691-20-200 Telecommunication 100 Final Drawings Part 4 (1) 42 x 30_Part3.pdf
PDF 46 MB Posted
- Solicitation number
- 36C26221B0009
About this file
This notice provides details of an upcoming federal construction solicitation by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. The solicitation will be for Project 691-20-200, Electronic Health Record Modernization Infrastructure Upgrades to be performed at the VA West Los Angeles Healthcare System located in Los Angeles, California. Work will include general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The project value is estimated between $20,000,000 to $50,000,000. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses and will utilize NAICS code 236220 with a size standard of $39.5M. The solicitation is expected to be issued on July 13, 2021 via beta.sam.gov as an Invitation for Bid. A pre-solicitation site visit will also be held with attendance details provided in the solicitation.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RACK EQUIPMENT CABLE INFORMATION
1 ALL CAT5E
WALL
RACK 1
1 PLYWOOD BACKBOARD
2 WALL MOUNTED 110 BLOCK
3 1U 24 PORT PATCH PANEL
4 2U 48 PORT PATCH PANEL
5 1U WIRE MANAGER
6 1U CISCO 3850 SWITCH
7 1U PDU
WALL
WALL
MOUNTED
RACK
WALL
MOUNTED
RACK
RACK 2 A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
20-SCE-07
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
213.T-402A
TELECOMMUNICATIONS RACK
ELEVATION TR 103
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.SCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
7 4U 3000VA UPS. SEE KEY NOTE 18
ON E-001
8 PDU. SEE KEY NOTE 18 ON E-001
AFF
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1
3 FIBER STRAND AS
SPECIFIED
SS
MM
213.T-403
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM 201
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA
RACKS WITH VERTICAL AND HORIZONTAL CABLE
MANAGEMENT TO BE REMOVED AFTER NEW
DATA RACK IS IN PLACE & COMMISSIONED.
EXISTING FIRE RATED TELEPHONE
BACKBOARD.
EXISTING 12”W CABLE LADDER RACK MOUNTED
AT 84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS TO REMAIN (TYPICAL).
INSTALL NEW FIRE RATED TELEPHONE
BACKBOARD ON WALLS 8'-0'' HIGH DO NOT
PAINT.
NEW TGB GROUND BUS. SEE RISER ON E-701.
NEW 12''W X 1 1/ 2''H LADDER RACK.
NEW 4 POST DATA RACK 84''H. WITH
HORIZONTAL & VERTICAL WIRE MANAGERS.
EZ PATH SLEEVES. QUANTITY AS REQUIRED.
SEE T-504.
TDU (TUBE DISTRIBUTION UNIT)
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM 201
RACK 1
1 PLYWOOD BACKBOARD
2 WALL MOUNTED SIECOR ENCLOSURE
3 WALL MOUNTED 110 BLOCK
4 1U 24 PORT PATCH PANEL
5 2U 48 PORT PATCH PANEL
6 2U WIRE MANAGER
7 1U CISCO 3850 SWITCH
8 1U PDU
9 UPS
WALL
MOUNTED
RACK
WIRE
MANAGER
(TYP.)
WALL WALL
4" CONDUIT
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
20-SCE-07
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
213.T-403A
TELECOMMUNICATIONS RACK
ELEVATION TR 201
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
7 4U 3000VA UPS. SEE KEY NOTE 18
ON E-001
8 PDU. SEE KEY NOTE 18 ON E-001
AFF
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1
SS
MM
213.T-404
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1' - 0"
NORTH
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM 301
TR ROOM 301
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA
RACKS WITH VERTICAL AND HORIZONTAL CABLE
MANAGEMENT TO BE REMOVED AFTER NEW
DATA RACK IS IN PLACE & COMMISSIONED.
EXISTING FIRE RATED TELEPHONE
BACKBOARD.
EXISTING 12”W CABLE LADDER RACK MOUNTED
AT 84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS TO REMAIN (TYPICAL).
INSTALL NEW FIRE RATED TELEPHONE
BACKBOARD ON WALLS 8'-0'' HIGH DO NOT
PAINT.
NEW TGB GROUND BUS. SEE RISER ON E-701.
NEW 12''W X 1 1/ 2''H LADDER RACK.
NEW 4 POST DATA RACK 84''H. WITH
HORIZONTAL & VERTICAL WIRE MANAGERS.
EZ PATH SLEEVES. QUANTITY AS REQUIRED.
SEE T-504.
TDU (TUBE DISTRIBUTION UNIT)
RACK 1
1 PLYWOOD BACKBOARD
2 WALL MOUNTED SIECOR ENCLOSURE
3 1U 24 PORT PATCH PANEL
4 2U 48 PORT PATCH PANEL
5 1U WIRE MANAGER
6 1U CISCO 3850 SWITCH
7 1U PDU
8 UPS
2 POST RACK
WIRE
MANAGER
(TYP.)
LADDER
RACK
SUPPORT
STRUT
WALL WALL
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
20-SCE-07
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
213.T-404A
TELECOMMUNICATIONS RACK
ELEVATION TR 301
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
7 4U 3000VA UPS. SEE KEY NOTE 18
ON E-001
8 PDU. SEE KEY NOTE 18 ON E-001
AFF
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1
9 SS
MM
214.T-401
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1' - 0"
NORTH
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM 105
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA
RACKS WITH VERTICAL AND HORIZONTAL CABLE
MANAGEMENT TO BE REMOVED AFTER NEW
DATA RACK IS IN PLACE & COMMISSIONED.
EXISTING FIRE RATED TELEPHONE
BACKBOARD.
EXISTING 12”W CABLE LADDER RACK MOUNTED
AT 84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS TO REMAIN (TYPICAL).
INSTALL NEW FIRE RATED TELEPHONE
BACKBOARD ON WALLS 8'-0'' HIGH DO NOT
PAINT.
NEW TGB GROUND BUS. SEE RISER ON E-701.
NEW 12''W X 1 1/ 2''H LADDER RACK.
NEW HEAVY DUTY WALL MOUNTED DATA RACK
23''W X 21''D X 73.5''H. WITH HORIZONTAL &
VERTICAL WIRE MANAGERS.
EZ PATH SLEEVES. QUANTITY AS REQUIRED.
SEE T-504.
TDU (TUBE DISTRIBUTION UNIT)
TR ROOM 105
RACK EQUIPMENT
CABLE INFORMATION
1 ALL CAT5E
2 ALL CAT6
RACK 1
1 PLYWOOD BACKBOARD
2 WALL MOUNTED SIECOR ENCLOSURE
3 WALL MOUNTED 66 BLOCK
4 WALL MOUNTED 110 BLOCK
5 1U 24 PORT PATCH PANEL
6 2U 48 PORT PATCH PANEL
7 1U CISCO 3850 SWITCH
8 UPS
4" CONDUIT
WALL
WALL
WALL
WIRE
MANAGER
(TYP.)
WALL
MOUNTED
RACK
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
20-SCE-07
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
214.T-401A
TELECOMMUNICATIONS RACK
ELEVATION TR 105
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
7 4U 3000VA UPS. SEE KEY NOTE 18
ON E-001
8 PDU. SEE KEY NOTE 18 ON E-001
AFF
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1
9 SS
MM
214.T-402
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA
RACKS WITH VERTICAL AND HORIZONTAL CABLE
MANAGEMENT TO BE REMOVED AFTER NEW
DATA RACK IS IN PLACE & COMMISSIONED.
EXISTING FIRE RATED TELEPHONE
BACKBOARD.
EXISTING 12”W CABLE LADDER RACK MOUNTED
AT 84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS TO REMAIN (TYPICAL).
INSTALL NEW FIRE RATED TELEPHONE
BACKBOARD ON WALLS 8'-0'' HIGH DO NOT
PAINT.
NEW TGB GROUND BUS. SEE RISER ON E-701.
NEW 12''W X 1 1/ 2''H LADDER RACK.
NEW HEAVY DUTY WALL MOUNTED DATA RACK
23''W X 21''D X 73.5''H. WITH HORIZONTAL &
VERTICAL WIRE MANAGERS.
EZ PATH SLEEVES. QUANTITY AS REQUIRED.
SEE T-504.
TDU (TUBE DISTRIBUTION UNIT)
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM
1 ALL CAT5E
2 ALL CAT6
RACK 1
1 PLYWOOD BACKBOARD
2 WALL MOUNTED SIECOR ENCLOSURE
3 WALL MOUNTED 66 BLOCK
4 WALL MOUNTED 110 BLOCK
5 1U 24 PORT PATCH PANEL
6 2U 48 PORT PATCH PANEL
7 1U CISCO 3850 SWITCH
8 UPS
4" CONDUIT
WALL
WALL
WALL
WIRE
MANAGER
(TYP.)
WALL
MOUNTED
RACK
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
20-SCE-07
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
214.T-402A
TELECOMMUNICATIONS RACK
ELEVATION TR 205
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
7 4U 3000VA UPS. SEE KEY NOTE 18
ON E-001
8 PDU. SEE KEY NOTE 18 ON E-001
AFF
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1
9 SS
MM
214.T-403
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA
RACKS WITH VERTICAL AND HORIZONTAL CABLE
MANAGEMENT TO BE REMOVED AFTER NEW
DATA RACK IS IN PLACE & COMMISSIONED.
EXISTING FIRE RATED TELEPHONE
BACKBOARD.
EXISTING 12”W CABLE LADDER RACK MOUNTED
AT 84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS TO REMAIN (TYPICAL).
INSTALL NEW FIRE RATED TELEPHONE
BACKBOARD ON WALLS 8'-0'' HIGH DO NOT
PAINT.
NEW TGB GROUND BUS. SEE RISER ON E-701.
NEW 12''W X 1 1/ 2''H LADDER RACK.
NEW HEAVY DUTY WALL MOUNTED DATA RACK
23''W X 21''D X 73.5''H. WITH HORIZONTAL &
VERTICAL WIRE MANAGERS.
EZ PATH SLEEVES. QUANTITY AS REQUIRED.
SEE T-504.
TDU (TUBE DISTRIBUTION UNIT)
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM
1 ALL CAT5E
2 ALL CAT6
RACK 1
1 PLYWOOD BACKBOARD
2 WALL MOUNTED SIECOR ENCLOSURE
3 WALL MOUNTED 66 BLOCK
4 WALL MOUNTED 110 BLOCK
5 1U 24 PORT PATCH PANEL
6 2U 48 PORT PATCH PANEL
7 1U CISCO 3850 SWITCH
8 UPS
4" CONDUIT
WALL
WALL
WALL
WIRE
MANAGER
(TYP.)
WALL
MOUNTED
RACK
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
20-SCE-07
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
214.T-403A
TELECOMMUNICATIONS RACK
ELEVATION TR 306
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
7 4U 3000VA UPS. SEE KEY NOTE 18
ON E-001
8 PDU. SEE KEY NOTE 18 ON E-001
AFF
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1
2HR 2HR
2H R
2H R
2H R
2H R
2H R
2HR2HR
2HR 2HR
2H R
2H R
2H R
2H R
2H R
2HR2HR
214.T-404
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM
1 EXISTING 110 BLOCK WITH FUSE TO REMAIN.
EXISTING FIBER PANEL TO BE REMOVED.
EXISTING BLOCK TO REMAIN.
EXISTING FIBER PATCH PANEL TO BE REMOVED.
EXISTING FIRE RATED TELEPHONE BACKBOARD
TO REMAIN.
EXISTING PANEL TO REMAIN.
NEW HEAVY DUTY WALL MOUNTED DATA RACK
23''W X 21''D X 73.5''H. WITH HORIZONTAL &
VERTICAL WIRE MANAGERS.
NEW TGB GROUND BUS. SEE RISER ON E-701.
NEW 12"W X 1 1/ 2"H LADDER RACK.
TDU (TUBE DISTRIBUTION UNIT).
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM
SCALE: NONE SCALE: NONE SCALE: NONE
1 PLYWOOD BACKBOARD
2 WALL MOUNTED SIECOR ENCLOSURE
3 NOT USED
4 WALL MOUNTED 110 BLOCK
5 FIBER PATCH PANEL
6 UPS MOVED TO NEW PATCH RACK
WALL WALL
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
20-SCE-07
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
214.T-404A
TELECOMMUNICATIONS RACK
ELEVATION TR BSMT
SCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
3 UPS (EX REINSTALLED ON NEW RACK)
4 2U FIBER PATCH
AFF
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1
SS
MM
SCALE: 1/4" = 1' - 0"
NORTH
215.T-401
TELECOMMUNICATIONS
ENLARGED PLAN - TR ROOM B7
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
TR ROOM
B7
SCALE: 1/4" = 1' - 0"
NORTH
TR ROOM
B7
1 FIBER PANEL TO BE REMOVED.
EXISTING FIRE RATED TELEPHONE BACKBOARD
TO REMAIN.
NEW 12”W CABLE LADDER RACK MOUNTED AT
84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS.
NOT USED.
NEW TGB GROUND BUS. SEE RISER ON E-701.
NEW 12''W X 1 1/ 2''H LADDER RACK.
NEW 4 POST DATA RACK 84''H. WITH
HORIZONTAL & VERTICAL WIRE MANAGERS.
EZ PATH SLEEVES. QUANTITY AS REQUIRED.
SEE T-504.
TDU (TUBE DISTRIBUTION UNIT)
1 ALL CAT5E
1 PLYWOOD BACKBOARD
2 WALL MOUNTED SIECOR ENCLOSURE
3 WALL MOUNTED HI PAIR TUBE
4 WALL MOUNTED 110 BLOCK
5 WALL MOUNTED PHONE BLOCK
6 WALL MOUNTED 24 PORT PATCH PANEL
7 WALL MOUNTED CISCO 3850 SWITCH
8 WALL MOUNTED FIRE ALARM PANEL
9 WALL MOUNTED FDLM
10 WALL MOUNTED MAG DOOR POWER SUPPLY
11 WALL MOUNTED POWER PACK
12 WALL MOUNTED BATTERY
13 UPS
WALL WALL
3" CONDUIT 4" CONDUIT
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
20-SCE-07
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades, WLA
FINAL CONSTRUCTION
DOCUMENTS
215.T-401A
TELECOMMUNICATIONS RACK
ELEVATION TR B7
ALL EXISTING CAT 5E AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM PATCH
PANELS TO EACH EXISTING EUD OUTLETS. THESE EXISTING
CABLES ARE TO BE REMOVED AFTER NEW CAT6A CABLES
HAVE BEEN INSTALLED AND TERMINATED AT BOTH ENDS IN
CAT6A COMPARABLE RJ45 JACKS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
X-RAY SCAN THE FLOOR TO IDENTIFY LOCATION OF
EXISTING REBAR AND DRILL HOLES TO MISS THE REBARS.
HOLE SIZE SHALL NOR EXCEED 5” TO ALLOW EZ-PATH 33
SERIES TO GO THROUGH. SEE DETAIL 4 ON T-501.
1.
2.
3.
4.
5.
6.
7.
8.
9.
SCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
7 4U 3000VA UPS. SEE KEY NOTE 18
ON E-001
8 PDU. SEE KEY NOTE 18 ON E-001
AFF
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1
EXISTING 4"C
FIBER ENTRY
EXISTING 4"C
FACP (EX)
FATC (EX)
FIBER BOX
(EX)
FATC (EX)
9 SS
MM
FACP (EX)
FATC (EX)
FIBER BOX
(EX)
FATC (EX)
SCALE: 1/4" = 1' - 0"
NORTH
215.T-402
TELECOMMUNICATIONS
ENLARGED PLAN - TR ROOM 123 215
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PM EW/JB
A
GENERAL NOTES
C
D
1. PROVIDE UL LISTED FIRESTOPPING AT ALL
PENETRATIONS OF FIRE RATED WALLS.
2. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO
PENETRATE WALLS, W/O LIMITING ABILITY TO
ADD/REMOVE CABLES AT A LATER TIME W/O
RESEALING.
3. COORDINATE RELOCATION OF EXISTING EQUIPMENT
AND FURNITURE WITH THE VA AS INDICATED ON
PROJECT NOTE 5 ON GI001.
20-SCE-07
KEY NOTES
GENERAL NOTE
FIRE PROTECTION
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
32 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECT/ENGINEER OF RECORD
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
20801.12
691-20-200
June 15, 2021
FULLY SPRINKLERED
11301 WILSHIRE BOULEVARD
WEST LOS ANGELES, CA 90073
Electronic Health Records…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .