Attch9_8 Fire Protection Drawings.pdf
PDF 11 MB Posted
- Solicitation number
- 36C25920R0096
About this file
This document provides details on a federal contract opportunity for emergency department and support expansion at the Salt Lake City VA Medical Center. The contractor will be responsible for providing all materials and labor to build an 18,500 square foot addition and renovate 4,000 square feet of existing space to create a new emergency department and associated police department. The project budget is between $10-20 million. The solicitation number is 36C25920R0096 and responses are due on or around July 27, 2020. This opportunity is set aside only for service-disabled veteran-owned small businesses and respondents must be verified and listed in the Vendor Information Pages database to be considered eligible. The work will be performed under the oversight of the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd0003_36C25920R0096 0003.docx | DOCX document | |
| Amd0003_attch2_36C25920R0096_1_updated per Amd0003.pdf | ||
| Amd0003_attch1_RFI_v3.pdf | ||
| Amd0002_attch2_HospitalLayout.pdf | ||
| Amd0002_36C25920R0096 0002.docx | DOCX document | |
| Amd0002_attch1_RFI_v2.pdf | ||
| Amd0001_36C25920R0096 0001.docx | DOCX document | |
| Amd0001_attch1_RFIs.pdf | ||
| Attch8_10 MechDrawings Part 1.pdf | ||
| Attch4_11 Elect Drawings Part 1.pdf | ||
| Attch7_ 9 Plumbing Drawings Part2.pdf | ||
| Attch2_6 Structural Drawings.pdf | ||
| Attch11_8 Arch Drawings Part 2.pdf | ||
| Attch10_7 Arch Drawings Part 1.pdf | ||
| 36C25920R0096_1.docx | DOCX document | |
| Attch13_Past Performance Questionnaire.docx | DOCX document | |
| Attch5_11 Elect Drawings Part 2.pdf | ||
| Attch1_3 General Drawings.pdf | ||
| Attch3_4 Civil Drawings.pdf | ||
| Attch6_9 Plumbing Drawings Part 1.pdf | ||
| Attch12_5 Landscape Drawings.pdf | ||
| 36C25920R0096.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ZONE 01-1-G
ZONE 01-1-B
ZONE -A
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS SOUTHERN
660-332
FA101
OVERALL LEVEL 1 FIRE ALARM PLAN
08-11-2015
SCALE: 3/32" = 1'-0"F1
OVERALL LEVEL 1 FIRE ALARM PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
1 2-HOUR FIRE BARRIER, FIRE ALARM ZONE AND SMOKE ZONE SEPARATION.
1. THE SCOPE OF WORK INCLUDES RELOCATING, ADDING, AND REMOVING FIRE
ALARM SYSTEM EQUIPMENT IN EXPANSION AND REMODEL AREAS. WORK
MAINLY AFFECTS FIRE ALARM ZONE 01-1-G BUT ALSO INCLUDES PORTIONS OF
01-1-B.
2. THESE DRAWINGS ARE FOR OWNER AND AHJ REVIEW AS WELL AS FOR
CONTRACTOR USE IN DEVELOPING INSTALLATION DRAWINGS. CONTRACTOR IS
RESPONSIBLE FOR REVIEWING THE ENTIRE SET OF DRAWINGS AND
PERFORMING ON-SITE INVESTIGATION TO VERIFY INFORMATION SHOWN ON
THESE DRAWINGS. CONTRACTOR SHALL SUBMIT DRAWINGS TO THE AHJ FOR
REVIEW AND PERMIT PRIOR TO INSTALLATION.
3. CODE SUMMARY:
a. 2012 INTERNATIONAL BUILDING CODE
b. 2012 INTERNATIONAL FIRE CODE
c. NFPA 101 LIFE SAFETY CODE, 2012
d. NFPA 70 (2014 ED.)
e. NFPA 72 (2013 ED.)
f. FIRE PROTECTION DESIGN MANUAL, DEPT. OF VETERANS AFFAIRS
g. LOCAL ORDINANACES/OWNER PROJECT REQUIREMENTS
4. THESE PLANS ARE BASED UPON CONNECTION TO NEW SIEMENS MXL CONTROL
PANEL. ALL MATERIALS ARE TO BE NEW AND COMPATIBLE WITH SIEMENS MXL
EQUIPMENT.
5. AIR HANDLING EQUIPMENT SIZES ARE NOT KNOWN AT THIS TIME. EQUIPMENT
OVER 2000 CFM WILL HAVE DUCT SMOKE DETECTORS INSTALLED PER IMC AND
NFPA 101.
6. THE ENTIRE ZONE G IS DESIGNED AS AN AMBULATORY HEALTH CARE
OCCUPANCY IN ACCORDANCE WITH NFPA 101.
