S06 Amendment A003_ DWG T-001.pdf
PDF 519 KB Posted
- Attached to
- Z2DA--EHRM GLA Main Campus Construction, Project 691-20-200 Federal contract opportunity
- Solicitation number
- 36C26221B0009
About this file
This solicitation notice provides details for an upcoming construction services project at the VA West Los Angeles Healthcare System located in Los Angeles, California. The project scope includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures to complete Electronic Health Record Modernization Infrastructure Upgrades. The work will be performed in a functioning hospital environment. The North American Industry Classification Code is 236220, Commercial and Institutional Building Construction with a Size Standard of $39.5M. The construction project magnitude is between $20,000,000 to $50,000,000. The solicitation will be issued as an Invitation for Bid on or around July 13, 2021 via www.sam.gov. A mandatory site visit will be scheduled to review the scope of work. This requirement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses listed on www.vip.vetbiz.va.gov.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONCRETE
WALK
RAMP DN
RAMP DOWN
STAIR
RAMP DOWN
A
B
C
D
E
F G
H
J
K
L
M
N
O
P
Q
R
S
FIRE PENETRATIONS NOTE
- M -
MAIN CIRCUIT BREAKER
NEUTRAL
MCB
N
- N -
PHASE
POWER
PANEL
PWR
PNL
- R -
- P -
ROOM
RECEPTACLE
RM
RECEPT
- B -
AMPERE
- A -
A
- C -
CIRCUIT
CIRCUIT BREAKER
BUILDING
CONDUIT
BLDG
CKT
C
CB
- E -
EG
- G -
GROUNDG, GND
EQUIPMENT GROUND
ABBREVIATIONS
VOLT OR VOLTAGE
VOLT AMPEREVA
V
- V -
WATTW
- W -
- J -
- K -
KILOVOLT AMPERE
KILOVOLT
JUNCTION BOX
KV
KW
KVA
JB
KILOWATT
ABOVE FINISHED FLOORAFF
UON UNLESS OTHERWISE NOTED
- U -
E1.01
AC
X
MOTOR TYPE
REVISION
RISER TAGPOINT OF CONNECTION
SCHEDULE NUMBER
# LIGHT FIXTURE TYPE
INDICATES DETAIL NUMBER
SHEET NUMBER TO FIND DETAIL
SPECIFIC NOTE/
POINT OF DISCONNECTION
REFERENCE NOTE
ANNOTATIONS
EWC ELECTRIC WATER COOLER
T-001
TELECOMMUNICATIONS
GENERAL NOTES:
ABBREVIATIONS VA
EHRM ELECTRONIC HEALTH RECORD MODERNINATION
CERNER INFORMATION TECHNOLOGY COMPANY
CEDT CERNER EHRM DEPLOYMENT TEAM
EUD END USER DEVICE
CIH CERTIFIED INDUSTRIAL HYGIENIST
LBVAMC LONG BEACH VA MEDICAL CENTER
MDF MAIN DISTRIBUTION FRAME
TR TELECOMMUNICATIONS ROOM
OIT OFFICE OF INFORMATION TECHNOLOGY
3D
3D
WALL MTD DATA OUTLET
W/3 CAT 6A DROPS
FLOOR MTD DATA OUTLET
W/3 CAT 6A DROPS
SEE DRAWING T-504
ABBREVIATIONS IT
SM
MM
SFP
ORL
OTDR
UTP
LAN
SINGLE MODE FIBER
MULTI MODE FIBER
SMALL FORM FACTOR PLUGGABLE TRANSCEIVER
OPTICAL RETURN LOSS
OPTICAL TIME DOMAIN REFLECTOMETER
UNSHIELDED TWISTED PAIR
LOCAL AREA NETWORK
EIA
TIA
OS1, OS2
OS2
ELECTRONIC INDUSTRIES ASSOCIATION
TELECOMMUNICATION INDUSTRY ASSOCIATION
TYPE OF SINGLE MODE FIBER
AIR BLOWN SINGLE MODE FIBER
1. PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS IN ACCORDANCE
WITH THE SPECIFICATIONS AND THE PROJECT SCHEDULE. NO INSTALLATION
SHALL PROCEED WITHOUT APPROVAL OF THE SHOP DRAWINGS.
