691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part5.pdf

PDF 47 MB Posted

Attached to
Z2DA--EHRM GLA Main Campus Construction, Project 691-20-200
Solicitation number
36C26221B0009
Issued by

About this file

This notice provides information about an upcoming federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 will issue an Invitation for Bid on or around July 13, 2021 via Contract Opportunities for Project 691-20-200 at the VA West Los Angeles Healthcare System campus. The project scope includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures to support Electronic Health Record Modernization Infrastructure Upgrades. The work will be performed in a functioning hospital environment. The contract will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses and have a value between $20-50 million. The North American Industry Classification Code is 236220 for Commercial and Institutional Building Construction. A site visit will be scheduled for interested vendors to inspect the location and ask any questions before submitting a bid response.

View the file

Other files

File Type Posted
S06 Amendment A003_ DWG 527_E-111.pdf PDF
S06 Amendment A003_COR RFIs_Job Walk Roster_DWGs_GLA EHRM CON_36C26221B0009.pdf PDF
S06 Amendment A003_ DWG T-001.pdf PDF
S06 Amendment A003_ DWG 527_T-111.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part2.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part6.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part1.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part3.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part7.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part4.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4_1_ 42 x 30_Part3.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4_1_ 42 x 30_Part1.pdf PDF
691-20-200 Elect 100 Final Drawings Part 3_1_ 42 x 30.pdf PDF
691-20-200 Architectural 100 Final Drawings Part 1_ 42 x 30_ Part2.pdf PDF
S06 Amentment A0002_EHRM GLA Main Campus_691-20-200_36C26221B0009.docx DOCX document
691-20-200 Architectural 100 Final Drawings Part 1_ 42 x 30_ Part1.pdf PDF
691-20-200 Strut-Mech 100 Final Drawings Part 2_ 42 x 30.pdf PDF
S06 A0001_Wage Rates_36C26221B0009.pdf PDF
S02 ATTACHMENT E_ Drawings Part 1 of 5_Architectural.pdf PDF
S02 ATTACHMENT F_ Drawings Part 2 of 5_Strut-Mech.pdf PDF
S02 ATTACHMENT C_ Wage Rates 6-25-21.pdf PDF
S02 ATTACHMENT G_ Drawings Part 3 of 5_Elect.pdf PDF
S02 ATTACHMENT B_ Specifications.pdf PDF
S02 ATTACHMENT J_ Facility Map.pdf PDF
S02 ATTACHMENT A_ SOW.pdf PDF
S02 ATTACHMENT I_ Drawings Part 5 of 5_ Telecommunication_Part2.pdf PDF
S02 Solicitation 36C26221B0009_1.pdf PDF
S02 ATTACHMENT D_ GLA Safety Req_Permits_Forms.pdf PDF
S02 ATTACHMENT H_ Drawings Part 4 of 5_ Telecommunication_Part1.pdf PDF
36C26221B0009.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2-4''C

110 BLOCK

RISER

FIRE ALARM

PANELS TO

REMAIN

SS

MM

FIRE ALARM

PANELS TO

REMAIN

SCALE: 1/4" = 1' - 0"

NORTH

220.T-401

TELECOMMUNICATIONS

ENLARGED PLAN - TR ROOM 014

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

TR ROOM

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED AFTER NEW

DATA RACK IS IN PLACE & COMMISSIONED.

EXISTING FIRE RATED TELEPHONE

BACKBOARD.

NOT USED.

INSTALL NEW FIRE RATED TELEPHONE

BACKBOARD ON WALLS 8'-0'' HIGH DO NOT

PAINT.

NEW TGB GROUND BUS. SEE RISER ON E-701.

NEW 12''W X 1 1/ 2''H LADDER RACK.

NEW 4 POST DATA RACK 84''H. WITH

HORIZONTAL & VERTICAL WIRE MANAGERS.

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

TDU (TUBE DISTRIBUTION UNIT)

SCALE: 1/4" = 1' - 0"

NORTH

TR ROOM

220.T-401A

TELECOMMUNICATIONS RACK

ELEVATION

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

20-SCE-07

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT5E

2 ALL CAT6

WALL

RACK 1

A.F.F. A.F.F.

1 PLYWOOD BACKBOARD

2 WALL MOUNTED PHONE BLOCK

3 WALL MOUNTED 110 BLOCK

4 WALL MOUNTED SIECOR ENCLOSURE

5 WALL MOUNTED FIBER ENCLOSURE

6 1U 24 PORT PATCH PANEL

7 2U 48 PORT PATCH PANEL

8 1U WIRE MANAGER

9 1U CISCO 3850 SWITCH

4" CONDUIT

(TYP.)

WALL MOUNTED

RACK

WALL WALL WALL

WALL MOUNTED

RACK

10 UPS

4" CONDUIT

(TYP.)

RACK 1

11 WALL MOUNTED FAPP

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1

7 4U 3000VA UPS. SEE KEY NOTE 18

ON E-001

8 PDU. SEE KEY NOTE 18 ON E-001

3 FIBER STRAND AS

SPECIFIED

4''C. CEILING 4''C. FLOOR

ELECTRICAL

PANEL (EX)

SINK TO BE

REMOVED

9 7

SS

MM

ELECTRICAL

PANEL (EX)

SCALE: 1/4" = 1' - 0"

NORTH

220.T-402

TELECOMMUNICATIONS

ENLARGED PLAN - TR ROOM 121

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

20-SCE-07

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

TR ROOM

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED AFTER NEW

DATA RACK IS IN PLACE & COMMISSIONED.

EXISTING FIRE RATED TELEPHONE

BACKBOARD.

NOT USED.

INSTALL NEW FIRE RATED TELEPHONE

BACKBOARD ON WALLS 8'-0'' HIGH DO NOT

PAINT.

NEW TGB GROUND BUS. SEE RISER ON E-701.

NEW 12''W X 1 1/ 2''H LADDER RACK.

NEW HEAVY DUTY WALL MOUNTED RACK 84''H.

WITH HORIZONTAL & VERTICAL WIRE

MANAGERS.

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

TDU (TUBE DISTRIBUTION UNIT)

SCALE: 1/4" = 1' - 0"

NORTH

220.T-402A

TELECOMMUNICATIONS RACK

ELEVATION

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

20-SCE-07

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT5E

2 ALL CAT6

WALL

RACK 1

A.F.F. A.F.F.

1 PLYWOOD BACKBOARD

2 WALL MOUNTED ELECTRICAL PANEL

3 WALL MOUNTED 110 BLOCK

4 WALL MOUNTED FIBER PANEL

5 WALL MOUNTED 48 PORT PATCH PANEL

6 1U 24 PORT PATCH PANEL

7 2U 48 PORT PATCH PANEL

8 2U WIRE MANAGER

9 1U CISCO 3850 SWITCH

WALL MOUNTED

RACK

WALL WALL WALL

WALL WALL

RACK 1

SINKSINK

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1

7 4U 3000VA UPS. SEE KEY NOTE 18

ON E-001

8 PDU. SEE KEY NOTE 18 ON E-001

2-4''C.

4''C. FLOOR

110 BLOCK

RISER

4''C. FLOOR

SPRINKLER

RISER (EX)

SS

MM

SCALE: 1/4" = 1' - 0"

NORTH

220.T-403

TELECOMMUNICATIONS

ENLARGED PLAN - TR ROOM 225

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

TR ROOM

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED AFTER NEW

DATA RACK IS IN PLACE & COMMISSIONED.

EXISTING FIRE RATED TELEPHONE

BACKBOARD.

EXISTING 12”W CABLE LADDER RACK MOUNTED

AT 84" AFF AND FIXED TO TOP OF EQUIPMENT

RACKS TO REMAIN (TYPICAL).

INSTALL NEW FIRE RATED TELEPHONE

BACKBOARD ON WALLS 8'-0'' HIGH DO NOT

PAINT.

NEW TGB GROUND BUS. SEE RISER ON E-701.

NOT USED.

NEW HEAVY DUTY WALL MOUNTED DATA RACK

CHATSWORTH CAT # 1532-3-7-24

(23”WX73.5”HX24”D

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

TDU (TUBE DISTRIBUTION UNIT)

SCALE: 1/4" = 1' - 0"

NORTH

220.T-403A

TELECOMMUNICATIONS RACK

ELEVATION

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

20-SCE-07

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT5E

2 ALL CAT6

WALL

RACK 1

A.F.F. A.F.F.

1 WALL MOUNTED 110 BLOCK

2 WALL MOUNTED FIBER ENCLOSURE

3 1U 24 PORT PATCH PANEL

4 2U 48 PORT PATCH PANEL

5 1U CISCO 3850 SWITCH

6 UPS

4" CONDUIT

(TYP.)

WALL MOUNTED

RACK

WALLWALL WALL WALLWALL

LADDER RACK

WIRE

MANAGER

WIRE

MANAGER

WALL MOUNTED

RACK

LADDER RACK

4" CONDUIT

(TYP.)

RACK 1

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1

7 4U 3000VA UPS. SEE KEY NOTE 18

ON E-001

8 PDU. SEE KEY NOTE 18 ON E-001

4''C. FLOOR

FACP (EX)

4 7

SS

MM

SCALE: 1/4" = 1' - 0"

NORTH

220.T-404

TELECOMMUNICATIONS

ENLARGED PLAN - TR ROOM 332

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

TR ROOM

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED AFTER NEW

DATA RACK IS IN PLACE & COMMISSIONED.

EXISTING FIRE RATED TELEPHONE

BACKBOARD.

EXISTING 12”W CABLE LADDER RACK MOUNTED

AT 84" AFF AND FIXED TO TOP OF EQUIPMENT

RACKS TO BE REMOVED (TYPICAL).

INSTALL NEW FIRE RATED TELEPHONE

BACKBOARD ON WALLS 8'-0'' HIGH DO NOT

PAINT.

NEW TGB GROUND BUS. SEE RISER ON E-701.

NEW 12''W X 1 1/ 2''H LADDER RACK.

NEW 4 POST DATA RACK 84''H. WITH

HORIZONTAL & VERTICAL WIRE MANAGERS.

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

TDU (TUBE DISTRIBUTION UNIT)

SCALE: 1/4" = 1' - 0"

NORTH

220.T-404A

TELECOMMUNICATIONS RACK

ELEVATION

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

20-SCE-07

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT6

A.F.F. A.F.F.

1 PLYWOOD BACKBOARD

2 WALL MOUNTED FIBER ENCLOSURE

3 2U 48 PORT PATCH PANEL

4 2U WIRE MANAGER

5 1U FIBER LIU

6 1U CISCO 3850 SWITCH

WALL MOUNTED

RACK

A.F.F.

LADDER RACK

(TYP,)

LADDER RACK

(TYP.)

LADDER RACK

(TYP.)

WALL MOUNTED

RACK

2 POST RACK

WIRE

MANAGER

WALL

WALLWALL

WALL

WALL

WALLWALL

WALL

WIRE MANAGER

SCALE: NONE SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1

7 4U 3000VA UPS. SEE KEY NOTE 18

ON E-001

8 PDU. SEE KEY NOTE 18 ON E-001

MMSS

SCALE: 1/4" = 1' - 0"

NORTH

256.T-401

TELECOMMUNICATIONS

ENLARGED PLAN - TR ROOM 1

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

TR ROOM

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED AFTER NEW

DATA RACK IS IN PLACE & COMMISSIONED.

EXISTING FIRE RATED TELEPHONE

BACKBOARD.

EXISTING 12”W CABLE LADDER RACK MOUNTED

AT 84" AFF AND FIXED TO TOP OF EQUIPMENT

RACKS TO REMAIN (TYPICAL).

INSTALL NEW FIRE RATED TELEPHONE

BACKBOARD ON WALLS 8'-0'' HIGH DO NOT

PAINT.

NEW TGB GROUND BUS. SEE RISER ON E-701.

NEW 12''W X 1 1/ 2''H LADDER RACK.

NEW 4 POST DATA RACK 84''H. WITH

HORIZONTAL & VERTICAL WIRE MANAGERS.

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

TDU (TUBE DISTRIBUTION UNIT)

SCALE: 1/4" = 1' - 0"

NORTH

256.T-401A

TELECOMMUNICATIONS RACK

ELEVATION

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

20-SCE-07

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT5E

2 ALL CAT6

WALL

RACK 1

A.F.F. A.F.F.

1 PLYWOOD BACKBOARD

2 WALL MOUNTED FIBER ENCLOSURE

3 WALL MOUNTED PHONE BLOCK

4 WALL MOUNTED 110 BLOCK

5 1U 24 PORT PATCH PANEL

6 2U 48 PORT PATCH PANEL

7 1U CISCO 3850 SWITCH

8 WALL MOUNTED SPLICE CASE

4" CONDUIT

(TYP.)

WALL MOUNTED

RACK

WALL WALL WALL

WALL MOUNTED

RACK

RACK 1

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1 RACK 2

7 4U 3000VA UPS. SEE KEY NOTE 18

ON E-001

8 PDU. SEE KEY NOTE 18 ON E-001

4''C. RISER

4''C. FEED

110 BLOCK

RISER

SS

MM 9

SCALE: 1/4" = 1' - 0"

NORTH

256.T-402

TELECOMMUNICATIONS

ENLARGED PLAN - TR ROOM 102

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

TR ROOM

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED AFTER NEW

DATA RACK IS IN PLACE & COMMISSIONED.

EXISTING FIRE RATED TELEPHONE

BACKBOARD.

EXISTING 12”W CABLE LADDER RACK MOUNTED

AT 84" AFF AND FIXED TO TOP OF EQUIPMENT

RACKS TO REMAIN (TYPICAL).

INSTALL NEW FIRE RATED TELEPHONE

BACKBOARD ON WALLS 8'-0'' HIGH DO NOT

PAINT.

NEW TGB GROUND BUS. SEE RISER ON E-701.

NEW 12''W X 1 1/ 2''H LADDER RACK.

NEW 4 POST DATA RACK 84''H. WITH

HORIZONTAL & VERTICAL WIRE MANAGERS.

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

TDU (TUBE DISTRIBUTION UNIT)

SCALE: 1/4" = 1' - 0"

NORTH

256.T-402A

TELECOMMUNICATIONS RACK

ELEVATION

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

20-SCE-07

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT3

2 ALL CAT5E

WALL

RACK 1

A.F.F. A.F.F.

1 PLYWOOD BACKBOARD

2 WALL MOUNTED SIECOR ENCLOSURE

3 WALL MOUNTED 110 BLOCK

4 2U 48 PORT PATCH PANEL

5 1U CISCO 3850 SWITCH

6 UPS

WIRE

MANAGER

WALL MOUNTED

RACK

WALL WALLWALL

WALL MOUNTED

RACK

WIRE

MANAGER

STEP STEP

RACK 1

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1

7 4U 3000VA UPS. SEE KEY NOTE 18

ON E-001

8 PDU. SEE KEY NOTE 18 ON E-001

226.1

4''C. CEILING/RISER 1

110 BLOCK FIBER

CR

226.1

SS

MM

SCALE: 1/4" = 1' - 0"

NORTH

256.T-403

TELECOMMUNICATIONS

ENLARGED PLAN - TR ROOM 226

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

Key Plan

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

TR ROOM

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED AFTER NEW

DATA RACK IS IN PLACE & COMMISSIONED.

EXISTING FIRE RATED TELEPHONE

BACKBOARD.

EXISTING 12”W CABLE LADDER RACK MOUNTED

AT 84" AFF AND FIXED TO TOP OF EQUIPMENT

RACKS TO REMAIN (TYPICAL).

INSTALL NEW FIRE RATED TELEPHONE

BACKBOARD ON WALLS 8'-0'' HIGH DO NOT

PAINT.

NEW TGB GROUND BUS. SEE RISER ON E-701.

NEW 12''W X 1 1/ 2''H LADDER RACK.

NEW 4 POST DATA RACK 84''H. WITH

HORIZONTAL & VERTICAL WIRE MANAGERS.

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

TDU (TUBE DISTRIBUTION UNIT)

SCALE: 1/4" = 1' - 0"

NORTH

256.T-403A

TELECOMMUNICATIONS RACK

ELEVATION TR 226

SCALE: NONE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

20-SCE-07

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH

PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING

CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES

HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN

CAT6A COMPARABLE RJ45 JACKS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A

COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD

OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN

A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH

EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE

MANUFACTURER’S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVING EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF

EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.

HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33

SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.

1.

2.

3.

4.

5.

6.

7.

8.

9.

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT3

2 ALL CAT5E

WALL 1 PLYWOOD BACKBOARD

2 WALL MOUNTED SIECOR ENCLOSURE

3 WALL MOUNTED 110 BLOCK

4 2U 48 PORT PATCH PANEL

5 1U WIRE MANAGER

6 1U CISCO 3850 SWITCH

7 UPSWIRE

MANAGER

(TYP.)

WALL MOUNTED

RACK

WIRE

MANAGER

WALL WALL WALL

WALL MOUNTED

RACK

WALL MOUNTED

CABINET

WALL MOUNTED

CABINET

RACK 1RACK 1

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .