36C26322R0065 0004.docx

DOCX document 103 KB Posted

Attached to
Y1DZ--PN: 636-18-304, Construct Combined Energy Plant Phase 1 (OM)
Solicitation number
36C26322R0065
Issued by

About this file

This document contains details for a federal construction contract opportunity and related questions and answers. The Department of Veterans Affairs is soliciting proposals for Project 636-18-304 to construct a new chiller plant at the Omaha VA Medical Center campus in Omaha, Nebraska. The project scope includes building a new chiller plant facility to house two centrifugal chillers and relocate an existing temporary chiller, with provisions for future expansion. An existing metal storage shed must also be removed. The estimated construction cost is between $10-20 million. Deductive bid alternates are permitted. The solicitation number is 36C26322R0065 and will be posted on February 8, 2022. The submission due date is March 8, 2022. The contract award period is 550 calendar days from notice to proceed. The opportunity is set aside for service-disabled veteran-owned small businesses. Additional details provided include questions and answers regarding project specifications, equipment, and temporary power requirements.

View the file

Other files

File Type Posted
36C26322R0065 0003.docx DOCX document
Addendum Plan SheetsPart-4.pdf PDF
Addendum specs 040822.pdf PDF
Addendum Plan SheetsPart-2.pdf PDF
Addendum Plan SheetsPart-6.pdf PDF
Addendum Plan SheetsPart-1.pdf PDF
Addendum 040822.pdf PDF
Addendum Plan SheetsPart-7.pdf PDF
Addendum Plan SheetsPart-3.pdf PDF
Addendum Plan SheetsPart-8.pdf PDF
Addendum Plan SheetsPart-5.pdf PDF
Geotechnical Report Terracon no 05215161R01.pdf PDF
HMS VA Omaha 103119.pdf PDF
S02_Specs - Volume 1 revised.pdf PDF
S02_ATTACH - Specs - Volume 2 (1376 pages).pdf PDF
Omaha VA Chiller photos.pdf PDF
S02_ATTACH - Drawings (132 pages).pdf PDF
36C26322R0065 0002.docx DOCX document
36C26322R0065 Final.docx DOCX document
Site Vist Sign In sheet.pdf PDF
36C26322R0065 0001.docx DOCX document
36C26322R0065.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

04-14-2022 636-22-4-5988-0002

636-18-304 36C263

Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077

36C263

Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077 To all Offerors/Bidders

36C26322R0065 03-11-2022

X

X April 19, 2022 at 4:00 pm CST

636-3620162-5988-854200-3220 23NR9WA20

Project: 636-18-304, Construct Combined Energy Plant Phase I (Chiller Plant), Omaha, Nebraska

A. The amendment is issued to answer all remaining questions. See the two (2) attached lists of questions.

B. The receipt of proposal date remains unchanged April 19, 2022 at 4:00 PM CST.

Sharon Spohn NCO 23 Contracting Officer

VA-VHA-2020-645FFEAB

Questions-Answers – March 30, 2022

No.
Questions
Answers
1.
There is no specification for the auger cast piling work. Please provide.

ACP were not listed as an option in the geotechnical engineering report. They are not part of the design.

6.
Who is the manufacturer of the current Public Address System?

Field Verify

7.
Who is the manufacturer of the current Physical Access Control System?

CCURE 9000

8.
Who is the manufacturer of the current Public Intrusion Detection System?

ProSecurity/CCURE 9000

9.
Who is the manufacturer of the current Video Surveillance System?
PELCO System at the main building, Avigilon at Fisher House and Parking Garage, AXIS system at ACC; Avigilon is the preference.
21.
During the site walk, new U/G piping was being installed for the future PT Bldg. Can the Government provide the contractor with the U/G piping distribution and profile drawings for this new building?

This project is a Design-Build with current changes being implemented. As-Built drawings are not available at this time.

24.
Who is the manufacturer of the existing chemical treatment equipment and associated components? Who services the existing system?
Waterlink
25.
Please confirm a Resident Engineer’s Field Office is required as outlined in 01 00 00 1.17.
Not Required (Change from Amend 0003)
26.
Please confirm the Contractor shall provide daily janitorial services/suppliers to the RE’s trailer (01 00 00 1.17-M.4).

Not Required (Change from Amend 0003)

28.
Page 14 of 96 of the solicitation requires a schedule of values broken down using the Factor 5 Draft Project Schedule. Schedule of Values are typically not developed until the contract has been issued and all subcontractors and suppliers SOVs are provided. Please confirm a divisional breakdown will be acceptable in lieu of a schedule of values.
Yes, a divisional breakdown is acceptable (change from Amend 0003).
31.
Refer to Specification Section 28 05 00, paragraph 2.2A. indicates that the “Security Management System shall provide full interface with all components of the security subsystem as follows…”

1. Will this system be required to communicate campus wide?

1. Please provide the contact information for the “Security Management System” supplier/contractor.

a) No.

b) CCURE 9000

32.
Refer to Specification Section 28 13 00 Physical Access Control System, paragraph 1.1K specifies that the “System Software: shall be compatible with existing campus building software.”

Please provide the contact information for the “existing campus building software” supplier/contractor.

CCURE 9000

34.
Two large projects that conflict with the work specified in this project have been previously awarded.

1. Please confirm the Boiler Project and the AHU Tower Project will be complete prior to issuing a NTP for this project.

1. Please provide a Final Site Plan, reflecting the modifications installed by these projects.

a.)Projects will not be complete
b.)This site plan doesn’t exist beyond the dwgs you already have
35.
Dwg 42 Detail S-3.303 references “1950” as -built drawings. Please provide as-built drawings
See Amendment 0003
39.
Please provide the ICRA requirements for routing the new comm. lines to Building 1 server room.
Follow hospital requirements based on route and current conditions
Once the government owned temp chiller, Pad Mounted Switch and Transformer is removed from service and relocated. Will the Switch # 95 located in Bldg. 17 be able to support the load of (3) 500 ton air-cooled chillers and pumps. I would estimate the load for each chiller/pumps would be less than 1500 amps per unit. The contractor could run temp cabling (in a raceway) from Switch 95 to a rental 15KV to 480V transformer. From the transformer cabling would be installed to the (3) rentals. This would be more economical to the government if that switch can support the load. We would then need rental generators for a estimated period of < 3 months to make the final 15KV connection to the new central plant followed by start-up and commissioning.
If the temporary chiller is offline and will not run at the same time with the rental units, the loading is available for use for rental power purposes. This consists of approximately 891,244VA for the temporary chiller, approximately 54,040VA for the 50hp temp chiller water pump, and approximately 79,813VA for the temp cooling tower fan for a total of 1,025,047VA and 1,233A at 480V/3-phase. This is insufficient for the proposed 4,500A total required by this question. The A/E does not have current power draws for the campus as a whole and any additional power will need to be coordinated with the VA. As of 12/19/2019, the peak demand on Circuit #90 was 47.8A at 13,800V and peak demand on Circuit #95 was 116.7A at 13,800V. Each is on a 200A circuit and includes a tie-breaker to connect both circuits to a single 200A circuit with the combined load if needed. The A/E does not have current data to know if the circuit has increased, decreased, or stayed the same to determine if additional power can be made available at this time or in the future when this project will require additional power for temporary use. Rental generators will be required for power beyond what can be made available. The contractor, at their discretion, can also contact the local utility company to obtain temporary power once their specific power needs are determined.

The estimated period of time for rental equipment is contractor dependent based on their specific phasing plans. The time frame for temporary equipment needs to be determined by the contractor.

Questions/Answers – Submitted after due date

Questions
Answers
1.
Spec 23 64 00: Water-cooled Chillers

With regards to spec 23 64 00 line 1.4.D.1, will a 5 year compressor parts and labor warranty which covers motor and internal gear cover warranty required in lieu of the 5-year motor, transmission, and compressor warranty?

This is acceptable.

2.
Spec 23 64 00: Water-cooled Chillers

Submittals in spec 23 64 00 line 1.6.b.1.c are asking for efficiency at full load and part load WITHOUT applying any tolerance indicated in the AHRI 550/590/standard, want to clarify that this chiller is not required under zero tolerance conditions, efficiencies are just to be ran at this standard for submittals?

Chiller to meet AHRI 550/590 rating as specified for all operating conditions as scheduled.

3.
Spec 23 64 00: Water-cooled Chillers

In spec 23 64 00 line 2.1.B says that “part load and full load efficiency ratings of the chiller shall not exceed those shown on the drawings.” By the inherent nature and design of conditions, either part load efficiency or full load efficiency of competing manufacturers will exceed efficiency rating of the chiller shown on the drawing, please make allowances for full load efficiency rating required for competing chiller manufacturers to bid system.

Shall not exceed values as scheduled and must meet ASHRAE 90.1 current standard as approved per current VA standards.

4.
Spec 23 65 00: Cooling Towers

With regards to the cooling towers, as long as most requirements are met, could a high-density polyethylene cooling tower be considered in lieu of stainless steel?

No, only stainless steel per specifications.

5.
We could not find a soils report in the specifications. Can you check on the availability of one if it exists?
Terracon soils report was previously provided.
6.
There is no specification for the auger cast piling work. Will there be one issued?
ACP were not listed as an option in the geotechnical engineering report. They are not part of the design.
7.
Can the VA provide “ AS Built” drawings of the site underground utilities in the area of the new chiller plant?
The original construction plans for the tunnel were previously provided, but have not been verified in the field. They are provided for information only.
8.
Can the VA provide a complete layout of the existing tunnel with elevations?
The original construction plans for the tunnel were previously provided, but have not been verified in the field. They are provided for information only.
9.
There is a new building presently being constructed with new underground piping, can the VA provide shop drawings of the approximate locations and elevations of the new piping?
That project is a design-build project current being constructed. Shop drawings may be available from COR.
10.
Is there an existing water treatment contractor that presently services the existing chiller plant?

Existing water treatment to be coordinated with existing VA.

11.
Page 84 of the solicitation states the COVID Requirements for this project. Are those COVID-19 requirements valid for this project.
Yes, it is a hospital. Follow the requirements based on current conditions.
12.
There is no mention of tax exemption status. Is this project Tax Exempt?
No, this project is NOT Tax Exempt.
13.
Sheet 0-M-001 Notes: Phase 1 B: PROVIDE TEMPORARY CHILLERS WITH POWER. Are these temporary chillers existing currently on site? Are they new to be provided and rented for the VA?
These chillers are to be provided as part of this project and are not currently rented. Total capacity is the requirement. If quantity exceeds 2, and 3 are provided this is acceptable as long as total capacity exceeds 1250 Tons. Contractor can provide temporary generators or coordinate power by new temporary feed from local utility company. The VA's building and site distribution system does not have capacity for providing power to the temporary chiller.
14.
Sheet O-MS-001 Note 10: TEMPORARY CHILLERS”S TOTAL CAPACITY TO MEET OR EXCEED 1250 TONS. Are there any other requirements for the temporary chillers? Are these rented as part of this project or are they currently being rented by the VA.
These chillers are to be provided as part of this project and are not currently rented. Total capacity is the requirement. If quantity exceeds 2, and 3 are provided this is acceptable as long as total capacity exceeds 1250 Tons.
15.
Various Spec Sections Reference Section 13 05 41 “Seismic Restraint Requirements for Non-Structural Components.” This section is not included in the specification. Are seismic restraints required for this project?
This project is not in a seismic zone. No special restraints are required. Follow manufacturer installation instructions for all equipment.
16.
While drawing 0-M-001 and 0-MS-001 | References ‘provide power to temporary chillers’ there is no reference to any existing spare electrical panels/buckets/switchboards/etc. to power the contractor furnished temporary chillers. Without knowing the electrical infrastructure of Building 17 how is the contractor able to provide accurate estimate to the government (please note that (1) 500 ton air-cooled chiller is rated at +/- 1000 MCA – for a total of 3000 amps needed for (3) chillers in order to meet the campus load). If there is no power available is the contractor required to provide rental generators to power this 3000 amp service? If rental generators are required is the contractor to assume N+1 generation back-up? Please provide clear direction to this very costly temporary rental chiller plant.
Contractor can provide temporary generators or coordinate power by new temporary feed from local utility company. The VA's building and site distribution system does not have capacity for providing power to the temporary chiller.
17.
Is structural calculations really needed for signage? Please see specification section 10 14 00 section 2.2.

For typical single pole signs, no.

18.
Specification section 32 12 16-Asphalt Paving was provided in the specs but it is not shown on the drawings. Please advise.

There is new paving on the west and south sides of the new chiller plant building, and asphalt patching in areas where new chilled water, etc lines are to be installed.

19.
Specification section 07 18 13-Pedestrian Traffic Coatings was provided in the specs but it is not shown on the drawings. Please advise.

This spec section is not required.

20.
Specification section 32 31 13-Chain Link Fence and Gates was provided in the specs but it is not shown on the drawings. Please advise.
The contractor will need to provide temporary fence around construction areas and there are two locations where permanent chain link fence will be modified. These are at the existing fuel storage tanks north of the new chiller building, and at the liquid oxygen tank next to the existing cooling towers to be demolished.