Attachment A5_Drawing 5 of 9.pdf
PDF 27 MB Posted
- Attached to
- Z2DA--EHRM Long Beach, 600-20-120, Construction Federal contract opportunity
- Solicitation number
- 36C26221B0004
About this file
This document provides details of an upcoming federal construction contract opportunity with the Department of Veterans Affairs. The VA Long Beach Healthcare System is seeking construction services for an Electronic Health Record Modernization Infrastructure Upgrade project at its facility located in Long Beach, California. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The contract will be set aside specifically for Service-Disabled Veteran-Owned Small Businesses and is estimated to be valued between $10-20 million. An Invitation for Bid will be issued on April 12, 2021 via Beta.SAM.gov. Responses are due by May 13, 2021 at 2PM Pacific Time in Los Angeles. The North American Industry Classification Code for this requirement is 236220 for Commercial and Institutional Building Construction.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING 2"C
EXISTING 2"C
EXISTING 4"C
EXISTING
3/4"C DOWN
THRU FLOOR
2.T-401
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM N108A
TR ROOM
N108A
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS 4 POST
WITH VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO
REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
FIBER TDU.
KEY NOTES FOR DETAIL 1
SCALE: NONE
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED CABLE LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 11 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 13 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 14 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 15 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 16 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 17 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 19 CLEAN UP AND PAINT TR ROOM.
STEP 20 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
BUILDING 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i l e
P a t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
2.T-401A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
BUILDING 2
SCALE: NONE
9 5
9 5
9 5
9 5
9 5
9 5
9 5
9 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
TO BE REPLACED.
NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400
SERIES DRAWING.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
1 ALL CAT5E
2 CAT 3
3 1 CAT5E, 2-4 EMPTY, 5-16 CAT6,
17-24 EMPTY, 25 CAT 5E, 26-38
EMPTY, 39-48 CAT5E
4 EMPTY
5 CAT 6A
RACK EQUIPMENT
1 1U FIBER HOUSING
2 2U 48 PORT PATCH PANEL
3 1U CISCO 3850
4 1U CISCO VG310
5 1U 110 BLOCK
6 2U BLOCK BOX PHONE
EQUIPMENT
7 2U UPS APC
8 TDU-N-108A
9 NEW 2U 48 PORT PATCH PANEL
(CAT 6A) FROM BUILDING 2
HALF OF BASEMENT, 1ST, 2ND
AND 3RD FLOORS.
10 NEW UPS VERIV.
ELEVATION 1 AND 2
2"C
2-3"C
STACKED
1 1/4"C
2"C
2"C
4"C
4"C2"C
2"C,3"C,4"C
STACKED
1 5
IT/DATA
E-108
5C.T-401
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM E108
5C
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 84" HIGH EQUIPMENT DATA RACKS WITH VERTICAL
AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN 84" AFF.
EXISTING PULL BOX (EMPTY) TO REMAIN.
EXISTING TDU-SC-E108 ON WALL TO REMAIN.
EXISTING FOUR POST RACK TO REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONE
EXISTING TGB 84"
AFF TO REMAIN.
SCALE: NONE
CABLE LADDER TO REMAIN.
SCALE: NONE
4 POST DATA RACK AND TDU CABINET TO REMAIN.
SCALE: NONE
FAR END - EXISTING CAT 5e FOR VOICE TO BLDG 5 TO
REMAIN NEAR SIZE FIBER IN TUBE CELL TO REMAIN.
SCALE: NONE
CABLE AT 48 PORT PATCH PANEL.
BUILDING 5C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
5C.T-401A
5C
TELECOMMUNICATIONS RACK
ELEVATIONS
BUILDING 5C
SCALE: NONE
RACK EQUIPMENT
1 1U 24 PORT PATCH PANEL
2 2U 48 PORT PATCH PANEL
3 1U WIRE MANAGER
4 2U WIRE MANAGER
5 2U FIBER HOUSING
6 1U CISCO 3850
7 1U CISCO 3500
8 2U UPS APC
9 9U AVAYA MG1010
1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE
MANAGERS. USE VELCRO STRAPS.
2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,
FIBER PATCH PANEL TO REMAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
4"C
1"C
4"C
1/2"C
4"C
2"C
6"C
TELEPHONE
6.T-401
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 34
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
WALL MOUNTED DATA RACK.
KEY NOTES FOR DETAIL 1
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE
BUILDING 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
6.T-401A
BUILDING 6
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE
MANAGERS. USE VELCRO STRAPS.
2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,
FIBER PATCH PANEL TO REMAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
KEY NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
ELEVATION 1 AND 2
ELEVATION 1 AND 2
SCALE: NONE
1 TO BE REPLACED BY ELECTRICAL CONTRACTOR.
NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400
SERIES DRAWINGS.
TELEPHONE
ROOM 111
8.T-401
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 111
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 84" HIGH EQUIPMENT DATA RACKS WITH VERTICAL
AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN 84" AFF.
EXISTING FLOOR MOUNTED UPS TO REMAIN.
EXISTING TDU ON WALL TO REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
LAY IN CEILING AND LIGHT FIXTURE TO BE REMOVED.
EXISTING NORTHERN TELEPHONE CABINET TO REMAIN.
EXISTING 4"C SLEEVE THRU LAY IN CEILING TO BE REMOVED.
KEY NOTES FOR DETAIL 1
SCALE: NONE SCALE: NONE
UPS (FLOOR MOUNTED) TO REMAIN.CEILING AND LIGHT FIXTURE TO BE REMOVED. EXISTING DATA RACKS TO REMAIN.
SCALE: NONE
SCALE: NONE SCALE: NONE
EXISTING NORTHERN TELEPHONE CABINET TO REMAIN.
EXISTING 2 - 4"C SLEEVE THROUGH CEILING GRID TO BE
REMOVED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
8.T-401A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
3 2U FIBER HOUSING
4 48 PORT PATCH PANEL
5 1U CISCO 3850
6 1U 110 BLOCK
7 MERDIAN TELECOM
8 1U UPS APC SMACK UPS SC450
9 TDU-8-111
10 MERDIAN TELECOM
1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE
MANAGERS. USE VELCRO STRAPS.
2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,
FIBER PATCH PANEL TO REMAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
11 NEW 12 PORT FIBER
PATCH PANEL FOR
NEW 12 STRAND
SINGLE MODE AIR
BLOWN FIBER FROM
MDF ROOM W50
BUILDING 126.
12 NEW UPS VERTIV.
ELEVATION 1 AND 2 ELEVATION 1 AND 2
SCALE: NONE
4"C
4"C
4"C
2"C
4"C
4"C
COMMUNICATIONS
ROOM 101B
TELE-
50.T-401
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 101B
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING WALL PHONE TO REMAIN.
EXISTING 110 BLOCK ON WALL TO REMAIN.
EXISTING 12”W RACK MOUNTED AT 84" AFF AND FIXED TO TOP
OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
EXISTING MERIDIAN PHONE CABINET TO REMAIN.
EXISTING SLEEVE THRU CEILING GRID TO BE REMOVED.
KEY NOTES FOR DETAIL 1
SCALE: NONE
EXISTING PHONE SYSTEM TO REMAIN.
SCALE: NONE
TBG TO REMAIN.
SCALE: NONE
EXISTING CABLING TO BE REMOVED AFTER CABLING IS
INSTALLED.
SCALE: NONE
EXISTING DATA RACK TO REMAIN.
BUILDING 50
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
50.T-401A
BUILDING 50
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
3 24 PORT PATCH PANEL
4 48 PORT PATCH PANEL
5 1U CISCO 3850
6 1U 110 BLOCK
7 MERDIAN TELECOM
8 1U UPS APC SMACK UPS SC450
9 2U FIBER HOUSING
10 4U LANSCAPE FIBER HOUSING
11 1U XIRRUS XT-5024
12 1U APC SMART UPS SC450
13 1U TREND NET
14 2U UPS APC
15 NEW UPS VERTIV
1. EXISTING CABLE TO BE DRESSED UP AND TUCKED INTO WIRE
MANAGERS. USE VELCRO STRAPS.
2. ALL EXISTING CABLING, PATCH PANELS, CISCO SWITCHES,
FIBER PATCH PANEL TO REMAIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
KEY NOTES
ELEVATION 1 AND 2
SCALE: NONE
EXISTING
4"C UP
THRU
CEILING
EXISTING
4"C UP
THRU
CEILING
EXISTING
9 - 4"C UP
THRU
CEILING
EXISTING 2"C UP
THRU CEILING
EXISTING 4"C UP
THRU CEILING
EXISTING 4"C
UP THRU
CEILING
EXISTING 2"C UP
THRU CEILING
EXISTING
12 - 4"C DOWN
THROUGH FLOOR
EXISTING
6 - 4"C DOWN
THROUGH FLOOR
126.T-401
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 11 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 13 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 14 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 15 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 16 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 17 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 18 REPEAT STEP 9 TO STEP 15 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 19 CLEAN UP AND PAINT TR ROOM.
STEP 20 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
SCALE: 1/4" = 1' - 0" NORTH
TELECOMMUNICATION
EQUIP AREA
W50
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 110 BLOCK ON RACK TO REMAIN.
EXISTING 18”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
EXISTING TDU #40 2-24 STRAND SINGLE MODE FIBER FROM
TDU TO SERVER ROOM E221. VERIFY EXACT LOCATION OF
TDU #40 IN MDF ROOM.
NEW 2-24 STRAND SINGLE MODE FIBER ON EXISTING CABLE
TRAY.
KEY NOTES FOR DETAIL 1
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
126.T-401A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
NEW 24 PORT FIBER PATCH
PANEL FOR NEW 24 STRAND
SINGLE MODE AIR BLOWN FIBER
FROM MDF W50 TO SERVER
ROOM E221 WEST IT RACK.
NEW 24 PORT FIBER PATCH
PANEL FOR NEW 24 STRAND
SINGLE MODE AIR BLOWN FIBER
FROM MDF W50 TO SERVER
ROOM E221 EAST IT RACK.
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
4" SLEEVE
2" SLEEVE
2" SLEEVE
4" SLEEVE
2" SLEEVE
4" SLEEVE 2
126.T-402
SCALE: 1/4" = 1' - 0"
NORTH
TELECOMMUNICATION
EQUIP AREA
W128V
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 11 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 13 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 14 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 15 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 16 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 17 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 19 CLEAN UP AND PAINT TR ROOM.
STEP 20 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
126.T-402A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
SCALE: NONE
RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
3 24 PORT PATCH PANEL
4 48 PORT PATCH PANEL
5 1U CISCO 3850
6 1U 110 BLOCK
7 2U VERTIV UPS
8 2U FIBER HOUSING
9 3U FIBER HOUSING
10 4U FIBER HOUSING
11 EQUIPMENT SLEEVE WITH
CISCO CATALYST 3560 CX
SERIES
NEW VERTICAL
WIRE
MANAGER
NEW VERTICAL
WIRE
MANAGER
12 NEW 2U 48 PORT PATCH
PANEL (CAT 6A) FEEDING
BUILDING 126 1ST FLOOR.
12 22
12 22
12 22
12 22
12 22
12 22
12 22
12 22
12 22
12 22
12 22
12 22
12 22
12 22
12 22
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
2" C
4" C
4" C4" C
4" C
13 1 1
S AND T
CLOSET
W232
126.T-403
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM W232
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONESCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 11 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 13 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 14 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 15 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 16 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 17 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 19 CLEAN UP AND PAINT TR ROOM.
STEP 20 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
126.T-403A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
SCALE: NONE
9 16
9 16
9 16
9 16
9 16
9 16
9 16
9 16
9 16
11 16
9 16
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
TO BE REPLACED.
NEW BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL 400
SERIES DRAWING.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
9 NEW 2U 48 PORT PATCH
PANEL (CAT 6A) FEEDING
BUILDING 126 2ND FLOOR.
2" FLEX2" C
2" FLEX
2" FLEX
1" FLEX
1" FLEX
1" FLEX
1" FLEX
2" FLEX
1" FLEX
126.T-404
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM W220
TELE AND SIG
CLOSET
W220
SCALE: 1/4" = 1' - 0" NORTH
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA 4 POST RACKS
WITH VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO
REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
KEY NOTES FOR DETAIL 1
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 2' 4' 8'
SCALE: 1/4" = 1'-0"
PROPOSED SEQUENCE OF WORK (T&E) FOR A
TYPICAL TR ROOM (EXCEPT TR313 BUILDING 1)
STEP 1 REMOVE CEILING AND GRID AND
TEMPORARILY SUPPORT THE EXISTING
LIGHT FIXTURE, HVAC DIFFUSER AND
SMOKE DETECTOR.
STEP 2 INSTALL LIGHT FIXTURE AND QUAD
RECEPTACLE (WHERE APPLICABLE).
REATTACH SMOKE DETECTOR.
STEP 3 INSTALL EZ PATH FOR NEW HORIZONTAL
CABLE ENTRY FROM EUD.
STEP 4 INSTALL SLOPED LADDER RACK
FROM EZ PATH ENTRY POINT TO EXISTING
CABLE LADDER RACK.
STEP 5 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 6 INSTALL WALL MOUNTED J-HOOKS ALONG
CORRIDOR ALONG MAIN CABLE ROUTE.
STEP 7 INSTALL PENDANT J-HOOKS ALONG CABLE
PATH FROM CORRIDOR TO EACH ROOM.
STEP 8 INSTALL EUD CABLES FROM TR TO THE
CORRIDORS ALONG MAIN CABLE ROUTE.
COIL UP CABLES AT EACH TAKE OFF POINT
TO INDIVIDUAL ROOMS AND LEAVE IT
ABOVE CEILING.
STEP 9 SCHEDULE A GROUP OF ROOMS FOR
INSTALLATION OF NEW FACEPLATE WITH
THREE RJ45 JACKS.
STEP 10 PULL OUT THE EXISTING RJ45 FACEPLATE
AND LET IT HANGING OUT TEMPORARILY.
STEP 11 TEST AND CERTIFY THE CABLE BY A
GROUP OF ROOMS TBD AND SCHEDULED.
STEP 12 TERMINATE AND INSTALL RJ45 JACKS AT
TR ROOM AND AT EUD FACEPLATE.
STEP 13 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW EUD FACEPLATE.
STEP 14 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 15 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 16 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 17 REMOVE ASSOCIATED EXISTING PATCH
PANEL FORM THE DATA RACK.
STEP 18 REPEAT STEP 9 TO STEP 17 UNTIL ALL THE
ROOMS HAVE BEEN COMPLETED.
STEP 19 CLEAN UP AND PAINT TR ROOM.
STEP 20 INSTALL TEMPERATURE AND HUMIDITY
SENSOR.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
126.T-404A
TELECOMMUNICATIONS
RACK ELEVATIONS
SCALE: NONE
RACK EQUIPMENT
1 1U FIBER HOUSING
2 1U CISCO 3850
3 48 PORT ANGLED PATCH PANEL
4 UPS "APCSMX+2000" TO BE REMOVED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
SCALE: NONE
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
KEY NOTES
EXISTING PATCH PANEL AND 2U MANAGER TO BE REMOVED
AFTER NEW 48 PORT PATCH PANEL IS IN PLACE (HATCH
ITEMS) UN HATCH ITEMS TO REMAIN.
QUANTITY OF 48 PORT PATCH PANEL SHOWN IS INCLUSIVE
OF 15% ADDITIONAL PATCH PANEL FOR FUTURE USE.
TO BE REPLACED BY ELECTRICAL CONTRACTOR.
BY ELECTRICAL CONTRACTOR SEE E 400 SERIES DRAWINGS.
