Attachment A8_Drawing 8 of 9.pdf

PDF 20 MB Posted

Attached to
Z2DA--EHRM Long Beach, 600-20-120, Construction Federal contract opportunity
Solicitation number
36C26221B0004
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document provides details of an upcoming federal contract opportunity for construction services. The Department of Veterans Affairs Long Beach Healthcare System will be issuing an Invitation for Bid for Project 600-20-120, Electronic Health Record Modernization Infrastructure Upgrades to be performed at its location at 5901 E. 7th Street in Long Beach, California. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The contract will be set aside for Service-Disabled Veteran-Owned Small Businesses listed in the Vendor Information Pages database. The North American Industry Classification Code is 236220 for commercial and institutional building construction. The estimated value of the construction project is between $10 million and $20 million. The solicitation will be issued on April 12, 2021 via beta.SAM.gov and include a mandatory site visit. Responses are due by May 13, 2021 at 2:00 PM Pacific Time in Los Angeles.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4"C

4"C 2"C

4"C

4"C

2"C

SCALE: 1/4" = 1' - 0"

NORTH

TELE COMM

164.T-401

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i l e

P a t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

164.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

9 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 164 1ST

FLOOR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

ELEVATION 1 AND 2

4" SLEEVE

2" SLEEVE

4" SLEEVE

TELE COMM

MAIN

164.T-402

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

NEW 4-POST RACK FOR BIO-MEDICAL. AL NEW BIOMED CAT 6A

WILL TERMINATE ON NEW 48 PORT PATCH PANEL INSTALLED

ON THIS NEW RACK.

KEY NOTES FOR DETAIL 1

SCALE: 1/4" = 1' - 0"

NORTH

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

164.T-402A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

18 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 164

BASEMENT AND 1ST

FLOOR.

19 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 164

BIOMED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

4"C

2"C

1"C

NORTH

TELE COMM

164.T-403

SCALE: 1/4" = 1' - 0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 9 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 10 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 11 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 12 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 13 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 14 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 15 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 16 REPEAT STEP 9 TO STEP 15 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 17 CLEAN UP AND PAINT TR ROOM.

STEP 18 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONE

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

164.T-403A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

11 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 164

2ND FLOOR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

4"C 2"C

4"C

164.T-404

TELE COMM

NORTHSCALE: 1/4" = 1' - 0"

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

SCALE: NONE

SCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

KEY NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

164.T-404A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

529-540

01-48

49-96

97-144

145-192

193-240

241-288

289-336

337-384

385-432

433-480

481-528

SCALE: NONE

10 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 164

3RD FLOOR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

6 - 1/2"C

2"C

4"C

4"C

2"C

2"C

TELECOMM

C135

165.T-401

SCALE: 1/4" = 1' - 0" NORTH

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONESCALE: NONESCALE: NONE

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS 4 POST

WITH VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO

REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

FIBER TDU.

KEY NOTES FOR DETAIL 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

165.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

ELEVATION 1 AND 2 ELEVATION 1 AND 2

4"C

1"C

165.T-402

TELECOMM

C211

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS 4 POST

WITH VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO

REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

FIBER TDU.

KEY NOTES FOR DETAIL 1

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

165.T-402A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

ELEVATION 1 AND 2 ELEVATION 1 AND 2

EXISTING

1"C THRU

WALL

EXISTING

3/4"C THRU

WALL

EXISTING

4"C THRU

WALL

EXISTING 4"C

THRU WALL

EXISTING 2"C

THRU WALL

EXISTING 4"C

THRU WALL

EXISTING

2"C THRU

WALL

TELECOMM

F121

166.T-401

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONESCALE: NONE

SCALE: NONE SCALE: NONESCALE: NONE

SCALE: NONE SCALE: NONESCALE: NONE

SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

166.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

EXISTING

4"C THRU

FLOOR

EXISTING

4"C THRU

WALL

EXISTING

2"C THRU

FLOOR

166.T-402

TELECOMM

F208

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONESCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

166.T-402A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

T-501

TELECOMMUNICATIONS DETAILS

IT RACK WITH PATCH PANEL

3-CAT 6A CABLE ABOVE CEILING ON

J-HOOKS

TYPICAL 48 PORT PATCH

PANEL CISCO SWITCH

WS-C3750X-48T-L

TEST INSTALLED CABLE AND

TERMINATE IN 3-RJ45 JACK AT

EUD OUTLETS. SEE DETAIL 4

ON T-502.

SCALE: NO SCALE

FINISH FLOOR

WALL LAY-IN CEILING (EX)

SCALE: NONE

STRUCTURE

J-HOOKS SEE DETAIL 1 T-503

SCALE: NO SCALE

J HOOKS (TYP. AVERAGE=60'' POINT TO POINT)

AND FACTORS FLAT SMOOTH SURFACED

REQUIREMENTS, DEPENDING ON THE COMPOSITION OF THE CABLE,

NUMBER OF CABLES IN A BUNDLE, TYPE OF SUPPORT FASTENERS

J HOOKS ARE RECOMMENDED FOR INSTALLATIONS

CABLE BUNDLES WILL HAVE DIFFERENT SAG/STRAIN RELIEF

NOTES:

STRUCTURE PER

STRUCTURE DRAWINGS

SCALE: NO SCALE

SCALE: NO SCALE

SCALE: NONE

SCALE: NONE

SCALE: NONE

SCALE: NONE

CAT 6A

BUNDLE CABLE

EZ PATH SERIES 33

SEE DRAWING E-504EXISTING CONCRETE

FLOOR SEE VIEW "B"

8'- 0''

5''

LEGRAND ALUMINUM (ANODIZED)

WITH SNAP COVER FOR

CABLE ACCESS LEGRAND NP800

(10'-0'' HEIGHT) CUT IN FIELD TO

LENGTH REQD.

CEILING SEE VIEW "A"

EXISTING CONCRETE

FLOOR

1/4'' ANCHOR BOLT

1 1/2'' ANGLE IRON

CAT 6A BUNDLE CABLE

EXISTING STRUCTURE

BEAM CLAMPS OR EXPANSION BOLT AS

APPLICABLE. SEE DETAIL SHEET T-503.

CORRIDOR

MULTIPLE J-HOOKS

WALL MOUNTED.

SEE T-5033 - CAT 6A CABLE (BLUE,

GRAY AND WHITE)

3 - CAT 6A CABLE IN

WALL CAVITY

MUDRING IN WALL WITH

DATA FACE PLATE

SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: PM EW/JB

A

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

5'' DIA HOLE REQD.

(SEE GENERAL NOTE 9 ON FLOOR PLAN

EXAMPLE 7.T-121) AND S-.

TRIM EXISTING CEILING BOARD OR TILE AND

PROVIDE ANGLE CLOSURE AROUND OPENING. DO

NOT CUT OR DAMAGE CEILING FRAMING.

TRIM EXISTING WALL BASE AND SECURE TO WALL

WITH ADHESIVE.

NOTES FOR DETAIL 4

VIEW "B"

FINISHED FLOOR

CABLE ACCESS COVER

VIEW "A"

CABLE ACCESS COVER

EXISTING HARD-LID

CEILING

EXISTING T-BAR

CEILING

T-502

TELECOMMUNICATIONS DETAILS

IDF

Identifier

Patch Panel

Identifier

Patch Panel

Port

1100GS3-48

A 4433282725 26 31 323029 3937363534 38 43424140 4846 4745

2009040301 02 07 080605 1513121110 14 181716 19 2422 2321

3 4

1 2

Voice

1A-H02 Cable Label

1A-HO2

SM 05

SM 03

MM 05

MM 03

MM 04

MM 06

SM 04

SM 06

SM 01

MM 01

MM 02

SM 02

SM 11

MM 11

MM 12

SM 12

SM 09

SM 07

MM 09

MM 07

MM 08

MM 10

SM 08

SM 10

DATA PATCH PANEL LABELING

SCALE: NONE

SINGLE-MODE FIBER

SCALE: NONE

FIBER PANEL LABELING - MDF TO SERVER ROOM BACKBONE

EUD OUTLET LABELING

SCALE: NONE

FACEPLATE LABELING-WALL PHONE (SS) LOCATIONS

SCALE: NONE

RACK ELEVATIONS (TYPICAL) - RACK LABELING (LEFT TO RIGHT)

AA

AB

AC

AD

FACE PLATE LABELING

PORT ON PATCH PANEL

126-07-727-CA-34-35-36

PATCH PANEL ID

TR CLOSET No.

FLOOR No.

BUILDING No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: PM EW/JB

A

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

AE

AF

AG

AH

AI

BA

BB

BC

BD

BE

BF

BG

BH

BI

RACK A RACK B RACK C RACK D

CA

CB

CC

CD

CE

CF

CG

CH

CI

DA

CB

DC

DD

DE

DF

DG

DH

DI

Data Cables Category 6A Patch Panels 6A

126-07-727-CA

PATCH PANEL ID

TR CLOSET No.

FLOOR No.

BUILDING No.

END USER DEVICE (EUD) OUTLETS SHALL BE FLUSH

MOUNT WITH APPROPRIATE MUDRING

AND SHALL BE ARRANGED AS INDICATED

ALL JACKS WILL BE CAT 6A

TOP TO BOTTOM. DATA JACKS START AT NEXT

OPEN ROW AFTER VOICE JACKS.

VOICE JACKS ARE GRAY, DATA JACKS ARE BLACK.

T-503

SWIVEL BALL JOINT SEE

STRUCTURE DRAWING

S-001 DETAIL 18.

3/8" ROD

RIVET

J-HOOK WITH

QUICK CLIP CEILING

SCALE: NONE

TELECOMMUNICATIONS DETAILS

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: PM EW/JB

A

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

164.T-401 TELECOMMUNICATIONS ENLARGED PLAN ROOM 140
164.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-402 TELECOMMUNICATIONS ENLARGED PLAN ROOM 189
164.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-403 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 223
164.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-404 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 323
164.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
165.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM C135
165.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
165.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM C211
165.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
166.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM F121
166.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
166.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM F208
166.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
T-501 TELECOMMUNICATIONS DETAILS
T-502 TELECOMMUNICATIONS DETAILS
T-503 TELECOMMUNICATIONS DETAILS
T-504 TELECOMMUNICATIONS DETAILS
T-601 INFRASTRUCTURE FIBER RISER BLDG 8, 161 AND 126