36C26322Q0029 0001.pdf
PDF 139 KB Posted
- Solicitation number
- 36C26322Q0029
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Narrative Report.pdf | ||
| Roofing diagram.pdf | ||
| Explanation of Attachments.docx | DOCX document | |
| Bldg 40 - Narrative Report.pdf | ||
| Bldg 39 - Narrative Report.pdf | ||
| Tunnels - Narrative Report.pdf | ||
| Volume 2.pdf | ||
| Bldg 11 - Narrative Report.pdf | ||
| Bldg 10 - Narrative Report.pdf | ||
| Volume 1.pdf | ||
| Attachment 3 - EC-26 Confined Space.docx | DOCX document | |
| Bldg 30 - Narrative Report.pdf | ||
| Bldg 13 - Narrative Report.pdf | ||
| Bldg 12 - Narrative Report.pdf | ||
| P15 Drawings.pdf | ||
| QA.docx | DOCX document | |
| Bldg 3 - Narrative Report.pdf | ||
| C03 36C26322Q0029.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
36C263
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506 St. Paul MN 55101
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506 St. Paul MN 55101
To all Offerors/Bidders
36C26322Q0029
X
See CONTINUATION Page
X 1
The purpose of this modification is to post the answers to questions and to extend the date the offers are due.
Offers were due 12/15/21 at noon and it is now 12/21/21 at noon.
Please see documents attached.
All other terms and conditions remain the same.
CONTINUATION PAGE
Time: 12:00 PM CST Date: December 9, 2021 Location: Fargo VA Health Care System -----, Contracting Officer Jean Cave, Contract Specialist
1.Offeror’s Question VA’s Answer
1. Document C03+36C26322Q0029: The SF1449 indicates a due date of Wednesday, 12-15-2021 (12:00 CST). However, on page 33 of 104, it indicates the submittal date is Friday, 12-10-2021 (9:00am CST). Please clarify which is the acceptable date.
Currently offers are due 12/15/2021 at 12:00 PM CST, but likely to get pushed out to 12/21/2021 at 12:00 PM CST.
2. Is the “new database management system” already in place?
Currently there is no database management system in Fargo. The contractor for this project will be creating the first one that will be used for the foreseeable future.
3. Is the intent of the contract to create a new database?
Yes. This database will be used for asbestos tracking on campus for the foreseeable future.
4. If the database is in place, how will we interface with it?
Currently there is no database management system in Fargo. Please see SOW for current software in use here in Fargo.
5. Do we input Data directly into the database (if it exists)?
Currently there is no database management system in Fargo. Please see SOW for current software in use here in Fargo.
6. Is there a list of the 17 buildings with the number of floors, the square footage per floor, and if a basement exists?
See attachment 1 of SOW.
7. Are any of the roofs under warranty?
Most of the roofs are no longer under warranties. See map on page 3 for roof locations currently under warranty.
ACM Inspection Service Contract – 2022
8. Are any permit-required confined spaces included in the areas to be inspected?
Yes. It is the contractor’s responsibility to follow local confined space SOP, see attachment 3, and the VA observe. One such area is the steam tunnel.
9. Attachment #1: Missing attachment. Please provide missing attachment for building & steam tunnel layouts.
Please see attachment 1.
10. Attachment #2: Missing attachment. Please provide the previous 2008 Asbestos Survey.
Please see attachment 2.
11. This is too rushed, extend the question period and the due date.
Questions are due 12/9/2021 at 12:00 PM CST and offers are currently due 12/15/2021 at 12:00 PM CST.
12. Do you have a set number of asbestos samples for the contractors to bid? So, everyone is bidding on the same work scope?
VA shall not set a “number of asbestos samples”, offerors shall determine the number of samples they need to take to provide a complete report based on the solicitation, SOW, attachments, etc. that all offerors have access to.
