Attachment A1_Drawing 1 of 9.pdf
PDF 28 MB Posted
- Attached to
- Z2DA--EHRM Long Beach, 600-20-120, Construction Federal contract opportunity
- Solicitation number
- 36C26221B0004
About this file
This document provides a presolicitation notice for a construction services contract opportunity with the Department of Veterans Affairs. The VA Long Beach Healthcare System requires construction services for Project 600-20-120 to perform Electronic Health Record Modernization infrastructure upgrades at its location in Long Beach, California. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The contract will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification Code is 236220 for commercial and institutional building construction with a size standard of $39.5 million. The magnitude of the construction project is estimated between $10-20 million. The VA will issue an Invitation for Bid via beta.SAM.gov on or around April 12, 2021. A site visit will also be scheduled.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020 JC GB
FULLY SPRINKLERED
A
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20801.10
TITLE SHEET
GI001
VA LONG BEACH HEALTHCARE SYSTEM,
ELECTRONIC HEALTH RECORDS MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
THE PROJECT UPGRADES DEFICIENT INFRASTRUCTURE TO PREPARE FOR CERNER EHRM
IMPLEMENTATION. UPGRADES ARE REQUIRED FOR TELECOMMUNICATION ROOMS (TRS) AND DATA
CENTERS IN THE FOLLOWING BUILDINGS: 1, 2, 5C, 6, 7, 8, 50, 126, 126A(OP), 138, 149, 150, 160, 161, 164, 165, 166.
A. THE RENOVATED AREAS INCLUDE 45 TRS LOCATED ON THE MAIN CAMPUS WHICH REQUIRE
DEMOLITION AND REPLACEMENT OF SELECTED CABLING OF THE MEDICAL CENTER (MC) AS WELL AS
ADDITIONAL SUMITOMO AIR BLOWN SINGLE-MODE CABLED OPTICAL FIBER BETWEEN THE MAIN
DISTRIBUTION FRAME (MDF) ROOM AND MAIN SERVER ROOM.
B. ADDITION OF TEMPERATURE AND HUMIDITY MONITORING SENSORS IN EVERY TR.
C. ADDITION OF ONE TEMPERATURE MONITORING SENSOR TO EACH ACTIVE POWERED RACK IN TRS.
D. ONE (1) NEW ELECTRICAL CIRCUIT IS REQUIRED IN EACH TR.
E. DESIGN FOR EXPANSION OF EXISTING TR INTO ADJACENT OCCUPIED SPACE.
F. HVAC UPGRADE IN TWO TRS.
G. INTEGRATION OF DIRECT DIGITAL CONTROLS (DDC) WITH EXISTING METASYS 10.0 BUILDING
AUTOMATION SYSTEM.
AREA OF WORK
NORTH
BUILDINGS 1, 2, 5C, 6, 7, 8, 50, 126, 126A(OP), 138, 149, 150, 160,
161, 164, 165 & 166 VA LONG BEACH HEALTHCARE SYSTEM
EHRM INFRASTRUCTURE UPGRADE
KEY PLANVICINITY MAP
NORTH
SCOPE OF WORK GENERAL NOTES
BUILDING 1
BUILDING 2
BUILDING 5C
BUILDING 6
BUILDING 8
BUILDING 50
BUILDING 126
BUILDING 149
BUILDING 7
BUILDING 161
BUILDING 164
BUILDING 165
BUILDING 166
BUILDING 150
BUILDING 138
BUILDING 126A (OP)
1. ALL CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH THE CODES LISTED UNDER THE
PROJECT APPLICABLE CODES ON THIS SHEET. BE FAMILIAR WITH ALL CODES AND ORDINANCES, CITY OR STATE, AS REQUIRED FOR THE CONSTRUCTION OF THIS PROJECT. WHERE ANY
CONFLICTS OCCUR BETWEEN FEDERAL, STATE AND LOCAL LAWS, CODES, ORDINANCES, AND
REGULATIONS, THE MOST STRINGENT SHALL GOVERN.
2. THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO CONSTRUCT ANY ADDITIONS,
ALTERATIONS OR REPAIRS TO THE BUILDINGS IN ACCORDANCE WITH THE 2018 EDITION OF
INTERNATIONAL CODES AND VA DESIGN GUIDES. SHOULD ANY CONDITIONS DEVELOP NOT
COVERED BY THE CONTRACT DOCUMENTS WHERE IN THE FINISHED WORK WILL NOT COMPLY
WITH SAID INTERNATIONAL CODES AND VA STANDARDS, A CHANGE ORDER DETAILING AND
SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED AND APPROVED BEFORE PROCEEDING
WITH THE WORK.
3. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING
SYSTEMS; MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR
TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOM &
ARCHITECTURAL DRAWINGS FOR ANY SYSTEMS OR PORTIONS THEREOF TO BE REMOVED,
RELOCATED, REVISED OR ABANDONED. ALL POSSIBLE CARE SHALL BE EXERCISED TO INSURE
THAT ANY SAID UTILITY WILL NOT BE THE CAUSE OF ENDANGERMENT TO THE LIFE OR HEALTH OF
ANY PERSON.
4. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE
CORRECTED AT NO EXPENSE TO THE OWNER OR ENGINEER OF RECORD (EOR).
5. VERIFICATIONS SHALL BE MADE FROM AVAILABLE SOURCES, SUCH AS BUT NOT LIMITED TO, UTILITY COMPANIES, PLANS OF EXISTING BUILDINGS, CONTRACT DOCUMENTS, THE OWNER, SITE INVESTIGATION REPORTS, ETC. IN NO WAY SHALL ANY DOCUMENTATION PROVIDED RELIEVE THE
REQUIREMENTS OF PERFORMING FIELD INVESTIGATIONS.
6. DRAWINGS HAVE BEEN DETAILED IN COMPLIANCE WITH U.L. LISTING REQUIREMENTS AND I.C.C.
REPORTS FOR THE MATERIALS SPECIFIED. IF AN ALTERNATE OR SUBSTITUTED MATERIAL IS
ACCEPTED AS AN EQUAL, CONTRACTOR SHALL ASSUME THE RESPONSIBILITY FOR WHATEVER
CONSTRUCTION MODIFICATION AND/OR ADDITIONAL COSTS ARE REQUIRED BY REASON OF THIS
ACCEPTANCE.
7. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL
TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL
AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT
TO THE WORK AREA CLEAN.
8. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE
FROM THE SITE, CHECK WITH THE PROJECT ENGINEER FOR AN ACCEPTABLE ACCESS ROUTE AND
TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE
USED WITHOUT PRIOR APPROVAL FROM THE PROJECT ENGINEER. ALL STAGING AREAS SHALL
BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED
FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN THE
CORRIDORS AT ANY TIME.
9. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO
START OF WORK.
10. PROVIDE WRITTEN REQUESTS FOR SHUT-DOWNS AT LEAST THREE WEEKS PRIOR TO EVENT.
WORK REQUIRING SHUT-DOWNS MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK
HOURS. IN ADDITION, SHUTDOWN NOTICES SHALL BE NOTED ON THE 3 WEEK LOOK AHEAD
SCHEDULE.
11. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND
TEMPORARY SUPPORTS AND RESTRAINTS IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
12. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL BE EXCESSIVE.
RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.
13. NOTIFY THE FACILITY PROJECT MANAGER OF ANY DISCREPANCIES DISCOVERED IN THE FIELD
FOR CORRECTIVE ACTION.
14. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED
DURING THE COURSE OF CONSTRUCTION.
15. ALL ITEMS TO BE REMOVED AND RELOCATED OR REPLACED SHALL BE HANDLED WITH PROPER
CARE AND STORED IN A SAFE PLACE TO PREVENT DAMAGE; WHEN DAMAGED, REPLACED WITH
NO EXPENSE TO THE OWNER.
16. WHEN INSTALLING DRILLED IN ANCHORS OR POWDER DRIVEN PINS INTO EXISTING REINFORCED
CONCRETE WHERE ALLOWED BY THE STRUCTURAL ENGINEER OF RECORD (SEOR), USE CARE TO
AVOID CUTTING OR DAMAGING THE REINFORCING BARS.
17. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH THE
PROVISIONS OF THE STRUCTURAL ENGINEERING DRAWINGS.
18. ABBREVIATIONS THROUGHOUT THE DOCUMENTS ARE THOSE IN COMMON USE.
19. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE
DRAWINGS. ITEMS WRONGLY LOCATED BY DRAWING SCALING SHALL BE CORRECTED .
20. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING
SIGNAGE REQUIREMENTS.
21. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER
ROUTINE. COORDINATE SEQUENCE OF WORK AND PHASING WITH THE PROJECT MANAGER TO
MINIMIZE DISRUPTION OF THE MEDICAL CENTER. SOME OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR HOLIDAYS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
22. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING
REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCE FROM AND AVOID DAMAGE TO EXISTING
REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE
REINFORCEMENT. WHEREVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING
RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL
PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOT TO EVENT; WORK MAY BE
REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON
THE THREE (3) WEEK LOOK AHEAD SCHEDULE.
