Bldg 10 - Narrative Report.pdf

PDF 1 MB Posted

Attached to
Amendment 0001 - ACM Inspection Service Contract - Fargo
Solicitation number
36C26322Q0029
Issued by

View the file

Other files

File Type Posted
Narrative Report.pdf PDF
Roofing diagram.pdf PDF
Explanation of Attachments.docx DOCX document
Bldg 40 - Narrative Report.pdf PDF
Bldg 39 - Narrative Report.pdf PDF
Tunnels - Narrative Report.pdf PDF
36C26322Q0029 0001.pdf PDF
Volume 2.pdf PDF
Bldg 11 - Narrative Report.pdf PDF
Volume 1.pdf PDF
Attachment 3 - EC-26 Confined Space.docx DOCX document
Bldg 30 - Narrative Report.pdf PDF
Bldg 13 - Narrative Report.pdf PDF
Bldg 12 - Narrative Report.pdf PDF
P15 Drawings.pdf PDF
QA.docx DOCX document
Bldg 3 - Narrative Report.pdf PDF
C03 36C26322Q0029.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING #10

LEGEND No. 0800912

TABLE OF CONTENTS

ITEM

NARRATIVE REPORT

1.0 BUILDING INTRODUCTION

2.0 ASBESTOS SURVEY INFORMATION

2.1 SUSPECT MATERIALS IDENTIFIED AND SAMPLED

2.2 ASBESTOS CONTAINING MATERIALS

2.3 COST ESTIMATES

ACM LOCATIONS/FRIABLE MATERIALS ASSESSMENTS TABLE

ACM LOCATIONS DIAGRAMS

LABORATORY DATA

ASBESTOS BULK SAMPLE RESULTS TABLE

ASBESTOS BULK SAMPLE LOCATIONS DIAGRAM

LEGEND No. 0800912 BUILDING #10 Page 1 of 3

1.0 BUILDING INFORMATION

Building #10 was originally constructed in 1945 and a 1976 renovation extended the building to the south; limited renovations are evident in the building.

The interior floor finishes included floor tile, ceramic tile, and concrete; the interior wall finishes included gypsum wallboard, concrete block, concrete, plaster, and brick; and the interior ceiling finishes included concrete and metal. The roofing system is a flat rubber-membrane roof; the exterior of the structure is brick.

The piping systems were insulated; fiberglass insulation (without hard fittings), millboard insulation (with hard fittings), and mag block insulation (with hard fittings) are located throughout the structure. Generator breeching and boiler breeching were observed in the structure. HVAC systems located in the structure consisted of steam radiators, electric radiators, and a forced air furnace equipped with heating coils.

2.0 ASBESTOS SURVEY INFORMATION

Building #10 was surveyed as part of a larger project for the VA. This report is part of “Volume 2” of a two volume series. This report includes building specific information only; please refer to the opening section of “Volume 2” for methodologies, definitions, and other pertinent supporting information.

A total of 48 samples were collected from suspect asbestos-containing materials (ACM) on October 15, 2008 and an additional 11 samples were collected on November 12, 2008.

Laboratory analysis results indicate 16 of these samples tested positive for asbestos.

2.1 Suspect Materials Identified and Sampled

Floor Tile (multiple types) Floor Tile Mastic (multiple types) Adhesive (multiple types) Ceiling Tile (multiple types) Gypsum Wallboard Joint Compound Plaster- Skimcoat Plaster- Basecoat CMU Coating Foundation Coating (multiple types) Hard Fittings on Mag Block Pipe Insulation Mag Block Pipe Insulation Window Glazing (multiple type) Sink Undercoating HVAC Canvas Connector Tank Insulation (multiple types) Generator Breeching Boiler Breeching Encapsulant on Fiberglass Insulation (multiple types) Gasket (on boiler) Building Seam Caulk (multiple types) Door Caulk (multiple types) Window Caulk (multiple types) Penetration Putty Air Vent Caulk (multiple types) Flashing Hard Fitting on Millboard Pipe Insulation Millboard Pipe Insulation

The Asbestos Bulk Sample Results Table includes asbestos sampling data.

LEGEND No. 0800912 BUILDING #10 Page 2 of 3

2.2 Asbestos Containing Materials

Mastic for 12” Gray/White Mottled Floor Tile Mastic for 12” Cream w/ Tan/Gray Clouds Floor Tile Hard Fitting on Mag Block Pipe Insulation Window Glazing (multiple type) Black Sink Undercoating White HVAC Canvas Connector Blow-Down Tank Insulation Boiler Breeching Door Caulk (1 type) Window Caulk (1 type) Hard Fitting on Millboard Pipe Insulation Millboard Pipe Insulation

The ACM Locations/ Friable Materials Assessments Table includes ACM locations data.

2.3 Cost Estimates

Legend Technical Services Inc. estimates abatement costs (removal & disposal) of ACM as follows:

ACM QUANTITY UNIT COST TOTAL COST

Asbestos Floor Tile Mastic (all types) 261 ft2 $10.00/ft2 $2,610.00 Asbestos Pipe Insulation (all types) 38 ft

127 fittings $25.00/ft

$60.00/fitting $8,570.00 Asbestos Window Glazing (all types) 39 ea $225.00/ea $8,775.00 Asbestos Sink Undercoating 2 ea $150.00/ea $300.00 Asbestos HVAC Canvas Connector 1 ea $250.00/ea $250.00 Asbestos Tank Insulation 1 ea $2,500.00/ea $2,500.00 Asbestos Boiler Breeching 3 ea $5,000.00/ea $15,000.00 Asbestos Door/Window Caulk 3 ea $125.00/ea $375.00

Total Estimated Abatement Costs: $38,380.00

2.4 Survey Notes

LEGEND identified and sampled tank insulation on the blow-down tank in the mechanical room;

a review of the data indicates the insulation contains asbestos. The tank is approximately 7’ tall and 4’ in diameter (113 ft2).

LEGEND identified and sampled boiler breeching on 3 exhaust stacks, one for each boiler, in the boiler room; a review of the data indicates the breeching contains asbestos. Each exhaust stack is approximately 28’ tall and 4’ in diameter for the vertical portion and 15’ tall, 3’ wide, and 5’ long for the horizontal portion (557 ft2 each).

LEGEND identified and sampled Mag Block Pipe Insulation and Hard Fittings in the building; a review of the data indicates all samples of the Mag Block Pipe Insulation and two samples (#54, #57) of the Hard Fittings did not contain asbestos. However, one sample (#19) of the Hard

LEGEND No. 0800912 BUILDING #10 Page 3 of 3

Fittings on Mag Block Pipe Insulation tested positive for asbestos; all the Hard Fittings on Mag Block Pipe Insulation appear identical (homogeneous). A review of available records indicates the piping in the building was abated in the earlier 1980s and re-insulated. LEGEND believes the pipes were re-insulated with non-ACM Mag Block Pipe Insulation and a mix of non-ACM/ACM Hard Fittings at that time; which would be consistent with the tunnel system which was abated/re-insulated at the same time. Due to this, all Hard Fittings on Mag Block Pipe Insulation (including elbows and T-fittings) must be treated as ACM.

LEGEND TECHNICAL SERVICES, INC.

LEGEND No. 0800912 (VA)

ROOM/

ACM

ACM TYPE

(SAMPLE #)

EST.

QUANTITY

MATERIAL

CONDITION

DAMAGE

POTENTIAL

HIGH

M

OD

LOW

ASSESS.

CAT.1 NOTES ABATEMENT INFORMATION

* = Non-Friable materials were not assessed Page 1 of 3

Bathroom (2nd Floor) Mastic for 12” Cream w/ Tan/Gray Clouds Floor Tile

Non-Friable Miscellaneous (4)

42 ft2 N/A* N/A* N/A* The mastic contains asbestos; the floor tile is negative.

LEGEND #: ____________________

Date: ________________________

Boiler Room

White HVAC Canvas Connector

Non-Friable Miscellaneous (22)

1 ea N/A* N/A* N/A* The canvas connector is on the AHU in the southwest corner of the room, upper level.

Boiler Breeching

Friable

TSI

(29,30,31)

3 ea

Damaged Physical

Air Erosion Vibration

1 The boiler breeching is on the exhaust stacks for all 3 boilers (Boiler #2 is partially abated).

Millboard Pipe Insulation

Friable

TSI

(52)

1 feet Significantly Damaged

Physical Air Erosion Vibration

1 The millboard insulation is on a domestic water pipe penetrating the north wall (residual).

Hard Fittings on Mag Block Pipe Insulation

Friable

TSI

(19)

115 ea Good Physical Air Erosion Vibration

6 The hard fittings are throughout the boiler room, both levels.

Entry

Door Caulk Non-Friable Miscellaneous (36)

1 ea N/A* N/A* N/A* The door caulk is around the door on the east end of the room.

Mechanical Room

Blow-Down Tank Insulation

Friable

TSI

(23)

1 ea

Significantly Damaged

Physical Air Erosion Vibration

1 The tank is in the southeast corner of the room.

Insulation and Hard Fittings

Friable

TSI

(50,52)

27 feet 3 fittings

Significantly Damaged

Physical Air Erosion Vibration

1 The millboard insulation and hard fittings are at ceiling level along the east and south walls.

ACM TYPE

(SAMPLE #)

EST.

QUANTITY

MATERIAL

CONDITION

DAMAGE

POTENTIAL

HIGH

M

* = Non-Friable materials were not assessed Page 2 of 3

Block Pipe Insulation

Friable

TSI

(19)

6 ea Good Physical Air Erosion Vibration

6 The hard fittings are on the west end of the room by the stairs.

Office (1st Floor)

Gray/White Mottled Floor Tile

Non-Friable Miscellaneous (2)

125 ft2 N/A* N/A* N/A* The mastic contains asbestos; the

Black Sink Undercoating

Non-Friable Miscellaneous (21)

1 ea N/A* N/A* N/A* The undercoating is on the sink in the southeast corner of the room.

Window Glazing Non-Friable

Miscellaneous (20)

1 ea N/A* N/A* N/A* The glazing is around the window on the north end of the room (window to boiler room).

Office (2nd Floor)

Cream w/ Tan/Gray Clouds Floor Tile

Non-Friable Miscellaneous (4)

74 ft2 N/A* N/A* N/A* The mastic contains asbestos; the

Work Room (1st Floor)

Mastic for 12” Gray/White Mottled Floor Tile

Non-Friable Miscellaneous (2)

20 ft2 N/A* N/A* N/A* The mastic contains asbestos; the floor tile is negative. It is located by the entry to the office.

Black Sink Undercoating

Non-Friable Miscellaneous (21)

1 ea N/A* N/A* N/A* The undercoating is on the sink in the northwest corner of the room.

Block Pipe Insulation

Friable

TSI

(19)

2 ea Good Physical Air Erosion Vibration

6 The hard fittings are by the unit heater along the east wall (they are T-fittings).

ACM TYPE

(SAMPLE #)

EST.

QUANTITY

MATERIAL

CONDITION

DAMAGE

POTENTIAL

HIGH

M

* = Non-Friable materials were not assessed Page 3 of 3

Work Room (2nd Floor)

Insulation and Hard Fittings

Friable

TSI

(50,52)

10 feet 1 fitting

Good Physical Air Erosion Vibration

6 The millboard insulation is along the south wall.

Exterior

Door Caulk Non-Friable Miscellaneous (36)

1 ea N/A* N/A* N/A* The door caulk is around the door to the entry on the west end of the building.

Window Caulk Non-Friable

Miscellaneous (39)

1 ea N/A* N/A* N/A* The window caulk is around the window to the entry on the west end of the building.

Window Glazing Non-Friable

Miscellaneous (40,41)

38 ea N/A* N/A* N/A* Refer to the ACM Locations Diagram for exact locations.

1Assessment Categories:

1) Damaged or Significantly Damaged TSI ACM 5) ACM with Potential for Damage

2) Damaged Friable Surfacing ACM 6) ACM with Potential for Significant Damage

3) Significantly Damaged Friable Surfacing ACM 7) Any Remaining Friable ACM or Friable Suspected ACM

4) Damaged or Significantly Damaged Friable Miscellaneous ACM

End

LABORATORY DATA

MATERIAL/

SAMPLE NO. LAB NO. LOCATION PHYSICAL DESCRIPTION ASBESTOS CONTENT BALANCE OF MATERIAL

< = Less than the number shown Page 1 of 7

1 0800912-NV 1st Floor Office North End

12” Gray/White Mottled Floor Tile Gray, Cementitious Homogeneous

None Detected <1% Cellulose 99% Nonfibrous

2 0800912-NW 1st Floor Office North End

Mastic for Sample #1 Black, Cementitious Homogeneous

5% Chrysotile 3% Cellulose 92% Nonfibrous

3 0800912-NX 2nd Floor Bathroom West End

12” Cream w/ Tan/Gray Clouds Floor Tile Gray, Cementitious Homogeneous

None Detected 100% Nonfibrous

4 0800912-NY 2nd Floor Bathroom West End

Mastic for Sample #3 Black, Cementitious Homogeneous

5% Chrysotile 95% Nonfibrous

5 0800912-NZ 1st Floor Office Southeast Corner

Adhesive (for baseboard) Brown, Cementitious Homogeneous

None Detected 3% Cellulose 97% Nonfibrous

6 0800912-OA 2nd Floor Bathroom West End

Adhesive (for baseboard) Brown, Cementitious Homogeneous

None Detected 100% Nonfibrous

7 0800912-OB 1st Floor office South End

2’x4’ White w/ Craters and Pinholes CT Gray, Fibrous Homogeneous

None Detected 60% Cellulose 30% Nonfibrous

10% Glass 8 0800912-OC 1st Floor Bathroom

South End 2’x4’ White w/ Widthwise Fissures/Pinholes CT Gray, Fibrous Homogeneous

None Detected 40% Cellulose 20% Nonfibrous

40% Glass 9 0800912-OD 1st Floor Bathroom

East End 2’x4’ White w/ Long Worms and Pinholes CT Gray, Fibrous Homogeneous

None Detected 40% Cellulose 30% Nonfibrous

30% Glass

< = Less than the number shown Page 2 of 7

10 0800912-OE 2nd Floor Office East Wall

Gypsum Wallboard White, Cementitious Homogeneous

None Detected 5% Cellulose 93% Nonfibrous

2% Glass 11 0800912-OF 2nd Floor Office

East Wall Joint Compound White, Cementitious Homogeneous

None Detected 100% Nonfibrous

12 0800912-OG 2nd Floor Office West Wall

Plaster- Skimcoat White, Cementitious Homogeneous

None Detected 100% Nonfibrous

13 0800912-OH 2nd Floor Office West Wall

Plaster- Basecoat Gray, Cementitious Homogeneous

None Detected <1% Cellulose 99% Nonfibrous

14 0800912-OI 2nd Floor Work Room East Wall

CMU Coating Gray, Cementitious Homogeneous

None Detected 100% Nonfibrous

15 0800912-OJ Mechanical Room East Wall

Foundation Coating Gray, Cementitious Homogeneous

None Detected 2% Cellulose 98% Nonfibrous

16 0800912-OK Boiler Room Feedwater Pipe (Blue)

Mag Block Pipe Insulation (straight) White, Cementitious Homogeneous

None Detected 20% Cellulose 70% Nonfibrous

10% Hair 17 0800912-OL Boiler Room

Condensate Pipe (Brown)

Mag Block Pipe Insulation (straight)

None Detected 15% Cellulose 70% Nonfibrous

15% Glass 18 0800912-OM Boiler Room

High Pressure Steam Pipe (Orange)

Mag Block Pipe Insulation (valve)

None Detected 90% Nonfibrous 10% Glass

< = Less than the number shown Page 3 of 7

19 0800912-ON Boiler Room Low Pressure Steam Pipe (Yellow)

Hard Fitting on Mag Block Pipe Insulation White/Gray, Cementitious Heterogeneous

5% Chrysotile 10% Cellulose 75% Nonfibrous

10% Glass 20 0800912-OO 1st Floor Office

North End Window Glazing Gray, Cementitious

3% Chrysotile 97% Nonfibrous

21 0800912-OP 1st Floor Work Room Northwest Corner

Black Sink Undercoating Black, Cementitious

5% Chrysotile 95% Nonfibrous

22 0800912-OQ Boiler Room Southwest Corner

White HVAC Canvas Connector White, Fibrous

80% Chrysotile 20% Cellulose

23 0800912-OR Mechanical Room Blow-Down Tank

Tank Insulation (side) White, Fibrous Homogeneous

30% Amosite 50% Nonfibrous 20% Glass

24 0800912-OS Mechanical Room Blow-Down Tank

Tank Insulation (end) White, Fibrous Homogeneous

None Detected 15% Cellulose 55% Nonfibrous

25% Glass 5% Mica

25 0800912-OT Boiler Room De-Aerator Tank

Tank Insulation (side) Gray, Fibrous Homogeneous

None Detected 35% Cellulose 45% Nonfibrous

20% Glass 26 0800912-OU Boiler Room

De-Aerator Tank Tank Insulation (end) Gray, Fibrous Homogeneous

None Detected 30% Cellulose 50% Nonfibrous

20% Glass 27 0800912-OV Generator Room

West End Generator Breeching (straight) Gray, Fibrous Homogeneous

None Detected 30% Cellulose 50% Nonfibrous

20% Glass

< = Less than the number shown Page 4 of 7

28 0800912-OW Generator Room West End

Generator Breeching (elbow) Gray, Fibrous Homogeneous

None Detected 30% Cellulose 45% Nonfibrous

20% Glass 5% Mica

29 0800912-OX Boiler Room Exhaust Stack #1 by Boiler #1

Boiler Breeching (vertical) Gray, Fibrous Homogeneous

3% Chrysotile 5% Cellulose 62% Nonfibrous

30% Glass 30 0800912-OY Boiler Room

Exhaust Stack #1

Boiler Breeching (horizontal) Gray, Fibrous Homogeneous

5% Chrysotile 75% Nonfibrous 20% Glass

31 0800912-OZ Boiler Room Exhaust Stack #1 by Boiler #1

Boiler Breeching (access hatch) Gray, Fibrous Homogeneous

5% Chrysotile 70% Nonfibrous 15% Glass 10% Mica

32 0800912-PA Mechanical Room North End

Encapsulant on Fiberglass Insulation White, Cementitious Homogeneous

None Detected 95% Nonfibrous 5% Glass

33 0800912-PB Boiler Room by Boiler #3

Encapsulant on Fiberglass Insulation White, Cementitious Homogeneous

None Detected 3% Cellulose 97% Nonfibrous

34 0800912-PC Boiler Room

Gasket (on boiler #1) Gray, Cementitious Homogeneous

None Detected 100% Nonfibrous

35 0800912-PD Boiler Room East End

Building Seam Caulk White, Cementitious Homogeneous

None Detected 100% Nonfibrous

36 0800912-PE Exterior West End

Door Caulk White, Cementitious

3% Chrysotile 97% Nonfibrous

< = Less than the number shown Page 5 of 7

37 0800912-PF Exterior East End

Door Caulk Gray, Cementitious Homogeneous

None Detected 98% Nonfibrous 2% Glass

38 0800912-PG Exterior East End

Window Caulk Gray, Cementitious Homogeneous

None Detected 95% Nonfibrous 5% Synthetic

39 0800912-PH Exterior West End by Entry

Window Caulk (small window) White, Cementitious Homogeneous

3% Chrysotile 2% Cellulose 95% Nonfibrous

40 0800912-PI Exterior by Entry

Window Glazing (small window) Gray, Cementitious Homogeneous

2% Chrysotile 97% Nonfibrous <1% Glass

41 0800912-PJ Exterior East End

Window Glazing (large windows) Gray, Cementitious Homogeneous

2% Chrysotile 97% Nonfibrous <1% Glass

42 0800912-PK Exterior West End

Penetration Putty Gray, Cementitious Homogeneous

None Detected 10% Cellulose 90% Nonfibrous

43 0800912-PL Exterior

South End Air Vent Caulk Gray, Cementitious Homogeneous

None Detected 100% Nonfibrous

44 0800912-PM Exterior South End

Air Vent Caulk Gray, Cementitious Homogeneous

None Detected 100% Nonfibrous

45 0800912-PN Exterior West End

Building Seam Caulk Gray, Cementitious

None Detected 100% Nonfibrous

< = Less than the number shown Page 6 of 7

46 0800912-PO Exterior

Building Seam Caulk White, Cementitious Homogeneous

None Detected 2% Cellulose 98% Nonfibrous

47 0800912-PP Exterior West End

Foundation Coating Gray, Cementitious Homogeneous

None Detected 99% Nonfibrous <1% Glass

48 0800912-PQ Roof South End

Flashing (on perimeter) Black, Cementitious Homogeneous

None Detected 100% Nonfibrous

49 0800912-ZF Boiler Room Feedwater Piping (Blue)

Mag Block Pipe Insulation (encapsulant) Gray, Cementitious Homogeneous

None Detected 15% Cellulose 65% Nonfibrous

20% Glass 50 0800912-ZG Mechanical Room

Domestic Water Piping Northeast Corner

Hard Fitting on Millboard Pipe Insulation White, Fibrous Homogeneous

25% Chrysotile 5% Amosite

10% Cellulose 55% Nonfibrous

5% Glass 51 0800912-ZH Mechanical Room

High Pressure Steam Piping (Orange)

Mag Block Pipe Insulation (encapsulant) Gray, Cementitious Homogeneous

None Detected 30% Cellulose 30% Nonfibrous

40% Glass 52 0800912-ZI Mechanical Room

Domestic Water Piping Northeast Corner

Millboard Pipe Insulation Tan/Gray/Black, Fibrous Layered

5% Chrysotile 80% Cellulose 15% Nonfibrous

53 0800912-ZJ Boiler Room

Low Pressure Steam Piping (Yellow)

Mag Block Pipe Insulation (straight) White, Cementitious Homogeneous

85% Nonfibrous

54 0800912-ZK Boiler Room

Condensate Piping (Brown)

Hard Fitting on Mag Block Pipe Insulation White, Cementitious Homogeneous

< = Less than the number shown Page 7 of 7

55 0800912-ZL Boiler Room High Pressure Steam Piping (Orange)

Mag Block Pipe Insulation (straight) White, Cementitious Homogeneous

56 0800912-ZM Boiler Room

Low Pressure Steam Piping (Yellow)

Mag Block Pipe Insulation (valve) Gray, Cementitious Homogeneous

None Detected 20% Cellulose 75% Nonfibrous

5% Glass 57 0800912-ZN Boiler Room

High Pressure Steam Piping (Orange)

Hard Fitting on Millboard Pipe Insulation Gray, Cementitious Homogeneous

None Detected 15% Cellulose 70% Nonfibrous

10% Glass 5% Wollastonite

58 0800912-ZO Boiler Room Northwest Corner Steam Manifold (Orange)

Mag Block Pipe Insulation (end) Gray, Cementitious Homogeneous

None Detected 15% Cellulose 82% Nonfibrous

3% Glass 59 0800912-ZP Boiler Room

Northwest Corner Steam Manifold (Orange)

Mag Block Pipe Insulation (side) Gray, Fibrous Homogeneous

None Detected 10% Cellulose 60% Nonfibrous

20% Glass 10% Wollastonite