NORTH
0 6' 12' 24'
SCALE: 3/32" = 1'-0"1
LEVEL 1 FIRE ALARM PLAN - ZONE A
SCALE: NTS
KEY PLAN - OVERALL
20150811
P
R
CM
MM MM
CM
R
CM
R
CM
R
CM
R
CM
R
CM
R
ZONE 01-1-G
ZONE 01-1-D
ZO
N E 01-1-G
ZO
N E 01-1-B
1.3
D
E.1
2.5
MM
KK
J
EVEV
EX
EWEW
EUEU
EV2
EV3
E18 E21 E23 E26
G
2.9
H.8
LL
E24
D.8
E26A
OFFICER
1B45.05
CHARTING
1G00FA
STORAGE
1B41
OFFICE
1B22
ON-CALL
1G41
HALL
1B00G
HALL
1B00E
Corridor
XXX
SHARED
EDUCATION
1G45
HALL
1G00J
ER
DIRECTOR
1G39
SHARED
CONFERENCE
1G43
OFFICER
1B45.07
OFFICER
1B45.04 Hall-1
1B43A-1
INTERVIEW
1B43B
OFFICER
1B45.06
OFFICER
1B45.03
Hall-2
1B43A-2
OFFICER
1B45.01
OFFICER
1B45.02
ELECTRICAL
ROOM
1G85
MENS
SHOWER
1B45DA
WOMENS
WC
1B45C
ISOLATION
EXAM
1G35
VESTIBULE
1B43
PSA
1B43A.01
MENS WC
1B45D
WOMENS
SHOWER
1B45CA
NURSE
SUPER.
1G37
IT ROOM
1B47
DISPATCH
1B45H
STORAGE
1B45F
EVIDENCE
1B45G
HOLD
1B43AA
BIOMED
1G87
SOILED
UTILITY
1G49
1G00HA
TOILET
1G33B
HALL
1G00I
STAFF WC
1G47
STAFF
WC/SHOWER
1G47A
HALL
1B45
BREAK
ROOM
1B45A
CORRIDOR
1G00O
ARMORY
1B45B
CHIEF
1B45E
ZONE 01-1-G
ZONE 01-1-B
FSD
FSD
"FPS"
"TRN"
WP
WP
120V
120V
120V
120V
120V
120V
120V
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS SOUTHERN
660-332
FA101A
LEVEL 1 FIRE ALARM PLAN - AREA A
08-11-2015
SCALE: 1/4" = 1'-0"F1
LEVEL 1 FIRE ALARM PLAN - AREA A
GENERAL SHEET NOTES
SHEET KEYNOTES
1 EXISTING ZONE 01-1-G CONTROL ASSEMBLY ABOVE CEILING.
2 NEW FIRE ALARM POWER SUPPLY BASED ON NEW SIEMENS MXL CONTROL
PANEL.
3 PROVIDE LOW FREQUENCY 520 HZ SOUNDER.
4 DUCT SMOKE DETECTORS FOR ROOF MOUNTED UNIT.
5 SMOKE DETECTOR CONNECTED TO ZONE D CIRCUITS.
6 FIRE ALARM ZONE 01-1-G TRANSPONDER.
1. THE SCOPE OF WORK INCLUDES RELOCATING, ADDING, AND REMOVING FIRE
ALARM SYSTEM EQUIPMENT IN EXPANSION AND REMODEL AREAS. WORK
MAINLY AFFECTS FIRE ALARM ZONE 01-1-G BUT ALSO INCLUDES PORTIONS OF
01-1-B.
2. THESE DRAWINGS ARE FOR OWNER AND AHJ REVIEW AS WELL AS FOR
CONTRACTOR USE IN DEVELOPING INSTALLATION DRAWINGS. CONTRACTOR IS
RESPONSIBLE FOR REVIEWING THE ENTIRE SET OF DRAWINGS AND
PERFORMING ON-SITE INVESTIGATION TO VERIFY INFORMATION SHOWN ON T
HESE DRAWINGS. CONTRACTOR SHALL SUBMIT DRAWINGS TO THE AHJ FOR
REVIEW AND PERMIT PRIOR TO INSTALLATION.
3. CODE SUMMARY:
a. 2012 INTERNATIONAL BUILDING CODE
b. 2012 INTERNATIONAL FIRE CODE
c. NFPA 101 LIFE SAFETY CODE, 2012
d. NFPA 70 (2014 ED.)
e. NFPA 72 (2013 ED.)
f. FIRE PROTECTION DESIGN MANUAL, DEPT. OF VETERANS AFFAIRS
g. LOCAL ORDINANACES/OWNER PROJECT REQUIREMENTS
4. THESE PLANS ARE BASED UPON CONNECTION TO NEW SIEMENS MXL CONTROL
PANEL. ALL MATERIALS ARE TO BE NEW AND COMPATIBLE WITH SIEMENS MXL
EQUIPMENT.
5. AIR HANDLING EQUIPMENT SIZES ARE NOT KNOWN AT THIS TIME. EQUIPMENT
OVER 2000 CFM WILL HAVE DUCT SMOKE DETECTORS INSTALLED PER IMC AND
NFPA 101.
NORTH
0 2' 4' 8'
SCALE: NTS
KEY PLAN - AREA A
1. DEDUCT ALTERNATE E: DEDUCT SHARED CONFERENCE, ON-CALL, OFFICES AND
CORRIDOR. SEE SHEET AE001.
2. DEDUCT ALTERNATE F: SHELL POLICE AREA. SEE SHEET AE001.
3. DEDUCT ALTERNATE G: DEDUCT NEW CONSTRUCTION IN POLICE AREA. SEE SHEET
AE001.
J
MM MM MM
CM
R
CM
R
1.3
A
B
C
D
E.1
R3R2
E18 E21 E23 E26
RC
E24D.8
RA
RF
RF
EXAM
1G12
CHARTING
1G00FA
SHARED
EDUCATION
1G45
EXAM
1G10
HALL
xxx
NURSE
WORK N
1G14
NURSE
WORK S
1G18
PHYS.
WORK
1G16
PHARM.
WK.
1G00E.01
UM WK.
1G00E.02
EMS
SUPPLY
1G19A
STAT LAB
1G00GB
HALL
1G00P
ANTE
ROOM
1G33
ISOLATION
EXAM
1G35
ALCOVE
1G00GA
EXAM
1G11
EXAM
1G15
EQUIPMENT
1G25
TRAUMA
ROOM
1G29
ISOLATION
EXAM
1G33A
TRAUMA
ROOM
1G31
STAFF
LOUNGE
1G27
HALL
1G00E
TOILET
1G06
TOILET
1G04
DISASTER/DECON
SUPPLY
1G23
MEDS
1G22A
CLEAN
LINEN
1G22B
SOILED
UTILITY
1G49
1G00HA
TOILET
1G33B
HALL
1G00G
HALL
1G00I
STAFF WC
1G47
STAFF
WC/SHOWER
1G47A
X-RAY
1G20
BARIATRIC
EXAM
1G08
CORRIDOR
1G00O
VESTIBULE
1G00DA
EXAM
1G17
P A
120V
120V
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS SOUTHERN
660-332
FA101B
LEVEL 1 FIRE ALARM PLAN - AREA B
08-11-2015
SCALE: 1/4" = 1'-0"F1
LEVEL 1 FIRE ALARM PLAN - AREA B
GENERAL SHEET NOTES
SHEET KEYNOTES
1 PROVIDE MONITORING FOR DRY-PIPE FIRE SPRINKLER SYSTEMS.
1. THE SCOPE OF WORK INCLUDES RELOCATING, ADDING, AND REMOVING FIRE
ALARM SYSTEM EQUIPMENT IN EXPANSION AND REMODEL AREAS. WORK
MAINLY AFFECTS FIRE ALARM ZONE 01-1-G BUT ALSO INCLUDES PORTIONS OF
01-1-B.
2. THESE DRAWINGS ARE FOR OWNER AND AHJ REVIEW AS WELL AS FOR
CONTRACTOR USE IN DEVELOPING INSTALLATION DRAWINGS. CONTRACTOR IS
RESPONSIBLE FOR REVIEWING THE ENTIRE SET OF DRAWINGS AND
PERFORMING ON-SITE INVESTIGATION TO VERIFY INFORMATION SHOWN ON T
HESE DRAWINGS. CONTRACTOR SHALL SUBMIT DRAWINGS TO THE AHJ FOR
REVIEW AND PERMIT PRIOR TO INSTALLATION.
3. CODE SUMMARY:
a. 2012 INTERNATIONAL BUILDING CODE
b. 2012 INTERNATIONAL FIRE CODE
c. NFPA 101 LIFE SAFETY CODE, 2012
d. NFPA 70 (2014 ED.)
e. NFPA 72 (2013 ED.)
f. FIRE PROTECTION DESIGN MANUAL, DEPT. OF VETERANS AFFAIRS
g. LOCAL ORDINANACES/OWNER PROJECT REQUIREMENTS
4. THESE PLANS ARE BASED UPON CONNECTION TO NEW SIEMENS MXL CONTROL
PANEL. ALL MATERIALS ARE TO BE NEW AND COMPATIBLE WITH SIEMENS MXL
EQUIPMENT.
5. AIR HANDLING EQUIPMENT SIZES ARE NOT KNOWN AT THIS TIME. EQUIPMENT
OVER 2000 CFM WILL HAVE DUCT SMOKE DETECTORS INSTALLED PER IMC AND
NFPA 101.
NORTH
0 2' 4' 8'
SCALE: NTS
KEY PLAN - AREA B
CM
R
CM
R
CM
R
EPO
E.1
2.5
G
2.9
RF
E.5
F
F.4
EXAM
1G12
HALL
xxx
EXAM
1G61
PHARM.
WK.
1G00E.01
UM WK.
1G00E.02
GENERATOR
1G81
ELECTRICAL
ROOM
1G85
MENS
SHOWER
1B45DA
EXAM
1G53
HALL
1G00K
EXAM
1G57
EXAM
1G55
CORRIDOR
1G00N
EXAM
1G59
TOILET
1G04
SECLUSION
1G51
TOILET
1G65
BIOMED
1G87
MH
CLINICAL
OFFICE
1G24
CLEAN
SUPPLY
1G22D
EVS
1G22C
MEDS
1G22A
CLEAN
LINEN
1G22B
SOILED
UTILITY
1G49
X-RAY
1G20
NOURISHMENT
1G22
VIS. TOILET
1G79
VENDING
1G00MA
FAST
TRACK/EXAM
1G67
FAST
TRACK/EXAM
1G69
INTERNAL
WAITING
1G63
HALL
1G00C
"FPS"
"TRN"
EM ELEC.
ROOM
1G83
WP
WP
120V
120V
120V
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS SOUTHERN
660-332
FA101C
LEVEL 1 FIRE ALARM PLAN - AREA C
08-11-2015
SCALE: 1/4" = 1'-0"F1
LEVEL 1 FIRE ALARM PLAN - AREA C
GENERAL SHEET NOTES
SHEET KEYNOTES
1 NEW FIRE ALARM POWER SUPPLY BASED ON NEW SIEMENS MXL CONTROL
PANEL.
2 FIRE ALARM ZONE 01-1-G TRANSPONDER.
1. THE SCOPE OF WORK INCLUDES RELOCATING, ADDING, AND REMOVING FIRE
ALARM SYSTEM EQUIPMENT IN EXPANSION AND REMODEL AREAS. WORK
MAINLY AFFECTS FIRE ALARM ZONE 01-1-G BUT ALSO INCLUDES PORTIONS OF
01-1-B.
2. THESE DRAWINGS ARE FOR OWNER AND AHJ REVIEW AS WELL AS FOR
CONTRACTOR USE IN DEVELOPING INSTALLATION DRAWINGS. CONTRACTOR IS
RESPONSIBLE FOR REVIEWING THE ENTIRE SET OF DRAWINGS AND
PERFORMING ON-SITE INVESTIGATION TO VERIFY INFORMATION SHOWN ON T
HESE DRAWINGS. CONTRACTOR SHALL SUBMIT DRAWINGS TO THE AHJ FOR
REVIEW AND PERMIT PRIOR TO INSTALLATION.
3. CODE SUMMARY:
a. 2012 INTERNATIONAL BUILDING CODE
b. 2012 INTERNATIONAL FIRE CODE
c. NFPA 101 LIFE SAFETY CODE, 2012
d. NFPA 70 (2014 ED.)
e. NFPA 72 (2013 ED.)
f. FIRE PROTECTION DESIGN MANUAL, DEPT. OF VETERANS AFFAIRS
g. LOCAL ORDINANACES/OWNER PROJECT REQUIREMENTS
4. THESE PLANS ARE BASED UPON CONNECTION TO NEW SIEMENS MXL CONTROL
PANEL. ALL MATERIALS ARE TO BE NEW AND COMPATIBLE WITH SIEMENS MXL
EQUIPMENT.
5. AIR HANDLING EQUIPMENT SIZES ARE NOT KNOWN AT THIS TIME. EQUIPMENT
OVER 2000 CFM WILL HAVE DUCT SMOKE DETECTORS INSTALLED PER IMC AND
NFPA 101.
NORTH
0 2' 4' 8'
SCALE: NTS
KEY PLAN - AREA C
1. DEDUCT ALTERNATE K: SHELL RECEPTION, PATIENT WAITING, CONSULT ROOM,
ENROLLMENT, VISITOR TOILET, AND WRAP AROUND CORRIDOR. SEE SHEET
R6
R7
E.1
RG
RD
RB
R4
R3
R5
RE
O
RA
RF
RH
E.5
VIS. TOILET
1G77
EXAM
1G11
OB/GYN
Exam
1G05
OB toilet
1G05A
EXAM
1G15
EXAM
1G13
EXAM
1G09
EXAM
1G07
TOILET
1G04
FAMILY
CONSULT
1G03
EVS
1G22C
VIS. TOILET
1G79
VENDING
1G00MA
FAST
TRACK/EXAM
1G67
FAST
TRACK/EXAM
1G69
FAST
TRACK/EXAM
1G71
HALL
1G00C
TRIAGE
1G00BA
REC /
ENROLLMENT
/ POLICE
1G73
CORRIDOR
1G00M
ENROLLMENT
1G75
VESTIBULE
1G00A
EXAM
1G17
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS SOUTHERN
660-332
FA101D
LEVEL 1 FIRE ALARM PLAN - AREA D
08-11-2015
SCALE: 1/4" = 1'-0"F1
LEVEL 1 FIRE ALARM PLAN - AREA D
GENERAL SHEET NOTES
SHEET KEYNOTES
1. THE SCOPE OF WORK INCLUDES RELOCATING, ADDING, AND REMOVING FIRE
ALARM SYSTEM EQUIPMENT IN EXPANSION AND REMODEL AREAS. WORK
MAINLY AFFECTS FIRE ALARM ZONE 01-1-G BUT ALSO INCLUDES PORTIONS OF
01-1-B.
2. THESE DRAWINGS ARE FOR OWNER AND AHJ REVIEW AS WELL AS FOR
CONTRACTOR USE IN DEVELOPING INSTALLATION DRAWINGS. CONTRACTOR IS
RESPONSIBLE FOR REVIEWING THE ENTIRE SET OF DRAWINGS AND
PERFORMING ON-SITE INVESTIGATION TO VERIFY INFORMATION SHOWN ON T
HESE DRAWINGS. CONTRACTOR SHALL SUBMIT DRAWINGS TO THE AHJ FOR
REVIEW AND PERMIT PRIOR TO INSTALLATION.
