Attachment A8_Drawing 8 of 9.pdf
PDF 20 MB Posted
- Attached to
- Z2DA--EHRM Long Beach, 600-20-120, Construction Federal contract opportunity
- Solicitation number
- 36C26221B0004
About this file
This document provides details of an upcoming federal contract opportunity for construction services. The Department of Veterans Affairs Long Beach Healthcare System will be issuing an Invitation for Bid for Project 600-20-120, Electronic Health Record Modernization Infrastructure Upgrades to be performed at its location at 5901 E. 7th Street in Long Beach, California. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The contract will be set aside for Service-Disabled Veteran-Owned Small Businesses listed in the Vendor Information Pages database. The North American Industry Classification Code is 236220 for commercial and institutional building construction. The estimated value of the construction project is between $10 million and $20 million. The solicitation will be issued on April 12, 2021 via beta.SAM.gov and include a mandatory site visit. Responses are due by May 13, 2021 at 2:00 PM Pacific Time in Los Angeles.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4"C
4"C 2"C
4"C
4"C
2"C
SCALE: 1/4" = 1' - 0"
NORTH
TELE COMM
164.T-401
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONESCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i l e
P a t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 11 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 13 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 14 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 15 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 16 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 17 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 19 CLEAN UP AND PAINT TR ROOM.
STEP 20 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
164.T-401A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
SCALE: NONE
9 NEW 2U 48 PORT
PATCH PANEL
(CAT 6A) FEEDING
BUILDING 164 1ST
FLOOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
ELEVATION 1 AND 2
4" SLEEVE
2" SLEEVE
4" SLEEVE
TELE COMM
MAIN
164.T-402
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
NEW 4-POST RACK FOR BIO-MEDICAL. AL NEW BIOMED CAT 6A
WILL TERMINATE ON NEW 48 PORT PATCH PANEL INSTALLED
ON THIS NEW RACK.
KEY NOTES FOR DETAIL 1
SCALE: 1/4" = 1' - 0"
NORTH
SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONESCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 11 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 13 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 14 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 15 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 16 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 17 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 19 CLEAN UP AND PAINT TR ROOM.
STEP 20 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
164.T-402A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
SCALE: NONE
18 NEW 2U 48 PORT
PATCH PANEL
(CAT 6A) FEEDING
BUILDING 164
BASEMENT AND 1ST
FLOOR.
19 NEW 2U 48 PORT
PATCH PANEL
(CAT 6A) FEEDING
BUILDING 164
BIOMED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
4"C
2"C
1"C
NORTH
TELE COMM
164.T-403
SCALE: 1/4" = 1' - 0"
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 9 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 10 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 11 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 12 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 13 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 14 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 15 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 16 REPEAT STEP 9 TO STEP 15 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 17 CLEAN UP AND PAINT TR ROOM.
STEP 18 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONESCALE: NONE
SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
164.T-403A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
SCALE: NONE
11 NEW 2U 48 PORT
PATCH PANEL
(CAT 6A) FEEDING
BUILDING 164
2ND FLOOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
4"C 2"C
4"C
164.T-404
TELE COMM
NORTHSCALE: 1/4" = 1' - 0"
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONE
SCALE: NONE
SCALE: NONESCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
KEY NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 11 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 13 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 14 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 15 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 16 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 17 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 19 CLEAN UP AND PAINT TR ROOM.
STEP 20 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
164.T-404A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
529-540
01-48
49-96
97-144
145-192
193-240
241-288
289-336
337-384
385-432
433-480
481-528
SCALE: NONE
10 NEW 2U 48 PORT
PATCH PANEL
(CAT 6A) FEEDING
BUILDING 164
3RD FLOOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
6 - 1/2"C
2"C
4"C
4"C
2"C
2"C
TELECOMM
C135
165.T-401
SCALE: 1/4" = 1' - 0" NORTH
SCALE: NONESCALE: NONESCALE: NONE
SCALE: NONESCALE: NONESCALE: NONE
SCALE: NONESCALE: NONESCALE: NONE
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS 4 POST
WITH VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO
REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
FIBER TDU.
KEY NOTES FOR DETAIL 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
165.T-401A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE
MANAGERS. USE VELCRO STRAPS.
2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,
FIBER PATCH PANEL TO REMAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
ELEVATION 1 AND 2 ELEVATION 1 AND 2
4"C
1"C
165.T-402
TELECOMM
C211
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS 4 POST
WITH VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO
REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
FIBER TDU.
KEY NOTES FOR DETAIL 1
SCALE: NONESCALE: NONESCALE: NONE
SCALE: NONESCALE: NONESCALE: NONE
SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
165.T-402A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE
MANAGERS. USE VELCRO STRAPS.
2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,
FIBER PATCH PANEL TO REMAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
ELEVATION 1 AND 2 ELEVATION 1 AND 2
EXISTING
1"C THRU
WALL
EXISTING
3/4"C THRU
WALL
EXISTING
4"C THRU
WALL
EXISTING 4"C
THRU WALL
EXISTING 2"C
THRU WALL
EXISTING 4"C
THRU WALL
EXISTING
2"C THRU
WALL
TELECOMM
F121
166.T-401
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONESCALE: NONE
SCALE: NONE SCALE: NONESCALE: NONE
SCALE: NONE SCALE: NONESCALE: NONE
SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
166.T-401A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE
MANAGERS. USE VELCRO STRAPS.
2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,
FIBER PATCH PANEL TO REMAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
EXISTING
4"C THRU
FLOOR
EXISTING
4"C THRU
WALL
EXISTING
2"C THRU
FLOOR
166.T-402
TELECOMM
F208
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONESCALE: NONESCALE: NONE
SCALE: NONESCALE: NONESCALE: NONE
SCALE: NONESCALE: NONESCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
166.T-402A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE
MANAGERS. USE VELCRO STRAPS.
2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,
FIBER PATCH PANEL TO REMAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
T-501
TELECOMMUNICATIONS DETAILS
IT RACK WITH PATCH PANEL
3-CAT 6A CABLE ABOVE CEILING ON
J-HOOKS
TYPICAL 48 PORT PATCH
PANEL CISCO SWITCH
WS-C3750X-48T-L
TEST INSTALLED CABLE AND
TERMINATE IN 3-RJ45 JACK AT
EUD OUTLETS. SEE DETAIL 4
ON T-502.
SCALE: NO SCALE
FINISH FLOOR
WALL LAY-IN CEILING (EX)
SCALE: NONE
STRUCTURE
J-HOOKS SEE DETAIL 1 T-503
SCALE: NO SCALE
J HOOKS (TYP. AVERAGE=60'' POINT TO POINT)
AND FACTORS FLAT SMOOTH SURFACED
REQUIREMENTS, DEPENDING ON THE COMPOSITION OF THE CABLE,
NUMBER OF CABLES IN A BUNDLE, TYPE OF SUPPORT FASTENERS
J HOOKS ARE RECOMMENDED FOR INSTALLATIONS
CABLE BUNDLES WILL HAVE DIFFERENT SAG/STRAIN RELIEF
NOTES:
STRUCTURE PER
STRUCTURE DRAWINGS
SCALE: NO SCALE
SCALE: NO SCALE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
CAT 6A
BUNDLE CABLE
EZ PATH SERIES 33
SEE DRAWING E-504EXISTING CONCRETE
FLOOR SEE VIEW "B"
8'- 0''
5''
LEGRAND ALUMINUM (ANODIZED)
WITH SNAP COVER FOR
CABLE ACCESS LEGRAND NP800
(10'-0'' HEIGHT) CUT IN FIELD TO
LENGTH REQD.
CEILING SEE VIEW "A"
EXISTING CONCRETE
FLOOR
1/4'' ANCHOR BOLT
1 1/2'' ANGLE IRON
CAT 6A BUNDLE CABLE
EXISTING STRUCTURE
BEAM CLAMPS OR EXPANSION BOLT AS
APPLICABLE. SEE DETAIL SHEET T-503.
CORRIDOR
MULTIPLE J-HOOKS
WALL MOUNTED.
SEE T-5033 - CAT 6A CABLE (BLUE,
GRAY AND WHITE)
3 - CAT 6A CABLE IN
WALL CAVITY
MUDRING IN WALL WITH
DATA FACE PLATE
SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: PM EW/JB
A
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
5'' DIA HOLE REQD.
(SEE GENERAL NOTE 9 ON FLOOR PLAN
EXAMPLE 7.T-121) AND S-.
TRIM EXISTING CEILING BOARD OR TILE AND
PROVIDE ANGLE CLOSURE AROUND OPENING. DO
NOT CUT OR DAMAGE CEILING FRAMING.
TRIM EXISTING WALL BASE AND SECURE TO WALL
WITH ADHESIVE.
NOTES FOR DETAIL 4
VIEW "B"
FINISHED FLOOR
CABLE ACCESS COVER
VIEW "A"
CABLE ACCESS COVER
EXISTING HARD-LID
CEILING
EXISTING T-BAR
CEILING
T-502
TELECOMMUNICATIONS DETAILS
IDF
Identifier
Patch Panel
Identifier
Patch Panel
Port
1100GS3-48
A 4433282725 26 31 323029 3937363534 38 43424140 4846 4745
2009040301 02 07 080605 1513121110 14 181716 19 2422 2321
3 4
1 2
Voice
1A-H02 Cable Label
1A-HO2
SM 05
SM 03
MM 05
MM 03
MM 04
MM 06
SM 04
SM 06
SM 01
MM 01
MM 02
SM 02
SM 11
MM 11
MM 12
SM 12
SM 09
SM 07
MM 09
MM 07
MM 08
MM 10
SM 08
SM 10
DATA PATCH PANEL LABELING
SCALE: NONE
SINGLE-MODE FIBER
SCALE: NONE
FIBER PANEL LABELING - MDF TO SERVER ROOM BACKBONE
EUD OUTLET LABELING
SCALE: NONE
FACEPLATE LABELING-WALL PHONE (SS) LOCATIONS
SCALE: NONE
RACK ELEVATIONS (TYPICAL) - RACK LABELING (LEFT TO RIGHT)
AA
AB
AC
AD
FACE PLATE LABELING
PORT ON PATCH PANEL
126-07-727-CA-34-35-36
PATCH PANEL ID
TR CLOSET No.
FLOOR No.
BUILDING No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: PM EW/JB
A
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
AE
AF
AG
AH
AI
BA
BB
BC
BD
BE
BF
BG
BH
BI
RACK A RACK B RACK C RACK D
CA
CB
CC
CD
CE
CF
CG
CH
CI
DA
CB
DC
DD
DE
DF
DG
DH
DI
Data Cables Category 6A Patch Panels 6A
126-07-727-CA
PATCH PANEL ID
TR CLOSET No.
FLOOR No.
BUILDING No.
END USER DEVICE (EUD) OUTLETS SHALL BE FLUSH
MOUNT WITH APPROPRIATE MUDRING
AND SHALL BE ARRANGED AS INDICATED
ALL JACKS WILL BE CAT 6A
TOP TO BOTTOM. DATA JACKS START AT NEXT
OPEN ROW AFTER VOICE JACKS.
VOICE JACKS ARE GRAY, DATA JACKS ARE BLACK.
T-503
SWIVEL BALL JOINT SEE
STRUCTURE DRAWING
S-001 DETAIL 18.
3/8" ROD
RIVET
J-HOOK WITH
QUICK CLIP CEILING
SCALE: NONE
TELECOMMUNICATIONS DETAILS
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: PM EW/JB
A
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
| 164.T-401 TELECOMMUNICATIONS ENLARGED PLAN ROOM 140 |
| 164.T-401A TELECOMMUNICATIONS RACK ELEVATIONS |
| 164.T-402 TELECOMMUNICATIONS ENLARGED PLAN ROOM 189 |
| 164.T-402A TELECOMMUNICATIONS RACK ELEVATIONS |
| 164.T-403 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 223 |
| 164.T-403A TELECOMMUNICATIONS RACK ELEVATIONS |
| 164.T-404 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 323 |
| 164.T-404A TELECOMMUNICATIONS RACK ELEVATIONS |
| 165.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM C135 |
| 165.T-401A TELECOMMUNICATIONS RACK ELEVATIONS |
| 165.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM C211 |
| 165.T-402A TELECOMMUNICATIONS RACK ELEVATIONS |
| 166.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM F121 |
| 166.T-401A TELECOMMUNICATIONS RACK ELEVATIONS |
| 166.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM F208 |
| 166.T-402A TELECOMMUNICATIONS RACK ELEVATIONS |
| T-501 TELECOMMUNICATIONS DETAILS |
| T-502 TELECOMMUNICATIONS DETAILS |
| T-503 TELECOMMUNICATIONS DETAILS |
| T-504 TELECOMMUNICATIONS DETAILS |
| T-601 INFRASTRUCTURE FIBER RISER BLDG 8, 161 AND 126 |
File details come from the government source that posted it. Updated .