23. PROTECT-IN-PLACE FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.
BUILDING 160
· INTERNATIONAL BUILDING CODES
INTERNATIONAL MECHANICAL CODE - 2018
INTERNATIONAL ELECTRICAL CODE - 2018
INTERNATIONAL PLUMBING CODE - 2018
· NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 - 2019
NFPA 70 - 2020
NFPA 90A - 2021
NFPA 99 - 2018
NFPA 101 - 2018
VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 - 2018 AND DOCUMENTS REFERENCED THEREIN, HENCE FORTH REFERRED TO AS NFPA 101, IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THIS DESIGN COMPLIES WITH THE REQUIREMENTS OF NFPA
101. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN COMPLY WITH THE REQUIREMENTS OF THE 2018 IBC. WHERE OVERLAP OR CONFLICT EXISTS BETWEEN NFPA 101
AND THE 2018 IBC, THE REQUIREMENTS OF NFPA 101 GOVERN.
APPLICABLE CODES
BUILDING 167
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO ANY FIREPROOFED COMPONENTS.
2. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO
MAINTAIN THE INTEGRITY OF SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION.
3. COORDINATE PHASING OF ALL DEMOLITION AND NEW WORK WITH OTHER TRADES. REVIEW
RENOVATION DRAWINGS TO VERIFY AND DETERMINE EXTENT OF, AND SCHEDULING FOR, ALL
DEMOLITION PRIOR TO PERFORMING ANY WORK.
4. FIELD VERIFY ALL SIZES, LOCATIONS, AND ROUTING OF EXISTING ITEMS TO REMAIN, AND OF NEW WORK INDICATED ON THE PLANS. NOTIFY THE DESIGN AUTHORITY OF ANY DEVIATIONS WHICH MAY
AFFECT RENOVATION WORK OR SYSTEM OPERATION PRIOR TO PROCEEDING WITH THE WORK.
5. PROVIDE AN ALLOWANCE FOR TEMPORARY RELOCATION OF EXISTING ANCHORED/UNANCHORED
AND POWERED/UNPOWERED EQUIPMENT AND FURNITURE TO INSTALL EUDS PROVIDED UNDER THIS
PROJECT. ALLOWANCE SHALL INCLUDE 500 INSTANCES FOR EACH CONDITION.
PROJECT NOTES
1. SEE VA REFERENCE DRAWINGS, SHEETS REF-01 THROUGH REF-09, PROVIDED BY THE VA FOR
CONTRACTOR COORDINATION AND ACCESS REQUIREMENTS.
COORDINATION & ACCESS REQUIREMENTS
MEDICAL CENTER DIRECTOR
ASSOCIATE DIRECTOR
CHIEF OF STAFF
CHIEF ENGINEER
CHIEF OF PLANNING
CHIEF OF BIOMED
CHIEF OF MAINTENANCE AND OPERATIONS
INFORMATION TECHNOLOGY AREA MANAGER
INFECTION PREVENTION & CONTROL
QUALITY, SAFETY AND VALUE SERVICES
OCCUPATIONAL SAFETY & EMERGENCY MANAGEMENT SERVICES
COR, PROJECT ENGINEER
PROJECT SIGNATURES
1. FIRE SPRINKLERS
DEFERRED APPROVAL
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020 JC GB
FULLY SPRINKLERED
A
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20801.10
SHEET INDEX
GI002
SHEET INDEX (CONTINUED)
SHEET NUMBER SHEET TITLE
150.E-111 ELECTRICAL FIRST FLOOR PLAN
160.E-111 ELECTRICAL FIRST FLOOR PLAN
161.E-111 ELECTRICAL FIRST FLOOR PLAN
164.E-111 ELECTRICAL FIRST FLOOR PLAN
164.E-121 ELECTRICAL SECOND FLOOR PLAN
164.E-131 ELECTRICAL THIRD FLOOR PLAN
165.E-111 ELECTRICAL FIRST FLOOR PLAN
165.E-121 ELECTRICAL SECOND FLOOR PLAN
166.E-111 ELECTRICAL FIRST FLOOR PLAN
166.E-121 ELECTRICAL SECOND FLOOR PLAN
1.E-401 ELECTRICAL ENLARGED PLAN
2.E-401 ELECTRICAL ENLARGED PLAN
5C.E-401 ELECTRICAL ENLARGED PLAN
6.E-401 ELECTRICAL ENLARGED PLAN
8.E-401 ELECTRICAL ENLARGED PLAN
50.E-401 ELECTRICAL ENLARGED PLAN
126.E-401 ELECTRICAL ENLARGED PLAN
126.E-402 ELECTRICAL ENLARGED PLAN
126.E-403 ELECTRICAL ENLARGED PLAN
126.E-404 ELECTRICAL ENLARGED PLAN
126.E-405 ELECTRICAL ENLARGED PLAN
126.E-406 ELECTRICAL ENLARGED PLAN
126.E-407 ELECTRICAL ENLARGED PLAN
126.E-408 ELECTRICAL ENLARGED PLAN
126.E-409 ELECTRICAL ENLARGED PLAN
126.E-410 ELECTRICAL ENLARGED PLAN
126A.E-401 ELECTRICAL ENLARGED PLAN
126A.E-402 ELECTRICAL ENLARGED PLAN
138.E-401 ELECTRICAL ENLARGED PLAN
149.E-401 ELECTRICAL ENLARGED PLAN
150.E-401 ELECTRICAL ENLARGED PLAN
150.E-402 ELECTRICAL ENLARGED PLAN
160.E-401 ELECTRICAL ENLARGED PLAN
161.E-401 ELECTRICAL ENLARGED PLAN
164.E-401 ELECTRICAL ENLARGED PLAN
164.E-402 ELECTRICAL ENLARGED PLAN
165.E-401 ELECTRICAL ENLARGED PLAN
166.E-401 ELECTRICAL ENLARGED PLAN
E-601 ELECTRICAL EMERGENCY SINGLE LINE
E-602 ELECTRICAL EMERGENCY SINGLE LINE
E-603 ELECTRICAL EMERGENCY SINGLE LINE
E-604 ELECTRICAL EMERGENCY SINGLE LINE
E-605 ELECTRICAL EMERGENCY SINGLE LINE
E-606 ELECTRICAL EMERGENCY SINGLE LINE
E-607 ELECTRICAL EMERGENCY SINGLE LINE
E-701 ELECTRICAL PANEL SCHEDULE
E-702 ELECTRICAL PANEL SCHEDULE
E-703 ELECTRICAL PANEL SCHEDULE
TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS SYMBOL LIST, GENERAL NOTES, ABBREVIATIONS
AND FIBER INFRASTRUCTURE RISER
T-002 FAILED SINGLE MODE FIBER STRAND LIST
TS-001 TELECOMMUNICATIONS SITE PLAN AND DRAWING LIST
1.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
1.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
1.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
1.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
1.T-141 TELECOMMUNICATIONS FOURTH FLOOR PLAN
1.T-151 TELECOMMUNICATIONS FIFTH FLOOR PLAN
2.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
2.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
2.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
2.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
5C.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
6.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
7.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
7.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
7.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
7.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
8.T.101 TELECOMMUNICATIONS BASEMENT FLOOR
8.T.111 TELECOMMUNICATIONS FIRST FLOOR PLAN
8.T.121 TELECOMMUNICATIONS SECOND FLOOR PLAN
8.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
50.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
126.T-101 TELECOMMUNICATIONS BASEMENT PLAN
126.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
126.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
126.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
126.T-141 TELECOMMUNICATIONS FOURTH FLOOR PLAN
126.T-151 TELECOMMUNICATIONS FIFTH FLOOR PLAN
126.T-161 TELECOMMUNICATIONS SIXTH FLOOR PLAN
126.T-171 TELECOMMUNICATIONS SEVENTH FLOOR PLAN
126.T-181 TELECOMMUNICATIONS EIGHTH FLOOR PLAN
126.T-191 TELECOMMUNICATIONS NINTH FLOOR PLAN
SHEET INDEX
SHEET NUMBER SHEET TITLE
GENERAL
GI001 TITLE SHEET
GI002 SHEET INDEX
GI003 ABBREVIATIONS & PHASING NOTES
GI004 INFECTION PREVENTION & CONTROL
GI005 INFECTION PREVENTION & CONTROL
GI006 INFECTION PREVENTION & CONTROL
GI007 INFECTION PREVENTION & CONTROL
GI008 OVERALL SITE PLAN
REFERENCES
REF-01 VA COORDINATION BASEMENT REFERENCE PLAN
REF-02 VA COORDINATION BASEMENT REFERENCE PLAN
REF-03 VA COORDINATION FIRST FLOOR REFERENCE PLAN
REF-04 VA COORDINATION SEVENTH FLOOR REFERENCE PLAN
REF-05 VA COORDINATION EIGHTH FLOOR REFERENCE PLAN
REF-06 VA COORDINATION NINTH FLOOR REFERENCE PLAN
REF-07 VA COORDINATION BASEMENT REFERENCE PLAN
REF-08 VA COORDINATION FIRST FLOOR REFERENCE PLAN
REF-09 VA COORDINATION SECOND FLOOR REFERENCE PLAN
ARCHITECTURAL
1.A-101 ARCHITECTURAL BASEMENT FLOOR PLAN
1.A-111 ARCHITECTURAL FIRST FLOOR PLAN
1.A-121 ARCHITECTURAL SECOND FLOOR PLAN
1.A-131 ARCHITECTURAL THIRD FLOOR PLAN
1.A-141 ARCHITECTURAL FOURTH FLOOR PLAN
1.A-151 ARCHITECTURAL FIFTH FLOOR PLAN
2.A-101 ARCHITECTURAL BASEMENT FLOOR PLAN
2.A-111 ARCHITECTURAL FIRST FLOOR PLAN
2.A-121 ARCHITECTURAL SECOND FLOOR PLAN
2.A-131 ARCHITECTURAL THIRD FLOOR PLAN
5C.A-111 ARCHITECTURAL FIRST FLOOR
6.A-111 ARCHITECTURAL FIRST FLOOR PLAN
7.A-101 ARCHITECTURAL BASEMENT FLOOR PLAN
7.A-111 ARCHITECTURAL FIRST FLOOR PLAN
7.A-121 ARCHITECTURAL SECOND FLOOR PLAN
7.A-131 ARCHITECTURAL THIRD FLOOR PLAN
8.A-101 ARCHITECTURAL BASEMENT FLOOR PLAN (FOR REFERENCE ONLY)
8.A-111 ARCHITECTURAL FIRST FLOOR PLAN
8.A-121 ARCHITECTURAL SECOND FLOOR PLAN (FOR REFERENCE ONLY)
8.A-131 ARCHITECTURAL THIRD FLOOR PLAN (FOR REFERENCE ONLY)
50.A-111 ARCHITECTURAL FIRST FLOOR PLAN
126.A-101 ARCHITECTURAL BASEMENT PLAN
126.A-111 ARCHITECTURAL FIRST FLOOR PLAN
126.A-121 ARCHITECTURAL SECOND FLOOR PLAN
126.A-131 ARCHITECTURAL THIRD FLOOR PLAN
126.A-141 ARCHITECTURAL FOURTH FLOOR PLAN
126.A-151 ARCHITECTURAL FIFTH FLOOR PLAN
126.A-161 ARCHITECTURAL SIXTH FLOOR PLAN
126.A-171 ARCHITECTURAL SEVENTH FLOOR PLAN
126.A-181 ARCHITECTURAL EIGHTH FLOOR PLAN
126.A-191 ARCHITECTURAL NINTH FLOOR PLAN
126.A-1101 ARCHITECTURAL TENTH FLOOR PLAN
126.A-1111 ARCHITECTURAL ELEVENTH FLOOR PLAN
126A.A-101 ARCHITECTURAL BASEMENT FLOOR PLAN
126A.A-111 ARCHITECTURAL FIRST FLOOR PLAN
126A.A-121 ARCHITECTURAL SECOND FLOOR PLAN
126A.A-131 ARCHITECTURAL THIRD FLOOR PLAN
138.A-101 ARCHITECTURAL BASEMENT FLOOR PLAN
138.A-111 ARCHITECTURAL FIRST FLOOR PLAN
138.A-121 ARCHITECTURAL SECOND FLOOR PLAN
149.A-111 ARCHITECTURAL FIRST FLOOR PLAN
150.A-101 ARCHITECTURAL BASEMENT PLAN
150.A-111 ARCHITECTURAL FIRST FLOOR PLAN
150.A-121 ARCHITECTURAL SECOND FLOOR PLAN
160.A-111 ARCHITECTURAL FIRST FLOOR PLAN
161.A-111 ARCHITECTURAL FIRST FLOOR PLAN
164.A-111 ARCHITECTURAL FIRST FLOOR PLAN
164.A-121 ARCHITECTURAL SECOND FLOOR PLAN
164.A-131 ARCHITECTURAL THIRD FLOOR PLAN
165.A-101 ARCHITECTURAL BASEMENT FLOOR PLAN (FOR REFERENCE ONLY)
165.A-111 ARCHITECTURAL FIRST FLOOR PLAN
165.A-121 ARCHITECTURAL SECOND FLOOR PLAN
166.A-111 ARCHITECTURAL FIRST FLOOR PLAN
166.A-121 ARCHITECTURAL SECOND FLOOR PLAN
A-401 ARCHITECTURAL ENLARGED FLOOR PLANS
A-402 ARCHITECTURAL ENLARGED FLOOR PLANS
A-403 ARCHITECTURAL ENLARGED FLOOR PLANS
A-404 ARCHITECTURAL ENLARGED FLOOR PLANS
A-405 ARCHITECTURAL ENLARGED FLOOR PLANS
A-406 ARCHITECTURAL ENLARGED FLOOR PLANS
A-407 ARCHITECTURAL ENLARGED FLOOR PLANS
A-408 ARCHITECTURAL ENLARGED FLOOR PLANS
A-409 ARCHITECTURAL ENLARGED FLOOR PLANS
A-410 ARCHITECTURAL ENLARGED FLOOR PLANS
SHEET INDEX (CONTINUED)
SHEET NUMBER SHEET TITLE
A-411 ARCHITECTURAL ENLARGED FLOOR PLANS
A-412 ARCHITECTURAL ENLARGED FLOOR PLANS
A-413 ARCHITECTURAL ENLARGED FLOOR PLANS
A-414 ARCHITECTURAL ENLARGED FLOOR PLANS
A-415 ARCHITECTURAL ENLARGED FLOOR PLANS
A-416 ARCHITECTURAL ENLARGED FLOOR PLANS
A-417 ARCHITECTURAL INTERIOR ELEVATION PLANS - BLDG 1 TR 313
A-601 ARCHITECTURAL DETAILS
A-602 ARCHITECTURAL DETAILS & SCHEDULES
STRUCTURAL
S-001 NOTES, DETAILS AND PARTIAL PLAN
MECHANICAL
M-001 MECHANICAL LEGEND, ABBREVIATIONS & NOTES
1-M.111 MECHANICAL FIRST FLOOR PLAN
1.M-131 MECHANICAL THIRD FLOOR PLAN
2.M-111 MECHANICAL FIRST FLOOR PLAN
5C.M-111 MECHANICAL FIRST FLOOR PLAN
6.M-111 MECHANICAL FIRST FLOOR PLAN
8.M-111 MECHANICAL FIRST FLOOR PLAN
50.M-111 MECHANICAL FIRST FLOOR PLAN
126.M-111 MECHANICAL FIRST FLOOR PLAN
126.M-121 MECHANICAL SECOND FLOOR PLAN
126.M-131 MECHANICAL THIRD FLOOR PLAN
126.M-141 MECHANICAL FOURTH FLOOR PLAN
126.M-151 MECHANICAL FIFTH FLOOR PLAN
126.M-161 MECHANICAL SIXTH FLOOR PLAN
126.M-171 MECHANICAL SEVENTH FLOOR PLAN
126.M-181 MECHANICAL EIGTH FLOOR PLAN
126.M-191 MECHANICAL NINTH FLOOR PLAN
126.M-1101 MECHANICAL TENTH FLOOR PLAN
126.M-1111 MECHANICAL ELEVENTH FLOOR PLAN
126A.M-101 MECHANICAL BASEMENT FLOOR PLAN
126A.M-111 MECHANICAL FIRST FLOOR PLAN
126A.M-121 MECHANICAL SECOND FLOOR PLAN
126A.M-131 MECHANICAL THIRD FLOOR PLAN
138.M-111 MECHANICAL FIRST FLOOR PLAN
149.M-111 MECHANICAL FIRST FLOOR PLAN
150.M-101 MECHANICAL BASEMENT PLAN
150.M-111 MECHANICAL FIRST FLOOR PLAN
160.M-111 MECHANICAL FIRST FLOOR PLAN
161.M-111 MECHANICAL FIRST FLOOR PLAN
164.M-111 MECHANICAL FIRST FLOOR PLAN
164.M-121 MECHANICAL SECOND FLOOR PLAN
164.M-131 MECHANICAL THIRD FLOOR PLAN
165.M-111 MECHANICAL FIRST FLOOR PLAN
165.M-121 MECHANICAL SECOND FLOOR PLAN
166.M-111 MECHANICAL FIRST FLOOR PLAN
166.M-121 MECHANICAL SECOND FLOOR PLAN
M-401 MECHANICAL ENLARGED FLOOR PLANS
M-402 MECHANICAL ENLARGED FLOOR PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
MI-701 MECHANICAL CONTROLS
M-901 MECHANICAL PHOTOS
ELECTRICAL
E-001 ELECTRICAL SYMBOL LIST, GENERAL NOTES, ABBREVIATIONS AND UPS
REQUIREMENT
ES-001 ELECTRICAL SITE PLAN, DRAWING LIST AND BUILDING LIST
1.E-111 ELECTRICAL FIRST FLOOR PLAN
1.E-131 ELECTRICAL THIRD FLOOR PLAN
2.E-111 ELECTRICAL FIRST FLOOR PLAN
5C.E-111 ELECTRICAL FIRST FLOOR PLAN
6.E-111 ELECTRICAL FIRST FLOOR PLAN
8.E-111 ELECTRICAL FIRST FLOOR PLAN
50.E-111 ELECTRICAL FIRST FLOOR
126.E-101 ELECTRICAL BASEMENT FLOOR
126.E-111 ELECTRICAL FIRST FLOOR PLAN
126.E-121 ELECTRICAL SECOND FLOOR PLAN
126.E-131 ELECTRICAL THIRD FLOOR PLAN
126.E-141 ELECTRICAL FOURTH FLOOR PLAN
126.E-151 ELECTRICAL FIFTH FLOOR PLAN
126.E-161 ELECTRICAL SIXTH FLOOR PLAN
126.E-171 ELECTRICAL SEVENTH FLOOR PLAN
126.E-181 ELECTRICAL EIGHTH FLOOR PLAN
126.E-191 ELECTRICAL NINTH FLOOR PLAN
126.E-1101 ELECTRICAL TENTH FLOOR PLAN
126.E-1111 ELECTRICAL ELEVENTH FLOOR PLAN
126A.E-101 ELECTRICAL BASEMENT PLAN
126A.E-111 ELECTRICAL FIRST FLOOR PLAN
126A.E-121 ELECTRICAL SECOND FLOOR PLAN
126A.E-131 ELECTRICAL THIRD FLOOR PLAN
138.E-111 ELECTRICAL FIRST FLOOR PLAN
149.E-111 ELECTRICAL FIRST FLOOR PLAN
150.E-101 ELECTRICAL BASEMENT PLAN
SHEET INDEX (CONTINUED)
SHEET NUMBER SHEET TITLE
126.T-1101 TELECOMMUNICATIONS TENTH FLOOR PLAN
126.T-1111 TELECOMMUNICATIONS ELEVENTH FLOOR PLAN
126A.T-101 TELECOMMUNICATIONS BASEMENT PLAN
126A.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
126A.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
126A.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
138.T-101 TELECOMMUNICATIONS BASEMENT PLAN
138.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
138.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
149.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
149.T-112 TELECOMMUNICATIONS FIRST FLOOR PLAN
150.T-101 TELECOMMUNICATIONS BASEMENT PLAN
150.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
150.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
160.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
161.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
164.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
164.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
164.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
165.T-101 TELECOMMUNICATIONS BASEMENT PLAN
165.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
165.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
166.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
166.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
1.T-401 TELECOMMUNICATIONS ENLARGED PLAN
1.T-401A TELECOMMUNICATIONS RACK ELEVATION
1.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 313 - DEMO WORK
1.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
1.T-403 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 313 - NEW WORK
2.T-401 TELECOMMUNICATIONS ENLARGED PLAN
2.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
5C.T-401 TELECOMMUNICATIONS ENLARGED PLAN
5C.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
6.T-401 TELECOMMUNICATIONS ENLARGED PLAN
6.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
8.T-401 TELECOMMUNICATIONS ENLARGED PLAN
8.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
50.T-401 TELECOMMUNICATIONS ENLARGED PLAN
50.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-401 TELECOMMUNICATIONS ENLARGED PLAN
126.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-402 TELECOMMUNICATIONS ENLARGED PLAN
126.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-403 TELECOMMUNICATIONS ENLARGED PLAN
126.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-404 TELECOMMUNICATIONS ENLARGED PLAN
126.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-405 TELECOMMUNICATIONS ENLARGED PLAN
126.T-405A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-405B TELECOMMUNICATIONS RACK ELEVATIONS
126.T-406 TELECOMMUNICATIONS ENLARGED PLAN
126.T-406A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-407 TELECOMMUNICATIONS ENLARGED PLAN
126.T-407A TELECOMMUNICATIONS ENLARGED PLANS
126.T-408 TELECOMMUNICATIONS ENLARGED PLAN
126.T-408A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-409 TELECOMMUNICATIONS ENLARGED PLAN
126.T-409A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-410 TELECOMMUNICATIONS ENLARGED PLAN
126.T-410A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-411 TELECOMMUNICATIONS ENLARGED PLAN
126.T-411A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-412 TELECOMMUNICATIONS ENLARGED PLAN
126.T-412A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-413 TELECOMMUNICATIONS ENLARGED PLAN
126.T-413A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-414 TELECOMMUNICATIONS ENLARGED PLAN
126.T-414A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-415 TELECOMMUNICATIONS ENLARGED PLAN
126.T-415A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-416 TELECOMMUNICATIONS ENLARGED PLAN
126.T-416A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-417 TELECOMMUNICATIONS ENLARGED PLAN
126.T-417A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-418 TELECOMMUNICATIONS ENLARGED PLAN
126.T-418A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-419 TELECOMMUNICATIONS ENLARGED PLAN
126.T-419A TELECOMMUNICATIONS RACK ELEVATIONS
126A.T-401 TELECOMMUNICATIONS ENLARGED PLAN
126A.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
126A.T-402 TELECOMMUNICATIONS ENLARGED PLAN
126A.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
126A.T-403 TELECOMMUNICATIONS ENLARGED PLAN
SHEET INDEX (CONTINUED)
SHEET NUMBER SHEET TITLE
126A.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
126A.T-404 TELECOMMUNICATIONS ENLARGED PLAN
126A.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
138.T-401 TELECOMMUNICATIONS ENLARGED PLAN
138.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
149.T-401 TELECOMMUNICATIONS ENLARGED PLAN
149.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
149.T-402 TELECOMMUNICATIONS ENLARGED PLAN
149.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
150.T-401 TELECOMMUNICATIONS ENLARGED PLAN
150.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
150.T-402 TELECOMMUNICATIONS ENLARGED PLAN
150.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
150.T-403 TELECOMMUNICATIONS ENLARGED PLAN
150.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
150.T-404 TELECOMMUNICATIONS ENLARGED PLAN
150.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
160.T-401 TELECOMMUNICATIONS ENLARGED PLAN
160.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
161.T-401 TELECOMMUNICATIONS ENLARGED PLAN
161.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-401 TELECOMMUNICATIONS ENLARGED PLAN
164.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-402 TELECOMMUNICATIONS ENLARGED PLAN
164.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-403 TELECOMMUNICATIONS ENLARGED PLAN
164.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-404 TELECOMMUNICATIONS ENLARGED PLAN
164.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
165.T-401 TELECOMMUNICATIONS ENLARGED PLAN
165.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
165.T-402 TELECOMMUNICATIONS ENLARGED PLAN
165.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
166.T-401 TELECOMMUNICATIONS ENLARGED PLAN
166.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
166.T-402 TELECOMMUNICATIONS ENLARGED PLAN
166.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
T-501 TELECOMMUNICATIONS DETAILS
T-502 TELECOMMUNICATIONS DETAILS
T-503 TELECOMMUNICATIONS DETAILS
T-504 TELECOMMUNICATIONS DETAILS
T-601 INFRASTRUCTURE FIBER RISER BLDGS 8, 161 & 126
./GI004 GENERAL NOTES.dwg
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020 JC GB
FULLY SPRINKLERED
A
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20801.10
ABBREVIATIONS & PHASING NOTES
GI003
ABBREV. DESCRIPTION
GENERAL ABBREVIATIONS
ACM ALUMINUM COMPOSITE MATERIAL
AIA AMERICAN INSTITUTE OF ARCHITECTS
BAS BUILDING AUTOMATION SYSTEM
BLDG BUILDING
CAD COMPUTER AIDED DESIGN
DDC DIRECT DIGITAL CONTROL
EHRM ELECTRONIC HEALTH RECORDS
MODERNIZATION
EUD(S) END USER DEVICE(S)
I.C.C. INTERNATIONAL CODE COUNCIL
MC MEDICAL CENTER
MDF MAIN DISTRIBUTION FRAME
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
OIT OFFICE OF INFORMATION TECHNOLOGY
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
SEOR STRUCTURAL ENGINEER OF RECORD
TAB TEST AND BALANCE
TR TELECOMMUNICATION ROOM
TRS TELECOMMUNICATION ROOMS
TSI THERMAL SYSTEM INSULATION
U.L. UNDERWRITER LABORATORIES
U.O.N. UNLESS OTHERWISE NOTE
VA VETERAN AFFAIRS
VALB VA LONG BEACH
VHA VETERAN HEALTH ADMINISTRATION
FOR CRITICAL ROOMS, SUCH AS OPERATING ROOMS, ICU, CCU, INPATIENT WARDS,
SLEEP LABS, SCI, BRC AND SIMILAR SPACES, NORMAL HOURS ARE 24/7.
ONLY ONE ROOM IN THE GIVEN DEPARTMENT MAY BE SHUT DOWN AT ANY TIME.
EACH ROOM MAY ONLY BE SHUT DOWN ONCE DURING THE DURATION OF THE
PROJECT.
FOR ADMINISTRATIVE SPACES, NORMAL OPERATING HOURS ARE FROM 7:00 AM TO
5:00 PM.
PREPARATION WORK MAY BE PERFORMED DURING NORMAL HOURS.
SWITCH OVER MUST OCCUR DURING ONE SINGLE OFF HOUR PERIOD.
FOR CLINICAL SPACES, NORMAL OPERATING HOURS ARE FROM 7:00 AM TO 5:00 PM.
PREPARATION WORK MAY BE PERFORMED DURING NORMAL HOURS.
SWITCH OVER MUST OCCUR DURING ONE SINGLE OFF HOUR PERIOD.
CONSTRUCTION ACTIVITY HOURS
THE FOLLOWING IS INTENDED AS A CONCEPTUAL PHASING PLAN AND IDENTIFIES CRITICAL STEPS REQUIRED TO BE COMPLETED. THIS LIST IS NOT INTENDED TO BE AN ALL-INCLUSIVE LIST NOR DOES IT LIST THE EXACT REQUIREMENTS FOR DOWNTIME OR OPERATIONAL SHUT DOWN
COORDINATION.
PREPARE A COMPLETE DETAILED PHASING PLAN WITHIN 30 DAYS OF NOTICE TO PROCEED. THE PHASING PLAN SHALL BE PREPARED IN "MICROSOFT PROJECT" OR SIMILAR SOFTWARE. IT SHALL INCLUDE SCHEMATIC DIAGRAMS AND LAYOUT FOR PHASING AND SHALL BE PRESENTED TO THE VA FOR APPROVAL. THERE SHALL BE NO DEMOLITION OR INSTALLATION WORK PRIOR TO SUCH APPROVAL BY THE VA.
THE PHASING PLAN SHALL IDENTIFY AT A MINIMUM:
a. SHUTDOWNS / UTILITY SERVICE INTERRUPTIONS (INFORMATION TECHNOLOGY/TELECOMMUNICATIONS, ELECTRIC, FIRE ALARM, MECHANICAL, ETC.)
b. ENERGIZED WORK
c. HOT WORK
d. ABOVE CEILING WORK
e. CONFINED SPACES
f. FIRE WATCH
g. RADIATION SAFETY
h. INFECTION PREVENTION AND CONTROLS
i. SCHEDULE
j. TEMPORARY SERVICE REQUIREMENTS
k. PRODUCT PROCUREMENT
l. INSTALLATION
m. SKETCHES TO INDICATE EACH STEP
n. EMERGENCY CONTACT NUMBERS
IN ADDITION TO AN OVERALL PROJECT PHASING PLAN, A SEPARATE METHOD OF PROCEDURE AND PHASING PLAN SHALL BE PROVIDED FOR EACH SHUTDOWN PRIOR TO THE COMMENCEMENT OF ANY WORK WITHIN THE BUILDING. ALL PHASING PLANS WILL REQUIRE APPROVAL BY THE OWNER PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. COORDINATE THE OVERALL PROJECT PHASING REQUIREMENTS WITH
THE ARCHITECT AND THE OWNER.
THIS PROJECT HAS TWO INCREMENTS:
INCREMENT 1: ACTIVATION OF CERNER EQUIPMENT - PREPARATION AND INSTALLATION
PHASE 1.0:
1. INSTALL 48 STRAND SINGLE MODE AIR BLOWN FIBER (SUMITOMO) FROM MDF TO SERVER ROOM.
2. INSTALL 12 STRAND SINGLE MODE AIR BLOWN FIBER (SUMITOMO) FROM MDF TO BUILDING 8 TR111.
3. INSTALL 24 STRAND SINGLE MODE AIR BLOWN FIBER (SUMITOMO) FROM MDF TO BUILDING 161 TR 100A.
PHASE 1.1:
1. ARCHITECTURAL IMPROVEMENTS FOR TR 313, BUILDING 1.
2. MECHANICAL IMPROVEMENTS FOR TRS 313, BUILDING 1 - OP-04 AND OP-301B, BUILDING 126A(OP).
3. INSTALL NEW RACKS AS REQUIRED.
4. REMOVE T-BAR CEILING AND RELOCATE/SUPPORT EXISTING SYSTEMS AND PROVIDE NEW SYSTEMS AS INDICATED.
5. INSTALL NEW RACK TEMPERATURE SENSOR AS INDICATED.
6. INSTALL DDC CONTROLLER.
7. INSTALL TEMPERATURE/HUMIDITY SENSOR. IF REPLACEMENT OF SENSOR IS INDICATED ON PLANS, REMOVE OLD SENSOR AND REPLACE
WITH NEW TEMPERATURE/HUMIDITY SENSOR. REPLACE THE SENSOR CONTROL WIRING BACK TO THE TERMINAL UNIT.
PHASE 1.2:
1. ROUTE NEW CABLES FROM TR ALONG CORRIDORS AND INSTALL J-HOOKS. THIS REQUIRES CORE DRILLING IN SOME LOCATIONS WHERE
SHOWN FOR VERTICAL TRANSITION OF EUD CAT6A DATA CABLES.
PHASE 1.3:
1. INSTALL EZ PATH. INSTALL SLOPED CABLE LADDER RACK.
2. POPULATE AVAILABLE SPACE OF RACK FOR NEW CAT 6A COMPLIANT PATCH PANEL.
3. INSTALL NEW FACEPLATES WITH THREE R45 JACKS. TEMPORARILY PULL OUT THE EXISTING RJ45 FACEPLATE.
4. PROVIDE, TEST AND CERTIFY ALL NEW CAT 6A CABLES AND EUDS AS INDICATED.
5. VALB OIT TO CROSS CONNECT NEW 48 PORT PATCH PANEL TO CISCO SWITCH AND ACTIVATE THE NEW EUD FACEPLATE. VALB OIT TO
SWITCH THE EUD DEVICE FROM OLD FACEPLATE TO NEW FACEPLATE.
6. REMOVE OLD FACEPLATES FROM THE ROOMS.
7. REMOVE EXISTING CAT 6 CABLES AND BELOW FROM TR PATCH PANELS TO EACH EXISTING EUD OUTLETS UNLESS OTHERWISE NOTED.
8. REMOVE EXISTING UNUSED CAT 3 CABLE IN ITS ENTIRETY TO THE EXISTING EUDS.
9. IN SOME CASES, EXISTING PATCH PANEL WILL BE TO BE REMOVED TO MAKE ROOM FOR NEW PATCH PANEL. IN THESE CASES RING OUT
THE EXISTING CABLE TO ENSURE EUD FED EXISTING PATCH PANELS HAVE BEEN SWITCHED OVER AND FED FROM NEW PATCH PANEL.
10. REMOVE ASSOCIATED EXISTING PATCH PANEL FROM THE DATA RACK.
(A) OLD FACE PLATES SHALL BE PULLED OUT, LEFT HANGING AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT 6A COMPATIBLE DATA JACKS AND NEW CAT 6A CABLE. ONCE THE NEW CABLES ARE TESTED AND CERTIFIED, THE EUD WILL BE DISCONNECTED FROM THE OLD FACEPLATE AND CONNECTED TO THE NEW FACE PLATE.
(B) SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE COORDINATION WITH THE VA. OTHER THAN LISTED ABOVE, THE ORDER OF WHICH BUILDING IS COMPLETED FIRST OR IF EACH ROOM IS COMPLETED IN
PARALLEL IS NOT PERTINENT.
INCREMENT 2: OTHER UPGRADES
PHASE 2.1: INSTALL NEW LIGHT FIXTURES AND CONNECT TO EXISTING CIRCUITS AND LIGHT SWITCH AS INDICATED.
PHASE 2.2: REINSTALL AND RECONNECT EXISTING SMOKE DETECTORS.
PHASE 2.3: INSTALL TGB (GROUND BUS) IN SELECT TRS AS SHOWN
PHASE 2.4: INSTALL NEW SMOKE DETECTOR IN SELECT TRS AS SHOWN.
PHASE 2.5: REPLACE AND ADD RACK MOUNTED 1800W 120VAC UNITS IN EACH TR (QUANTITY IN EACH TR VARIES).
PHASE 2.6: REMOVE SENSORS AS INDICATED.
PHASE 2.7: PAINT AND FINISH THE WALLS OF TRS.
PHASING NOTES
BASED ON REPORTS PROVIDED BY VA LONG BEACH A SUMMARY OF ASBESTOS
CONTAINING MATERIALS NOTED TO BE PRESENT IS SUMMARIZED IN THIS TABLE. SPECIFIC
LOCATIONS AND MATERIALS ARE NOTED IN THE SPECIFICATIONS, BUT IF THE SAME
MATERIAL IS FOUND TO BE PRESENT IN OTHER AREAS OF THE SAME BUILDINGS, IT IS
REQUIRED TO BE TREATED AS ASBESTOS.
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE DRYWALL THAT CONTAIN HAZARDOUS
MATERIALS:
· BLDG 8: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND. LOCATIONS:
THROUGHOUT WALLS / CEILINGS.
· BLDG 126: ASBESTOS IS PRESENT IN THE DRYWALL JOINT COMPOUND. LOCATIONS:
THROUGHOUT WALLS / CEILINGS.
THE JOINT COMPOUND IS ASSOCIATED WITH THE DRYWALL AND CANNOT BE SEPARATED
NOR CAN BE VISIBLY SEEN WHERE THE JOINT COMPOUND IS ON DRYWALL. FOR THIS FACT,
THE DRYWALL AND ASSOCIATED JOINT COMPOUND NEED TO BE TREATED AS ASBESTOS
CONTAINING UNLESS THE CONTRACTOR CAN VISIBLY SEE WHERE THE JOINT COMPOUND IS
LOCATED AND THE PENETRATIONS WILL BE MADE IN LOCATIONS WHERE THIS IS OBSERVED.
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE FLOORING (TILE, MASTIC) THAT
CONTAIN ASBESTOS:
· BLDG 1
· BLDG 2
· BLDG 6
· BLDG 8
· BLDG 50
· BLDG 126
· BLDG 126A(OP)
· BLDG 138
REPORTS INDICATE THE FOLLOWING BUILDINGS HAVE FRIABLE ASBESTOS:
· BLDG 2 / TSI MAY BE PRESENT
· BLDG 7 / TSI MAY BE PRESENT
· BLDG 8 / TSI MAY BE PRESENT
· BLDG 50 / TSI MAY BE PRESENT
· BLDG 126 / TSI MAY BE PRESENT - DRYWALL JOINT COMPOUND
REPORTS INDICATE THE FOLLOWING TRS HAVE / MAY CONTAIN HAZARDOUS MATERIALS:
BLDG 1 - ROOM 313:
DOOR/DOOR FRAME - POSSIBLE SUSPECT MATERIAL IN CORE
BLDG 2 - ROOM N108:
FLOOR - RESILIENT FLOOR TILE
BLDG 2 - ROOM N167:
(UNKNOWN, NOT REPORTED)
BLDG 6 - ROOM 34:
(UNKNOWN, NOT REPORTED)
BLDG 8 - ROOM 111:
(UNKNOWN, WAS NOT ACCESSIBLE PER REPORT)
BLDG 50- ROOM 101B:
MISC (TSI/F REMOVED) - ASBESTOS
BLDG 126- ROOM W128 V:
MISC (TSI AT FITTING) - ASBESTOS
BLDG 126- ROOM 321, 326A, W627 :
WALLS - ASBESTOS PRESENT
BLDG 126- ROOM 1013:
WALLS - ASBESTOS PRESENT
BLDG 126- ROOM W220A, W232, W428, W520B, W521A (522 OR 529), 727, 813B, 827, 923C (922C), W1027:
(UNKNOWN, NOT REPORTED)
BLDG 126A(OP)- ROOM OP-04, 1N111, 2N107, 301B:
(UNKNOWN, NOT REPORTED)
BUILDING 138- ROOM 139:
FLOOR - ASBESTOS
BUILDING 149 - ROOM 109A & 151:
(UNKNOWN, NOT REPORTED)
BUILDING 160 - ROOM 126:
(UNKNOWN, NOT REPORTED)
PER HAZMAT REPORT PROVIDED BY VA THE CEILING PLENUM SPACES ARE
UNCONTAMINATED AND NORMAL ACCESS AND ENTRY MAY BE PERFORMED WITH BASIC
PERSONAL PROTECTIVE MEASURES (DUST MASK OR N95 RESPIRATORS, AND APPROPRIATE
EYE PROTECTION). IF SUSPECT CONTAMINATION IS DISCOVERED, WORK SHOULD NOT
PROCEED UNTIL THE AREA IS VERIFIED TO BE CLEARED FOR ACCESS BY QUALIFIED
PERSONNEL.
WHERE PENETRATIONS ARE PLANNED FOR ASBESTOS CONTAINING MATERIALS NOTED IN
THE REFERENCE DOCUMENTS, WORKERS SHALL HAVE APPROPRIATE ASBESTOS TRAINING
AND CERTIFICATION. EXPOSURE ASSESSMENTS SHOULD BE PERFORMED FOR THE
WORKERS PERFORMING THESE PENETRATIONS IN ORDER TO DETERMINE THE
APPROPRIATE PERSONNEL PROTECTIVE EQUIPMENT REQUIRED FOR THESE TASKS.
HAZMAT NOTES
1. THESE DRAWINGS AND BIM DESIGN MODEL ARE A GENERAL GRAPHIC
REPRESENTATION OF THE WORK. DUCTING, PIPING, WIRING AND EQUIPMENT,
AS SHOWN, ARE SCHEMATIC. FABRICATE AND INSTALL BASED ON ACTUAL
FIELD MEASUREMENTS. COORDINATE WITH OTHER TRADES. PROVIDE A
COMPLETE SET OF COORDINATED FABRICATION DRAWINGS REFLECTING
ACTUAL DIMENSIONS, ACCESS REQUIREMENTS, AND DETAILS BASED UPON
ACTUAL EQUIPMENT PROCURED. DESIGN BIM MODEL SHALL NOT BE UTILIZED
AS DIRECT COPY FOR FABRICATION DRAWINGS. DO NOT USE UNSTATED
DIMENSIONS FROM BIM DESIGN MODEL FOR CREATION OF FABRICATION
DRAWINGS. BIM MODEL IS REQUIRED TO BE FURTHER DEVELOPED FOR USE OF
FABRICATION DRAWING MODEL PER AIA LEVEL OF DEVELOPMENT GUIDELINES.
FULLY COORDINATED WITH OTHER TRADES INCLUDING BUT NO LIMITED TO:
ARCHITECTURAL, CIVIL, STRUCTURAL, ELECTRICAL, MECHANICAL, FIRE
PROTECTION AND SEISMIC PRIOR TO SUBMITTAL, WORK SHALL NOT
COMMENCE UNTIL FABRICATION DRAWINGS HAVE BEEN FULLY REVIEWED AND
APPROVED. MAINTAIN AN UP TO DATE SET OF AS-BUILT DRAWINGS AT THE JOB
SITE. PROCEED WITH THE PREPARATION OF COMPREHENSIVE THREE
DIMENSIONAL (3D) FABRICATION DRAWINGS UPON RECEIPT OF AN
AUTHORIZATION TO PROCEED FOR THE PROJECT. FABRICATION DRAWINGS
SHALL BE ORIGINALLY PREPARED BY THE CONTRACTOR. PROVIDE MINIMUM
1/4" = 1'-0" SCALE FLOOR PLANS IN ADDITION TO THE FABRICATION DRAWINGS
COMPLETED WITHIN A 3D MODEL IN REVIT, AUTOCAD, NAVISWORKS, OR
SIMILAR PROGRAM. SUBMIT A COMPLETE AND COMPREHENSIVE SET OF
FABRICATION DRAWINGS IN ONE PACKAGE WITHIN 30 DAYS OF CONTRACT
AWARD AND PRIOR TO MATERIAL FABRICATION, ORDER, AND INSTALLATION.
THIS PROJECT IS ON AN ACCELERATED TIMELINE. ADHERENCE TO THE
REQUIRED DEADLINES IS OF THE UTMOST IMPORTANCE. FABRICATION
DRAWINGS SHALL INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
A. ARCHITECTURAL, STRUCTURAL, ELECTRICAL, PLUMBING,
TELECOMMUNICATIONS, AND OTHER WORK SPECIFIED OUTSIDE DIVISION
23.
B. DUCT AND PIPE (MECHANICAL AND PLUMBING) ELEVATIONS.
C. DIMENSIONS OF PURCHASED EQUIPMENT.
D. HANGERS AND SUPPORTS, INCLUDING METHODS FOR DUCT AND
BUILDING ATTACHMENT, SEISMIC RESTRAINTS, AND VIBRATION
ISOLATION.
E. ACCESS PANELS INCLUDING CEILING PANELS.
F. ACCESS CLEARANCES FOR EQUIPMENT.
G. LOCATIONS OF DIFFUSERS, REGISTERS, AND GRILLES.
H. LOCATIONS OF MANUAL VOLUME DAMPERS INCLUDING EXTRACTORS AND
SPLITTERS.
I. LOCATIONS OF STRUCTURAL PENETRATIONS SUCH AS BEAMS.
J. LOCATION OF CONTROL PANELS AND POWER CONNECTIONS TO
EQUIPMENT.
K. COLOR CODED DESIGNATION FOR DUCT AND PIPING BASED UPON
MATERIAL USED AND STATIC PRESSURE RATING.
L. LABEL AND TAG SCHEDULE FOR EQUIPMENT.
M. DUCT AND PIPING OFF-SETS AND TRANSITIONS TO CLEAR BUILDING
ARCHITECTURE, STRUCTURE, ELECTRICAL, FIRE PROTECTION, OR OTHER
TIGHT OR CONGESTED AREAS.
N. EXISTING BUILDING UTILITIES BEING RELOCATED TO ACCOMMODATE
DESIGN.
O. ROOM TEMPERATURE AND OTHER SIMILAR SENSOR LOCATIONS.
P. POINT OF CONNECTION TO UTILITIES OUTSIDE THE BUILDING.
Q. GRIDLINES.
2. COORDINATE WITH OTHER TRADES AND EXISTING CONDITIONS.
3. INCLUDE SIGNATURES ON THE FABRICATION DRAWINGS FROM ALL APPLICABLE
TRADES CONFIRMING ALL COORDINATION HAS OCCURRED AND THE
SUBMITTED FABRICATION DRAWINGS ARE FREE OF CONFLICTS.
4. FABRICATION DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE
COMMISSIONING AUTHORITY PRIOR TO SUBMITTAL TO ASSURE DESIGN INTENT
IS MET AND PROPER COORDINATION IS MAINTAINED.
5. PRIOR TO FABRICATION AND UPON RECEIVING APPROVAL FROM
COMMISSIONING AUTHORITY, SUBMIT A FINAL SET OF FABRICATION DRAWINGS.
FABRICATION DRAWING NOTES
CONFIRM EXISTING HAZMAT CONDITIONS AND HAZMAT CLEARANCE REQUIREMENTS
WITH VA PRIOR TO COMMENCING WORK.
CEILING TYPES
THE TABLE SHOWN BELOW IS AN APPROXIMATION OF THE
PERCENTAGE OF HARD LID CEILING FOR REFERENCE:
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020 JC GB
FULLY SPRINKLERED
A
17075 Via Del Campo, San Diego, CA 92127 Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20801.10
INFECTION PREVENTION &
CONTROL
INFECTION CONTROL RISK ASSESSMENT
REFERENCE:
· REFER TO OVERALL FLOOR PLANS 1.A-101 TO 166.A-121 FOR ICRA CLASS APPLICABLE
TO EACH ROOM.
ICRA CLASS (CLASS I)
GENERAL NOTES:
1. INFECTION PREVENTION AND CONTROL (IPC)& COORDINATOR OR THEIR DESIGNEE IS
RESPONSIBLE TO PARTICIPATE IN THE DESIGN AND IMPLEMENTATION OF
CONSTRUCTION PROJECTS.
· DOCUMENT THE PRE-CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (PICRA)
IN CONJUNCTION WITH THE CONTRACTOR.
· PROVIDE ADVICE AND RECOMMENDATIONS TO CONTRACTORS AND ENGINEERS TO
MAINTAIN A HEALTHY AND SAFE ENVIRONMENT DURING CONSTRUCTION ACTIVITIES.
· CONDUCT PERIODIC JOB-SITE INSPECTIONS TO ENSURE COMPLIANCE ITEMS ON THE
POSTED PERMIT & IDENTIFY DEFICIENCIES TO THE CONSTRUCTION SAFETY OFFICER
(CSO). PROVIDE INSPECTION SUMMARIES TO CSO & INFECTION CONTROL DEPARTMENT.
· RECOMMEND TO TEMPORARILY HALT CONSTRUCTION IF, DURING INSPECTION, IT IS
NOTED THAT THERE IS AN IMMEDIATE RISK TO PATIENTS OR EMPLOYEES.
· COMPLETE PREOCCUPANCY INSPECTION AND CHECKLIST.
2. CSO & COMMITTEE IS RESPONSIBLE FOR OVERSIGHT OF THE CONSTRUCTION SAFETY
PROGRAM AND ENSURE THE GOALS OF VHA DIRECTIVE 7715 ARE MET.
3. FACILITY MANAGEMENT SERVICE (FMS; CHIEF/CO/COR/CSO/PE/PM) STAFF HAVE THE
OVERALL RESPONSIBILITY FOR THE DAY TO DAY OVERSIGHT OF ONGOING
CONSTRUCTION PROJECTS:
· COMMUNICATION WITH CONTRACTORS.
· ENSURE THAT THE CONTRACTOR IS INFORMED OF THE IPCS EXPECTATIONS DURING
CONSTRUCTION.
· NOTIFICATION TO IPC OF ALL CONSTRUCTION MEETINGS, INFORMATION, OR
CHANGES THAT MAY IMPACT INFECTION CONTROL.
· CONDUCT REVIEW OF AIR QUALITY, UTILITIES, NOISE, VIBRATION, LIFE SAFETY AND
OTHER HAZARDS AS THEY PERTAIN TO THE PICRA.
· ENSURE THAT IDENTIFIED DEFICIENCIES ARE CORRECTED BY THE CONTRACTOR AND
ARE RESOLVED IN A TIMELY MATTER.
· RESPONSIBLE FOR RETRIEVAL OF AIR MONITORING LOG.
· COORDINATE A FINAL INSPECTION AND CLEARANCE BY THE IPCC.
4. CONTRACTOR
· CONDUCT A PRE-CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (PICRA) TO
DETERMINE THE RISK GROUP, CONSTRUCTION CLASS, AND PRECAUTIONS THAT WILL
BE REQUIRED DURING CONSTRUCTION.
· PRIOR TO START OF WORK, AS PART OF THE GUIDELINES PROVIDED BY THE
INFECTION CONTROL GROUP AS SPECIFIED IN THIS SECTION, PREPARE A PROGRAM
DETAILING PROJECT-SPECIFIC INFECTION CONTROL MEASURES, INCLUDING PERIODIC
STATUS REPORTS. SUBMIT PROGRAM TO CONTRACTING OFFICER REPRESENTATIVE
(COR) AND FACILITY INFECTION CONTROL GROUP FOR APPROVAL AND PERMIT, IN
ACCORDANCE WITH CONTRACT REQUIREMENTS AND SECTION 01 33 23, SHOP
DRAWINGS, PRODUCT DATA AND SAMPLES.
· MAINTAIN A COPY OF INFECTION PREVENTION AND CONTROL PERMIT WITH THE
DESIGNATED RISK CATEGORY, POSTED AT THE CONSTRUCTION SITE.
· PROVIDE A WRITTEN CERTIFICATION THAT ALL CONTRACT EMPLOYEES ASSIGNED TO
THE WORK SITE HAVE HAS A PER-PLACEMENT TUBERCULIN SCREENING WITHIN 90
DAYS PRIOR TO ASSIGNMENT TO THE WORKSITE AND HAVE BEEN FOUND TO HAVE
NEGATIVE SCREENING REACTIONS (CONTRACT EMPLOYEES WITH POSITIVE
SCREENING REACTIONS TO THE TUBERCULIN MUST BE EVALUATED BY A PHYSICIAN
TO DETERMINE EVIDENCE OF ACTIVE PULMONARY TB. AN EMPLOYEE WITH ACTIVE
PULMONARY TB MUST UNDERGO TREATMENT TO RESOLVE THE CONDITION).
5. CONSTRUCTION PROCEDURES & PROCESSES
BARRIER WALLS
a. CONSTRUCTION SITES MUST BE SEPARATED FROM PATIENT CARE AREAS BY BARRIERS
THAT KEEP THE DIRT AND DUST INSIDE WORKSITES.
b. THE INTEGRITY OF THE BARRIER WALLS MUST ASSURE A COMPLETE SEAL OF THE
CONSTRUCTION AREA FROM ADJACENT AREAS.
c. RIGID CONSTRUCTION OF FIRE RATED PLASTIC SHEETING (4- OR 6-MM THICKNESS) IS
USED, DEPENDING ON THE LOCATION OF THE PROJECT, ADJACENT USES, AND
DURATION OF THE PROJECT.
d. WALLS WILL BE DUST PROOF WITH AIRTIGHT SEALS MAINTAINED AT THE FULL
PERIMETER OF THE WALLS, AS WELL AS ALL PENETRATIONS.
ENVIRONMENTAL CONTROL
a. A HEPA FILTER VACUUM SYSTEM, RATED AT 95% CAPTURE OF 0.3 MICRONS SHALL BE
INSTALLED TO ENSURE CONTINUOUS NEGATIVE AIR PRESSURE OF AT LEAST -0.03
W.C. MAINTAINED AT ALL TIMES WITHIN THE CONSTRUCTION ZONE FOR CLASS III &
IV PROJECTS. THERE WILL BE NO RE-CIRCULATION OF AIR. CONTRACTOR IS TO
COMPLETE DAILY NEGATIVE AIR PRESSURE VERIFICATION LOG WHICH WILL BE
POSTED AT SITE NEXT TO MANOMETER.
b. CONSTRUCTION DEBRIS WILL BE REMOVED IN TIGHTLY FITTED COVERED CARTS, WIPED DOWN PRIOR TO REMOVAL FROM PROJECT AREA. SPECIFIC CONSTRUCTION
TRAFFIC PATTERNS WILL BE ESTABLISHED PRIOR TO THE BEGINNING OF
CONSTRUCTION.
c. TACKY/WALK-OFF MATS SHALL BE UTILIZED IMMEDIATELY OUTSIDE THE
CONSTRUCTION ZONE TO REMOVE DUST AND SOIL FROM SHOES, CARTWHEELS, ETC.
AS PERSONNEL EXIT THE AREA. THE TACKY MATS MUST BE LARGE ENOUGH TO COVER
THE EXIT AND CHANGED DAILY, OR WHENEVER IT BECOMES COVERED IN DUST AND
DEBRIS.
d. EXTERIOR WINDOW SEALS MUST BE ASSURED TO MINIMIZE INFILTRATION OF
OUTSIDE EXCAVATION DEBRIS.
e. WHEN USING DEMOLITION CHUTES, THE CHUTE OPENING MUST BE SEALED WHEN
NOT IN USE. THE CHUTE AND DAMPER MUST BE SPRAYED WITH WATER, AS
NECESSARY TO MAINTAIN DUST CONTROL.
f. CONTROL, COLLECTION AND DISPOSAL MUST BE PROVIDED FOR ANY DRAINING
LIQUID OR SLUDGE ENCOUNTERED WHEN DEMOLISHING PLUMBING.
INFECTION CONTROL RISK ASSESSMENT (CONTINUED)
TRAFFIC CONTROL
a. DESIGNATED ENTRY AND EXIT PROCEDURE SHALL BE DEFINED FOR EACH CONSTRUCTION PROJECT.
b. ALL EGRESS PATHWAYS WILL REMAIN FREE OF DEBRIS ALWAYS.
c. UNAUTHORIZED PERSONNEL WILL NOT BE ALLOWED TO ENTER THE CONSTRUCTION ZONE AND THE DOORS WILL REMAIN LOCKED. THE DOORS WILL BE LABELED WITH WARNING SIGNS STATING, “DANGER HARD HAT AREA” AND CONSTRUCTION AREA
AUTHORIZED PERSONNEL ONLY.”
d. ONLY DESIGNATED ELEVATORS WILL BE USED FOR CONSTRUCTION ACTIVITIES DURING SCHEDULED TIMES.
CLEANING
a. THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE SWEPT AND MOPPED DAILY OR MORE FREQUENTLY, IF NEEDED, TO MINIMIZE DUST.
b. FMS WILL BE RESPONSIBLE FOR THE ROUTINE CLEANING OF ADJACENT AREAS AND FOR THE FINAL TERMINAL CLEANING OF THE
CONSTRUCTION ZONE PRIOR TO OPENING OF NEWLY CONSTRUCTED AREAS.
PERSONNEL REQUIREMENTS
a. CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE.
b. PERSONNEL PROTECTION EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES AND N95 RESPIRATORS WILL BE UTILIZED AS APPROPRIATE FOR THE TASK AT HAND. THE CONTRACTOR WILL PROVIDE THESE ON THE PERMIT.
c. PERSONNEL ENTERING STERILE/INVASIVE PROCEDURE AREAS WILL BE PROVIDED WITH A DISPOSABLE JUMP SUIT, HEAD COVERING, AND SHOE COVERINGS BY THE CONTRACTOR. THESE MUST BE REMOVED PRIOR TO EXITING THE WORK AREA. THIS
IS DETERMINED IN THE PICRA PROCESS AND WILL BE NOTED ON THE PERMIT.
d. TOOLS AND EQUIPMENT MUST BE DAMP WIPED PRIOR TO ENTRY AND EXIT FROM STERILE AND INVASIVE PROCEDURE AREAS.
e. HOSPITAL APPROVED GERMICIDES WILL BE USED TO CLEAN TOOLS AND EQUIPMENT THAT MAY BE SOILED WITH BLOOD AND
BODY FLUIDS.
f. ALL CONTRACTORS, SUBCONTRACTORS, SAFETY MANAGEMENT AND FMS EMPLOYEES SHALL RECEIVE INFECTION CONTROL
TRAINING AS IT RELATES TO CONSTRUCTION.
ENVIRONMENTAL MONITORING
a. FMS, IN CONJUNCTION WITH IPC WILL PLAN FOR ENVIRONMENTAL MONITORING PRIOR TO THE OPENING OF ANY NEW CONSTRUCTION AREA. THIS MAY INCLUDE AIR TESTING, ENVIRONMENTAL TESTING FOR THE PROJECT, AS APPROPRIATE.
COMPLIANCE MONITORING
a. A MULTIDISCIPLINARY TEAM FROM THE CONSTRUCTION SAFETY COMMITTEE AND INFECTION PREVENTION AND CONTROL WILL CONDUCT COMPLIANCE MONITORING ROUNDS PER VA DIRECTIVE 7715. THE FOLLOWING PARAMETERS WILL BE MONITORED:
i. AIR HANDLING
ii. INTEGRITY OF BARRIER WALLS
iii. DRESS CODE
iv. ENVIRONMENTAL CONTROL
v. NOISE
vi. TRAFFIC CONTROL vii.PERSONAL PROTECTIVE EQUIPMENT
viii. FIRE AND GENERAL SAFETY
x. INTERIM LIFE SAFETY MEASURES
xi. IPC CONSTRUCTION SURVEILLANCE FINDINGS ARE PROVIDED TO THE FMS-CHIEF OR OTHER DESIGNATED LEAD WHO WILL
FORWARD TO THE COR/CO/PM FOR FOLLOW UP
COMPLETION PHASE
a. AFTER COMPLETION OF CONSTRUCTION, VENTILATION MUST MEET SPECIFICATIONS AS MANDATED BY REGULATORY BODIES.
b. THE AREA MUST BE THOROUGHLY CLEANED AND DISINFECTED BEFORE BEING PLACED INTO SERVICE.
c. THE COR WILL NOTIFY THE IPC COORDINATOR AT LEAST 72 HOURS BEFORE PROJECT COMPLETION TO SCHEDULE A WALK-THROUGH. THE PRE-OCCUPANCY CHECK (PICRA, APPENDIX E) WILL BE COMPLETED AND SUBMITTED TO THE COR WHO
WILL ADDRESS ANY ITEMS THAT REQUIRE FOLLOW UP.
6. A PRELIMINARY ICRA HAS BEEN CONDUCTED TO DETERMINE PROJECT 600-20-120 EHRM INFRASTRUCTURE UPGRADES - LONG BEACH AS CLASS I THROUGH IV DEPENDING ON THE ROOM (REFER TO OVERALL FLOOR PLANS FOR CLASS DESIGNATION) WITH THE
FOLLOWING REQUIRED PRECAUTIONS:
CLASS I
· EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
· REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION AS SOON AS POSSIBLE.
· ENSURE THAT WORK AREA IS LEFT CLEAN AND DUST-FREE UPON PROJECT COMPLETION.
CLASS II
· REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
· PLACE TACKY/WALK-OFF MAT AT THE EXIT OF WORK AREA. THE MAT MUST BE LARGE ENOUGH TO COVER THE ENTIRE EXIT AND
CHANGED DAILY AND WHENEVER IT BECOMES VISIBLY COVERED WITH DUST AND DEBRIS.
· PROVIDE ACTIVE MEANS TO PREVENT AIR-BORNE DUST FROM DISPERSING INTO ATMOSPHERE.
· WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING.
· SEAL UNUSED DOORS WITH DUCT TAPE.
· BLOCK OFF AND SEAL DUCT VENTS.
· CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
· VACUUM WITH HEPA FILTERED VACUUM AND WET MOP BEFORE LEAVING WORK AREA DAILY, AND MORE OFTEN AS NEEDED.
· WIPE CASEWORK AND HORIZONTAL SURFACES WITH DISINFECTANT UPON COMPLETION OF PROJECT.
· REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK HAS BEEN PERFORMED UPON COMPLETION OF PROJECT.
CLASS III (ALL REQUIREMENTS LISTED IN CLASS I-II APPLY)
· COVER UP OR REMOVE ALL SUPPLIES AND EQUIPMENT THAT COULD POTENTIALLY COME IN CONTACT WITH CONSTRUCTION
DUST/DIRT/DEBRIS.
· COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
· MAINTAIN NEGATIVE AIR PRESSURE (MINIMUM -0.03 COLUMN INCHES OF WATER PRESSURE DIFFERENTIAL BY MANOMETRIC
MEASUREMENT) WITHIN WORK SITE AT ALL TIMES, UTILIZING HEPA FILTERED VENTILATION UNITS. COMPLETE DAILY NEGATIVE
AIR PRESSURE VERIFICATION LOG AND POST AT SITE NEXT TO MANOMETER.
· USE ADDITIONAL HEPA EQUIPPED AIR SCRUBBERS WITHIN PROJECT CONTAINMENT AREA TO MINIMIZE SUFFICIENT TO
ADEQUATELY FILTER THE AIR GIVEN THE SIZE OF THE CONTAINMENT AREA.
· DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .