S06 Amendment A003_ DWG 527_T-111.pdf

PDF 476 KB Posted

Attached to
Z2DA--EHRM GLA Main Campus Construction, Project 691-20-200 Federal contract opportunity
Solicitation number
36C26221B0009
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document package includes construction drawings and specifications for the Electronic Health Record Modernization Infrastructure Upgrades project at the VA West Los Angeles Healthcare System located at 11301 Wilshire Boulevard in Los Angeles, California. The project scope includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The construction value is estimated between $20 million to $50 million.

The Department of Veterans Affairs will issue an Invitation for Bid on or around July 13, 2021 via beta.SAM.gov for the project. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses listed in the Vendor Information Pages database. A mandatory site visit will be scheduled to review the facility and project requirements. All work must be performed in accordance with applicable local and VA building codes.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--EHRM GLA Main Campus Construction, Project 691-20-200, newest first.
File Type Posted
S06 Amendment A003_ DWG T-001.pdf PDF
S06 Amendment A003_ DWG 527_E-111.pdf PDF
S06 Amendment A003_COR RFIs_Job Walk Roster_DWGs_GLA EHRM CON_36C26221B0009.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part3.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part1.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part2.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part4.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part5.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part6.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part7.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4_1_ 42 x 30_Part3.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4_1_ 42 x 30_Part1.pdf PDF
691-20-200 Elect 100 Final Drawings Part 3_1_ 42 x 30.pdf PDF
691-20-200 Strut-Mech 100 Final Drawings Part 2_ 42 x 30.pdf PDF
S06 Amentment A0002_EHRM GLA Main Campus_691-20-200_36C26221B0009.docx DOCX document
691-20-200 Architectural 100 Final Drawings Part 1_ 42 x 30_ Part1.pdf PDF
691-20-200 Architectural 100 Final Drawings Part 1_ 42 x 30_ Part2.pdf PDF
S06 A0001_Wage Rates_36C26221B0009.pdf PDF
S02 ATTACHMENT C_ Wage Rates 6-25-21.pdf PDF
S02 ATTACHMENT I_ Drawings Part 5 of 5_ Telecommunication_Part2.pdf PDF
S02 ATTACHMENT J_ Facility Map.pdf PDF
S02 ATTACHMENT A_ SOW.pdf PDF
S02 ATTACHMENT E_ Drawings Part 1 of 5_Architectural.pdf PDF
S02 Solicitation 36C26221B0009_1.pdf PDF
S02 ATTACHMENT D_ GLA Safety Req_Permits_Forms.pdf PDF
S02 ATTACHMENT F_ Drawings Part 2 of 5_Strut-Mech.pdf PDF
S02 ATTACHMENT H_ Drawings Part 4 of 5_ Telecommunication_Part1.pdf PDF
S02 ATTACHMENT B_ Specifications.pdf PDF
S02 ATTACHMENT G_ Drawings Part 3 of 5_Elect.pdf PDF
36C26221B0009.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EX EX

EXISTING

PROJECTION

SCREEN TO

AVU

AVP

HA

HB

HC

9 9

SCALE: 1/8" = 1' - 0"

527.T-111

A

F i l e

P a t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

20801.12

Key Plan

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

FOR ENLARGED PLAN

SEE 527.T-402

FOR ENLARGED PLAN

SEE 527.T-401

85'' HDMI DISPLAY. WALL MOUNTED.

OVERHEAD PROJECTOR.

DESK WITH INTEGRAL RECEPTACLE PRE-WIRED

FROM WALL.

INSTRUCTOR DESK/ LECTERN.

60'' HDMI DISPLAY - WALL MOUNTED.

NOT USED.

PROVIDE WIRELESS ACCESS POINT FOR

MOUNTING DETAIL SEE T-503

NOT USED.

1 1/ 4''C WITH HDMI CABLE WITH HDMI

CONNECTION AT BOTH ENDS TO INSTRUCTOR

DESK.

NEW CEILING MOUNTED MOTION SENSOR.

CONNECT TO EXISTING SECURITY SYSTEM

PANEL. (SECURITY OF LOS ANGELES)

NEW SECURITY SYSTEM KEY PAD. CONNECT TO

EXISTING SECURITY SYSTEM PANEL.

EXISTING SOLA SECURITY PANEL.

CONNECT NEW FIRE ALARM DEVICE TO EXISTING FIRE

ALARM SYSTEM. REPLACE/ UPGRADE BATTERY IN FACP.

RE-USE EXISTING SECURITY SYSTEM.

VERIFY PERIMETER DOOR SENSORS ARE CONNECTED AND

WORKING PROPERLY TO MONITOR BUILDING PERIMETER.

PROVIDE ALARM CONTACT TO VA NETWORK SECURITY.

COMMISSION SECURITY SYSTEM OPERATIONAL.

1.

2.

NORTH

3.

4.

5.

ADDENDUM 08-12-2021

AUGUST 12, 2021

File details come from the government source that posted it. Updated .