2. MINIMAL STORAGE WILL BE AVAILABLE ON THE CONSTRUCTION SITE. CABLING
CONTRACTOR RESPONSIBLE FOR RECEIVING AND STORING MATERIALS AND
FOR COORDINATING MATERIALS DELIVERY TO THE JOB-SITE.
3. COMMUNICATIONS CABLES INSTALLED SHALL BE INSTALLED IN ACCORDANCE
WITH THE REQUIREMENTS DETAILED HEREIN AND SHALL BE FREE OF KINKS,
TWISTS, SHARP BENDS, UNNECESSARY LOOPS OR WORKMANSHIP DEFECT.
4. PROPERLY SEAL WALL PENETRATIONS THROUGH FIRE RATED WALL & FLOOR
USING EZ PATH DETAILED ON T-504.
5. RUN OPEN CABLE FOR EACH SYSTEM IN SLEEVES, J-HOOKS DEDICATED FOR
THE SYSTEM.
6. SEPARATE AND BUNDLE CABLE BY SYSTEM.
7. MAINTAIN EIA/ TIA RECOMMENDED SEPARATIONS BETWEEN CABLING OF
DIFFERENT SYSTEMS. 6'' FROM LIGHT FIXTURES. 24'' FROM 480V & 12'' FROM
208V.
8. MAINTAIN RECOMMENDED SEPARATIONS BETWEEN CABLING AND
INTERFERENCE PRODUCING ELECTRICAL DEVICES SUCH AS POWER CABLING,
ELECTRICAL PANELS, FLUORESCENT LIGHTS, BALLAST RELAYS, ELECTRIC
MOTORS, MOTOR CONTROLLERS, VFD, TRANSFORMERS AND OTHER
ELECTROMAGNETIC DEVICES. SEE NOTE 7.
9. WHERE CABLE IS OPEN ON J-HOOK SYSTEM, RUN PARALLEL OR
PERPENDICULAR TO WALLS AND SUPPORT A MINIMUM OF EVERY 5 FEET USING
APPROVED J-HOOKS.
10. ALL CABLE HOOKS AND OTHER CABLE SUPPORT DEVICES SHALL BE ATTACHED
TO THE BUILDING STRUCTURE IN ACCORDANCE WITH CODES AND
SPECIFICATIONS.
11. NO OPEN CABLE SHALL BE DRAPED OVER OR SUPPORTED ON PLUMBING,
ELECTRICAL, MEDICAL GAS, FIRE SUPPRESSION, OR OTHER PIPING OR
DUCTWORK.
12. ALL CABLES TO BE PLENUM RATED.
13. THE CABLE LENGTH FROM THE TERMINATION POINT IN TR TO EUD IN THE
WORK AREA SHALL NOT EXCEED 295FEET INDEPENDENT OF MEDIA TYPE.
14. THE 295FEET INCLUDES AN ALLOWANCE OF 10FEET FROM EUD TO DEVICE AND
AN ADDITIONAL 24 FEET FROM PATCH PANEL TO ACTIVE COMPONENTS IN TR.
15. VISUALLY INSPECT CONNECTIONS ON CABLE TO ENSURE PROPER COMPLIANCE
WITH EIA/TIA 568B TERMINATION.
16. INSPECT ALL EXPOSED PORTIONS OF THE CABLE TO INSURE A MINIMUM OF 4
TIMES THE CABLE DIAMETER BEND RADIUS AT ANY POINT.
17. ENSURE NO CABLE BUNDLES OR TIE POINTS DISPLAY KINKS, SHARP BENDS,
CREASING OR DEFORMATION OF OUTER SHEATH OR SIGNS OF EXCESSIVE
PULLING FORCE.
18. IN TR CABLES SHOULD BE COMBED AND DRESSED UP BEFORE BUDLING AND
USING VELCRO STRAPS. ZIP TIES OR TWIST TIES SHALL NOT BE USED. STRAPS
SHALL BE SPACED AT APPROPRIATE DISTANCE TO ENSURE CABLES ARE HELD
TOGETHER.
19. ON THE RACK THE CABLES SHOULD BE DIVIDED IN THE MIDDLE, WHERE HALF
FLOWS TO THE LEFT AND HALF FLOWS TO THE RIGHT.
20. ALL CABLING SHALL BE INSTALLED BY CABLE MANUFACTURER'S CERTIFIED
INSTALLER.
21. BEFORE ACCEPTANCE OF ANY NEWLY INSTALLED COMMUNICATIONS WIRING,
THE CABLE WILL UNDERGO SEVERAL LEVELS OF TESTING TO ENSURE THAT ALL
MATERIALS AND INSTALLATION CONFORM TO STANDARD INCLUDED IN THE
DRAWINGS AND SPECIFICATIONS. THIS WILL INCLUDE BOTH THE UTP AND FIBER
OPTICS SYSTEMS. FAILURE TO MEET THE DRAWINGS AND SPECIFICATIONS
SHALL CONSTITUTE REASON TO REJECT THE INSTALLATION UNTIL ALL
PROBLEMS ARE SOLVED.
22. ALL RECORDED TESTING RESULTS SHALL REMAIN IN THE APPROPRIATE TR.
TEST BOTH CABLES AND THEIR CORRESPONDING CONNECTING SYSTEMS AS A
WHOLE UNIT TO ENSURE SYSTEM INTEGRITY.
23. TEST ALL FIBER OPTICS CABLE AND COMPONENTS COMPRISING THE
BACKBONE SYSTEM. TEST ALL FIBER STRAND IN BOTH DIRECTION. USE OTDR
OPERATING AT BOTH 1310 AND 1550 NM WAVELENGTHS.
24. PHYSICAL LABELING FOR ALL CABLES AND RELATED COMPONENTS IS
REQUIRED COMPONENTS WILL DEPEND HEAVILY ON ADHERING TO A LOGICAL
LABELING SCHEME TO ENABLE EXPEDIENT PATCH PANEL, DATA JACK AND
SWITCH PORT IDENTIFICATION.
25. PROVIDE ALL NEW CABLING IN THE BUILDING S WITH AN AS-BUILT,
ELECTRONICALLY AND PAPER, FOR THE CABLE PLANT. EACH TR WIRING
CLOSETS CABLE PLANT AS-BUILT WILL BE INSTALLED IN A FOLDER ON THE
BACK OF THE DOOR SECURED IN A HOLDER ATTACHED TO THE DOOR.
METHOD OF PROCEDUREMOP
SPECIFIC NOTE/
REFERENCE NOTE
SECURITY SYMBOLS
A
F i l e
P a t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
C
D
20-SCE-07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
FIRE PROTECTION WALL SYMBOLS
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
- D -
DEEPD
- H -
HEIGHTH
26. CABLING DIAGRAM: SUBMIT, FOR APPROVAL, A COMPLETE CABLING DIAGRAM. THE DIAGRAM SHALL BE BASED ON THE DRAWING INCLUDED IN THE CONSTRUCTION DOCUMENTS. IT SHALL BE UPDATED TO SHOW QUANTITIES AND PART NUMBERS FOR ALL COMPONENTS INCLUDING PATCH PANELS, CABLE, SERVER CABINETS AND EQUIPMENT RACKS AND ALL OTHER ASSOCIATED COMPONENTS. INCLUDE THE
FOLLOW:
1). DETAIL AND ELEVATION DRAWINGS: PROVIDE TR RACK ELEVATION, ENLARGED TR
ROOM LAYOUT.
2). BUILDING COMPOSITE FLOOR PLANS: PROVIDE BUILDING FLOOR PLANS SHOWING WORK AREA OUTLET (WAO) OUTLET LOCATIONS AND CONFIGURATION, TYPES OF JACKS, DISTANCE FOR EACH
CABLE, AND CABLE ROUTING LOCATIONS.
3). FLOOR PLANS TO INCLUDE:
a. FINAL ROOM NUMBERS AND ACTUAL BACKBONE CABLING AND PATHWAY LOCATIONS
(HORIZONTAL AND VERTICAL) AND LABELING.
b. RISER FLOOR PENETRATION / DATA POLE LOCATION AFTER SCANNING THE FLOOR FOR
REBARS.
c. INPUTS AND OUTPUTS OF EQUIPMENT IDENTIFIED ACCORDING TO LABELS INSTALLED ON
CABLES AND EQUIPMENT.
d. DEVICE LOCATIONS WITH LABELS.
e. EZ PATH SLEEVES.
f. WIRING DIAGRAM.
g. LABELING AND ADMINISTRATION DOCUMENTATION.
SCALE: NO SCALE
TR 16SA
TR 15SA
TR 14SA
TR 13SA
TR 12SA
TR 11SA
TR 10SA
TR 16IS
TR 15IS
TR 14IS
TR 13IS
TR 12IS
TR 11IS
TR 10IS
TR 16IN
TR 15IN
TR 14IN
TR 13IN
TR 12IN
TR 11IN
TR 10IN
TR 16SE
TR 15SE
TR 14SE
TR 13SE
TR 12SE
TR 11SE
TR 10SE
PATCH CORDS TABLE
27. ALL DATA & TELEPHONE CABLES THAT ARE REMOVED WILL BE RECYCLED BY VA.
PLEASE DISPOSE OFF CABLES TO VA PROVIDED DUMPSTERS.
28. THE LOCATION OF END USER DEVICES (EUD) SHOWN ON THESE DRAWINGS ARE
APPROXIMATE AND ARE SUBJECT TO VERIFICATION BY THE CONTRACTOR.
CONTRACTOR SHALL REMOVE EXISTING EUD DATA OUTLETS AND PROVIDE NEW
EUD DATA OUTLETS AT THE SAME LOCATION.
29. ALL CAT 6A CABLES TO BE PLENUM AND POE RATED.
THE CONTRACTOR TO COORDINATE WITH VA AND REMOVE ABANDONED SYSTEMS/
ITEM IDENTIFIED BY VA. EXAMPLE INCLUDE OLD FIRE ALARM PANELS, BATTERIES
AND CHARGERS, TELEPHONE EQUIPMENT NOT IN USE, OLD 110 BLOCKS NOT IN
USE, EXISTING FIBERS, EXISTING FIBER DISTRIBUTED LINE MODULE (FOLM).
31. THE CORE AREA EUD LOCATION OF FLOORS 2-6 SHALL BE SERVED WITH CAT6A BY EITHER THE NORTH (IN) OR SOUTH (IS)INTERSTITIAL TELECOM ROOM. THIS SHOULD BE CONSISTENT FOR CORE AREAS FLOORS 2-6.
WHEN RE-CABLING EXISTING SLEEVES SHALL BE REMOVED AND NEW DRY WALL MUST BE INSTALLED
AND FINISHED BEFORE INSTALLING NEW SLEEVES.
CONTRACTOR TO REMOVE ALL 66 BLOCK AND ASSOCIATED CABLING OF ALL TR ROOM. ALL REMOVED
CABLING SHALL BE PUT IN A VA FURNISHED DUMPSTER FOR RECYCLING.
IN TR WHICH REQUIRES INSTALLATION OF FIRE RATED TELEPHONE BACKBOARDS. AFTER UNUSED DEVICES, 110 BLOCK AND OTHER ITEMS ARE REMOVED CONTRACTOR WILL DEMOUNT THE REMAINING
ITEMS, SUPPORT IT TEMPORARILY, INSTALL THE BACKBOARD AND REMOUNT ITEMS ON THE
BACKBOARD.
ALL UNUSED CABLES IN UNDERGROUND CONDUIT SYSTEM INCLUDING ASSOCIATED MANHOLES SHALL
BE PULLED OUT AND REMOVED BY CONTRACTOR AND TRANSPORTED TO VA SUPPLIED DUMPSTERS
INTENDED FOR RECYCLING BY VA. CONTRACTOR SHALL COORDINATE WITH VA WHO WILL IDENTIFY UNUSED CABLES WITHIN EACH MANHOLE. THERE ARE EXISTING LEAD SHEATHED CABLES THAT WILL
REQUIRE SPECIAL HANDLING AND COORDINATION WITH VA.
32.
33.
34.
30.
35.
BLDG. 500 INTERSTITIAL LEVEL EXISTING TR WAY FINDING MAP
TELEPHONE CABLE SCHEDULE
FIRE ALARM SYMBOLS
FIRE ALARM AUDIO/VISUAL INDICATING UNIT
AUTOMATIC FIRE ALARM SMOKE DETECTOR
ADDENDUM 08-12-2021
AUGUST 12, 2021
File details come from the government source that posted it. Updated .