13. Establish a set number of asbestos bulk samples to bid like 500, then include a unit rate for additional samples.
VA shall not set a “number of asbestos samples”, offerors shall determine the number of samples they need to take to provide a complete report based on the solicitation, SOW, attachments, etc. that all offerors have access to.
14. The RFP indicates this is a destructive survey, do you want holes punched into walls, ceilings, flooring?
We do not expect holes “punched” anywhere. If there is a reasonable suspicion that there may be ACM behind a partition/wall/barrier/etc. that needs to be tested, then an access hole will be created to allow access to test the suspect material.
The hole will then need to be patched to match. If a location is suspected that it cannot be repaired discuss with COR on how to proceed. All test locations should be in inconspicuous locations and patched to match back to before sampling conditions. If the prime contractor does not have experience in finish work, then it is expected that they will hire a licensed journeyman level sub with experience to perform the work for them. Suspect ACM locations will be discovered through investigation, survey, inspection, past survey information review, experience, etc.
from the contractor. Prime will use the appropriate sub for all utility work/access/sampling/etc.
15. A trench was stated that had to be opened up to test for pipes below (basement hallway of Bldg. 9)? Who will cut open the concrete and repair?
The trench has sectioned concrete covers that are removable. Most of the trench is currently beneath LVT in the hallway, the covers are exposed in BA-09 and easily removed. If LVT needs to be removed it is the responsibility of the contractor to put the LVT back to the condition it was found in. If the prime contractor does not have experience in tile work, then it is expected that they will hire someone with experience to perform the work for them.
16. RFP states floor tile to be repaired if sampled, who purchases, matches, and installs the new floor tiles?
It is the responsibility of the prime contractor to put the LVT back to the condition it was found in. If the prime contractor does not have experience in tile work, then it is expected that they will hire someone with experience to perform the work for them. Prime will use the appropriate sub for all utility work/access/sampling/etc.
17. The RFP is not clear, are previous sampling report sample results to be used or the materials resampled?
Previous sampling reports will be made available, but they are to be used to help identify areas needing sampling. No results from previous surveys will be used for this contract.
18. Wiring is to be sampled? Who hires the electrician to cut the wires, shut down the electrical, and who pays to replace the wiring?
If there is a reasonable suspicion that wiring may contain asbestos, then it will be tested. It is the responsibility of the prime contractor to safely sample the wiring insulation. If the prime contractor does not have experience in this work, then it is expected that they will hire a licensed journeyman level sub with experience to perform the work for them. Prime will use the appropriate sub for all utility work/access/sampling/etc.
19. Hood ducting, countertops, fume hoods are to be sampled. This is destructive sampling, who replaces the damaged sampled equipment?
Sampling of this equipment and furniture should not destroy them. Take inconspicuous samples and repair sample locations as needed, coordinate with
COR.
20. Are roofing samples to be collected? If so, who hires the roofer to cut and repair the holes. A licensed roofing contractor has to make the cuts into DPM roofing or the warranty is void. If that is included, we need to know how many different roofs area present.
See SOW and attachments for roofing layout and square footage. It is the responsibility of the prime contractor to sample roofing material. If the prime contractor does not have experience in this work, then it is expected that they will hire a licensed journeyman level sub with experience to perform the work for them. Prime will use the appropriate sub for all utility work/access/sampling/etc.
See attached document: Explanation of Attachments.
See attached document: Volume 1.
See attached document: Volume 2.
See attached document: Narrative Report.
See attached document: Tunnels - Narrative Report.
See attached document: Bldg 3 - Narrative Report.
See attached document: Bldg 10 - Narrative Report.
See attached document: Bldg 12 - Narrative Report.
See attached document: Bldg 11 - Narrative Report.
See attached document: Bldg 13 - Narrative Report.
See attached document: Bldg 30 - Narrative Report.
See attached document: Bldg 39 - Narrative Report.
See attached document: Bldg 40 - Narrative Report.
See attached document: Roofing diagram.
See attached document: P15 Drawings.
See attached document: Attachment 3 - EC-26 Confined Space.