This pre-solicitation notice announces an upcoming invitation for bid for construction services for Project 691-20-200, Electronic Health Record Modernization Infrastructure Upgrades at the VA West Los Angeles Healthcare System located in Los Angeles, California. The scope of work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The project is set aside for Service-Disabled Veteran-Owned Small Businesses listed in the Vendor Information Pages database. The North American Industry Classification code is 236220 for commercial and institutional building construction with a size standard of $39.5 million. The estimated value of the construction project is between $20-50 million. The invitation for bid will be issued on July 13, 2021 via Contract Opportunities and include a mandatory site visit.

View the file

Other files

File Type Posted
S06 Amendment A003_ DWG 527_E-111.pdf PDF
S06 Amendment A003_ DWG T-001.pdf PDF
S06 Amendment A003_ DWG 527_T-111.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part2.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part6.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part1.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part3.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part7.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part4.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part5.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4_1_ 42 x 30_Part3.pdf PDF
691-20-200 Telecommunication 100 Final Drawings Part 4_1_ 42 x 30_Part1.pdf PDF
691-20-200 Elect 100 Final Drawings Part 3_1_ 42 x 30.pdf PDF
691-20-200 Architectural 100 Final Drawings Part 1_ 42 x 30_ Part2.pdf PDF
S06 Amentment A0002_EHRM GLA Main Campus_691-20-200_36C26221B0009.docx DOCX document
691-20-200 Architectural 100 Final Drawings Part 1_ 42 x 30_ Part1.pdf PDF
691-20-200 Strut-Mech 100 Final Drawings Part 2_ 42 x 30.pdf PDF
S06 A0001_Wage Rates_36C26221B0009.pdf PDF
S02 ATTACHMENT E_ Drawings Part 1 of 5_Architectural.pdf PDF
S02 ATTACHMENT F_ Drawings Part 2 of 5_Strut-Mech.pdf PDF
S02 ATTACHMENT C_ Wage Rates 6-25-21.pdf PDF
S02 ATTACHMENT G_ Drawings Part 3 of 5_Elect.pdf PDF
S02 ATTACHMENT B_ Specifications.pdf PDF
S02 ATTACHMENT J_ Facility Map.pdf PDF
S02 ATTACHMENT A_ SOW.pdf PDF
S02 ATTACHMENT I_ Drawings Part 5 of 5_ Telecommunication_Part2.pdf PDF
S02 Solicitation 36C26221B0009_1.pdf PDF
S02 ATTACHMENT D_ GLA Safety Req_Permits_Forms.pdf PDF
S02 ATTACHMENT H_ Drawings Part 4 of 5_ Telecommunication_Part1.pdf PDF
36C26221B0009.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

3. EFFECTIVE DATE

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 11

4. REQUISITION/PURCHASE REQ. NUMBER

691-21-3-5278-0017

5. PROJECT NUMBER (if applicable)

691-20-200

00262

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite Long Beach CA 90815

00262

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite Long Beach CA 90815

To all Offerors/Bidders

9A. AMENDMENT OF SOLICITATION NUMBER

36C26221B0009

08-12-2021 X

X X

See CONTINUATION Page

X ONE (1)

Amendment A0003 is issued to post the following documents:

- COR Responses to Contractor RFIs # 1-20

- Site Visit, Sign-in Sheet, EHRM GLA Main Campus, 691-20-200

- Revised DRAWINGS to provide clarification in Sheet T-001:Added Fire Alarm Symbols; Sheet 527.E-111: Revised background, Revised Electrical work to match updated background, Revised Keynotes, and added Receptacle in Room 102;

and Sheet 527.T-111: Revised background

HARRY SEBALLOS

CONTRACTING OFFICER

RFI Questions & Answers

Project Name: Project 691-20-200 EHRM Infrastructure Upgrades – VAGLA Solicitation Number: 36C26221B0009

Received 20 question on 08/06/2021

Question 1 [EDS] Q: Sheet GI-002, Conceptual Phasing Notes, Phase 1: Is Contractor to mandrel all empty/spare underground conduits or just the segments in which new tube cells will be installed?

A: Just the segments in which new tube cells will be installed.

Question 2 [VA] Q: Sheet GI-002, Conceptual Phasing Notes, Phase 1: Is Contractor to removed unused cables from entire underground conduit system or just the segments in which new tube cells will be installed?

A: Cabling will be removed from just segments in which new tubes will be installed.

Question 3 [VA] Q: Sheet GI-002, Conceptual Phasing Notes, Phase 1: Please provide info indicating quantities, types and routing for all unused copper cables to be removed by Contractor in each manhole and duct bank.

a. Please indicate which of these cables are lead sheathed.

b. If requested information is not available, please indicate how Bidder shall estimate this

SOW.

A: Due to the age of the communication cabling we don’t have a proper count of what needs to be removed. You will have to provide a general demo price for cable removal.

Provide a fare but reasonable over all communication cabling removal price for manhole duct banks and in buildings.

Manholes between Bldg. 301 to Bldg. 500 are all lead sheathed cable. Please reference the manhole photos included in the drawings. All the conduits within the manholes between Bldg. 500 to Bldg. 301 must be cleared out for the new tubes.

Question 4 [VA] Q: Sheet T-001, Telecommunications General Note #30: Please provide info indicating quantities, types, and locations for all abandoned system components to be removed by Contractor.

a. If this information is not available, please indicate how Bidder shall estimate this

SOW.

A. Provide a fare but reasonable demo price to remove abandoned systems for all TR closets.

Question 5 [VA] Q: Sheet T-001, Telecommunications General Note #35: Is Contractor to removed unused cables from entire underground conduit system or just the segments in which new tube cells will be installed?

A: Cabling will be removed from just segments in which new tubes will be installed.

Question 6 [VA]

Q: Sheet T-001, Telecommunications General Note #35: Please provide info indicating quantities, types, and routing for all unused cables to be removed by Contractor in underground conduit system.

a. Please indicate which/how many of these cables are lead sheathed.

b. If requested information is not available, please indicate how Bidder shall estimate this

SOW.

A: Due to the age of the communication cabling we don’t have a proper count of what needs to be removed. You will have to provide a general demo price for cable removal.

Provide a fare but reasonable over all communication cabling removal price for manhole duct banks and in buildings.

Manholes between Bldg. 301 to Bldg. 500 are all lead sheathed cable. Please reference the manhole photos included in the drawings. All the conduits within the manholes between Bldg. 500 to Bldg. 301 must be cleared out for the new tubes.

Question 7 [EDS] Q: Sheet T-001, Telephone Cable Schedule: Please indicate whether Contractor is to provide new cables for all From/To’s indicated in this table or whether Contractor is simply to move terminations of existing cables from old TRs to new TRs as noted in table.

a. If scope is to move terminations from old TRs to new TRs, has VA confirmed that all existing Cat 3 cable are long enough to relocate to new TRs? Are Bidders to assume all these cables are of sufficient length to re-terminate?

A: Contractor to provide new Cat3 cables as per the schedule. Contractor to also terminate the multi-pair cables on 110 Block at both ends on the wall as shown on elevation drawings.

Question 8 [VA] Q: Sheet TS-001, Step 1: Is Contractor to removed unused cables from entire underground conduit system or just the segments in which new tube cells will be installed?

A: Cabling will be removed from just segments in which new tubes will be installed.

Question 9 [VA] Q: Sheet TS-001, Step 1: Please provide info indicating quantities, types and routing for all unused copper cables to be removed by Contractor in each manhole and duct bank.

a. Please indicate which/how many of these cables are lead sheathed.

b. If requested information is not available, please indicate how Bidder shall estimate this

SOW.

A: Due to the age of the communication cabling we don’t have a proper count of what needs to be removed. You will have to provide a general demo price for cable removal.

Provide a fare but reasonable over all communication cabling removal price for manhole duct banks and in buildings.

Manholes between Bldg. 301 to Bldg. 500 are all lead sheathed cable. Please reference the manhole photos included in the drawings. All the conduits within the manholes between Bldg. 500 to Bldg. 301 must be cleared out for the new tubes.

Question 10 [EDS] Q: Sheet TS-001, Step 3: Is Contractor to mandrel all empty/spare underground conduits or just the segments in which new tube cells will be installed?

A: Mandrel just the segments in which new tube cells will be installed.

Question 11 [EDS] Q: Sheets TS-001 and TS-002, Key Note #2: Please confirm that only the UG conduit segments marked with Key Note #2 are to receive new cell tubes.

A: All U/G conduits are to receive new cell tubes. Keynote 2 call out is typical for all

U/G conduit segments. Refer to Table on TS-002 and riser diagrams on drawings T-601, T-602, T-603, T-604, T-605 and T-606, for additional/specific requirements.

Question 12 [VA] Q: Floor plan sheets: For any data outlet symbols shown on the drawings with no cable quantity indicated, please clarify how Bidders shall determine per-outlet cable quantity to be used.

A: For any data outlet symbols shown on the drawings with no cable quantity indicated it will be three cables to support three CAT6A RJ45wall jacks.

Question 13 [VA] Q: Floor plan sheets, General Note #1 indicates Contractor shall remove all existing Cat 5 and unused Cat 3 cables.

a. Please indicate how Contractor is to determine quantity of existing Cat 5 and unused Cat 3 cables are currently installed.

A: Contractor will provide a reasonable but fare demo price per TR to remove existing Cat 5 and unused Cat 3 cables that aren’t indicated on drawings.

Question 14 [VA] Q: Floor plan sheets, General Note #3 indicates all new Cat 6A cables and termination jacks shall be color-coded (one white, one gray, one blue per data outlet).

a. Please indicate how Contractor shall determine color coding for cables and jacks when a data outlet includes more than or fewer than three cables.

A: If there are four or more color code will follow: White, Blue, Grey, White, Blue, Grey If there are lease than three color code will follow: White, Blue or White.

Question 15 [VA] Q: Floor plan sheets, Key Note #4 indicates that Contractor shall provide new faceplate with one white, one gray, one blue RJ-45 jack.

a. Please indicate how Contractor shall determine RJ-45 jack color coding for faceplates that will include more than or fewer than three cables.

A: If there are four or more color code will follow: White, Blue, Grey, White, Blue, Grey.

If there are lease than three color code will follow: White, Blue or White.

Question 16 [EDS] Q: 16. Rack elevations sheets, General Note #1 indicates that “existing Cat 5 and below” cables “shall be removed…” The rack elevation sheets depict existing Cat 3 cabling/patch panels as grey in many of the “NEW” rack elevation drawings. Please confirm that all existing Cat 3 cable depicted in this manner are to be left in place.

A: All unused or abandoned CAT 3 cables shall be removed as called out.

Question 17 [EDS] Q: Rack elevation sheets: Please confirm that any item that appear as grey in a “NEW” rack elevation drawing does not require replacement and is to be left in place.

A: Confirmed; however, note that the contractor is to coordinate the installation with shop drawing requirements for final rack configuration. New Fiber patch panel, new CAT6A patch panel and rack mounted UPS are called out on new rack elevation. Both Fiber and Cat6A patch panel are furnished and installed by the contractor for termination the cables on the rack. Note also, that new rack mounted UPS are furnished and installed by the contractor.

Question 18 [EDS] Q: Rack elevation sheets: Please confirm that any item that appear as black in a “NEW” rack elevation drawing represents a new item to be added to the rack.

A: Confirmed; however, note that the contractor is to coordinate the installation with shop drawing requirements for final rack configuration. New Fiber patch panel, new CAT6A patch panel and rack mounted UPS are called out on new rack elevation. Both Fiber and Cat6A patch panel are furnished and installed by the contractor for termination the cables on the rack. Note also, that new rack mounted UPS are furnished and installed by the contractor.

Question 19 [EDS] Q: Spec 27 15 00, Section 2.3.A.3: Please clarify whether telecommunication outlet faceplates provided for this project must be stainless steel or if plastic faceplates are acceptable.

A: All faceplate shall be stainless steel.

Question 20 [SC] Q: Spec 01 91 00, Section 1.1 states in part “The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor”. However other spec divisions under various commissioning requirements for Div 21, 22, 23, 26, etc. in Section 1.1 state in part “A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.”

Please clarify the responsibility of engaging the commissioning agent for the project, VA, or Contractor A: A Commissioning Agent (CxA) is the Contractor responsibility. Refer to Spec 01 91 00, Section 1.1 “The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors.” Refer to Div. 21, 22, 23, 26, 27, 28, .., Section 1.1 “An independent third party Commissioning Agent (CxA) appointed by the contractor will manage the commissioning process.”

See attached document: S04. Site Visit Sign-In Sheet, EHRM GLA Main Campus CON.

See attached document: T-001.

See attached document: 527_E-111.

See attached document: 527_T-111.

CONCRETE

WALK

RAMP DN

RAMP DOWN

STAIR

RAMP DOWN

A

B

C

D

E

F G

H

J

K

L

M

N

O

P

Q

R

S

FIRE PENETRATIONS NOTE

- M -

MAIN CIRCUIT BREAKER

NEUTRAL

MCB

N

- N -

PHASE

POWER

PANEL

PWR

PNL

- R -

- P -

ROOM

RECEPTACLE

RM

RECEPT

- B -

AMPERE

- A -

A

- C -

CIRCUIT

CIRCUIT BREAKER

BUILDING

CONDUIT

BLDG

CKT

C

CB

- E -

EG

- G -

GROUNDG, GND

EQUIPMENT GROUND

ABBREVIATIONS

VOLT OR VOLTAGE

VOLT AMPEREVA

V

- V -

WATTW

- W -

- J -

- K -

KILOVOLT AMPERE

KILOVOLT

JUNCTION BOX

KV

KW

KVA

JB

KILOWATT

ABOVE FINISHED FLOORAFF

UON UNLESS OTHERWISE NOTED

- U -

E1.01

AC

X

MOTOR TYPE

REVISION

RISER TAGPOINT OF CONNECTION

SCHEDULE NUMBER

# LIGHT FIXTURE TYPE

INDICATES DETAIL NUMBER

SHEET NUMBER TO FIND DETAIL

SPECIFIC NOTE/

POINT OF DISCONNECTION

REFERENCE NOTE

ANNOTATIONS

EWC ELECTRIC WATER COOLER

T-001

TELECOMMUNICATIONS

GENERAL NOTES:

ABBREVIATIONS VA

EHRM ELECTRONIC HEALTH RECORD MODERNINATION

CERNER INFORMATION TECHNOLOGY COMPANY

CEDT CERNER EHRM DEPLOYMENT TEAM

EUD END USER DEVICE

CIH CERTIFIED INDUSTRIAL HYGIENIST

LBVAMC LONG BEACH VA MEDICAL CENTER

MDF MAIN DISTRIBUTION FRAME

TR TELECOMMUNICATIONS ROOM

OIT OFFICE OF INFORMATION TECHNOLOGY

3D

3D

WALL MTD DATA OUTLET

W/3 CAT 6A DROPS

FLOOR MTD DATA OUTLET

W/3 CAT 6A DROPS

SEE DRAWING T-504

ABBREVIATIONS IT

SM

MM

SFP

ORL

OTDR

UTP

LAN

SINGLE MODE FIBER

MULTI MODE FIBER

SMALL FORM FACTOR PLUGGABLE TRANSCEIVER

OPTICAL RETURN LOSS

OPTICAL TIME DOMAIN REFLECTOMETER

UNSHIELDED TWISTED PAIR

LOCAL AREA NETWORK

EIA

TIA

OS1, OS2

OS2

ELECTRONIC INDUSTRIES ASSOCIATION

TELECOMMUNICATION INDUSTRY ASSOCIATION

TYPE OF SINGLE MODE FIBER

AIR BLOWN SINGLE MODE FIBER

1. PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS IN ACCORDANCE

WITH THE SPECIFICATIONS AND THE PROJECT SCHEDULE. NO INSTALLATION

SHALL PROCEED WITHOUT APPROVAL OF THE SHOP DRAWINGS.

2. MINIMAL STORAGE WILL BE AVAILABLE ON THE CONSTRUCTION SITE. CABLING

CONTRACTOR RESPONSIBLE FOR RECEIVING AND STORING MATERIALS AND

FOR COORDINATING MATERIALS DELIVERY TO THE JOB-SITE.

3. COMMUNICATIONS CABLES INSTALLED SHALL BE INSTALLED IN ACCORDANCE

WITH THE REQUIREMENTS DETAILED HEREIN AND SHALL BE FREE OF KINKS,

TWISTS, SHARP BENDS, UNNECESSARY LOOPS OR WORKMANSHIP DEFECT.

4. PROPERLY SEAL WALL PENETRATIONS THROUGH FIRE RATED WALL & FLOOR

USING EZ PATH DETAILED ON T-504.

5. RUN OPEN CABLE FOR EACH SYSTEM IN SLEEVES, J-HOOKS DEDICATED FOR

THE SYSTEM.

6. SEPARATE AND BUNDLE CABLE BY SYSTEM.

7. MAINTAIN EIA/ TIA RECOMMENDED SEPARATIONS BETWEEN CABLING OF

DIFFERENT SYSTEMS. 6'' FROM LIGHT FIXTURES. 24'' FROM 480V & 12'' FROM

208V.

8. MAINTAIN RECOMMENDED SEPARATIONS BETWEEN CABLING AND

INTERFERENCE PRODUCING ELECTRICAL DEVICES SUCH AS POWER CABLING,

ELECTRICAL PANELS, FLUORESCENT LIGHTS, BALLAST RELAYS, ELECTRIC

MOTORS, MOTOR CONTROLLERS, VFD, TRANSFORMERS AND OTHER

ELECTROMAGNETIC DEVICES. SEE NOTE 7.

9. WHERE CABLE IS OPEN ON J-HOOK SYSTEM, RUN PARALLEL OR

PERPENDICULAR TO WALLS AND SUPPORT A MINIMUM OF EVERY 5 FEET USING

APPROVED J-HOOKS.

10. ALL CABLE HOOKS AND OTHER CABLE SUPPORT DEVICES SHALL BE ATTACHED

TO THE BUILDING STRUCTURE IN ACCORDANCE WITH CODES AND

SPECIFICATIONS.

11. NO OPEN CABLE SHALL BE DRAPED OVER OR SUPPORTED ON PLUMBING,

ELECTRICAL, MEDICAL GAS, FIRE SUPPRESSION, OR OTHER PIPING OR

DUCTWORK.

12. ALL CABLES TO BE PLENUM RATED.

13. THE CABLE LENGTH FROM THE TERMINATION POINT IN TR TO EUD IN THE

WORK AREA SHALL NOT EXCEED 295FEET INDEPENDENT OF MEDIA TYPE.

14. THE 295FEET INCLUDES AN ALLOWANCE OF 10FEET FROM EUD TO DEVICE AND

AN ADDITIONAL 24 FEET FROM PATCH PANEL TO ACTIVE COMPONENTS IN TR.

15. VISUALLY INSPECT CONNECTIONS ON CABLE TO ENSURE PROPER COMPLIANCE

WITH EIA/TIA 568B TERMINATION.

16. INSPECT ALL EXPOSED PORTIONS OF THE CABLE TO INSURE A MINIMUM OF 4

TIMES THE CABLE DIAMETER BEND RADIUS AT ANY POINT.

17. ENSURE NO CABLE BUNDLES OR TIE POINTS DISPLAY KINKS, SHARP BENDS,

CREASING OR DEFORMATION OF OUTER SHEATH OR SIGNS OF EXCESSIVE

PULLING FORCE.

18. IN TR CABLES SHOULD BE COMBED AND DRESSED UP BEFORE BUDLING AND

USING VELCRO STRAPS. ZIP TIES OR TWIST TIES SHALL NOT BE USED. STRAPS

SHALL BE SPACED AT APPROPRIATE DISTANCE TO ENSURE CABLES ARE HELD

TOGETHER.

19. ON THE RACK THE CABLES SHOULD BE DIVIDED IN THE MIDDLE, WHERE HALF

FLOWS TO THE LEFT AND HALF FLOWS TO THE RIGHT.

20. ALL CABLING SHALL BE INSTALLED BY CABLE MANUFACTURER'S CERTIFIED

INSTALLER.

21. BEFORE ACCEPTANCE OF ANY NEWLY INSTALLED COMMUNICATIONS WIRING,

THE CABLE WILL UNDERGO SEVERAL LEVELS OF TESTING TO ENSURE THAT ALL

MATERIALS AND INSTALLATION CONFORM TO STANDARD INCLUDED IN THE

DRAWINGS AND SPECIFICATIONS. THIS WILL INCLUDE BOTH THE UTP AND FIBER

OPTICS SYSTEMS. FAILURE TO MEET THE DRAWINGS AND SPECIFICATIONS

SHALL CONSTITUTE REASON TO REJECT THE INSTALLATION UNTIL ALL

PROBLEMS ARE SOLVED.

22. ALL RECORDED TESTING RESULTS SHALL REMAIN IN THE APPROPRIATE TR.

TEST BOTH CABLES AND THEIR CORRESPONDING CONNECTING SYSTEMS AS A

WHOLE UNIT TO ENSURE SYSTEM INTEGRITY.

23. TEST ALL FIBER OPTICS CABLE AND COMPONENTS COMPRISING THE

BACKBONE SYSTEM. TEST ALL FIBER STRAND IN BOTH DIRECTION. USE OTDR

OPERATING AT BOTH 1310 AND 1550 NM WAVELENGTHS.

24. PHYSICAL LABELING FOR ALL CABLES AND RELATED COMPONENTS IS

REQUIRED COMPONENTS WILL DEPEND HEAVILY ON ADHERING TO A LOGICAL

LABELING SCHEME TO ENABLE EXPEDIENT PATCH PANEL, DATA JACK AND

SWITCH PORT IDENTIFICATION.

25. PROVIDE ALL NEW CABLING IN THE BUILDING S WITH AN AS-BUILT,

ELECTRONICALLY AND PAPER, FOR THE CABLE PLANT. EACH TR WIRING

CLOSETS CABLE PLANT AS-BUILT WILL BE INSTALLED IN A FOLDER ON THE

BACK OF THE DOOR SECURED IN A HOLDER ATTACHED TO THE DOOR.

METHOD OF PROCEDUREMOP

SPECIFIC NOTE/

REFERENCE NOTE

SECURITY SYMBOLS

A

F i l e

P a t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

C

D

20-SCE-07

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

20801.12

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

FIRE PROTECTION WALL SYMBOLS

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

- D -

DEEPD

- H -

HEIGHTH

26. CABLING DIAGRAM: SUBMIT, FOR APPROVAL, A COMPLETE CABLING DIAGRAM. THE DIAGRAM SHALL BE BASED ON THE DRAWING INCLUDED IN THE CONSTRUCTION DOCUMENTS. IT SHALL BE UPDATED TO SHOW QUANTITIES AND PART NUMBERS FOR ALL COMPONENTS INCLUDING PATCH PANELS, CABLE, SERVER CABINETS AND EQUIPMENT RACKS AND ALL OTHER ASSOCIATED COMPONENTS. INCLUDE THE

FOLLOW:

1). DETAIL AND ELEVATION DRAWINGS: PROVIDE TR RACK ELEVATION, ENLARGED TR

ROOM LAYOUT.

2). BUILDING COMPOSITE FLOOR PLANS: PROVIDE BUILDING FLOOR PLANS SHOWING WORK AREA OUTLET (WAO) OUTLET LOCATIONS AND CONFIGURATION, TYPES OF JACKS, DISTANCE FOR EACH

CABLE, AND CABLE ROUTING LOCATIONS.

3). FLOOR PLANS TO INCLUDE:

a. FINAL ROOM NUMBERS AND ACTUAL BACKBONE CABLING AND PATHWAY LOCATIONS

(HORIZONTAL AND VERTICAL) AND LABELING.

b. RISER FLOOR PENETRATION / DATA POLE LOCATION AFTER SCANNING THE FLOOR FOR

REBARS.

c. INPUTS AND OUTPUTS OF EQUIPMENT IDENTIFIED ACCORDING TO LABELS INSTALLED ON

CABLES AND EQUIPMENT.

d. DEVICE LOCATIONS WITH LABELS.

e. EZ PATH SLEEVES.

f. WIRING DIAGRAM.

g. LABELING AND ADMINISTRATION DOCUMENTATION.

SCALE: NO SCALE

TR 16SA

TR 15SA

TR 14SA

TR 13SA

TR 12SA

TR 11SA

TR 10SA

TR 16IS

TR 15IS

TR 14IS

TR 13IS

TR 12IS

TR 11IS

TR 10IS

TR 16IN

TR 15IN

TR 14IN

TR 13IN

TR 12IN

TR 11IN

TR 10IN

TR 16SE

TR 15SE

TR 14SE

TR 13SE

TR 12SE

TR 11SE

TR 10SE

PATCH CORDS TABLE

27. ALL DATA & TELEPHONE CABLES THAT ARE REMOVED WILL BE RECYCLED BY VA.

PLEASE DISPOSE OFF CABLES TO VA PROVIDED DUMPSTERS.

28. THE LOCATION OF END USER DEVICES (EUD) SHOWN ON THESE DRAWINGS ARE

APPROXIMATE AND ARE SUBJECT TO VERIFICATION BY THE CONTRACTOR.

CONTRACTOR SHALL REMOVE EXISTING EUD DATA OUTLETS AND PROVIDE NEW

EUD DATA OUTLETS AT THE SAME LOCATION.

29. ALL CAT 6A CABLES TO BE PLENUM AND POE RATED.

THE CONTRACTOR TO COORDINATE WITH VA AND REMOVE ABANDONED SYSTEMS/

ITEM IDENTIFIED BY VA. EXAMPLE INCLUDE OLD FIRE ALARM PANELS, BATTERIES

AND CHARGERS, TELEPHONE EQUIPMENT NOT IN USE, OLD 110 BLOCKS NOT IN

USE, EXISTING FIBERS, EXISTING FIBER DISTRIBUTED LINE MODULE (FOLM).

31. THE CORE AREA EUD LOCATION OF FLOORS 2-6 SHALL BE SERVED WITH CAT6A BY EITHER THE NORTH (IN) OR SOUTH (IS)INTERSTITIAL TELECOM ROOM. THIS SHOULD BE CONSISTENT FOR CORE AREAS FLOORS 2-6.

WHEN RE-CABLING EXISTING SLEEVES SHALL BE REMOVED AND NEW DRY WALL MUST BE INSTALLED

AND FINISHED BEFORE INSTALLING NEW SLEEVES.

CONTRACTOR TO REMOVE ALL 66 BLOCK AND ASSOCIATED CABLING OF ALL TR ROOM. ALL REMOVED

CABLING SHALL BE PUT IN A VA FURNISHED DUMPSTER FOR RECYCLING.

IN TR WHICH REQUIRES INSTALLATION OF FIRE RATED TELEPHONE BACKBOARDS. AFTER UNUSED DEVICES, 110 BLOCK AND OTHER ITEMS ARE REMOVED CONTRACTOR WILL DEMOUNT THE REMAINING

ITEMS, SUPPORT IT TEMPORARILY, INSTALL THE BACKBOARD AND REMOUNT ITEMS ON THE

BACKBOARD.

ALL UNUSED CABLES IN UNDERGROUND CONDUIT SYSTEM INCLUDING ASSOCIATED MANHOLES SHALL

BE PULLED OUT AND REMOVED BY CONTRACTOR AND TRANSPORTED TO VA SUPPLIED DUMPSTERS

INTENDED FOR RECYCLING BY VA. CONTRACTOR SHALL COORDINATE WITH VA WHO WILL IDENTIFY UNUSED CABLES WITHIN EACH MANHOLE. THERE ARE EXISTING LEAD SHEATHED CABLES THAT WILL

REQUIRE SPECIAL HANDLING AND COORDINATION WITH VA.

32.

33.

34.

30.

35.

BLDG. 500 INTERSTITIAL LEVEL EXISTING TR WAY FINDING MAP

TELEPHONE CABLE SCHEDULE

FIRE ALARM SYMBOLS

FIRE ALARM AUDIO/VISUAL INDICATING UNIT

AUTOMATIC FIRE ALARM SMOKE DETECTOR

ADDENDUM 08-12-2021

AUGUST 12, 2021

J

HB-1,3,5

HB-26,28,30 28

EX EX

EX

AVU

AVP

HA

EX EX EX

NEW

NEWNEWNEWNEW

NEWNEW

NEW

NEW

1 1

NEWHB

HC

AVP-22,24,26

EXISTING

PROJECTION

SCREEN TO

REMAIN

10 12

12 14

16 12 14 16

16HA-12,14,16

HA-18

9 9

AVP-8,10,12

3 3

3 3 3

1 9

GFI

SCALE: 1/8" = 1' - 0"

527.E-111

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

20801.12

Key Plan

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

FOR ENLARGED PLAN

SEE 527.E-401

FOR ENLARGED PLAN

SEE 527.E-401

85'' HDMI DISPLAY. WALL MOUNTED.

OVERHEAD PROJECTOR.

DESK WITH INTEGRAL RECEPTACLE PRE-WIRED

FROM WALL.

INSTRUCTOR DESK/ LECTERN.

60'' HDMI DISPLAY - WALL MOUNTED.

NOT USED.

NOT USED.

3/4''C- 3 #12 + 3 #12N + 1 #12EG

INSTALL 1 1/ 4''C FROM EACH MONITOR TO

INSTRUCTORS DESK FOR HDMI CABLE.

NEW 3/4"C - 2 # 12 + 1 # 12 EG.

REPLACE EXISTING RECEPTACLE WITH GFI

RECEPTACLE.

1. ALL EXISTING RECEPTACLES TO REMAIN.1.

NORTH

EX EX

EXISTING

PROJECTION

SCREEN TO

AVU

AVP

HA

HB

HC

9 9

SCALE: 1/8" = 1' - 0"

527.T-111

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PM EW/JB

A

GENERAL NOTES

C

D

1. PROVIDE UL LISTED FIRESTOPPING AT ALL

PENETRATIONS OF FIRE RATED WALLS.

2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO

PENETRATE WALLS, W/O LIMITING ABILITY TO

ADD/REMOVE CABLES AT A LATER TIME W/O

RESEALING.

3. COORDINATE RELOCATION OF EXISTING EQUIPMENT

AND FURNITURE WITH THE VA AS INDICATED ON

PROJECT NOTE 5 ON GI001.

20-SCE-07

KEY NOTES

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

GENERAL NOTE

FIRE PROTECTION

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

32 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

20801.12

Key Plan

691-20-200

June 15, 2021

FULLY SPRINKLERED

11301 WILSHIRE BOULEVARD

WEST LOS ANGELES, CA 90073

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA

FINAL CONSTRUCTION

DOCUMENTS

FOR ENLARGED PLAN

SEE 527.T-402

FOR ENLARGED PLAN

SEE 527.T-401

85'' HDMI DISPLAY. WALL MOUNTED.

OVERHEAD PROJECTOR.

DESK WITH INTEGRAL RECEPTACLE PRE-WIRED

FROM WALL.

INSTRUCTOR DESK/ LECTERN.

60'' HDMI DISPLAY - WALL MOUNTED.

NOT USED.

PROVIDE WIRELESS ACCESS POINT FOR

MOUNTING DETAIL SEE T-503

NOT USED.

1 1/ 4''C WITH HDMI CABLE WITH HDMI

CONNECTION AT BOTH ENDS TO INSTRUCTOR

DESK.

NEW CEILING MOUNTED MOTION SENSOR.

CONNECT TO EXISTING SECURITY SYSTEM

PANEL. (SECURITY OF LOS ANGELES)

NEW SECURITY SYSTEM KEY PAD. CONNECT TO

EXISTING SECURITY SYSTEM PANEL.

EXISTING SOLA SECURITY PANEL.

CONNECT NEW FIRE ALARM DEVICE TO EXISTING FIRE

ALARM SYSTEM. REPLACE/ UPGRADE BATTERY IN FACP.

RE-USE EXISTING SECURITY SYSTEM.

VERIFY PERIMETER DOOR SENSORS ARE CONNECTED AND

WORKING PROPERLY TO MONITOR BUILDING PERIMETER.

PROVIDE ALARM CONTACT TO VA NETWORK SECURITY.

COMMISSION SECURITY SYSTEM OPERATIONAL.

1.

2.

NORTH

3.

4.

5.