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A (WHITE, GRAY AND BLUE) IN NEW CAT6A COMPATIBLE
JACKS ON NEW FACEPLATE AT EACH EUD OUTLET AND
LABEL IT AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATIBLE RJ45 JACKS AND NEW CAT6A COMPLIANT 48
PORT PATCH PANEL. EACH CABLE TO EUD OUTLETS SHALL
BE TESTED AND CERTIFIED BY CABLE MANUFACTURER’S
CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCHPANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE WILL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVINF EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
5 NEW 2U 48 PORT PATCH
PANEL (CAT 6A) FEEDING
BUILDING 126 2ND FLOOR.
6 NEW UPS VERTIV
ELEVATION 1 AND 2
ELEVATION 1 AND 2
5 5
5 5
5 5
5 5
5 5
5 5
5 5
RK-D03RK-C03 RK-E03
R K
E
R K
E
E L E
R K
E
R K
E
R K
R K
G
R K
R K
R K
R K
R K
L
R K
L
R K
L
R K
L
R K
L
4" C
4" C
6D
6D
6D
6D
6D
6D
6D
6D
4 4
6D
6D
6D
6D
6D
6D
6D
6D
6D
6D
6D
SERVER
CABINETS
TYPICAL
WEST IT
RACKS
6D
6D
6D 6D 6D 6D 6D
6D 6D
6D 6D
6D
6D
6D
6D
6D
6D 6D 6D
6D 6D 6D
6D
6D 6D 6D
6D
6D
46D
6D
6D 6D 6D
6D 6D 6D
6D
6D
6D
6D
6D
6D
EAST IT
RACKS
RK-401
RK-402
RK-402
6D
6D
6D
8TYPICAL
FOR
TR ROOM
SERVER ROOM
E221
126.T-405
TELECOMMUNICATIONS
ENLARGED PLAN - TR ROOM
SERVER ROOM E221
SCALE: 1/4" = 1' - 0" NORTH
PROPOSED SEQUENCE OF WORK
FOR SERVER ROOM RACK
STEP 1 POPULATE AVAILABLE SPACE IN EXISTING
RACK WITH NEW 48 PORT PATCH PANEL
CAT 6A COMPLIANT.
STEP 2 INSTALL NEW CAT 6A ON EXISTING CABLE
TRAY FROM EXISTING RACKS TO 6-PORT
RJ45. MOUNT 6 PORT ON EXISTING MULTI
RACEWAY.
STEP 3 TEST AND CERTIFY THE CABLE.
STEP 4 TERMINATE AND INSTALL RJ45 JACKS AT
RACK AND AT 6 PORT BOX.
STEP 5 VALB OIT TO CROSS CONNECT NEW 48
PORT PATCH PANEL TO CISCO SWITCH
AND ACTIVATE THE NEW PORTS.
STEP 6 VALB OIT TO SWITCH THE EUD DEVICE
FROM OLD FACE PLATE TO NEW
FACEPLATE.
STEP 7 EUD DEVICE ARE NOW CONNECTED TO
NEW CABLING.
STEP 8 PULLOUT AND REMOVE EXISTING DATA
CABLE FORM THE EUD TO TR ROOM
EXISTING PATCH PANEL.
STEP 9 REMOVE ASSOCIATED EXISTING PATCH
PANEL FROM THE DATA RACK.
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO REMAIN.
EXISTING TELECOMMUNICATIONS GROUND BUS BAR (TGB) TO
REMAIN.
EXISTING 12”W LADDER RACK MOUNTED AT 84" AFF AND FIXED
TO TOP OF EQUIPMENT RACKS TO REMAIN (TYPICAL).
EXISTING POWER RACEWAY TO REMAIN.
EXISTING FIBER TDV BOX. NEW TWO 24 STRAND SM FIBER TO
THIS BOX FROM MDF ROOM W50. EXTEND ONE 24 STRAND
INTO EAST RACK INTO NEW SEICOR PATCH PANEL MOUNTED
ON RACK & EXTEND SECOND 24 STRAND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .