This pre-solicitation notice announces an upcoming invitation for bid for construction services for Project 691-20-200, Electronic Health Record Modernization Infrastructure Upgrades at the VA West Los Angeles Healthcare System located in Los Angeles, California. The scope of work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The project is set aside for Service-Disabled Veteran-Owned Small Businesses listed in the Vendor Information Pages database. The North American Industry Classification code is 236220 for commercial and institutional building construction with a size standard of $39.5 million. The estimated value of the construction project is between $20-50 million. The invitation for bid will be issued on July 13, 2021 via Contract Opportunities and include a mandatory site visit.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
3. EFFECTIVE DATE
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 11
4. REQUISITION/PURCHASE REQ. NUMBER
691-21-3-5278-0017
5. PROJECT NUMBER (if applicable)
691-20-200
00262
Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite Long Beach CA 90815
00262
Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite Long Beach CA 90815
To all Offerors/Bidders
9A. AMENDMENT OF SOLICITATION NUMBER
36C26221B0009
08-12-2021 X
X X
See CONTINUATION Page
X ONE (1)
Amendment A0003 is issued to post the following documents:
- COR Responses to Contractor RFIs # 1-20
- Site Visit, Sign-in Sheet, EHRM GLA Main Campus, 691-20-200
- Revised DRAWINGS to provide clarification in Sheet T-001:Added Fire Alarm Symbols; Sheet 527.E-111: Revised background, Revised Electrical work to match updated background, Revised Keynotes, and added Receptacle in Room 102;
and Sheet 527.T-111: Revised background
HARRY SEBALLOS
CONTRACTING OFFICER
RFI Questions & Answers
Project Name: Project 691-20-200 EHRM Infrastructure Upgrades – VAGLA Solicitation Number: 36C26221B0009
Received 20 question on 08/06/2021
Question 1 [EDS] Q: Sheet GI-002, Conceptual Phasing Notes, Phase 1: Is Contractor to mandrel all empty/spare underground conduits or just the segments in which new tube cells will be installed?
A: Just the segments in which new tube cells will be installed.
Question 2 [VA] Q: Sheet GI-002, Conceptual Phasing Notes, Phase 1: Is Contractor to removed unused cables from entire underground conduit system or just the segments in which new tube cells will be installed?
A: Cabling will be removed from just segments in which new tubes will be installed.
Question 3 [VA] Q: Sheet GI-002, Conceptual Phasing Notes, Phase 1: Please provide info indicating quantities, types and routing for all unused copper cables to be removed by Contractor in each manhole and duct bank.
a. Please indicate which of these cables are lead sheathed.
b. If requested information is not available, please indicate how Bidder shall estimate this
SOW.
A: Due to the age of the communication cabling we don’t have a proper count of what needs to be removed. You will have to provide a general demo price for cable removal.
Provide a fare but reasonable over all communication cabling removal price for manhole duct banks and in buildings.
Manholes between Bldg. 301 to Bldg. 500 are all lead sheathed cable. Please reference the manhole photos included in the drawings. All the conduits within the manholes between Bldg. 500 to Bldg. 301 must be cleared out for the new tubes.
Question 4 [VA] Q: Sheet T-001, Telecommunications General Note #30: Please provide info indicating quantities, types, and locations for all abandoned system components to be removed by Contractor.
a. If this information is not available, please indicate how Bidder shall estimate this
SOW.
A. Provide a fare but reasonable demo price to remove abandoned systems for all TR closets.
Question 5 [VA] Q: Sheet T-001, Telecommunications General Note #35: Is Contractor to removed unused cables from entire underground conduit system or just the segments in which new tube cells will be installed?
A: Cabling will be removed from just segments in which new tubes will be installed.
Question 6 [VA]
Q: Sheet T-001, Telecommunications General Note #35: Please provide info indicating quantities, types, and routing for all unused cables to be removed by Contractor in underground conduit system.
a. Please indicate which/how many of these cables are lead sheathed.
b. If requested information is not available, please indicate how Bidder shall estimate this
SOW.
A: Due to the age of the communication cabling we don’t have a proper count of what needs to be removed. You will have to provide a general demo price for cable removal.
Provide a fare but reasonable over all communication cabling removal price for manhole duct banks and in buildings.
Manholes between Bldg. 301 to Bldg. 500 are all lead sheathed cable. Please reference the manhole photos included in the drawings. All the conduits within the manholes between Bldg. 500 to Bldg. 301 must be cleared out for the new tubes.
Question 7 [EDS] Q: Sheet T-001, Telephone Cable Schedule: Please indicate whether Contractor is to provide new cables for all From/To’s indicated in this table or whether Contractor is simply to move terminations of existing cables from old TRs to new TRs as noted in table.
a. If scope is to move terminations from old TRs to new TRs, has VA confirmed that all existing Cat 3 cable are long enough to relocate to new TRs? Are Bidders to assume all these cables are of sufficient length to re-terminate?
A: Contractor to provide new Cat3 cables as per the schedule. Contractor to also terminate the multi-pair cables on 110 Block at both ends on the wall as shown on elevation drawings.
Question 8 [VA] Q: Sheet TS-001, Step 1: Is Contractor to removed unused cables from entire underground conduit system or just the segments in which new tube cells will be installed?
A: Cabling will be removed from just segments in which new tubes will be installed.
Question 9 [VA] Q: Sheet TS-001, Step 1: Please provide info indicating quantities, types and routing for all unused copper cables to be removed by Contractor in each manhole and duct bank.
a. Please indicate which/how many of these cables are lead sheathed.
b. If requested information is not available, please indicate how Bidder shall estimate this
SOW.
A: Due to the age of the communication cabling we don’t have a proper count of what needs to be removed. You will have to provide a general demo price for cable removal.
Provide a fare but reasonable over all communication cabling removal price for manhole duct banks and in buildings.
Manholes between Bldg. 301 to Bldg. 500 are all lead sheathed cable. Please reference the manhole photos included in the drawings. All the conduits within the manholes between Bldg. 500 to Bldg. 301 must be cleared out for the new tubes.
Question 10 [EDS] Q: Sheet TS-001, Step 3: Is Contractor to mandrel all empty/spare underground conduits or just the segments in which new tube cells will be installed?
A: Mandrel just the segments in which new tube cells will be installed.
Question 11 [EDS] Q: Sheets TS-001 and TS-002, Key Note #2: Please confirm that only the UG conduit segments marked with Key Note #2 are to receive new cell tubes.
A: All U/G conduits are to receive new cell tubes. Keynote 2 call out is typical for all
U/G conduit segments. Refer to Table on TS-002 and riser diagrams on drawings T-601, T-602, T-603, T-604, T-605 and T-606, for additional/specific requirements.
Question 12 [VA] Q: Floor plan sheets: For any data outlet symbols shown on the drawings with no cable quantity indicated, please clarify how Bidders shall determine per-outlet cable quantity to be used.
A: For any data outlet symbols shown on the drawings with no cable quantity indicated it will be three cables to support three CAT6A RJ45wall jacks.
Question 13 [VA] Q: Floor plan sheets, General Note #1 indicates Contractor shall remove all existing Cat 5 and unused Cat 3 cables.
a. Please indicate how Contractor is to determine quantity of existing Cat 5 and unused Cat 3 cables are currently installed.
A: Contractor will provide a reasonable but fare demo price per TR to remove existing Cat 5 and unused Cat 3 cables that aren’t indicated on drawings.
Question 14 [VA] Q: Floor plan sheets, General Note #3 indicates all new Cat 6A cables and termination jacks shall be color-coded (one white, one gray, one blue per data outlet).
a. Please indicate how Contractor shall determine color coding for cables and jacks when a data outlet includes more than or fewer than three cables.
A: If there are four or more color code will follow: White, Blue, Grey, White, Blue, Grey If there are lease than three color code will follow: White, Blue or White.
Question 15 [VA] Q: Floor plan sheets, Key Note #4 indicates that Contractor shall provide new faceplate with one white, one gray, one blue RJ-45 jack.
a. Please indicate how Contractor shall determine RJ-45 jack color coding for faceplates that will include more than or fewer than three cables.
A: If there are four or more color code will follow: White, Blue, Grey, White, Blue, Grey.
If there are lease than three color code will follow: White, Blue or White.
Question 16 [EDS] Q: 16. Rack elevations sheets, General Note #1 indicates that “existing Cat 5 and below” cables “shall be removed…” The rack elevation sheets depict existing Cat 3 cabling/patch panels as grey in many of the “NEW” rack elevation drawings. Please confirm that all existing Cat 3 cable depicted in this manner are to be left in place.
A: All unused or abandoned CAT 3 cables shall be removed as called out.
Question 17 [EDS] Q: Rack elevation sheets: Please confirm that any item that appear as grey in a “NEW” rack elevation drawing does not require replacement and is to be left in place.
A: Confirmed; however, note that the contractor is to coordinate the installation with shop drawing requirements for final rack configuration. New Fiber patch panel, new CAT6A patch panel and rack mounted UPS are called out on new rack elevation. Both Fiber and Cat6A patch panel are furnished and installed by the contractor for termination the cables on the rack. Note also, that new rack mounted UPS are furnished and installed by the contractor.
Question 18 [EDS] Q: Rack elevation sheets: Please confirm that any item that appear as black in a “NEW” rack elevation drawing represents a new item to be added to the rack.
A: Confirmed; however, note that the contractor is to coordinate the installation with shop drawing requirements for final rack configuration. New Fiber patch panel, new CAT6A patch panel and rack mounted UPS are called out on new rack elevation. Both Fiber and Cat6A patch panel are furnished and installed by the contractor for termination the cables on the rack. Note also, that new rack mounted UPS are furnished and installed by the contractor.
Question 19 [EDS] Q: Spec 27 15 00, Section 2.3.A.3: Please clarify whether telecommunication outlet faceplates provided for this project must be stainless steel or if plastic faceplates are acceptable.
A: All faceplate shall be stainless steel.
Question 20 [SC] Q: Spec 01 91 00, Section 1.1 states in part “The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor”. However other spec divisions under various commissioning requirements for Div 21, 22, 23, 26, etc. in Section 1.1 state in part “A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.”
Please clarify the responsibility of engaging the commissioning agent for the project, VA, or Contractor A: A Commissioning Agent (CxA) is the Contractor responsibility. Refer to Spec 01 91 00, Section 1.1 “The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors.” Refer to Div. 21, 22, 23, 26, 27, 28, .., Section 1.1 “An independent third party Commissioning Agent (CxA) appointed by the contractor will manage the commissioning process.”
See attached document: S04. Site Visit Sign-In Sheet, EHRM GLA Main Campus CON.
See attached document: T-001.
See attached document: 527_E-111.
See attached document: 527_T-111.
CONCRETE
WALK
RAMP DN
RAMP DOWN
STAIR
RAMP DOWN
A
B
C
D
E
F G
H
J
K
L
M
N
O
P
Q
R
S
FIRE PENETRATIONS NOTE
- M -
MAIN CIRCUIT BREAKER
NEUTRAL
MCB
N
- N -
PHASE
POWER
PANEL
PWR
PNL
- R -
- P -
ROOM
RECEPTACLE
RM
RECEPT
- B -
AMPERE
- A -
A
- C -
CIRCUIT
CIRCUIT BREAKER
BUILDING
CONDUIT
BLDG
CKT
C
CB
- E -
EG
- G -
GROUNDG, GND
EQUIPMENT GROUND
ABBREVIATIONS
VOLT OR VOLTAGE
VOLT AMPEREVA
V
- V -
WATTW
- W -
- J -
- K -
KILOVOLT AMPERE
KILOVOLT
JUNCTION BOX
KV
KW
KVA
JB
KILOWATT
ABOVE FINISHED FLOORAFF
UON UNLESS OTHERWISE NOTED
- U -
E1.01
AC
X
MOTOR TYPE
REVISION
RISER TAGPOINT OF CONNECTION
SCHEDULE NUMBER
# LIGHT FIXTURE TYPE
INDICATES DETAIL NUMBER
SHEET NUMBER TO FIND DETAIL
SPECIFIC NOTE/
POINT OF DISCONNECTION
REFERENCE NOTE
ANNOTATIONS
EWC ELECTRIC WATER COOLER
T-001
TELECOMMUNICATIONS
GENERAL NOTES:
ABBREVIATIONS VA
EHRM ELECTRONIC HEALTH RECORD MODERNINATION
CERNER INFORMATION TECHNOLOGY COMPANY
CEDT CERNER EHRM DEPLOYMENT TEAM
EUD END USER DEVICE
CIH CERTIFIED INDUSTRIAL HYGIENIST
LBVAMC LONG BEACH VA MEDICAL CENTER
MDF MAIN DISTRIBUTION FRAME
TR TELECOMMUNICATIONS ROOM
OIT OFFICE OF INFORMATION TECHNOLOGY
3D
3D
WALL MTD DATA OUTLET
W/3 CAT 6A DROPS
FLOOR MTD DATA OUTLET
W/3 CAT 6A DROPS
SEE DRAWING T-504
ABBREVIATIONS IT
SM
MM
SFP
ORL
OTDR
UTP
LAN
SINGLE MODE FIBER
MULTI MODE FIBER
SMALL FORM FACTOR PLUGGABLE TRANSCEIVER
OPTICAL RETURN LOSS
OPTICAL TIME DOMAIN REFLECTOMETER
UNSHIELDED TWISTED PAIR
LOCAL AREA NETWORK
EIA
TIA
OS1, OS2
OS2
ELECTRONIC INDUSTRIES ASSOCIATION
TELECOMMUNICATION INDUSTRY ASSOCIATION
TYPE OF SINGLE MODE FIBER
AIR BLOWN SINGLE MODE FIBER
1. PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS IN ACCORDANCE
WITH THE SPECIFICATIONS AND THE PROJECT SCHEDULE. NO INSTALLATION
SHALL PROCEED WITHOUT APPROVAL OF THE SHOP DRAWINGS.
2. MINIMAL STORAGE WILL BE AVAILABLE ON THE CONSTRUCTION SITE. CABLING
CONTRACTOR RESPONSIBLE FOR RECEIVING AND STORING MATERIALS AND
FOR COORDINATING MATERIALS DELIVERY TO THE JOB-SITE.
3. COMMUNICATIONS CABLES INSTALLED SHALL BE INSTALLED IN ACCORDANCE
WITH THE REQUIREMENTS DETAILED HEREIN AND SHALL BE FREE OF KINKS,
TWISTS, SHARP BENDS, UNNECESSARY LOOPS OR WORKMANSHIP DEFECT.
4. PROPERLY SEAL WALL PENETRATIONS THROUGH FIRE RATED WALL & FLOOR
USING EZ PATH DETAILED ON T-504.
5. RUN OPEN CABLE FOR EACH SYSTEM IN SLEEVES, J-HOOKS DEDICATED FOR
THE SYSTEM.
6. SEPARATE AND BUNDLE CABLE BY SYSTEM.
7. MAINTAIN EIA/ TIA RECOMMENDED SEPARATIONS BETWEEN CABLING OF
DIFFERENT SYSTEMS. 6'' FROM LIGHT FIXTURES. 24'' FROM 480V & 12'' FROM
208V.
8. MAINTAIN RECOMMENDED SEPARATIONS BETWEEN CABLING AND
INTERFERENCE PRODUCING ELECTRICAL DEVICES SUCH AS POWER CABLING,
ELECTRICAL PANELS, FLUORESCENT LIGHTS, BALLAST RELAYS, ELECTRIC
MOTORS, MOTOR CONTROLLERS, VFD, TRANSFORMERS AND OTHER
ELECTROMAGNETIC DEVICES. SEE NOTE 7.
9. WHERE CABLE IS OPEN ON J-HOOK SYSTEM, RUN PARALLEL OR
PERPENDICULAR TO WALLS AND SUPPORT A MINIMUM OF EVERY 5 FEET USING
APPROVED J-HOOKS.
10. ALL CABLE HOOKS AND OTHER CABLE SUPPORT DEVICES SHALL BE ATTACHED
TO THE BUILDING STRUCTURE IN ACCORDANCE WITH CODES AND
SPECIFICATIONS.
11. NO OPEN CABLE SHALL BE DRAPED OVER OR SUPPORTED ON PLUMBING,
ELECTRICAL, MEDICAL GAS, FIRE SUPPRESSION, OR OTHER PIPING OR
DUCTWORK.
12. ALL CABLES TO BE PLENUM RATED.
13. THE CABLE LENGTH FROM THE TERMINATION POINT IN TR TO EUD IN THE
WORK AREA SHALL NOT EXCEED 295FEET INDEPENDENT OF MEDIA TYPE.
14. THE 295FEET INCLUDES AN ALLOWANCE OF 10FEET FROM EUD TO DEVICE AND
AN ADDITIONAL 24 FEET FROM PATCH PANEL TO ACTIVE COMPONENTS IN TR.
15. VISUALLY INSPECT CONNECTIONS ON CABLE TO ENSURE PROPER COMPLIANCE
WITH EIA/TIA 568B TERMINATION.
16. INSPECT ALL EXPOSED PORTIONS OF THE CABLE TO INSURE A MINIMUM OF 4
TIMES THE CABLE DIAMETER BEND RADIUS AT ANY POINT.
17. ENSURE NO CABLE BUNDLES OR TIE POINTS DISPLAY KINKS, SHARP BENDS,
CREASING OR DEFORMATION OF OUTER SHEATH OR SIGNS OF EXCESSIVE
PULLING FORCE.
18. IN TR CABLES SHOULD BE COMBED AND DRESSED UP BEFORE BUDLING AND
USING VELCRO STRAPS. ZIP TIES OR TWIST TIES SHALL NOT BE USED. STRAPS
SHALL BE SPACED AT APPROPRIATE DISTANCE TO ENSURE CABLES ARE HELD
TOGETHER.
19. ON THE RACK THE CABLES SHOULD BE DIVIDED IN THE MIDDLE, WHERE HALF
FLOWS TO THE LEFT AND HALF FLOWS TO THE RIGHT.
20. ALL CABLING SHALL BE INSTALLED BY CABLE MANUFACTURER'S CERTIFIED
INSTALLER.
21. BEFORE ACCEPTANCE OF ANY NEWLY INSTALLED COMMUNICATIONS WIRING,
THE CABLE WILL UNDERGO SEVERAL LEVELS OF TESTING TO ENSURE THAT ALL
MATERIALS AND INSTALLATION CONFORM TO STANDARD INCLUDED IN THE
DRAWINGS AND SPECIFICATIONS. THIS WILL INCLUDE BOTH THE UTP AND FIBER
OPTICS SYSTEMS. FAILURE TO MEET THE DRAWINGS AND SPECIFICATIONS
SHALL CONSTITUTE REASON TO REJECT THE INSTALLATION UNTIL ALL
PROBLEMS ARE SOLVED.
22. ALL RECORDED TESTING RESULTS SHALL REMAIN IN THE APPROPRIATE TR.
TEST BOTH CABLES AND THEIR CORRESPONDING CONNECTING SYSTEMS AS A
WHOLE UNIT TO ENSURE SYSTEM INTEGRITY.
23. TEST ALL FIBER OPTICS CABLE AND COMPONENTS COMPRISING THE
BACKBONE SYSTEM. TEST ALL FIBER STRAND IN BOTH DIRECTION. USE OTDR
OPERATING AT BOTH 1310 AND 1550 NM WAVELENGTHS.
24. PHYSICAL LABELING FOR ALL CABLES AND RELATED COMPONENTS IS
REQUIRED COMPONENTS WILL DEPEND HEAVILY ON ADHERING TO A LOGICAL
LABELING SCHEME TO ENABLE EXPEDIENT PATCH PANEL, DATA JACK AND
SWITCH PORT IDENTIFICATION.
25. PROVIDE ALL NEW CABLING IN THE BUILDING S WITH AN AS-BUILT,
ELECTRONICALLY AND PAPER, FOR THE CABLE PLANT. EACH TR WIRING
CLOSETS CABLE PLANT AS-BUILT WILL BE INSTALLED IN A FOLDER ON THE
BACK OF THE DOOR SECURED IN A HOLDER ATTACHED TO THE DOOR.
METHOD OF PROCEDUREMOP
SPECIFIC NOTE/
REFERENCE NOTE
SECURITY SYMBOLS
A
F i l e
P a t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
C
D
20-SCE-07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
FIRE PROTECTION WALL SYMBOLS
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
- D -
DEEPD
- H -
HEIGHTH
26. CABLING DIAGRAM: SUBMIT, FOR APPROVAL, A COMPLETE CABLING DIAGRAM. THE DIAGRAM SHALL BE BASED ON THE DRAWING INCLUDED IN THE CONSTRUCTION DOCUMENTS. IT SHALL BE UPDATED TO SHOW QUANTITIES AND PART NUMBERS FOR ALL COMPONENTS INCLUDING PATCH PANELS, CABLE, SERVER CABINETS AND EQUIPMENT RACKS AND ALL OTHER ASSOCIATED COMPONENTS. INCLUDE THE
FOLLOW:
1). DETAIL AND ELEVATION DRAWINGS: PROVIDE TR RACK ELEVATION, ENLARGED TR
ROOM LAYOUT.
2). BUILDING COMPOSITE FLOOR PLANS: PROVIDE BUILDING FLOOR PLANS SHOWING WORK AREA OUTLET (WAO) OUTLET LOCATIONS AND CONFIGURATION, TYPES OF JACKS, DISTANCE FOR EACH
CABLE, AND CABLE ROUTING LOCATIONS.
3). FLOOR PLANS TO INCLUDE:
a. FINAL ROOM NUMBERS AND ACTUAL BACKBONE CABLING AND PATHWAY LOCATIONS
(HORIZONTAL AND VERTICAL) AND LABELING.
b. RISER FLOOR PENETRATION / DATA POLE LOCATION AFTER SCANNING THE FLOOR FOR
REBARS.
c. INPUTS AND OUTPUTS OF EQUIPMENT IDENTIFIED ACCORDING TO LABELS INSTALLED ON
CABLES AND EQUIPMENT.
d. DEVICE LOCATIONS WITH LABELS.
e. EZ PATH SLEEVES.
f. WIRING DIAGRAM.
g. LABELING AND ADMINISTRATION DOCUMENTATION.
SCALE: NO SCALE
TR 16SA
TR 15SA
TR 14SA
TR 13SA
TR 12SA
TR 11SA
TR 10SA
TR 16IS
TR 15IS
TR 14IS
TR 13IS
TR 12IS
TR 11IS
TR 10IS
TR 16IN
TR 15IN
TR 14IN
TR 13IN
TR 12IN
TR 11IN
TR 10IN
TR 16SE
TR 15SE
TR 14SE
TR 13SE
TR 12SE
TR 11SE
TR 10SE
PATCH CORDS TABLE
27. ALL DATA & TELEPHONE CABLES THAT ARE REMOVED WILL BE RECYCLED BY VA.
PLEASE DISPOSE OFF CABLES TO VA PROVIDED DUMPSTERS.
28. THE LOCATION OF END USER DEVICES (EUD) SHOWN ON THESE DRAWINGS ARE
APPROXIMATE AND ARE SUBJECT TO VERIFICATION BY THE CONTRACTOR.
CONTRACTOR SHALL REMOVE EXISTING EUD DATA OUTLETS AND PROVIDE NEW
EUD DATA OUTLETS AT THE SAME LOCATION.
29. ALL CAT 6A CABLES TO BE PLENUM AND POE RATED.
THE CONTRACTOR TO COORDINATE WITH VA AND REMOVE ABANDONED SYSTEMS/
ITEM IDENTIFIED BY VA. EXAMPLE INCLUDE OLD FIRE ALARM PANELS, BATTERIES
AND CHARGERS, TELEPHONE EQUIPMENT NOT IN USE, OLD 110 BLOCKS NOT IN
USE, EXISTING FIBERS, EXISTING FIBER DISTRIBUTED LINE MODULE (FOLM).
31. THE CORE AREA EUD LOCATION OF FLOORS 2-6 SHALL BE SERVED WITH CAT6A BY EITHER THE NORTH (IN) OR SOUTH (IS)INTERSTITIAL TELECOM ROOM. THIS SHOULD BE CONSISTENT FOR CORE AREAS FLOORS 2-6.
WHEN RE-CABLING EXISTING SLEEVES SHALL BE REMOVED AND NEW DRY WALL MUST BE INSTALLED
AND FINISHED BEFORE INSTALLING NEW SLEEVES.
CONTRACTOR TO REMOVE ALL 66 BLOCK AND ASSOCIATED CABLING OF ALL TR ROOM. ALL REMOVED
CABLING SHALL BE PUT IN A VA FURNISHED DUMPSTER FOR RECYCLING.
IN TR WHICH REQUIRES INSTALLATION OF FIRE RATED TELEPHONE BACKBOARDS. AFTER UNUSED DEVICES, 110 BLOCK AND OTHER ITEMS ARE REMOVED CONTRACTOR WILL DEMOUNT THE REMAINING
ITEMS, SUPPORT IT TEMPORARILY, INSTALL THE BACKBOARD AND REMOUNT ITEMS ON THE
BACKBOARD.
ALL UNUSED CABLES IN UNDERGROUND CONDUIT SYSTEM INCLUDING ASSOCIATED MANHOLES SHALL
BE PULLED OUT AND REMOVED BY CONTRACTOR AND TRANSPORTED TO VA SUPPLIED DUMPSTERS
INTENDED FOR RECYCLING BY VA. CONTRACTOR SHALL COORDINATE WITH VA WHO WILL IDENTIFY UNUSED CABLES WITHIN EACH MANHOLE. THERE ARE EXISTING LEAD SHEATHED CABLES THAT WILL
REQUIRE SPECIAL HANDLING AND COORDINATION WITH VA.
32.
33.
34.
30.
35.
BLDG. 500 INTERSTITIAL LEVEL EXISTING TR WAY FINDING MAP
TELEPHONE CABLE SCHEDULE
FIRE ALARM SYMBOLS
FIRE ALARM AUDIO/VISUAL INDICATING UNIT
AUTOMATIC FIRE ALARM SMOKE DETECTOR
ADDENDUM 08-12-2021
AUGUST 12, 2021
J
HB-1,3,5
HB-26,28,30 28
EX EX
EX
AVU
AVP
HA
EX EX EX
NEW
NEWNEWNEWNEW
NEWNEW
NEW
NEW
1 1
NEWHB
HC
AVP-22,24,26
EXISTING
PROJECTION
SCREEN TO
REMAIN
10 12
12 14
16 12 14 16
16HA-12,14,16
HA-18
9 9
AVP-8,10,12
3 3
3 3 3
1 9
GFI
SCALE: 1/8" = 1' - 0"
527.E-111
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
20801.12
Key Plan
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
FOR ENLARGED PLAN
SEE 527.E-401
FOR ENLARGED PLAN
SEE 527.E-401
85'' HDMI DISPLAY. WALL MOUNTED.
OVERHEAD PROJECTOR.
DESK WITH INTEGRAL RECEPTACLE PRE-WIRED
FROM WALL.
INSTRUCTOR DESK/ LECTERN.
60'' HDMI DISPLAY - WALL MOUNTED.
NOT USED.
NOT USED.
3/4''C- 3 #12 + 3 #12N + 1 #12EG
INSTALL 1 1/ 4''C FROM EACH MONITOR TO
INSTRUCTORS DESK FOR HDMI CABLE.
NEW 3/4"C - 2 # 12 + 1 # 12 EG.
REPLACE EXISTING RECEPTACLE WITH GFI
RECEPTACLE.
1. ALL EXISTING RECEPTACLES TO REMAIN.1.
NORTH
EX EX
EXISTING
PROJECTION
SCREEN TO
AVU
AVP
HA
HB
HC
9 9
SCALE: 1/8" = 1' - 0"
527.T-111
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
20801.12
Key Plan
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
FOR ENLARGED PLAN
SEE 527.T-402
FOR ENLARGED PLAN
SEE 527.T-401
85'' HDMI DISPLAY. WALL MOUNTED.
OVERHEAD PROJECTOR.
DESK WITH INTEGRAL RECEPTACLE PRE-WIRED
FROM WALL.
INSTRUCTOR DESK/ LECTERN.
60'' HDMI DISPLAY - WALL MOUNTED.
NOT USED.
PROVIDE WIRELESS ACCESS POINT FOR
MOUNTING DETAIL SEE T-503
NOT USED.
1 1/ 4''C WITH HDMI CABLE WITH HDMI
CONNECTION AT BOTH ENDS TO INSTRUCTOR
DESK.
NEW CEILING MOUNTED MOTION SENSOR.
CONNECT TO EXISTING SECURITY SYSTEM
PANEL. (SECURITY OF LOS ANGELES)
NEW SECURITY SYSTEM KEY PAD. CONNECT TO
EXISTING SECURITY SYSTEM PANEL.
EXISTING SOLA SECURITY PANEL.
CONNECT NEW FIRE ALARM DEVICE TO EXISTING FIRE
ALARM SYSTEM. REPLACE/ UPGRADE BATTERY IN FACP.
RE-USE EXISTING SECURITY SYSTEM.
VERIFY PERIMETER DOOR SENSORS ARE CONNECTED AND
WORKING PROPERLY TO MONITOR BUILDING PERIMETER.
PROVIDE ALARM CONTACT TO VA NETWORK SECURITY.
COMMISSION SECURITY SYSTEM OPERATIONAL.