Attachment A4_Drawing 4 of 9.pdf
PDF 26 MB Posted
- Attached to
- Z2DA--EHRM Long Beach, 600-20-120, Construction Federal contract opportunity
- Solicitation number
- 36C26221B0004
About this file
This document provides notice of an upcoming solicitation for construction services. The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 22 will issue an Invitation for Bid on or around April 12, 2021 via beta.SAM.gov to perform construction work for Project 600-20-120, Electronic Health Record Modernization Infrastructure Upgrades at the VA Long Beach Healthcare System located at 5901 E. 7th Street, Long Beach, CA 90822. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The project is set aside 100% for Service-Disabled Veteran-Owned Small Businesses listed in the Vendor Information Pages database. The North American Industry Classification Code is 236220 for commercial and institutional building construction with a size standard of $39.5 million. The magnitude of the construction project is estimated between $10,000,000 to $20,000,000. A site visit will be scheduled for potential offerors.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PENETRATIONS NOTE
- M -
MAIN CIRCUIT BREAKER
NEUTRAL
MCB
N
- N -
PHASE
POWER
PANEL
PWR
PNL
- R -
- P -
ROOM
RECEPTACLE
RM
RECEPT
- B -
AMPERE
- A -
A
- C -
CIRCUIT
CIRCUIT BREAKER
BUILDING
CONDUIT
BLDG
CKT
C
CB
- E -
EG
- G -
GROUNDG, GND
EQUIPMENT GROUND
ABBREVIATIONS
VOLT OR VOLTAGE
VOLT AMPEREVA
V
- V -
WATTW
- W -
- J -
- K -
KILOVOLT AMPERE
KILOVOLT
JUNCTION BOX
KV
KW
KVA
JB
KILOWATT
ABOVE FINISHED FLOORAFF
UON UNLESS OTHERWISE NOTED
- U -
E1.01
AC
X
MOTOR TYPE
REVISION
RISER TAGPOINT OF CONNECTION
SCHEDULE NUMBER
# LIGHT FIXTURE TYPE
INDICATES DETAIL NUMBER
SHEET NUMBER TO FIND DETAIL
SPECIFIC NOTE/
POINT OF DISCONNECTION
REFERENCE NOTE
ANNOTATIONS
EWC ELECTRIC WATER COOLER
T-001
TELECOMMUNICATIONS
GENERAL NOTES: VETERANS ADMINISTRATION HAS AWARDED CERNER A CONTRACT TO TAKE OVER THE MANAGEMENT OF VETERANS HEALTHCARE RECORDS, REPLACING THE LEGACY VISTA ELECTRONIC HEALTH RECORD (EHR) SYSTEM AND MERGING THE NEW CERNER EHR SYSTEM WITH THAT OF THE DEPARTMENT OF DEFENSE. CERNER HAS PUBLISHED A GUIDELINE “OEHRM REQUIREMENT SPECIFICATION VERSION 1.0” THAT DETAILS REQUIREMENTS FOR CABLING AND DATA TRANSMISSION FOR THE ELECTRONIC HEALTH RECORD MODERNIZATION SYSTEM. THE EXISTING IT INFRASTRUCTURE IS NOT CAPABLE OF MEETING THE REQUIREMENT.
THE MAIN OBJECTIVE OF THIS PROJECT IS TO UPGRADE THE EXISTING IT INFRASTRUCTURE TO MAKE IT COMPATIBLE WITH AND MEET REQUIREMENTS OF THE
CERNER EHRM.
THERE ARE 17 BUILDINGS AND TOTAL OF 45 TR (TELECOMMUNICATION ROOM) INVOLVED. IN ADDITION, MDF ROOM AND MAIN SERVER ROOM WILL REQUIRE SOME ADDITION OF FIBER AND CERNER EQUIPMENT. ALL TR ARE NETWORKED WITH THE MAIN SERVER ROOM AND MDF ROOM USING SINGLE MODE FIBER. TELECOM RACK WITH 48 PORT PATCH PANELS ARE ALSO INSIDE THE MDF ROOM AND SERVER ROOM. ALL CABLES ON THESE RACKS ARE TO BE REPLACED WITH CAT 6A CABLES AND CAT6A COMPLIANT RJ45 JACKS. ALL CABLES SHALL BE TESTED AND CERTIFIED BY CABLE MANUFACTURER'S CERTIFIED CABLE CONTRACTOR.
LISTED BELOW ARE THE DETAILED IT REQUIREMENT SCOPE OF THE PROJECT.
1. REPLACE EXISTING COPPER CABLES WITH CAT6A AS SHOWN.
2. INSTALL NEW TWO 24 STRAND SINGLE MODE AIR BLOWN FIBER FROM MDF TO SERVER ROOM BUILDING 126. TWO-24 STRAND SINGLE MODE FIBER SHALL BE INSTALLED IN EXISTING CELL TUBE WHICH HAS BEEN TESTED AND IS CLEAR OF ANY OBSTRUCTION. PLEASE SEE CELL TUBE RISER DIAGRAM SHOWING THE ROUTING OF THE NEW FIBER. TWO 24 STRAND SINGLE MODE FIBER TO BE AIR BLOWN AND AS MANUFACTURED BY SUMITOMO. 24 STRAND SINGLE MODE FIBER TO BE TERMINATED ON THE WEST RACK AND 24 STRAND ON THE EAST RACK OF SERVER ROOM E221. CONNECTOR TYPE TO BE LC.
3. PROVIDE 15% MORE DATA DROPS THAN WHAT IS REQUIRED PROJECT WIDE AND AS SHOWN ON PLANS. ADD NEW EUDS AT LOCATIONS DETERMINED BY CEDT DURING CONSTRUCTION ACTIVITIES AND AFTER COMPLETION OF CD (POST 100% SUBMISSION).
4. PROJECT REQUIRES 1 GbE CONNECTIVITY TO DESKTOP AND OTHER EUDS AND AT EACH NEW WALL JACKS.
5. REMOVE EXISTING LAY-IN CEILING IN ALL TR ROOMS.
6. PROVIDE FOUR NEW FOUR POST RACKS IN EXPANDED PORTION OF RM 313 BLDG 1 & ONE 4-POST RACK FOR BIOMED IN TR 189 BLDG. 164.
7. NEW PATCH PANEL TO BE CAT6A 48 PORT FLAT (NON-ANGLED) PATCH PANEL AND COMPLY WITH EIA/TIA 310-E. PATCH PANELS TO HAVE HOLES FOR RJ45 JACKS ALIGNED IN TWO HORIZONTAL ROWS PER PANEL. PROVIDE HORIZONTAL AND VERTICAL CABLE MANAGERS. HORIZONTAL TO BE PLACED BETWEEN EACH 48 PORT PATCH PANEL AND VERTICAL PLACED BETWEEN EACH FOUR POST RACKS AND ON EACH END OF FINAL ASSEMBLY.
8. ALL PATCH PANELS SHALL BE LABELED PER IT-SOP #07-013.
9. INSTALL NEW LADDER RACK IN TR313A BLDG 1 AND CONNECT TO EXISTING.
10. NON-VA EQUIPMENT IN TR (GUEST WIRELESS SWITCHES, GUEST WIRELESS PANELS, BIOMEDICAL/PATIENT MONITORING SWITCHES, BIOMEDICAL/PATIENT MONITORING PANELS, ETC) ARE NOT INCLUDED IN THIS CONTRACT.
11. REPLACE ALL BIOMEDICAL CABLING THAT DOES NOT MEET CERNER EHRM GUIDELINES SHALL BE REPLACED AS PART OF THIS CONTRACT. ALL
BIOMEDICAL CABLING WILL BE ORANGE IN COLOR AS SHOWN ON THESE DRAWINGS.
12. ALL INSTALLED FIBER CABLE SHALL BE TERMINATED. UN-TERMINATED FUTURE CAPACITY FIBER CABLE NOT PERMITTED.
13. FIBER CONTRACTOR SHALL BE CERTIFIED SUMITOMO INSTALLER.
14. GOVERNMENT TO INSTALL SFP (IN EXISTING SINGLE MODE FIBERS AS REQUIRED) TO REDUCE THE SIGNAL STRENGTH DUE TO SHORT LENGTH OF PATH FOR BOTH NEW AND EXISTING FIBERS IN THE ENTIRE CAMPUS, INCLUDING 167T ROOM E110 AND BUILDING 168T ROOM 168T-00. SFP WILL BE
GOVERNMENT FURNISHED AND GOVERNMENT INSTALLED.
15. PROVIDE MOUNTING OF FIBER TERMINATION UNITS AT THE TOP OF EAST AND WEST EQUIPMENT RACK IN SERVER ROOM. THE UNIT SHALL ACCOMMODATE AT LEAST 48 (TOTAL) STRANDS OF SINGLE MODE FIBER, LC CONNECTORS. TERMINATION UNITS TO BE HIGHEST OEM APPROVED DENSITY OF FIBER LC TERMINATORS WHILE MAINTAINING HIGH LEVEL OF MANAGEABILITY. PROVIDE PROPER LC COUPLERS FOR EACH PAIR OF FIBER OPTIC CABLE LC
CONNECTORS.
16. PROVIDE AND INSTALLLC/LC PATCH CORDS OF MATCHING TYPE FOR EACH PAIR OF FIBER OPTIC STRANDS WITH CONNECTOR TO MATCH COUPLERS.
17. WORK WITH LOCAL OIT TO DEVELOP FIBER LABELING PLAN THAT IS COMPLIANT WITH ANSI 606-B AND CONSISTENT THROUGH OUT THE FACILITY. PRESENT THIS
PLAN AS PART OF 95% DESIGN PROCESS.
18. COPPER REPLACEMENT TO INCLUDE ALL CABLING RATED CAT5 AND BELOW THROUGHOUT THE FACILITY TO INCLUDE JACK/PATCH PANELS AT BOTH ENDS.
19. CAT5E AND GREATER, INCLUDING CORRESPONDING NETWORK HARDWARE AND TERMINATION UNITS MAY REMAIN IN PLACE WITH FOLLOWING EXCEPTION:
1. ALL COPPER CABLING ON FLOORS PROVIDING PERMANENT MOBILE OR TEMPORARY IMAGING SERVICES SHALL BE CAT 6A. SEE TABLE 2 ON T-001.
20. CAT3 CABLES THAT ARE USED FOR NON-VOIP PHONES SHALL REMAIN IN PLACE. THE REMAINDER OF THE CAT3 WILL BE DEMO AND REMOVED FROM EUDs TO TR
ROOM.
21. NEW CABLE PATHWAYS TO SUPPORT REPLACEMENT OF EXISTING DEFICIENT CABLES AND NEW CABLES ARE SHOWN. ANY DEVIATION FROM IT SHALL BE
DOCUMENTED AND SUBMITTED AS SHOP DRAWING.
22. ALL NEW CAT6A CABLES TO BE PLENUM RATED.
23. PROVIDE EACH NETWORK DROP WITH THREE PLENUM RATED CAT6A CABLES COLOR CODED IN GRAY/BLUE/WHITE WITH THE CORRESPONDING COLOR-CODED
GRAY/BLUE WHITE MODULAR JACK.
24. REPLACE JACKS AT EUDs JACK TO BE CAT6A COMPLIANT U.O.N.
25. PROVIDE CAT6A MODULAR JACKS CAPABLE OF ACCEPTING AND FUNCTIONING WITH OTHER MODULAR EG RJ11.
26. PROVIDE PATCH CORDS CONFORMING TO EIA/ECA 310-3 DIMENSIONS AND SUITABLE FOR MOUNTING IN STANDARD EQUIPMENT RACKS WITH 48 RJ45 JACKS
ALIGNED IN TWO HORIZONTAL ROWS PER PATCH PANEL.
27. CABLING SHALL BE COMBED AND DRESSED NEATLY.
28. LABEL ALL FACE PLATE PER IT-SOP #07-013 CABLE INSTALLATION LABELING AND TESTING.
29. CABLING FOR WAP AND DISTRIBUTED ANTENNA SYSTEM (DAS) ARE NOT PART OF THIS PROJECT.
30. PROVIDE DETAILED MOP. REFER TO SHEET G1003 FOR MINIMUM REQUIREMENTS FOR THE SEPARATE PHASING PLAN AND MOPS.
ABBREVIATIONS VA
EHRM ELECTRONIC HEALTH RECORD MODERNIZATION
CERNER INFORMATION TECHNOLOGY COMPANY
CEDT CERNER EHRM DEPLOYMENT TEAM
EUD END USER DEVICE
CIH CERTIFIED INDUSTRIAL HYGIENIST
LBVAMC LONG BEACH VA MEDICAL CENTER
MDF MAIN DISTRIBUTION FRAME
TR TELECOMMUNICATIONS ROOM
OIT OFFICE OF INFORMATION TECHNOLOGY
3D
3D
WALL MTD DATA OUTLET
W/3 CAT 6A DROPS
FLOOR MTD DATA OUTLET
W/3 CAT 6A DROPS
SEE DRAWING T-504
ABBREVIATIONS
SM
MM
SFP
ORL
OTDR
UTP
LAN
SINGLE MODE FIBER
MULTI MODE FIBER
SMALL FORM FACTOR PLUGGABLE TRANSCEIVER
OPTICAL RETURN LOSS
OPTICAL TIME DOMAIN REFLECTOMETER
UNSHIELDED TWISTED PAIR
LOCAL AREA NETWORK
EIA
TIA
OS1, OS2
OS2
ELECTRONIC INDUSTRIES ASSOCIATION
TELECOMMUNICATION INDUSTRY ASSOCIATION
TYPE OF SINGLE MODE FIBER
AIR BLOWN SINGLE MODE FIBER
1. PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS IN ACCORDANCE WITH THE SPECIFICATIONS AND THE PROJECT SCHEDULE. NO INSTALLATION SHALL PROCEED WITHOUT APPROVAL OF THE SHOP
DRAWINGS.
2. MINIMAL STORAGE WILL BE AVAILABLE ON THE CONSTRUCTION SITE. CABLING CONTRACTOR
RESPONSIBLE FOR RECEIVING AND STORING MATERIALS AND FOR COORDINATING MATERIALS
DELIVERY TO THE JOB-SITE.
3. COMMUNICATIONS CABLES INSTALLED SHALL BE INSTALLED IN ACCORDANCE WITH THE
REQUIREMENTS DETAILED HEREIN AND SHALL BE FREE OF KINKS, TWISTS, SHARP BENDS,
UNNECESSARY LOOPS OR WORKMANSHIP DEFECT.
4. PROPERLY SEAL WALL PENETRATIONS THROUGH FIRE RATED WALL & FLOOR USING EZ PATH
DETAILED ON T-504.
5. RUN OPEN CABLE FOR EACH SYSTEM IN SLEEVES, J-HOOKS DEDICATED FOR THE SYSTEM.
6. SEPARATE AND BUNDLE CABLE BY SYSTEM.
7. MAINTAIN EIA/ TIA RECOMMENDED SEPARATIONS BETWEEN CABLING OF DIFFERENT SYSTEMS. 6''
FROM LIGHT FIXTURES. 24'' FROM 480V & 12'' FROM 208V.
8. MAINTAIN RECOMMENDED SEPARATIONS BETWEEN CABLING AND INTERFERENCE PRODUCING
ELECTRICAL DEVICES SUCH AS POWER CABLING, ELECTRICAL PANELS, FLUORESCENT LIGHTS,
BALLAST RELAYS, ELECTRIC MOTORS, MOTOR CONTROLLERS, VFD, TRANSFORMERS AND OTHER
ELECTROMAGNETIC DEVICES. SEE NOTE 7.
9. WHERE CABLE IS OPEN ON J-HOOK SYSTEM, RUN PARALLEL OR PERPENDICULAR TO WALLS AND
SUPPORT A MINIMUM OF EVERY 5 FEET USING APPROVED J-HOOKS.
10. ALL CABLE HOOKS AND OTHER CABLE SUPPORT DEVICES SHALL BE ATTACHED TO THE BUILDING
STRUCTURE IN ACCORDANCE WITH CODES AND DETAILS SHOWN ON THESE SET OF DRAWINGS.
11. NO OPEN CABLE SHALL BE DRAPED OVER OR SUPPORTED ON PLUMBING, ELECTRICAL, MEDICAL GAS, FIRE SUPPRESSION, OR OTHER PIPING OR DUCTWORK.
12. ALL CABLES TO BE PLENUM RATED.
13. THE CABLE LENGTH FROM THE TERMINATION POINT IN TR TO EUD IN THE WORK AREA SHALL NOT
EXCEED 295FEET INDEPENDENT OF MEDIA TYPE.
14. VISUALLY INSPECT CONNECTIONS ON CABLE TO ENSURE PROPER COMPLIANCE WITH EIA/TIA 568B
TERMINATION.
15. INSPECT ALL EXPOSED PORTIONS OF THE CABLE TO INSURE A MINIMUM OF 4 TIMES THE CABLE
DIAMETER BEND RADIUS AT ANY POINT.
16. ENSURE NO CABLE BUNDLES OR TIE POINTS DISPLAY KINKS, SHARP BENDS, CREASING OR
DEFORMATION OF OUTER SHEATH OR SIGNS OF EXCESSIVE PULLING FORCE.
17. IN TR CABLES SHOULD BE COMBED AND DRESSED UP BEFORE BUNDLING AND USING VELCRO STRAPS.
ZIP TIES OR TWIST TIES SHALL NOT BE USED. STRAPS SHALL BE SPACED AT APPROPRIATE DISTANCE
TO ENSURE CABLES ARE HELD TOGETHER.
18. ON THE RACK THE CABLES SHOULD BE DIVIDED IN THE MIDDLE, WHERE HALF FLOWS TO THE LEFT
AND HALF FLOWS TO THE RIGHT.
19. ALL CABLING SHALL BE INSTALLED BY CABLE MANUFACTURER'S CERTIFIED
INSTALLER.
20. BEFORE ACCEPTANCE OF ANY NEWLY INSTALLED COMMUNICATIONS WIRING, THE CABLE WILL
UNDERGO SEVERAL LEVELS OF TESTING TO ENSURE THAT ALL MATERIALS AND INSTALLATION
CONFORM TO STANDARDS INCLUDED IN THE DRAWINGS AND SPECIFICATIONS. THIS WILL INCLUDE BOTH THE UTP AND FIBER OPTICS SYSTEMS. FAILURE TO MEET THE DRAWINGS AND SPECIFICATIONS REQUIREMENTS SHALL CONSTITUTE REASON TO REJECT THE INSTALLATION UNTIL ALL PROBLEMS
ARE SOLVED.
21. ALL RECORDED TESTING RESULTS SHALL REMAIN IN THE APPROPRIATE TR. TEST BOTH CABLES AND THEIR CORRESPONDING CONNECTING SYSTEMS AS A WHOLE UNIT TO ENSURE SYSTEM INTEGRITY.
22. TEST ALL FIBER OPTICS CABLE AND COMPONENTS COMPRISING THE BACKBONE SYSTEM. TEST ALL
FIBER STRAND IN BOTH DIRECTION. USE OTDR OPERATING AT BOTH 1310 AND 1550 NM
WAVELENGTHS.
23. PHYSICAL LABELING FOR ALL CABLES AND RELATED COMPONENTS IS REQUIRED COMPONENTS WILL DEPEND HEAVILY ON ADHERING TO A LOGICAL LABELING SCHEME TO ENABLE EXPEDIENT PATCH
PANEL, DATA JACK AND SWITCH PORT IDENTIFICATION.
24. PROVIDE ALL NEW CABLING IN THE BUILDING S WITH AN AS-BUILT ELECTRONIC AND PAPER FORMATS, FOR THE CABLE PLANT. EACH TR WIRING CLOSETS CABLE PLANT AS-BUILT SHALL BE INSTALLED IN A
FOLDER ON THE BACK OF THE DOOR SECURED IN A HOLDER ATTACHED TO THE DOOR.
25. CABLING DIAGRAM: SUBMIT, FOR APPROVAL, A COMPLETE CABLING DIAGRAM. THE DIAGRAM SHALL BE BASED ON THE DRAWING INCLUDED IN THE CONSTRUCTION DOCUMENTS. IT SHALL BE UPDATED TO SHOW QUANTITIES AND PART NUMBERS FOR ALL COMPONENTS INCLUDING PATCH PANELS, CABLE, SERVER CABINETS AND EQUIPMENT RACKS AND ALL OTHER ASSOCIATED COMPONENTS. INCLUDE THE
FOLLOW:
1). DETAIL AND ELEVATION DRAWINGS: PROVIDE TR RACK ELEVATION, ENLARGED TR
ROOM LAYOUT.
2). BUILDING COMPOSITE FLOOR PLANS: PROVIDE BUILDING FLOOR PLANS SHOWING END USER DEVICE (EUD) OUTLET LOCATIONS AND CONFIGURATION, TYPES OF JACKS, DISTANCE FOR EACH
CABLE, AND CABLE ROUTING LOCATIONS.
3). FLOOR PLANS TO INCLUDE:
a. FINAL ROOM NUMBERS AND ACTUAL BACKBONE CABLING AND PATHWAY LOCATIONS
(HORIZONTAL AND VERTICAL) AND LABELING.
b. RISER FLOOR PENETRATION / DATA POLE LOCATION AFTER SCANNING THE FLOOR FOR
REBARS.
c. INPUTS AND OUTPUTS OF EQUIPMENT IDENTIFIED ACCORDING TO LABELS INSTALLED ON
CABLES AND EQUIPMENT.
d. DEVICE LOCATIONS WITH LABELS.
e. EZ PATH SLEEVES.
f. WIRING DIAGRAM.
g. LABELING AND ADMINISTRATION DOCUMENTATION.
METHOD OF PROCEDUREMOP
SPECIFIC NOTE/
REFERENCE NOTE
DESCRIPTION OF THE PROJECT
FIRE PROTECTION WALL SYMBOLS
POWER SYMBOLS
GROUND BUS BAR (TGB)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i l e
P a t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: PM EW/JB
A
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
MOUNTEDMTD
THRU THROUGH
- T -
WAP WIRELESS ACCESS POINT
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
3D
CEILING PENDANT
MOUNTED DATA OUTLET
W/3CAT 6A DROPS
TABLES
T-002
FAILED SINGLE MODE FIBER
STRAND LIST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: PM EW/JB
A
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
164 166165
TELECOMMUNICATIONS SITE PLAN (REFERENCE ONLY)
SCALE: 1/128" = 1' - 0" NORTH
TS-001
TELECOMMUNICATIONS SITE PLAN
AND DRAWING LIST
TELECOMMUNICATION DRAWING LIST
T-001 TELECOMMUNICATIONS SYMBOL LIST, GENERAL NOTES ABBREVIATIONS AND FIBER
INFRASTRUCTURE RISER
T-002 FAILED SINGLE MODE FIBER STRAND LIST
TS-001 TELECOMMUNICATIONS SITE PLAN AND DRAWING LIST
1.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
1.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
1.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
1.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
1.T-141 TELECOMMUNICATIONS FOURTH FLOOR PLAN
1.T-151 TELECOMMUNICATIONS FIFTH FLOOR PLAN
2.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
2.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
2.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
2.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
5C.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
6.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
7.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
7.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
7.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
7.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
8.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
8.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
8.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
8.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
50.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
126.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
126.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
126.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
126.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
126.T-141 TELECOMMUNICATIONS FOURTH FLOOR PLAN
126.T-151 TELECOMMUNICATIONS FIFTH FLOOR PLAN
126.T-161 TELECOMMUNICATIONS SIXTH FLOOR PLAN
126.T-171 TELECOMMUNICATIONS SEVENTH FLOOR PLAN
126.T-181 TELECOMMUNICATIONS EIGHTH FLOOR PLAN
126.T-191 TELECOMMUNICATIONS NINTH FLOOR PLAN
126.T-1101 TELECOMMUNICATIONS TENTH FLOOR PLAN
126.T-1111 TELECOMMUNICATIONS ELEVENTH FLOOR PLAN
126A.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
126A.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
126A.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
126A.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
138.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
138.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
138.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
149.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
149.T-112 TELECOMMUNICATIONS FIRST FLOOR PLAN
150.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
150.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
150.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
160.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
161.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
164.T-111 TELECOMMUNICATIONS FIRST FLOOR
164.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
164.T-131 TELECOMMUNICATIONS THIRD FLOOR PLAN
165.T-101 TELECOMMUNICATIONS BASEMENT FLOOR
165.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
165.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
166.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN
166.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN
1.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 103
1.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
1.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 313 – DEMO WORK
1.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
1.T-403 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 313 – NEW WORK
2.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM N108A
2.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
5C.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM E108
5C.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
6.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 34
6.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
8.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 111
8.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
50.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM101B
50.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-401 TELECOMMUNICATIONS ENLARGED PLAN MDF ROOM W50
126.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W128V
126.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-403 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W232
126.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-404 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W220
126.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-405 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM SERVER ROOM E221
126.T-405A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-405B TELECOMMUNICATIONS RACK ELEVATIONS
126.T-406 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 321
126.T-406A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-407 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 326A
126.T-407A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-408 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W428
126.T-408A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-409 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W416
126.T-409A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-410 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W521A
126.T-410A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-411 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W520B
126.T-411A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-412 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 627
126.T-412A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-413 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 727
126.T-413A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-414 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 827
126.T-414A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-415 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 813B
126.T-415A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-416 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W923C
126.T-416A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-417 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W11211
126.T-417A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-418 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM W1027
126.T-418A TELECOMMUNICATIONS RACK ELEVATIONS
126.T-419 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM E1013B
126.T-419A TELECOMMUNICATIONS RACK ELEVATIONS
126A.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM OP-04
126.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
126A.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 1N111
126.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
126A.T-403 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 2N107
126.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
126A.T-404 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM OP-301B
126.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
138.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 139A
138.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
149.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 109A
149.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
149.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM T128A
149.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
150.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM R-6
150.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
150.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM T128A
150.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
150.T-403 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM U120
150.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
150.T-404 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM V110A
150.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
160.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 126
160.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
161.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 100A
161.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 140
164.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-402 TELECOMMUNICATIONS ENLARGED PLAN ROOM 189
164.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-403 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 223
164.T-403A TELECOMMUNICATIONS RACK ELEVATIONS
164.T-404 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 323
164.T-404A TELECOMMUNICATIONS RACK ELEVATIONS
165.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM C135
165.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
165.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM C211
165.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
166.T-401 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM F121
166.T-401A TELECOMMUNICATIONS RACK ELEVATIONS
166.T-402 TELECOMMUNICATIONS ENLARGED PLAN TR ROOM F208
166.T-402A TELECOMMUNICATIONS RACK ELEVATIONS
T-501 TELECOMMUNICATIONS DETAILS
T-502 TELECOMMUNICATIONS DETAILS
T-503 TELECOMMUNICATIONS DETAILS
T-504 TELECOMMUNICATIONS DETAILS
T-601 INFRASTRUCTURE FIBER RISER BLDG 8, 161 AND 126
LEGEND
BUILDING IN SCOPE
BLDG.
BLDG.
126A
MDF
W50
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: PM EW/JB
A
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
C
D
20-SCE-04
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
0' 64' 128' 256'
SCALE: 1/128" = 1'-0"
ELEVATOR
MACHINE RM
B-031A
MECH RM
STORAGE
NOURISH
B-028
CART WASHER
AREA
CO
RR
ID
OR
CC
-B
-1
CORRIDOR
CC-B-5
CO
NN
EC
TI
ON
CO
RR
ID
OR
CC
-B -6
CO
RR
ID
OR
CC
-B
-1
ENTRANCE
MED MEDIA
ENTRANCE
MAIL RM
BOILER
CHAMBER
STORAGE
TRASH
COMPACTOR
AREA
TRASH
COMPACTOR WELL
LAB STORAGE
B-037
ELEVATOR
S-10
ELEVATOR
S-9
EMS
SUPV
OFFICE
EMS SUPV
OFFICE
B-034
PHARMACY
STORAGE
B-015
STORAGE
B-016
GENERAL
STORAGE
B-017
B-019B
CHIEFS OFFICE
B-019A
B-019
TELE CLOSET
STAIR
CORRIDOR
C-B-9
ELEVATOR
P-7
ELEVATOR
P-8
WORK SPACE
B-22B
SEC/RECEPT
B-029
PASSENGER
ELEVATOR LOBBY
PHOTO STUDIO
B-021
FINISHING
RM
B-22D
STORAGE
B-22A
COMPUTER
RM
B-22C
OFFICE
B-22E
CLASS RM
B-22F
CO
RR
ID
OR
C- B-
8 CLASS RM
B-23
CONTROL RM
B-23A
GENERAL
STORAGE
B-24
MED/GRAPHICS DESIGN
OFFICE
B-25
GRAPHIC
ARTIST
B-26
EQUIP
CHECKOUT
B-027MI
CR
OS
CO
PE
RM
B-
7BCHIEF
B-029A
HAC
STORAGE
B-031
GENERAL
STORAGE
B-013
GENERAL
STORAGE
B-012
ENV CARE
SUPV
OFFICE
B-011
RE
CO
RD
MG
MT
OF
FI
CE
B-
9C
BOILER RM
B-014
CO
RR
ID
OR
CC
-B
-1
4 SUPPLY RM
35B
35A
STORAGE
SUPPLY AND
EQUIPMENT
ISSUE
MAIL RM
HAC STORAGE
ELECTRICAL
PANEL
SVC RM ELEVATOR
LOBBY
VE
RY
D
AR
K
RM
B-
7A
B-014A
B-014B
CENTER
DATA CABLES GOING
UP TO FLOOR ABOVE
SEE 1.T-111
EXISTING
TDU-01-31A
ROOM 31A
SEE
7.T-101
FOR
CONTINUATION
NEW 2 CELL TUBE
W/ 24 STRAND SINGLE
MODE FIBER OS2 (SUMITOMO)
ABOVE CEILING
(FROM MDF W50 TO TR 100A BLDG. 101)
DATA CABLES GOING
UP TO FLOOR ABOVE
SEE 1.T-111
SCALE: 1/8" = 1' - 0" NORTH
1.T-101
TELECOMMUNICATIONS
BASEMENT FLOOR PLAN
BUILDING 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
SCALE: 1/8" = 1'-0"
0' 4' 8' 16'
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
SCALE: NONE
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD SHALL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE SHALL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACKS WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
RECOMMENDED ROUTING OF NEW CAT6A BUNDLED CABLE
ON PENDANT MOUNTED U-HOOKS. SEE DETAILS ON
STRUCTURAL DRAWING.
NEW PLENUM RATED 3-CAT6A (GRAY, BLUE WHITE) DROP IN
FREE AIR WITHIN WALL CAVITY. SUPPORT USING WALL
MOUNTED J-HOOKS OR SUSPENDED FROM STRUCTURE
ABOVE. SEE DETAIL ON DRAWINGS T-501, T-503 & T-504.
NEW FACEPLATE WITH GRAY, BLUE AND WHITE CAT6A
COMPLIANT RJ45.
NOT USED.
FOR FLOOR MOUNTED DATA OUTLET PROVIDE TEMPORARY
DATA CABLING. REMOVE EXISTING CABLE FROM UNDER
FLOOR FEED & INSTALL NEW RJ45 JACK.
PROVIDE MULTI RACEWAY MTD EUD AT LAB BENCHES AND
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTI RACEWAY & INSTALL NEW CAT 6A CABLES &
ASSOCIATED RJ 45 JACKS.
PROVIDE NEW EUD AT EXISTING MULTIRACEWAY. PROVIDE
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTIRACEWAY AND INSTALL NEW CAT6A CABLES AND
ASSOCIATED RJ45 JACKS AND FACEPLATE.
FOR PREWIRED SYSTEM FURNITURE PROVIDE TEMPORARY
CABLE TO EUD AT SYSTEMS FURNITURE. PULL OLD CABLES OUT
AND INSTALL NEW CABLES AND RJ45 JACK (CAT 6A COMPLIANT
AND ASSOCIATED NEW FACEPLATE).
BEFORE DISCONNECTING PROVIDE TEMPORARY DATA DROP FOR
NURSE STATION. REMOVE EXISTING CABLE AND INSTALL NEW IN
THE EXISTING CONDUIT ABOVE THE CEILING O FLOOR BELOW.
EXISTING FIBER BOX TDU-126-E221 WITH TUBE CELL GOING TO
MDF FROM W50. INSTALL 2-24 STRAND SINGLE MODE AIR BLOWN
FIBER FROM MDF TO THIS BOX AND EXTEND 24 STARND TO EACH
OF THE EAST AND WEST RACKS. TERMINATE IN FIBER PANEL
USING LC CONNECTOR.
(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)
KEY NOTES
7.
8.
9.
STAFF
WOMEN
112A
MECH
SHAFT
DOC
CONN
CORRIDOR
MC-C6
S101A
STAIR
CORRIDOR
C-1-2
CORRIDOR
C-1-4
CORRIDOR
C-1-5
CORRIDOR
C-1-6
CORRIDOR
C-1-1
W
AI
TI
NG
A
RE
A
MEN REST
RM
N104
HAC
N103
MECH
SHAFT
CLOSET
IT
STORAGE
N166
SVC ELEVATOR
LOBBY
ELEVATOR
S-9
ELEVATOR
S-10
NURSE CASE
MGR
S116
NURSE CASE
MGR
116A
NURSE
S117
STAFF LOUNGE
GROUP RM
PSYCH
RN CARE
CO-ORDR OFFICE
118A
MEDICATION
RM
DOC OFFICE
S120
WAITING AREA
S123
NURSE
PSYCH
S122
PSYCH
OFFICE
S124
TELECOM
STAIR
CORRIDOR
C-1-3
ELEVATOR
P-8
ELEVATOR
P-7
PASSENGER
ELEVATOR
ELOBBY
RN CARE
CO-ORDR
S101L
CONFERENCE
RM
S101M
OFFICE
S101K
CASE MGR
OFFICE
S101J
EXAM/
TREATMENT RM
S102G S
PATHOLOGIST
TRAINEE
S102F
STAIR
SPEECH
PATHOLOGIST
OFFICE
S102D
WAITING
S102C
CHIEF
SPEECH
PATHOLOGY
S102B
SPEECH
PATHOLOGIST
S102A
STAFF
PSYCHIATRIST
S101H
OFFICE
S101G
OFFICE
S101F
DOCTORS OFFICE
S101E
NURSE
CASE MGR
OFFICE
S101D
WAITING
AREA
S101
DIABETIC
S101C
ADMIN
NURSE
OFFICE
S101B
HAC
SOCIAL
WORKER
COUPLES
OFFICE
S105
OF
FI
CE
S1
-1EXAM RM
S106
NURSE
PRACTITIONER
S107
STAFF
PSYCHATRIST
S108
STAFF
PSYCHIATRISTS
EXAM RM
S109
OFFICE
S110
HAC
SOCIAL
WORKER
OFFICE
S114
OFFICE
S114A
PRIMARY CARE
NURSE
PRACTITIONER
S113
STAFF
MEN
NO 3
NO 2
FE
SOUND
BOOTH
CLASS RM
FAC
PEER
SUPPORT
OFFICE
S102E
IT
STORAGE
N166B
S123A
CENTERFEC
CORRIDOR
EMS SVC
N166A
C1-3A
SOLARIUM
CORRIDOR
C-1-7
DATA CABLES UP TO
FLOOR ABOVE
SEE 1.T-121
TO BLDG 7 SEE DRAWING
7.T-111, CAT 6A CABLES FROM BLDG. 7
TO TR 103 (ABOVE CEILING).
T-501
CAT 6A CABLES FROM BLDG. 7
FROM FLOOR ABOVE. SEE
DRAWING 1.T-121.
CAT 6A CABLES FROM BLDG. 2
FROM FLOOR ABOVE. SEE
DRAWING 1.T-121
FOR CONTINUATION
DATA CABLES UP TO
FLOOR ABOVE
SEE 1.T-121
DATA CABLES
FROM FLOOR
BELOW TO
FLOOR ABOVE
SEE 1.T-101 &
1.T-121 & DETAIL
T-501
DATA CABLES FROM FLOOR
BELOW TO FLOOR ABOVE
SEE 1.T-101 & 1.T-121 & DETAIL
SCALE: 1/8" = 1' - 0" NORTH
1.T-111
TELECOMMUNICATIONS FIRST
FLOOR PLAN
SEE DETAIL 1
SHEET 1.T-401
FOR ENLARGED PLAN
BUILDING 1
TR:103
SEE SHEET 2.T-111
FOR CONTINUATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
SCALE: 1/8" = 1'-0"
0' 4' 8' 16'
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD SHALL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE SHALL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACKS WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
RECOMMENDED ROUTING OF NEW CAT6A BUNDLED CABLE
ON PENDANT MOUNTED U-HOOKS. SEE DETAILS ON
STRUCTURAL DRAWING.
NEW PLENUM RATED 3-CAT6A (GRAY, BLUE WHITE) DROP IN
FREE AIR WITHIN WALL CAVITY. SUPPORT USING WALL
MOUNTED J-HOOKS OR SUSPENDED FROM STRUCTURE
ABOVE. SEE DETAIL ON DRAWINGS T-501, T-503 & T-504.
NEW FACEPLATE WITH GRAY, BLUE AND WHITE CAT6A
COMPLIANT RJ45.
NOT USED.
FOR FLOOR MOUNTED DATA OUTLET PROVIDE TEMPORARY
DATA CABLING. REMOVE EXISTING CABLE FROM UNDER
FLOOR FEED & INSTALL NEW RJ45 JACK.
PROVIDE MULTI RACEWAY MTD EUD AT LAB BENCHES AND
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTI RACEWAY & INSTALL NEW CAT 6A CABLES &
ASSOCIATED RJ 45 JACKS.
PROVIDE NEW EUD AT EXISTING MULTIRACEWAY. PROVIDE
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTIRACEWAY AND INSTALL NEW CAT6A CABLES AND
ASSOCIATED RJ45 JACKS AND FACEPLATE.
FOR PREWIRED SYSTEM FURNITURE PROVIDE TEMPORARY
CABLE TO EUD AT SYSTEMS FURNITURE. PULL OLD CABLES OUT
AND INSTALL NEW CABLES AND RJ45 JACK (CAT 6A COMPLIANT
AND ASSOCIATED NEW FACEPLATE).
BEFORE DISCONNECTING PROVIDE TEMPORARY DATA DROP FOR
NURSE STATION. REMOVE EXISTING CABLE AND INSTALL NEW IN
THE EXISTING CONDUIT ABOVE THE CEILING O FLOOR BELOW.
EXISTING FIBER BOX TDU-126-E221 WITH TUBE CELL GOING TO
MDF FROM W50. INSTALL 2-24 STRAND SINGLE MODE AIR BLOWN
FIBER FROM MDF TO THIS BOX AND EXTEND 24 STARND TO EACH
OF THE EAST AND WEST RACKS. TERMINATE IN FIBER PANEL
USING LC CONNECTOR.
(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)
KEY NOTES
7.
NOW AN OFFICE
FEC
PH
AR
MA
CY
VE
ND
OR
CLOSET
200X
EP
200J
ST
OR
AG
E
0W
0V
CORRIDOR
C2-5
CO
RR
ID
OR
C2 -4
VISUAL INFO
SPECIALIST
OFFICE
CORRIDOR
C2-3
STUDENT
CO-ORDR OFFICE
NURSE
OFFICE
INPATIENT
CLINICAL
PHARMACY
RESIDENT
218B
INPATIENT
CLINICAL SUP
RESIDENCY
PROG DIR
218A
STERILE
PROCESSING
CORRIDOR
ELEVATOR
S-10
ELEVATOR
S-9
MECH
SHAFT
CO
RR
ID
OR
STORAGE
232A
HAC
GENERAL
STORAGE
PHARMACY
AND CLINICAL
SUPPORT
SVCS
BUSINESS
MGR OFFICE
ADMIN ASST
OFFICE
PRAYER AND
MEDITATION RM
NUTRITION
OFFICE
225A
MEN TOILET
FAC
INFORMATICS
PHARMACIST
WOMEN
TIOLET
HAC
CLOSET
CORRIDOR
C2-1
PASSENGER
ELEVATOR
LOBBY
EL
EV
AT
OR
P-
EL
EV
AT
OR
P-
CORRIDOR
C2-6
CORRIDOR
C2-8
CO
RR
ID
OR
C2 -7
QA/QC COORD
OFFICE
200A
LAB / OPERATIONS
MGR OFFICE
200B
SUPPLY
TECHNICIAN
OFFICE
200C
CO
NN
EC
TI
ON
CO
RR
ID
OR
MC
-C
CO
RR
ID
OR
C2 -2
ELECTRIC
CLOSET
CL
OS
ET
2A
RED CROSS
VOLUNTEERS
BREAK RM
223A
STAIR
NO 3
PHARMACY/ CONFERENCE
BREAKROOM
PHARMACY
ADMINISTRATIVE
OFFICE
COPY
219H
CONFERENCE RM
CORRIDOR
C2-10
ACTING
CHIEF OF
PATHOLOGY
200Z
STAIR
PGM SUPPORT
OFFICE
200Y
CONFERENCE
RM
200U
CO
RR
ID
OR
C2 -1
PATHOLOGIST
OFFICE
200T
PATHOLOGIST
OFFICE
200S
NURSING OFFICER
OF THE DAY (NOD)
OFFICE
ST
OR
AG
E
3MECH
SHAFT
CHIEF OF
PATHOLOGY
OFFICE
200D
CLOSET
200G
SECY
OFFICE
200E
MULTI-HEADED
MICROSCOPE RM
200H
COPY/ BREAK RM
200F
PATHOLOGY
RESIDENTS
AREA
200K
PATHOLOGY
TRANSCRIPTION
RECORD RM
200L
MI
CR
OS
CO
PE
RM 20
0M
PATHOLOGIST
OFFICE
200N
PATHOLOGIST
OFFICE
200P
PATHOLOGIST
OFFICE
200Q
PATHOLOGIST
OFFICE
200R
STAIR
NO 2
EQ
UI
PM
EN
T
ST
OR
AG
E
ALCOVE
FAC
STORAGE
201P
202P
P
CENTER
SVC ELEVATOR LOBBY
203A
DATA CABLES FROM
FLOOR BELOW AND
THIS FLOOR UP TO
3RD FLOOR TR 313
SEE 1.T-111, 1.T-131
AND 1.T-403
CAT 6A CABLES FROM 3RD
FLOOR ABOVE. SEE 1.T-131 FOR
CONTINUATION.
CAT 6A CABLES DOWN
TO TR 103 ON 1ST
FLOOR. SEE 1.T-111
FOR CONTINUATION
T-501
SEE 2.T-121
FOR CONTINUATION
DATA CABLES FROM FLOOR
BELOW TO CEILING SPACE OF
THIS LEVEL SEE 1.T-111 AND
DETAIL
T-501
DATA CABLES FROM FLOOR BELOW & THIS FLOOR UPTO
THIRD FLOOR SEE 1.T-131 AND DETAIL
T-501
DATA CABLES FROM FLOOR
BELOW UPTO CEILING OF
THIRD FLOOR ABOVE SEE
1.T-131 AND DETAIL
T-501
DATA CABLES FROM FLOOR
BELOW TO CEILING SPACE OF
THIS FLOOR SEE 1.T-111 AND
DETAIL
T-501
DATA CABLES FROM FLOOR
BELOW TO CEILING SPACE OF
THIS FLOOR SEE 1.T-111 AND
DETAIL
T-501
SCALE: 1/8" = 1' - 0" NORTH
1.T-121
TELECOMMUNICATIONS SECOND
FLOOR PLAN
BUILDING 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
SCALE: 1/8" = 1'-0"
0' 4' 8' 16'
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD SHALL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE SHALL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACKS WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
RECOMMENDED ROUTING OF NEW CAT6A BUNDLED CABLE
ON PENDANT MOUNTED U-HOOKS. SEE DETAILS ON
STRUCTURAL DRAWING.
NEW PLENUM RATED 3-CAT6A (GRAY, BLUE WHITE) DROP IN
FREE AIR WITHIN WALL CAVITY. SUPPORT USING WALL
MOUNTED J-HOOKS OR SUSPENDED FROM STRUCTURE
ABOVE. SEE DETAIL ON DRAWINGS T-501, T-503 & T-504.
NEW FACEPLATE WITH GRAY, BLUE AND WHITE CAT6A
COMPLIANT RJ45.
NOT USED.
FOR FLOOR MOUNTED DATA OUTLET PROVIDE TEMPORARY
DATA CABLING. REMOVE EXISTING CABLE FROM UNDER
FLOOR FEED & INSTALL NEW RJ45 JACK.
PROVIDE MULTI RACEWAY MTD EUD AT LAB BENCHES AND
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTI RACEWAY & INSTALL NEW CAT 6A CABLES &
ASSOCIATED RJ 45 JACKS.
PROVIDE NEW EUD AT EXISTING MULTIRACEWAY. PROVIDE
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTIRACEWAY AND INSTALL NEW CAT6A CABLES AND
ASSOCIATED RJ45 JACKS AND FACEPLATE.
FOR PREWIRED SYSTEM FURNITURE PROVIDE TEMPORARY
CABLE TO EUD AT SYSTEMS FURNITURE. PULL OLD CABLES OUT
AND INSTALL NEW CABLES AND RJ45 JACK (CAT 6A COMPLIANT
AND ASSOCIATED NEW FACEPLATE).
BEFORE DISCONNECTING PROVIDE TEMPORARY DATA DROP FOR
NURSE STATION. REMOVE EXISTING CABLE AND INSTALL NEW IN
THE EXISTING CONDUIT ABOVE THE CEILING O FLOOR BELOW.
EXISTING FIBER BOX TDU-126-E221 WITH TUBE CELL GOING TO
MDF FROM W50. INSTALL 2-24 STRAND SINGLE MODE AIR BLOWN
FIBER FROM MDF TO THIS BOX AND EXTEND 24 STARND TO EACH
OF THE EAST AND WEST RACKS. TERMINATE IN FIBER PANEL
USING LC CONNECTOR.
(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)
KEY NOTES
7.
8.
9.
SCALE: NONE
CL CL
4 x D
CORE DRILL WITH
DIAMETER D
VESTIBULE
316A
FEMALE TOILET
ELECTRICAL
CLOSET
309A
TOILET
RM
327B
TELE-COMM
CLOSET
315A
302F
DRESSING
RM
323A
LOCKER
327A
CORRIDOR
CORRIDOR
C3-2
CO
RR
ID
OR
C3 -5
CO
RR
ID
OR
C3 -5
A
CORRIDOR
C3-3
CORRIDOR
C3-4
CORRIDOR
C3-4A
STERILE SUPPLY RM
322B
CO
NN
EC
TI
NG
CO
RR
ID
OR
MC
-C
ELEVATOR LOBBY
TOILET
(LIBRARY)
BREAK RM
335C
EL
EV
AT
OR
EL
EV
AT
OR
LIBRARY
STORAGE
335B
LIBRARY
OFFICE
LIBRARY
OFFICE
335A
MALE
TOILET
PASSENGER
ELEVATOR
LOBBY
301D
ORTHO NURSES
OFFICE
301A
ORTHO
STORAGE
301B
ELECTRICAL
RM
301E
ORTHO
WAITING
AREA
301C
ORTHO
RECEPTION
AREA
ORTHO
PHYSICIAN
OFFICE
EQUIPMENT
STORAGE
ORTHO
CHIEFS
OFFICE
OR
TH
O
SE
CR
EA
TA
RY
OF
FI
CE
5 ORTHO
LIBRARY RM
STAIR
ORTHO
CONFERENCE
RM
ORTHO
EXAM RM
307A
ORTHO
EXAM RM
ORTHO
EXAM RM
308A
ORTHO
EXAM RM
ORTHO
CAST RM
ORTHO
STORAGE
310A
ORTHO
CAST RM
310B
ORTHO DR
OFFICE
311CLOSET
CASE MGR
OFFICE
CATH LAB
WAITING RM
CATH
LAB
OFFICE
314AASST CHIEF
CARDIAC CRITICAL
CARE UNIT
OFFICE
CHIEF CARDIAC
CATH LAB
319A
WORK
STATION
ASST CHIEF
CARDIAC
319B
SOILED
UTILITY
320CONTROL RM
CARDIAC
CATH LAB
EQUIP
RM
322A
STAIR
ELEVATOR
ELEVATOR
ELECTRICAL
VAULT RM
TELE RM
STAIR
BREAK RM
EQUIPMENT
STORAGE
326A
CONFERENCE RM
COPIER
RM
OFFICE
OFFICE
324A
ENTRANCE
REST
ROOM
323D
HAC
323C
CH
IE
F
CA
RD
IO
LO
GY
OF
FI
CE
3B
NO 2
NO 3
P-8
P-7
S-
S-
ALCOVE
323E
TEL
FAC
TELE-COMM
FEC
325A
CENTER
SHAFT
CO
RR
ID
OR
C3 -6
A
CORRIDOR
C3-6
SHAFT
2 2
ABOVE CEILING 3RD FLOOR
DATA CABLES FROM FLOOR
BELOW TO CEILING OF THIS
FLOOR SEE 1.T-121 AND DETAIL
T-501
CAT 6A CABLES FROM BLDG. 7
TO TR 103 (ABOVE CEILING)
TO BLDG. 7 SEE DRAWING
7.T-131
TO NEW
PATCH
PANEL
DATA CABLES FROM FOURTH
FLOOR TO CEILING OF 3RD
FLOOR SEE 1.T-141
T-501
DATA CABLES FROM FOURTH
FLOOR TO CEILING OF THIS
FLOOR SEE 1.T-141
DATA CABLES FROM FOURTH
FLOOR TO CEILING OF THIS
FLOOR SEE 1.T-121 AND DETAIL
T-501
DATA CABLES FROM
FLOOR ABOVE TO
CEILING SPACE OF THIS
FLOOR SEE 1.T-141
SCALE: 1/8" = 1' - 0" NORTH
1.T-131
TELECOMMUNICATIONS THIRD
FLOOR PLAN
SEE DETAIL 1
SHEET 1.T-403
FOR ENLARGED PLAN
BUILDING 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
SCALE: 1/8" = 1'-0"
0' 4' 8' 16'
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD SHALL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE SHALL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACKS WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
RECOMMENDED ROUTING OF NEW CAT6A BUNDLED CABLE
ON PENDANT MOUNTED U-HOOKS. SEE DETAILS ON
STRUCTURAL DRAWING.
NEW PLENUM RATED 3-CAT6A (GRAY, BLUE WHITE) DROP IN
FREE AIR WITHIN WALL CAVITY. SUPPORT USING WALL
MOUNTED J-HOOKS OR SUSPENDED FROM STRUCTURE
ABOVE. SEE DETAIL ON DRAWINGS T-501, T-503 & T-504.
NEW FACEPLATE WITH GRAY, BLUE AND WHITE CAT6A
COMPLIANT RJ45.
NOT USED.
FOR FLOOR MOUNTED DATA OUTLET PROVIDE TEMPORARY
DATA CABLING. REMOVE EXISTING CABLE FROM UNDER
FLOOR FEED & INSTALL NEW RJ45 JACK.
PROVIDE MULTI RACEWAY MTD EUD AT LAB BENCHES AND
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTI RACEWAY & INSTALL NEW CAT 6A CABLES &
ASSOCIATED RJ 45 JACKS.
PROVIDE NEW EUD AT EXISTING MULTIRACEWAY. PROVIDE
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTIRACEWAY AND INSTALL NEW CAT6A CABLES AND
ASSOCIATED RJ45 JACKS AND FACEPLATE.
FOR PREWIRED SYSTEM FURNITURE PROVIDE TEMPORARY
CABLE TO EUD AT SYSTEMS FURNITURE. PULL OLD CABLES OUT
AND INSTALL NEW CABLES AND RJ45 JACK (CAT 6A COMPLIANT
AND ASSOCIATED NEW FACEPLATE).
BEFORE DISCONNECTING PROVIDE TEMPORARY DATA DROP FOR
NURSE STATION. REMOVE EXISTING CABLE AND INSTALL NEW IN
THE EXISTING CONDUIT ABOVE THE CEILING O FLOOR BELOW.
EXISTING FIBER BOX TDU-126-E221 WITH TUBE CELL GOING TO
MDF FROM W50. INSTALL 2-24 STRAND SINGLE MODE AIR BLOWN
FIBER FROM MDF TO THIS BOX AND EXTEND 24 STARND TO EACH
OF THE EAST AND WEST RACKS. TERMINATE IN FIBER PANEL
USING LC CONNECTOR.
(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)
KEY NOTES
7.
MENS
TOILET
WOMENS
TOILET
ELECTRIC
CLOSET
EEO MGR
CORRIDOR
C4-4
SMALL CONF
RM
ST
OR
AG
E
RM 42
MECH HVAC RM
CORRIDOR
C4-1
SVC ELEVATOR
LOBBY
PASSENGER
ELEVATOR
LOBBY
CORRIDOR
C4-2
ADMIN
PRIMARY CARE
OFFICE
STAIR
EL
EV
AT
OR
S-
EL
EV
AT
OR
S-
BREAK RM
403A
COMPLIANCE
OFFICE
FI
LE
S
TO
RA
GE
R M
ELEVATOR
P-7
ELEVATOR
P-8
MEDICINE
OFFICE
402 RESTROOM
EEO
RECORDS
SECY
OFFICE
OFFICE RM
423A
MECH
SHAFT
OFFICE RM
CONFERENCE
RM
419B
CHIEF OF
PATIENT
CARE SVCS
CHIEF
OF
MEDICINE
PUBLIC
RELATIONS
AD
MI
NI
ST
RA
TI
VE
OF
FI
CE
FAC
DIRECTOR OF
PUBLIC
AFFAIRS
OFFICE
REGIONAL
COUNCIL
ADMIN
OFFICER
CHIEF OF
STAFF
CONFERENCE
409A EEO
OFFICE
409B
OFFICE RM
OFFICE RM
OFFICE RM
OFFICE RM
FAC
NO-3
STAIR
NO-2
STAIR
EC
OFFICE RM
OFFICE RM
OFFICE RM
OFFICE RM
OFFICE RM
CHIEF OFFICE RM
OFFICE RM
445A
C O
P Y
M A
C H
I N
E
F I L E
C A
B I N
E T
S
OFFICE RM
OFFICE RM
OFFICE RM
OFFICE RM
OFFICE RM
OFFICE RM
OFFICE RM
BREAK RM
ST
OR
AG
E
RM 42
OFFICE RM
OFFICE RM
CORRIDOR
C4-7
CORRIDOR
C4-5
CO
RR
ID
OR
C4 -9
CORRIDOR
C4-6
432A
CENTER
COPY
CORRIDOR
DATA CABLES FROM THIS FLOOR
DOWN TO CEILING OF 3RD FLOOR
SEE 1.T-131 & DETAIL
T-501
DATA CABLES FROM THIS FLOOR
DOWN TO CEILING OF 3RD FLOOR
SEE 1.T-131 & DETAIL
T-501
DATA CABLES FROM FLOOR
ABOVE TO CEILING SPACE OF THIS FLOOR
SEE 1.T-151
DATA CABLES FROM THIS FLOOR
DOWN TO CEILING OF 3RD FLOOR
SEE 1.T-131 & DETAIL
T-501
SCALE: 1/8" = 1' - 0" NORTH
1.T-141
TELECOMMUNICATIONS FOURTH
FLOOR PLAN
BUILDING 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F i t h
U.S. Department of Veterans Affairs
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Key Plan
PM EW/JB
NORTH
A
GENERAL NOTES
17075 Via Del Campo, San Diego, CA 92127
Phone: 858.946.0333
ARCHITECT/ENGINEER OF RECORD
SCALE: 1/8" = 1'-0"
0' 4' 8' 16'
C
D
20-SCE-04
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
FULLY SPRINKLERED
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Long Beach
5901 E. SEVENTH STREET, LONG BEACH, CA 90822
600-20-120
CONTRACT DOCUMENTS
December 16, 2020
ALL NEW CAT6A CABLES TO BE ROUTED TO RESPECTIVE TR
ROOMS AS INDICATED. TERMINATE NEW COLOR CODED (3)
CAT6A CABLES (WHITE, GRAY AND BLUE) IN NEW CAT6A
COMPATIBLE JACKS ON NEW FACEPLATE AT EACH EUD
OUTLET AND LABEL IT AS SHOWN. TERMINATE ON TR END IN
A CAT6A COMPATIBLE RJ45 JACK AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO EACH
EUD OUTLET SHALL BE TESTED AND CERTIFIED BY CABLE
MANUFACTURER’S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL BE
DONE ROOM BY ROOM AND FLOOR BY FLOOR IN CLOSE
COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE PATCH PANEL IN
EXISTING RACKS IN TR ROOM.
RING AND STRING METHOD SHALL BE USED TO INSTALL NEW
CAT6A CABLES.
OLD FACE PLATE SHALL BE PULLED OUT AND LEFT HANGING
AND REMAIN CONNECTED TO EUD TEMPORARILY WHILE THE
NEW FACEPLATE WILL BE INSTALLED WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE. ONCE
THE NEW CABLES ARE TESTED AND CERTIFIED THE EUD
WILL BE DISCONNECTED FROM OLD FACEPLATE AND
CONNECTED TO NEW FACE PLATE BY OIT.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACKS WITH
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL. ONCE
THESE NEW PATCH PANELS ARE POPULATED REMOVE
EXISTING PATCH PANEL TO MAKE ROOM FOR NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. BEFORE
DISCONNECTING AND REMOVING EXISTING PATCH PANEL,
RING OUT AND VERIFY THAT THE DATA CABLES ORIGINATING
IN THOSE PATCH PANELS TO EUD HAVE BEEN
SUCCESSFULLY REPLACED WITH NEW DATA CABLE AND
CAT6A COMPLIANT PATCH PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE SEE
GENERAL NOTE 7 ON STRUCTURE DRAWING S-001.
1.
2.
3.
4.
5.
6.
RECOMMENDED ROUTING OF NEW CAT6A BUNDLED CABLE
ON PENDANT MOUNTED U-HOOKS. SEE DETAILS ON
STRUCTURAL DRAWING.
NEW PLENUM RATED 3-CAT6A (GRAY, BLUE WHITE) DROP IN
FREE AIR WITHIN WALL CAVITY. SUPPORT USING WALL
MOUNTED J-HOOKS OR SUSPENDED FROM STRUCTURE
ABOVE. SEE DETAIL ON DRAWINGS T-501, T-503 & T-504.
NEW FACEPLATE WITH GRAY, BLUE AND WHITE CAT6A
COMPLIANT RJ45.
NOT USED.
FOR FLOOR MOUNTED DATA OUTLET PROVIDE TEMPORARY
DATA CABLING. REMOVE EXISTING CABLE FROM UNDER
FLOOR FEED & INSTALL NEW RJ45 JACK.
PROVIDE MULTI RACEWAY MTD EUD AT LAB BENCHES AND
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTI RACEWAY & INSTALL NEW CAT 6A CABLES &
ASSOCIATED RJ 45 JACKS.
PROVIDE NEW EUD AT EXISTING MULTIRACEWAY. PROVIDE
TEMPORARY CABLING. REMOVE EXISTING CABLE FROM
MULTIRACEWAY AND INSTALL NEW CAT6A CABLES AND
ASSOCIATED RJ45 JACKS AND FACEPLATE.
FOR PREWIRED SYSTEM FURNITURE PROVIDE TEMPORARY
CABLE TO EUD AT SYSTEMS FURNITURE. PULL OLD CABLES OUT
AND INSTALL NEW CABLES AND RJ45 JACK (CAT 6A COMPLIANT
AND ASSOCIATED NEW FACEPLATE).
BEFORE DISCONNECTING PROVIDE TEMPORARY DATA DROP FOR
NURSE STATION. REMOVE EXISTING CABLE AND INSTALL NEW IN
THE EXISTING CONDUIT ABOVE THE CEILING O FLOOR BELOW.
EXISTING FIBER BOX TDU-126-E221 WITH TUBE CELL GOING TO
MDF FROM W50. INSTALL 2-24 STRAND SINGLE MODE AIR BLOWN
FIBER FROM MDF TO THIS BOX AND EXTEND 24 STARND TO EACH
OF THE EAST AND WEST RACKS. TERMINATE IN FIBER PANEL
USING LC…
This is the start of the file's text. The full file is on GovTribe.