Attachment A5_Drawing 5 of 9.pdf

PDF 27 MB Posted

Attached to
Z2DA--EHRM Long Beach, 600-20-120, Construction Federal contract opportunity
Solicitation number
36C26221B0004
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document provides details of an upcoming federal construction contract opportunity with the Department of Veterans Affairs. The VA Long Beach Healthcare System is seeking construction services for an Electronic Health Record Modernization Infrastructure Upgrade project at its facility located in Long Beach, California. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The contract will be set aside specifically for Service-Disabled Veteran-Owned Small Businesses and is estimated to be valued between $10-20 million. An Invitation for Bid will be issued on April 12, 2021 via Beta.SAM.gov. Responses are due by May 13, 2021 at 2PM Pacific Time in Los Angeles. The North American Industry Classification Code for this requirement is 236220 for Commercial and Institutional Building Construction.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING 2"C

EXISTING 2"C

EXISTING 4"C

EXISTING

3/4"C DOWN

THRU FLOOR

2.T-401

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM N108A

TR ROOM

N108A

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS 4 POST

WITH VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO

REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

FIBER TDU.

KEY NOTES FOR DETAIL 1

SCALE: NONE

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED CABLE LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

BUILDING 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i l e

P a t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

2.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

BUILDING 2

SCALE: NONE

9 5

9 5

9 5

9 5

9 5

9 5

9 5

9 5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

1 ALL CAT5E

2 CAT 3

3 1 CAT5E, 2-4 EMPTY, 5-16 CAT6,

17-24 EMPTY, 25 CAT 5E, 26-38

EMPTY, 39-48 CAT5E

4 EMPTY

5 CAT 6A

RACK EQUIPMENT

1 1U FIBER HOUSING

2 2U 48 PORT PATCH PANEL

3 1U CISCO 3850

4 1U CISCO VG310

5 1U 110 BLOCK

6 2U BLOCK BOX PHONE

EQUIPMENT

7 2U UPS APC

8 TDU-N-108A

9 NEW 2U 48 PORT PATCH PANEL

(CAT 6A) FROM BUILDING 2

HALF OF BASEMENT, 1ST, 2ND

AND 3RD FLOORS.

10 NEW UPS VERIV.

ELEVATION 1 AND 2

2"C

2-3"C

STACKED

1 1/4"C

2"C

2"C

4"C

4"C2"C

2"C,3"C,4"C

STACKED

1 5

IT/DATA

E-108

5C.T-401

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM E108

5C

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 84" HIGH EQUIPMENT DATA RACKS WITH VERTICAL

AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN 84" AFF.

EXISTING PULL BOX (EMPTY) TO REMAIN.

EXISTING TDU-SC-E108 ON WALL TO REMAIN.

EXISTING FOUR POST RACK TO REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE

EXISTING TGB 84"

AFF TO REMAIN.

SCALE: NONE

CABLE LADDER TO REMAIN.

SCALE: NONE

4 POST DATA RACK AND TDU CABINET TO REMAIN.

SCALE: NONE

FAR END - EXISTING CAT 5e FOR VOICE TO BLDG 5 TO

REMAIN NEAR SIZE FIBER IN TUBE CELL TO REMAIN.

SCALE: NONE

CABLE AT 48 PORT PATCH PANEL.

BUILDING 5C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

5C.T-401A

5C

TELECOMMUNICATIONS RACK

ELEVATIONS

BUILDING 5C

SCALE: NONE

RACK EQUIPMENT

1 1U 24 PORT PATCH PANEL

2 2U 48 PORT PATCH PANEL

3 1U WIRE MANAGER

4 2U WIRE MANAGER

5 2U FIBER HOUSING

6 1U CISCO 3850

7 1U CISCO 3500

8 2U UPS APC

9 9U AVAYA MG1010

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

4"C

1"C

4"C

1/2"C

4"C

2"C

6"C

TELEPHONE

6.T-401

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 34

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

WALL MOUNTED DATA RACK.

KEY NOTES FOR DETAIL 1

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE

BUILDING 6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

6.T-401A

BUILDING 6

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

KEY NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

ELEVATION 1 AND 2

ELEVATION 1 AND 2

SCALE: NONE

1 TO BE REPLACED BY ELECTRICAL CONTRACTOR.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWINGS.

TELEPHONE

ROOM 111

8.T-401

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 111

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 84" HIGH EQUIPMENT DATA RACKS WITH VERTICAL

AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN 84" AFF.

EXISTING FLOOR MOUNTED UPS TO REMAIN.

EXISTING TDU ON WALL TO REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

LAY IN CEILING AND LIGHT FIXTURE TO BE REMOVED.

EXISTING NORTHERN TELEPHONE CABINET TO REMAIN.

EXISTING 4"C SLEEVE THRU LAY IN CEILING TO BE REMOVED.

KEY NOTES FOR DETAIL 1

SCALE: NONE SCALE: NONE

UPS (FLOOR MOUNTED) TO REMAIN.CEILING AND LIGHT FIXTURE TO BE REMOVED. EXISTING DATA RACKS TO REMAIN.

SCALE: NONE

SCALE: NONE SCALE: NONE

EXISTING NORTHERN TELEPHONE CABINET TO REMAIN.

EXISTING 2 - 4"C SLEEVE THROUGH CEILING GRID TO BE

REMOVED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

8.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

3 2U FIBER HOUSING

4 48 PORT PATCH PANEL

5 1U CISCO 3850

6 1U 110 BLOCK

7 MERDIAN TELECOM

8 1U UPS APC SMACK UPS SC450

9 TDU-8-111

10 MERDIAN TELECOM

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

11 NEW 12 PORT FIBER

PATCH PANEL FOR

NEW 12 STRAND

SINGLE MODE AIR

BLOWN FIBER FROM

MDF ROOM W50

BUILDING 126.

12 NEW UPS VERTIV.

ELEVATION 1 AND 2 ELEVATION 1 AND 2

SCALE: NONE

4"C

4"C

4"C

2"C

4"C

4"C

COMMUNICATIONS

ROOM 101B

TELE-

50.T-401

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 101B

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING WALL PHONE TO REMAIN.

EXISTING 110 BLOCK ON WALL TO REMAIN.

EXISTING 12”W RACK MOUNTED AT 84" AFF AND FIXED TO TOP

OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

EXISTING MERIDIAN PHONE CABINET TO REMAIN.

EXISTING SLEEVE THRU CEILING GRID TO BE REMOVED.

KEY NOTES FOR DETAIL 1

SCALE: NONE

EXISTING PHONE SYSTEM TO REMAIN.

SCALE: NONE

TBG TO REMAIN.

SCALE: NONE

EXISTING CABLING TO BE REMOVED AFTER CABLING IS

INSTALLED.

SCALE: NONE

EXISTING DATA RACK TO REMAIN.

BUILDING 50

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

50.T-401A

BUILDING 50

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

3 24 PORT PATCH PANEL

4 48 PORT PATCH PANEL

5 1U CISCO 3850

6 1U 110 BLOCK

7 MERDIAN TELECOM

8 1U UPS APC SMACK UPS SC450

9 2U FIBER HOUSING

10 4U LANSCAPE FIBER HOUSING

11 1U XIRRUS XT-5024

12 1U APC SMART UPS SC450

13 1U TREND NET

14 2U UPS APC

15 NEW UPS VERTIV

1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE

MANAGERS. USE VELCRO STRAPS.

2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,

FIBER PATCH PANEL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

KEY NOTES

ELEVATION 1 AND 2

SCALE: NONE

EXISTING

4"C UP

THRU

CEILING

EXISTING

4"C UP

THRU

CEILING

EXISTING

9 - 4"C UP

THRU

CEILING

EXISTING 2"C UP

THRU CEILING

EXISTING 4"C UP

THRU CEILING

EXISTING 4"C

UP THRU

CEILING

EXISTING 2"C UP

THRU CEILING

EXISTING

12 - 4"C DOWN

THROUGH FLOOR

EXISTING

6 - 4"C DOWN

THROUGH FLOOR

126.T-401

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 15 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

SCALE: 1/4" = 1' - 0" NORTH

TELECOMMUNICATION

EQUIP AREA

W50

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 110 BLOCK ON RACK TO REMAIN.

EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

EXISTING TDU #40 2-24 STRAND SINGLE MODE FIBER FROM

TDU TO SERVER ROOM E221. VERIFY EXACT LOCATION OF

TDU #40 IN MDF ROOM.

NEW 2-24 STRAND SINGLE MODE FIBER ON EXISTING CABLE

TRAY.

KEY NOTES FOR DETAIL 1

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

126.T-401A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

NEW 24 PORT FIBER PATCH

PANEL FOR NEW 24 STRAND

SINGLE MODE AIR BLOWN FIBER

FROM MDF W50 TO SERVER

ROOM E221 WEST IT RACK.

NEW 24 PORT FIBER PATCH

PANEL FOR NEW 24 STRAND

SINGLE MODE AIR BLOWN FIBER

FROM MDF W50 TO SERVER

ROOM E221 EAST IT RACK.

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

4" SLEEVE

2" SLEEVE

2" SLEEVE

4" SLEEVE

2" SLEEVE

4" SLEEVE 2

126.T-402

SCALE: 1/4" = 1' - 0"

NORTH

TELECOMMUNICATION

EQUIP AREA

W128V

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

126.T-402A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

SCALE: NONE

RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

3 24 PORT PATCH PANEL

4 48 PORT PATCH PANEL

5 1U CISCO 3850

6 1U 110 BLOCK

7 2U VERTIV UPS

8 2U FIBER HOUSING

9 3U FIBER HOUSING

10 4U FIBER HOUSING

11 EQUIPMENT SLEEVE WITH

CISCO CATALYST 3560 CX

SERIES

NEW VERTICAL

WIRE

MANAGER

NEW VERTICAL

WIRE

MANAGER

12 NEW 2U 48 PORT PATCH

PANEL (CAT 6A) FEEDING

BUILDING 126 1ST FLOOR.

12 22

12 22

12 22

12 22

12 22

12 22

12 22

12 22

12 22

12 22

12 22

12 22

12 22

12 22

12 22

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

2" C

4" C

4" C4" C

4" C

13 1 1

S AND T

CLOSET

W232

126.T-403

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM W232

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONESCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

126.T-403A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

SCALE: NONE

9 16

9 16

9 16

9 16

9 16

9 16

9 16

9 16

9 16

11 16

9 16

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED.

NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400

SERIES DRAWING.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

9 NEW 2U 48 PORT PATCH

PANEL (CAT 6A) FEEDING

BUILDING 126 2ND FLOOR.

2" FLEX2" C

2" FLEX

2" FLEX

1" FLEX

1" FLEX

1" FLEX

1" FLEX

2" FLEX

1" FLEX

126.T-404

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM W220

TELE AND SIG

CLOSET

W220

SCALE: 1/4" = 1' - 0" NORTH

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA 4 POST RACKS

WITH VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO

REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

KEY NOTES FOR DETAIL 1

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

0' 2' 4' 8'

SCALE: 1/4" = 1'-0"

PROPOSED SEQUENCE OF WORK (T&E) FOR A

TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)

STEP 1 REMOVE CEILING AND GRID AND

TEMPORARILY SUPPORT THE EXISTING

LIGHT FIXTURE, HVAC DIFFUSER AND

SMOKE DETECTOR.

STEP 2 INSTALL LIGHT FIXTURE AND QUAD

RECEPTACLE (WHERE APPLICABLE).

REATTACH SMOKE DETECTOR.

STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL

CABLE ENTRY FROM EUD.

STEP 4 INSTALL SLOPED LADDER RACK

FROM EZ PATH ENTRY POINT TO EXISTING

CABLE LADDER RACK.

STEP 5 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG

CORRIDOR ALONG MAIN CABLE ROUTE.

STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE

PATH FROM CORRIDOR TO EACH ROOM.

STEP 8 INSTALL EUD CABLES FROM TR TO THE

CORRIDORS ALONG MAIN CABLE ROUTE.

COIL UP CABLES AT EACH TAKE OFF POINT

TO INDIVIDUAL ROOMS AND LEAVE IT

ABOVE CEILING.

STEP 9 SCHEDULE A GROUP OF ROOMS FOR

INSTALLATION OF NEW FACEPLATE WITH

THREE RJ45 JACKS.

STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE

AND LET IT HANGING OUT TEMPORARILY.

STEP 11 TEST AND CERTIFY THE CABLE BY A

GROUP OF ROOMS TBD AND SCHEDULED.

STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT

TR ROOM AND AT EUD FACEPLATE.

STEP 13 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW EUD FACEPLATE.

STEP 14 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 15 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 16 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 17 REMOVE ASSOCIATED EXISTING PATCH

PANEL FORM THE DATA RACK.

STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE

ROOMS HAVE BEEN COMPLETED.

STEP 19 CLEAN UP AND PAINT TR ROOM.

STEP 20 INSTALL TEMPERATURE AND HUMIDITY

SENSOR.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

126.T-404A

TELECOMMUNICATIONS

RACK ELEVATIONS

SCALE: NONE

RACK EQUIPMENT

1 1U FIBER HOUSING

2 1U CISCO 3850

3 48 PORT ANGLED PATCH PANEL

4 UPS "APCSMX+2000" TO BE REMOVED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F i t h

U.S. Department of Veterans Affairs

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Key Plan

PM EW/JB

NORTH

A

GENERAL NOTES

17075 Via Del Campo, San Diego, CA 92127

Phone: 858.946.0333

ARCHITECT/ENGINEER OF RECORD

C

D

20-SCE-04

FULLY SPRINKLERED

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach

5901 E. SEVENTH STREET, LONG BEACH, CA 90822

600-20-120

CONTRACT DOCUMENTS

December 16, 2020

SCALE: NONE

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

KEY NOTES

EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED

AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH

ITEMS) UN HATCH ITEMS TO REMAIN.

QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE

OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.

TO BE REPLACED BY ELECTRICAL CONTRACTOR.

BY ELECTRICAL CONTRACTOR SEE E 400 SERIES DRAWINGS.

ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR

ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)

CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE

JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND

LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48

PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL

BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S

CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE

DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE

COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN

EXISTING RACKS IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL NEW

CAT6A CABLES.

OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING

AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE

NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE

THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD

WILL BE DISCONNECTED FROM OLD FACEPLATE AND

CONNECTED TO NEW FACE PLATE BY OIT.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE

THESE NEW PATCH PANELS ARE POPULATED REMOVE

EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. BEFORE

DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,

RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING

IN THOSE PATCH PANELS TO EUD HAVE BEEN

SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND

CAT6A COMPLIANT PATCH PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE

GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

5 NEW 2U 48 PORT PATCH

PANEL (CAT 6A) FEEDING

BUILDING 126 2ND FLOOR.

6 NEW UPS VERTIV

ELEVATION 1 AND 2

ELEVATION 1 AND 2

5 5

5 5

5 5

5 5

5 5

5 5

5 5

RK-D03RK-C03 RK-E03

R K

E

R K

E

E L E

R K

E

R K

E

R K

R K

G

R K

R K

R K

R K

R K

L

R K

L

R K

L

R K

L

R K

L

4" C

4" C

6D

6D

6D

6D

6D

6D

6D

6D

4 4

6D

6D

6D

6D

6D

6D

6D

6D

6D

6D

6D

SERVER

CABINETS

TYPICAL

WEST IT

RACKS

6D

6D

6D 6D 6D 6D 6D

6D 6D

6D 6D

6D

6D

6D

6D

6D

6D 6D 6D

6D 6D 6D

6D

6D 6D 6D

6D

6D

46D

6D

6D 6D 6D

6D 6D 6D

6D

6D

6D

6D

6D

6D

EAST IT

RACKS

RK-401

RK-402

RK-402

6D

6D

6D

8TYPICAL

FOR

TR ROOM

SERVER ROOM

E221

126.T-405

TELECOMMUNICATIONS

ENLARGED PLAN - TR ROOM

SERVER ROOM E221

SCALE: 1/4" = 1' - 0" NORTH

PROPOSED SEQUENCE OF WORK

FOR SERVER ROOM RACK

STEP 1 POPULATE AVAILABLE SPACE IN EXISTING

RACK WITH NEW 48 PORT PATCH PANEL

CAT 6A COMPLIANT.

STEP 2 INSTALL NEW CAT 6A ON EXISTING CABLE

TRAY FROM EXISTING RACKS TO 6-PORT

RJ45. MOUNT 6 PORT ON EXISTING MULTI

RACEWAY.

STEP 3 TEST AND CERTIFY THE CABLE.

STEP 4 TERMINATE AND INSTALL RJ45 JACKS AT

RACK AND AT 6 PORT BOX.

STEP 5 VALB OIT TO CROSS CONNECT NEW 48

PORT PATCH PANEL TO CISCO SWITCH

AND ACTIVATE THE NEW PORTS.

STEP 6 VALB OIT TO SWITCH THE EUD DEVICE

FROM OLD FACE PLATE TO NEW

FACEPLATE.

STEP 7 EUD DEVICE ARE NOW CONNECTED TO

NEW CABLING.

STEP 8 PULLOUT AND REMOVE EXISTING DATA

CABLE FORM THE EUD TO TR ROOM

EXISTING PATCH PANEL.

STEP 9 REMOVE ASSOCIATED EXISTING PATCH

PANEL FROM THE DATA RACK.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.

EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO

REMAIN.

EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED

TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).

EXISTING POWER RACEWAY TO REMAIN.

EXISTING FIBER TDV BOX. NEW TWO 24 STRAND SM FIBER TO

THIS BOX FROM MDF ROOM W50. EXTEND ONE 24 STRAND

INTO EAST RACK INTO NEW SEICOR PATCH PANEL MOUNTED

ON RACK & EXTEND SECOND 24 STRAND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .