Attachment A7_Drawing 7 of 9.pdf

PDF 27 MB Posted

Attached to
Z2DA--EHRM Long Beach, 600-20-120, Construction Federal contract opportunity
Solicitation number
36C26221B0004
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document provides a presolicitation notice for a construction services project at the VA Long Beach Healthcare System located in Long Beach, California. The project involves Electronic Health Record Modernization infrastructure upgrades with a magnitude between $10 million and $20 million. Work will include general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The project is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification Code is 236220 for commercial and institutional building construction. The VA will issue an Invitation for Bid on or around April 12, 2021 via beta.SAM.gov. A site visit will be scheduled for an unspecified date. Responses are due by 2:00 PM Pacific time on May 13, 2021.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING

4"C UP

THRU

GRID

EXISTING 4"C UP

THRU GRID

EXISTING

4"C UP

THRU

GRID

126A.T-402

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 1N111

126A

TEL/DAT

ROOM

1N111

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE

SCALE: NONESCALE: NONE

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i l e

P a t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

126A.T-402A

126A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

10 13

10 13

10 13

10 13

10 13

9 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 126A

1ST FLOOR.

10 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 7

1ST FLOOR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

ELEVATION 1 AND 2 ELEVATION 1 AND 2

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

9 13

4" SLEEVE

UP THRU

CEILING

EXISTING 4"

SLEEVE UP

THRU CEILING

EXISTING

4"C

EXISTING

4" SLEEVE

UP THRU

CEILING

EXISTING

3" SLEEVE

UP THRU

CEILING

EXISTING

4" SLEEVE

UP THRU

CEILING

EXISTING 2"

SLEEVE UP

THRU CEILING

TELECOM/

DATA ROOM

2N107

126A.T-403

TELECOMMUNICATIONS

ENLARGED TR ROOM 2N107

126A

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONE

SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4'8'

126A.T-403A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

10 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 126A

2ND FLOOR.

11 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 7

2ND FLOOR.

10 13

10 13

10 13

11 13

11 13

11 13

11 13

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

11 13

KEY NOTES

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

9 1

ELEVATION 1 AND 2

ELEVATION 1 AND 2

10 13

10 13

10 13

10 13

10 13

10 13

10 13

10 13

UP THRU

CEILING

EXISTING

4" SLEEVE

UP THRU

CEILING

126A.T-404

TELECOMMUNICATIONS

ENLARGED TR ROOM OP-301B

126A

SCALE: 1/4" = 1' - 0" NORTH

TELECOM/

DATA ROOM

301B

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

126A.T-404A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

12 4

SCALE: NONE

12 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 7

3RD FLOOR.

12 4

12 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

ELEVATION 1 AND 2

2"C 4"C3

2"C

4"C

4"C

NORTH

TELECOM

ROOM

139A

138.T-401

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 139A

SCALE: 1/4" = 1' - 0"

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

138.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

8 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 138

BASEMENT AND 1ST

FLOOR.

9 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 138

BASEMENT AND 2ND

FLOOR.

8 3

8 3

8 3

8 3

8 3

8 3

8 3

9 3

9 3

9 3

9 3

9 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

4"C

IT CLOSET AND

STORAGE RM

109A

149.T-401

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

149.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

ELEVATION 1 AND 2

SCALE: NONE

UP THRU

CEILING

EXISTING 3"

SLEEVE UP THRU

CEILING

EXISTING 2"

SLEEVE UP THRU

CEILING

EXISTING

2" SLEEVE

UP THRU

CEILING

IT

149.T-402

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONESCALE: NONESCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONESCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

149.T-402A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

ELEVATION 1 AND 2

SCALE: NONE

4" SLEEVE

UP THRU

CEILING

EXISTING

2" SLEEVE

UP THRU

CEILING

EXISTING

4" SLEEVE

UP THRU

CEILING

EXISTING

2" SLEEVE

UP THRU

CEILING

EXISTING 3"

SLEEVE UP

THRU

CEILING

150.T-401

SCALE: 1/4" = 1' - 0" NORTH

TR ROOM

R-6

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

150.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

16 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 150

BASEMENT.

16 8

16 8

16 8

16 8

16 8

16 8

16 8

16 8

16 8

16 8

16 8

16 8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

4"C

TEL RM

T128A

150.T-402

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONESCALE: NONESCALE: NONE

SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

150.T-402A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

12 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 150

1ST AND 2ND

FLOORS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

ELEVATION 1 AND 2

4" SLEEVE

UP THRU

CEILING

EXISTING

2" SLEEVE

UP THRU

CEILING

150.T-403

SCALE: 1/4" = 1' - 0" NORTH

IDF/TEL

U 120

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONESCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

150.T-403A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

12 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 150

1ST AND 2ND

FLOORS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

ELEVATION 1 AND 2 ELEVATION 1 AND 2

4"C

2"C

TEL RM

V110A

150.T-404

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

150.T-404A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

15 NEW 2U 48 PORT

PATCH PANEL

(CAT 6A) FEEDING

BUILDING 150

1ST AND 2ND

FLOORS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

WAITING

351 SF

ROOM

115 SF

RECEPTION

H160-1A

ROOM

(E) ELEC.

76 SF

I.T. ROOM

EXISTING

3" SLEEVE

UP THRU

CEILING

EXISTING

3" SLEEVE

UP THRU

CEILING

160.T-401

TELECOMMUNICATIONS

ROOM 126

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

SCALE: NONE

SCALE:…