AutoCAD SHX Text
10 OIL STORAGE TANKS
AutoCAD SHX Text
9 GARAGE AND LAUNDRY
AutoCAD SHX Text
8 DAY HOSPITAL CARE
AutoCAD SHX Text
16 COOLING TOWER CENTRAL AIR COND.
AutoCAD SHX Text
24 HIGH VOLTAGE SWITCHING STATION
AutoCAD SHX Text
22 T BUILDING
AutoCAD SHX Text
19 WELDING SHOP
AutoCAD SHX Text
12 STORAGE
AutoCAD SHX Text
11 STORAGE
AutoCAD SHX Text
SYMBOL TYPE ACREAGE
AutoCAD SHX Text
HELIPORT AREA
AutoCAD SHX Text
UTILITY EASEMENT
AutoCAD SHX Text
LICENSED UTILITY EASEMENT
AutoCAD SHX Text
BRIDGE REPLACEMENT EASEMENT
AutoCAD SHX Text
TOTAL MEDICAL FACILITY ACREAGE
AutoCAD SHX Text
LAND ACREAGE USAGE SCHEDULE
AutoCAD SHX Text
PARKING AREA AND ROADS
AutoCAD SHX Text
HOSPITAL AND ADMINISTRATION
AutoCAD SHX Text
PATIENT RECREATION
AutoCAD SHX Text 0.02
AutoCAD SHX Text 0.15
AutoCAD SHX Text 34.55
AutoCAD SHX Text 0.85
AutoCAD SHX Text 1.11
AutoCAD SHX Text 4.48
AutoCAD SHX Text 10.44
AutoCAD SHX Text 17.50
AutoCAD SHX Text
BUILDING SCHEDULE
AutoCAD SHX Text
3 ENGINEERING SERVICE
AutoCAD SHX Text
2 CENTRAL HEATING PLANT
AutoCAD SHX Text
1 MAIN HOSPITAL BUILDING
AutoCAD SHX Text
4 RESIDENT ENGINEER, UNION OFFICE
AutoCAD SHX Text
6 DENTAL
AutoCAD SHX Text
5 MENTAL HYGIENE
AutoCAD SHX Text
NO. BUILDING
AutoCAD SHX Text
25 OUTPATIENT CLINIC
AutoCAD SHX Text
MH
AutoCAD SHX Text
FA
AutoCAD SHX Text
TRASH
AutoCAD SHX Text
COMPACTOR
AutoCAD SHX Text
1 1/2" %%C OXYGEN
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text
MH#8
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
MH#11
AutoCAD SHX Text S
AutoCAD SHX Text 400W
AutoCAD SHX Text E
AutoCAD SHX Text
CAMERA
AutoCAD SHX Text
CAMERA
AutoCAD SHX Text
2#8, 1#8 GRD- 3/4" C
AutoCAD SHX Text
PL
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
NATURAL GAS PIPING
AutoCAD SHX Text
NAT. GAS METER STA.
AutoCAD SHX Text G
AutoCAD SHX Text M
AutoCAD SHX Text
ELEC. STREET LIGHT MERC VAPOR
AutoCAD SHX Text
LUMINAIRE 480V
AutoCAD SHX Text
MAN HOLE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
FIRE MAIN PIPE
AutoCAD SHX Text
TELEPHONE CABLE
AutoCAD SHX Text
TRANSFORMER ON CONC.PAD
AutoCAD SHX Text
ELECTRIC MANHOLE
AutoCAD SHX Text
SIAMESE FIRE HYDRANTS
AutoCAD SHX Text
CLOSED CIRCUIT TV CABLE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
CCTV
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text
MH
AutoCAD SHX Text
FH
AutoCAD SHX Text
FM
AutoCAD SHX Text T
AutoCAD SHX Text
EXH
AutoCAD SHX Text E
AutoCAD SHX Text
TANK
AutoCAD SHX Text N
AutoCAD SHX Text
NEW LITES WITH OPC
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
FA
AutoCAD SHX Text
FA
AutoCAD SHX Text
AutoCAD SHX Text
480V ST. LT.
AutoCAD SHX Text
12"X12"X8"PULL BOX
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text 1000W
AutoCAD SHX Text N
AutoCAD SHX Text
2 #8, 1 #8 GRD-3/4" C (TYP)
AutoCAD SHX Text
CAMERA
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text 1000W
AutoCAD SHX Text N
AutoCAD SHX Text 1000W
AutoCAD SHX Text N
AutoCAD SHX Text
MH#10
AutoCAD SHX Text E
AutoCAD SHX Text 1000W
AutoCAD SHX Text E
AutoCAD SHX Text
MH#9
AutoCAD SHX Text
CAMERA
AutoCAD SHX Text
MH
AutoCAD SHX Text
8" SAN
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
6" FOUNDATION
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
ABANDONED STORM SEWER
AutoCAD SHX Text
STORM
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
ABANDONED
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
21" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
MH
AutoCAD SHX Text
24" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
12" ST
AutoCAD SHX Text
12" ST
AutoCAD SHX Text
12" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
MH
AutoCAD SHX Text
27" ST
AutoCAD SHX Text
27" ST
AutoCAD SHX Text
27" ST
AutoCAD SHX Text
30" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
18" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
MH
AutoCAD SHX Text
30" ST
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
30" ST
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text 1" W
AutoCAD SHX Text 3" W
AutoCAD SHX Text
18" CWS
AutoCAD SHX Text
18" CWR
AutoCAD SHX Text
18" CWR
AutoCAD SHX Text
18" CWS
AutoCAD SHX Text 3" W
AutoCAD SHX Text 1" W
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
ABANDON 12" ST
AutoCAD SHX Text
24" ST
AutoCAD SHX Text 1000W
AutoCAD SHX Text
24" ST
AutoCAD SHX Text
15" ST
AutoCAD SHX Text
ABANDON 15" ST
AutoCAD SHX Text
AUTOMATIC
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
VALVES
AutoCAD SHX Text
POWER SUPPLY TO GATE
AutoCAD SHX Text
26 SMOKE SHELTER
AutoCAD SHX Text
ACESS ROAD FOR HEAVY EQUIPMENT.
AutoCAD SHX Text
4' WIDE/EAST-WEST SHEET PILING 30 FEET DEEP LOCATED HERE
AutoCAD SHX Text
4" PVC QWEST FIBER OPTIC CONDUIT
AutoCAD SHX Text 36"deep
AutoCAD SHX Text 18feet deep
AutoCAD SHX Text 12 feet deep
AutoCAD SHX Text 8'6" deep
AutoCAD SHX Text 4"deep
AutoCAD SHX Text 48 fiber
AutoCAD SHX Text US West Fiber Manhole
AutoCAD SHX Text US West Copper
AutoCAD SHX Text Manhole
AutoCAD SHX Text 42" deep
AutoCAD SHX Text 8' deep
AutoCAD SHX Text 8' deep
AutoCAD SHX Text 8' deep
AutoCAD SHX Text 8'-4" deep
AutoCAD SHX Text 9' deep
AutoCAD SHX Text 7'-2"deep
AutoCAD SHX Text 6'6"deep
AutoCAD SHX Text 5'deep
AutoCAD SHX Text splice pit
AutoCAD SHX Text 42" deep
AutoCAD SHX Text 8' deep
AutoCAD SHX Text 8'deep
AutoCAD SHX Text 8'deep
AutoCAD SHX Text 8'deep
AutoCAD SHX Text 8'deep
AutoCAD SHX Text 6'deep
AutoCAD SHX Text 6'deep
AutoCAD SHX Text 6'deep
AutoCAD SHX Text 4'deep
AutoCAD SHX Text manhole
AutoCAD SHX Text 4"PVC conduit
AutoCAD SHX Text with 3 inner ducts
AutoCAD SHX Text with 3 innerducts
AutoCAD SHX Text approximate location of
AutoCAD SHX Text fiber optic bored conduit
AutoCAD SHX Text from University to VA
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text 2"%%c GAS
AutoCAD SHX Text 2"%%c GAS
AutoCAD SHX Text G
AutoCAD SHX Text
ABANDONED 2" GAS LINE
AutoCAD SHX Text
FROM MUD ON 42ND STREET
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text abandon
AutoCAD SHX Text 2"
AutoCAD SHX Text yellow
AutoCAD SHX Text plastic
AutoCAD SHX Text steel
AutoCAD SHX Text pipe north
AutoCAD SHX Text plastic
AutoCAD SHX Text pipe south
AutoCAD SHX Text B535A
AutoCAD SHX Text
COLD ROOM
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text B540A
AutoCAD SHX Text @18"
AutoCAD SHX Text @7"
AutoCAD SHX Text @21"
AutoCAD SHX Text
480V ST. LTS.
AutoCAD SHX Text
400W PER LIGHT BULB
AutoCAD SHX Text
HIGH PRESSURE SODIUM
AutoCAD SHX Text
12"X12"X8"PULL BOX
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
A WELLNESS FACILITY
AutoCAD SHX Text
B EMS/SAFETY/
AutoCAD SHX Text
C CONTRACTING/FINANCE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
LOT 11
AutoCAD SHX Text
MV
AutoCAD SHX Text
MV
AutoCAD SHX Text
MV
AutoCAD SHX Text
COMMUNICATIONS PULL BOX
AutoCAD SHX Text
HIGH VOLTAGE PULL BOX
AutoCAD SHX Text
COMMUNICATIONS PULL BOX
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
PULL BOX
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
PULL BOX
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
MV
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
AutoCAD SHX Text
SAN
AutoCAD SHX Text
AutoCAD SHX Text
DCW
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SANITARY STORM "Y" 15' DEEP
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
AMI ENVIRONMENTAL
AutoCAD SHX Text
8802 SOUTH 135TH STREET, SUITE 100
AutoCAD SHX Text
OMAHA, NEBRASKA, 68138
AutoCAD SHX Text
PH: (402) 397-3313
AutoCAD SHX Text A/E Design to Construct Combined Energy Plant Phase I (Chiller Plant)
AutoCAD SHX Text 8718 Botts Ln, San Antonio, TX 78217 Tel 210.881.9714 Fax 210.881.6808
AutoCAD SHX Text
HAZARDOUS MATERIALS ASSESMENT
AutoCAD SHX Text
HA-100
AutoCAD SHX Text
MET
AutoCAD SHX Text
WHC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Omaha
AutoCAD SHX Text 10/29/19
AutoCAD SHX Text
ONE
AutoCAD SHX Text 636-18-304
APPENDIX D
Analytical Results
Asbestos Analysis Laboratory Report
Lead Results
Lead Analysis Laboratory Report
Client Sample Description ConcentrationLab ID Analyzed Weight Lead
Collected
EMSL Analytical, Inc.
200 Route 130 North, Cinnaminson, NJ 08077 Phone/Fax: (856) 303-2500 / (856) 786-5974 http://www.EMSL.com cinnaminsonleadlab@emsl.com
Attn: Dustin Wessel AMI Group, Inc.
8802 South 135th Street Suite 100 Omaha, NE 68138-6511
Received: 09/23/19 10:20 AM
19-00268 / VA Omaha Chiller Piping
Fax: (402) 397-3313 Phone: (402) 397-5001
Project:
9/19/2019Collected:
Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*
201910091 CustomerID: AMI50 CustomerPO: 19-00268 ProjectID:
EMSL Order:
0.0709 Site: A/C Plant "Absorber"
201910091-0001L-1 <0.028 % wt9/23/2019 g9/19/2019
0.2614 Site: Room Inside B024
201910091-0003L-3 <0.0080 % wt9/23/2019 g9/19/2019
0.1066 Site: Condenser Water Return Pipe in Room Inside B024
201910091-0004L-4 <0.019 % wt9/23/2019 g9/19/2019
0.2583 Site: Cooling Tower 16
201910091-0005L-5 0.17 % wt9/23/2019 g9/19/2019
0.2514 Site: Cooling Tower 16
201910091-0006L-6 <0.0080 % wt9/23/2019 g9/19/2019
Phillip Worby, Lead Laboratory Manager or other approved signatory
Test Report ChmSnglePrm/nQC-7.32.3 Printed: 9/24/2019 12:06:08 PM
*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request.