3. CODE SUMMARY:
a. 2012 INTERNATIONAL BUILDING CODE
b. 2012 INTERNATIONAL FIRE CODE
c. NFPA 101 LIFE SAFETY CODE, 2012
d. NFPA 70 (2014 ED.)
e. NFPA 72 (2013 ED.)
f. FIRE PROTECTION DESIGN MANUAL, DEPT. OF VETERANS AFFAIRS
g. LOCAL ORDINANACES/OWNER PROJECT REQUIREMENTS
4. THESE PLANS ARE BASED UPON CONNECTION TO NEW SIEMENS MXL CONTROL
PANEL. ALL MATERIALS ARE TO BE NEW AND COMPATIBLE WITH SIEMENS MXL
EQUIPMENT.
5. AIR HANDLING EQUIPMENT SIZES ARE NOT KNOWN AT THIS TIME. EQUIPMENT
OVER 2000 CFM WILL HAVE DUCT SMOKE DETECTORS INSTALLED PER IMC AND
NFPA 101.
NORTH
0 2' 4' 8'
SCALE: NTS
KEY PLAN - AREA D
1. DEDUCT ALTERNATE K: SHELL RECEPTION, PATIENT WAITING, CONSULT ROOM,
ENROLLMENT, VISITOR TOILET, AND WRAP AROUND CORRIDOR. SEE SHEET
GENERAL SHEET NOTES
SD
SD
NO SCALEF5
ADDRESSABLE FIRE ALARM RISER
OUTPUT DEVICES
IN
IT
IA
T
IN
G D
E V
IC
E
S
INPUTS
NOTES
FIRE ALARM
INPUT/OUTPUT
MATRIX
G E
N E
R A
L A
L A
R M
P E
R Z
O N
E
D O
O R
H O
L D
E R
/C L
O S
E R
S R
E L E
A S
E B
E T
W E
E N
Z O
N E
I N
A L A
R M
A N
D A
D J A
C E
N T
Z O
N E
S
F A
N S
H U
T D
O W
N P
E R
Z O
N E
F
IR
E /S
M O
K E
D A
M P
E R
C L O
S E
ZONE G FLOW SWITCH
ZONE G TAMPER SWITCH
ZONE G INITIATING
LOOP
ZONE B INITIATING LOOP
T R
O U
B L E
S
IG
N A
L
ZONE B FLOW SWITCH
ZONE B TAMPER SWITCH
CIRCUIT TROUBLE
AC POWER LOSS
SYSTEM TROUBLE
LOW BATTERY POWER
REMOTE POWER SUPPLY
TROUBLE
S U
P E
R V
IS
O
R Y
S
IG
N A
L
FIRE/SMOKE DAMPER DUCT
SMOKE DETECTOR
HVAC UNIT DUCT SMOKE
DETECTOR
DRY-PIPE SYSTEM TAMPER
SWITCH
DRY-PIPE SYSTEM
PRESSURE FLOW SWITCH
DRY-PIPE SYSTEM HI/LOW
AIR PRESSURE
DOOR HOLDER SMOKE
DETECTOR
TYPICAL EVACUATION
SPEAKER/STROBE
ZONE
EXISTING
SIEMENS MXL
FIRE
ALARM
CTRL
PANEL
"FCP" LOCATED
OUTSIDE OF
PROJECT
BOUNDARY
E E
120V
NEW SIEMENS
MXL
COMPATIBLE
TRANSPONDER
PANEL AND
POWER SUPPLY
"TRN" & "FPS"
CONDUCTORS PER MANUFACTURER'S
REQUIREMENTS
TYPICAL
HEAT
DETECTOR
135°-175°
IN BOILER
ROOM
TYPICAL
SMOKE
DETECTOR
TYPICAL
DUCT
DETECTOR
TYPICAL
FIRE
ALARM
MANUAL
PULL
STATION
TYPICAL
DOOR
CLOSER
ANNUNCIATOR
LIGHT
ELEVATOR
RECALL
ALTERNATE
LEVEL
ELEVATOR
RECALL
ELEVATOR
SHUNT
TRIP
TYPICAL
FAN SHUT
DOWN
RELAY
T Y
P
IC
A L A
D D
R E
S S
A B
L E
L O
O P
F
A
TYPICAL
FLOW
SWITCH
TYPICAL
TAMPER
SWITCH
TYPICAL
SMOKE
DAMPER
MM MM P CM
R
C
CM CM
R
CM
R
CM
R
CM
R
CM
R
TYPICAL
REMOTE
POWER
SUPPLY
CONTROL/
SUPERVISION
FPS
CM
1. PLANS ARE BASED UPON CONNECTION TO NEW SIEMENS MXL CONTROL
PANEL. MAXIMUM INITIAL DEVICES PER LOOP SHALL NOT EXCEED 75%
MAXIMUM ALLOWABLE.
2. PLANS ARE BASED UPON THE WIRING SCHEDULE SHOWN. WHERE
MANUFACTURER'S REQUIREMENTS EXCEED REQUIREMENTS SHOWN,
INCLUDE ADDITIONAL ASSOCIATED COSTS AND SUBMITTAL DRAWINGS
INDICATING NEW WIRING CONFIGURATION.
3. PLANS ARE BASED UPON 2 AMPS AT 24 VDC, NOT TO EXCEED 75% (1.50
AMPS AVAILABLE), POWER SUPPLY CAPACITY PER NOTIFICATION CIRCUIT.
NOTIFICATION DEVICE LOADS ARE BASED UPON NOTIFICATION DEVICE
SCHEDULE SHOWN. INCLUDE ADDITIONAL ASSOCIATED COSTS FOR
INCREASED WIRING AND POWER SUPPLY CAPACITY IF LOADS OF ACTUAL
DEVICES PROVIDED EXCEED CIRCUIT CAPACITY, OR IF LOAD OUTPUT OF
ACTUAL POWER SUPPLIES PROVIDED IS SIZED DIFFERENTLY. PROVIDE
SUBMITTAL DRAWINGS SHOWING NEW WIRING CONFIGURATION.
4. COORDINATE FLOW AND TAMPER LOCATIONS WITH FIRE SUPPRESSION
CONTRACTOR OR FIELD VERIFY ACTUAL REQUIREMENTS. INCLUDE ANY
ADDITIONAL MONITOR MODULES REQUIRED BY ACTUAL DESIGN
REQUIREMENTS.
5. HEAT DETECTORS WHEN INSTALLED IN ELEVATOR SHAFTS OR MECHANICAL
ROOMS FOR ELEVATOR SHUT DOWN SHALL HAVE HEAT DETECTOR WITH
LOWER RESPONSE TIME INDEX THAN SPRINKLER HEAD.
6. PROVIDE POWER SUPPLY CAPACITY AS REQUIRED FOR DOOR HOLD OPENS
SHOWN.
7. BATTERY CAPACITY TO BE ADEQUATE TO OPERATE 15 MINUTES AFTER 24
HOURS PLUS 25% SPARE CAPACITY.
8. RUN SPARE LOOPS IN SAME CONDUIT. DO NOT EXCEED 40% AREA FILL OF
CONDUITS.
9. PROVIDE DUCT DETECTORS FOR SUPPLY AND RETURN AIR SYSTEMS OVER
2000 CFM. INSTALL DUCT DETECTORS PER NFPA 72 REQUIREMENTS AND
PROVIDE ADDITIONAL DUCT DETECTORS DEPENDING UPON FINAL DUCT
ARRANGEMENT.
10. LOCATE SMOKE DETECTORS MINIMUM 3' FROM AIR SUPPLY AND RETURN
LOUVERS.
11. PROVIDE SYNCHRONIZED STROBES THROUGHOUT FACILITY. PROVIDE
SYNCHRONIZATION MODULES PER MANUFACTURER'S REQUIREMENTS.
INCLUDE ADDITIONAL WIRING, IF REQUIRED.
12. INITIATING AND INDICATING LOOPS SHALL NOT SERVE AN AREA OF
GREATER THAN 22,500 SQUARE FEET. PROVIDE ADDITIONAL LOOPS FOR
AREAS LARGER THAN THIS.
13. ALL OUTPUT DEVICES ARE DESIGNED ON SYSTEMS WITH 2 AMP POWER
SUPPLY.
14. HORN/STROBE BASED ON 120 MILLIAMPS, DOOR HOLDERS BASED ON 70
MILLIAMPS.
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS SOUTHERN
660-332
FA601
FIRE ALARM RISER
08-11-2015
0. 00
RAMP
DOWN
UP
UP
UP
U P
B1 G
49,672.2
C
S a fe
P rin te r/
R e frig
S h e lv e s
S h e lv e s
Pixis Computer
P ix is
Shelves/overhead
Filing Shelves
Desk
Filing
Shelves
Wood Palettes
BAR JOIST
SWAY BRACE
ATTACHMENT
PIPE = 1" THRU 2"
PER NFPA #13
SWAY BRACE
ATTACHMENT
BAR JOIST SWAY
BRACE ATTACHMENT
BAR JOIST SWAY
BRACE ATTACHMENT
FIG. 119
FENDER WASHER
FIG. 100
ALL THREAD ROD
FIG. 200
ADJUSTABLE RING HANGER
FIG. 113
HEX NUT
FIG. 61T
BAR JOIST BEAM HANGER (THREADED)
BAR JOIST BAR JOIST BEAM HANGER
WITH THREADED HOLE
FIG. 69
RETAINING
STRAP
VIEW A-A
A
FIG. 100
ALL THREAD ROD
FIG. 200
ADJUSTABLE RING
HANGER
LOCK
NUT REQ'D
FIG. 65
BEAM CLAMP
A
SWIVEL SWAY
BRACE FITTING
"FAST CLAMP" SWAY
BRACE ATTACHMENT
BRACE PIPE
BRACE PIPE
SWIVEL SWAY
BRACE FITTING
PIPE CLAMP FOR
SWAY BRACE
PIPE CLAMP FOR
SWAY BRACE
BRACE PIPE
SWIVEL SWAY
BRACE FITTING
SWAY BRACE
ATTACHMENT TO
STEEL I-BEAM
TO LCO
FIRE
PUMP
6"
6"
DROP TO
TUNNEL
BELOW
SECTIONAL
CONTROL
VALVE
6"
SECTIONAL
CONTROL
VALVE
6"
4" 4"
B
A
SRC
SECTIONAL
CONTROL VALVE COMBINATION
STANDPIPE RISER
D
CAP TUNNEL FIRE
SPRINKLER PIPING.
COORDINATE EXACT
LOCATION WITH DEMO
PLAN.
SECTIONAL
CONTROL VALVE
6"
C
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS -
660-332
FX001
FIRE PROTECTION GENERAL INFORMATION
08-11-2015
SCALE: NTSF8
BAR JOIST SWAY BRACE ATTACHMENT
SCALE: NTSD8
BOTTOM BEAM CLAMP, ROD, AND RING
SCALE: NTSB8
BOTTOM BEAM CLAMP, ROD, AND RING
SCALE: NTSF6
LATERAL EARTHQUAKE BRACE
SCALE: NTSD6
LONGITUDINAL EARTHQUAKE BRACE
SCALE: NTSB6
SWAY BRACE ATTACHMENT TO
STEEL I-BEAM
SCALE: 1/16" = 1'-0"F1
GROUND LEVEL FIRE PROTECTION PLAN
NORTH
0 8' 16' 32'
ZONE 01-1-G
ZONE 01-1-B
31 32
R6
R7
1.31
A
H
B
C
D
E.1
2.5
M
K
J
RG
EV
EX
EW
R4
R3
R2
EU
E18
RC
G
D.2
2.9
H.8
L
2.1 2.3 2.7
R5
D.8
E33B
RE
O
RA
RF
RF
F.5
RH
E
C.9
E.5
F F.4
E.7
R1
E.4
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
ZONE - A
LIGHT HAZARD
0.10 GPM/SQ.FT.
OVER 1500 SQ.FT.
WITH 100 GPM
HOSE STREAM.
ORDINARY
HAZARD GROUP 1
0.15 GPM/SQ.FT.
OVER 1500 SQ.FT.
WITH 250 GPM
HOSE STREAM.
LEGEND
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS -
660-332
FX101
FIRE PROTECTION PLAN
08-11-2015
GENERAL SHEET NOTES
SHEET KEYNOTES
SCALE: 3/32" = 1'-0"F1
LEVEL 1 FIRE PROTECTION PLAN
1 EXISTING STANDPIPE FOR FIRE SPRINKLER SUPPLY.
2 EXISTING 2-1/2" HOSE VALVE SUPPLIED BY ADJACENT STANDPIPE.
3 EXISTING FIRE SPRINKLER ZONE 01-1-G CONTROL ASSEMBLY.
4 EXISTING ZONE FEED MAIN TO BE REVISED AND MODIFIED FOR NEW WORK.
5 2-HOUR FIRE BARRIER AND ZONE SEPARATION.
6 SUGGESTED ROUTING OF NEW DRY SYTSEM SUPPLY PIPING.
7 NEW DRY SYSTEM VALVE LOCATION.
NORTH
0 6' 12' 24'
SCALE: 3/32" = 1'-0"1
LEVEL 1 FIRE PROTECTION RCP - ZONE A
1. THE SCOPE OF WORK INCLUDES RELOCATING, ADDING, AND REMOVING FIRE
SPRINKLER SYSTEM EQUIPMENT IN EXPANSION AND REMODEL AREAS. WORK
MAINLY AFFECTS FIRE SPRINKER ZONE 01-1-G BUT ALSO INCLUDES
PORTIONS OF 01-1-B.
2. THESE DRAWINGS ARE FOR OWNER AND AHJ REVIEW AS WELL AS FOR
CONTRACTOR USE IN DEVELOPING INSTALLATION DRAWINGS. CONTRACTOR
IS RESPONSIBLE FOR REVIEWING THE ENTIRE SET OF DRAWINGS AND
PERFORMING ON-SITE INVESTIGATION TO VERIFY INFORMATION SHOWN ON
THESE DRAWINGS. CONTRACTOR SHALL SUBMIT DRAWINGS TO THE AHJ
FOR REVIEW AND PERMIT PRIOR TO INSTALLATION.
3. CODE SUMMARY:
a. 2012 INTERNATIONAL BUILDING CODE
b. 2012 INTERNATIONAL FIRE CODE
c. NFPA 101 LIFE SAFETY CODE, 2012
d. NFPA 13 (2013 ED.)
e. FIRE PROTECTION DESIGN MANUAL, DEPT. OF VETERANS AFFAIRS
f. LOCAL ORDINANCES/OWNER PROJECT REQUIREMENTS
4. ALL MATERIALS ARE TO BE UL LISTED OR FM APPROVED FOR USE IN FIRE
PROTECTION SYSTEMS UNLESS OTHERWISE ALLOWED BY CODE OR AHJ.
5. THE FIRE PROTECTION WATER SUPPLY FOR THIS PROJECTIS PROVIDED
THROUGH AN EXISTING FIRE PUMP, STANDPIPE SYSTEM, AND FLOOR
CONTROL ASSEMBLY LOCATED AS SHOWN. REVIEW LATEST FIRE PUMP
TESTING REPORT FOR WATER SUPPLY INFORMATION TO BE USED IN
HYDRAULIC CALCULATIONS. PROVIDE 10% PRESSURE CUSHION FOR SAFETY
FACTOR.
6. OFF PREMISE MONITORING OF THE FIRE SPRINKLER SYSTEM IS EXISTING.
ANY WORK OUTLINED ON THESE DOCUMENTS THAT IMPACTS THE FIRE
ALARM SYSTEM SHALL BE COORDINATED BY THE FIRE SPRINKLER AND FIRE
ALARM CONTRACTORS WITH THE COR AND MC SAFETY OFFICER.
7. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE WITH FIRE ALARM
CONTRACTOR FOR PROVISION OF CONNECTIONS BETWEEN FIRE SPRINKLER
SYSTEM AND FIRE ALARM SYSTEM.
8. PROVIDE SLEEVES AND WALL PLATES FOR ALL PENETRATIONS THROUGH
WALLS OR FLOORS THAT MIGHT INCLUDE DRILLING THROUGH CONCRETE,
METAL, SHEETROCK, OR OTHER MATERIALS. FIELD VERIFY APPROXIMATE
FLOOR AND WALL PENETRATIONS SHOWN ON THE PLANS. SEAL ALL
PENETRATIONS MADE IN RATED WALLS WITH APPROVED FIRE-STOP
MATERIAL TO MAINTAIN THE MINIMUM FIRE
9. PIPING - STEEL PIPE SCH. 40.
10. FITTINGS - CAST IRON FOR THREADED PIPE, RUBBER GASKETED FOR
ROLL-GROOVED SCHEDULE 40 MAINS, AND WELDED OUTLETS FOR
BRANCHLINE ATTACHMENTS TO MAINS.
11. HANGERS AND SEISMIC BRACING SHALL BE DESIGNED AND INSTALLED IN
ACCORDANCE WITH 2009 IBC AND ASCE 7-05. ALL SEISMIC BRACING IS
REQUIRED TO BE STAMPED AND SIGNED BY A LICENSED ENGINEER OBTAINED
BY CONTRACTOR AND SUBMITTED FOR REVIEW. HANGER TYPES SHALL BE
SHOWN ON SHOP DRAWINGS WITH LOCATIONS INDICATED. SEISMIC BRACING
SHALL BE SHOWN ON SHOP DRAWINGS WITH LOCATIONS, CALCULATIONS
AND 'AREA OF INFLUENCE'.
12. SPRINKLERS - PROVIDE WHITE OR CHROME RECESSED, QUICK RESPONSE
SPRINKLERS WITH MATCHING ESCUTCHEONS FOR ALL LIGHT HAZARD AND
ORDINARY HAZARD AREAS WITH CEILINGS. LOCATE SPRINKLERS IN ONE
FOOT INCREMENTS FROM THE EDGE OF CEILING TILES AND ALIGN
SPRINKLERS WITH LIGHT FIXTURES WHERE POSSIBLE IN GYPSUM BOARD
CEILINGS. CONTRACTOR SHALL MATCH EXISTING SPRINKLERS WHERE NOT
SPECIFICALLY SHOWN ON DRAWINGS. CONTRACTOR SHALL COORDINATE
SPRINKLER STYLES, COLORS, FINISHES, ETC. WITH ARCHITECT FOR
AESTHETIC PURPOSES PRIOR TO INSTALLATION. PROVIDE BRASS UPRIGHT
SSU SPRINKLERS IN AREAS OPEN TO THE DECK. ALL SPRINKLERS SHALL BE
FM APPROVED QUICK RESPONSE.
13. CONTRACTOR IS RESPONSIBLE FOR FINAL DESIGN AND SHALL BE FIELD
VERIFIED PRIOR TO FABRICATION. MAJOR CONFLICTS SHALL BE BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND ENGINEER FOR RESOLUTION.
14. PROVIDE ACCESS DOORS AND SIGNAGE WHERE ACCESS IS REQUIRED TO
CONCEALED SPRINKLER SYSTEM EQUIPMENT, VALVES, DRAINS, AND
CONTROLS. LOCATIONS TO BE APPROVED BY THE ARCHITECT.
15. CONTRACTOR SHALL FIELD-VERIFY THE EXISTING SYSTEM. IF PIPING
REMOVED IN THE DEMO AREA AFFECTS SPRINKLER COVERAGE OUTSIDE THE
DEMO AREA, THE CONTRACTOR IS TO MAKE NECESSARY MODIFICATIONS TO
MAINTAIN SPRINKLER COVERAGE OUTSIDE THE DEMO AREA AS PART OF THE
PROJECT.
16. PROVIDE LOW POINT DRAINS WHERE PIPING IS TRAPPED.
17. PIPING SHOWN IS CONCEPTUAL. CONTRACTOR SHALL COORDINATE WITH
OTHER TRADES TO ENSURE FIRE SPRINKLER EQUIPMENT DOES NOT
INTERFERE WITH EQUIPMENT WORK ZONES, SUCH AS FAN COIL UNIT CLEAR
SPACES.
SCALE: NTS
KEY PLAN - OVERALL
1. DEDUCT ALTERNATE B: DEDUCT THE ADMINISTRATION AREA. SEE SHEET AE001.
IT ROOM
1B47
OFFICER
1B45.05
CHARTING
1G00FA
SOILED
UTILITY
1G49
ISOLATION
EXAM
1G33A
TOILET
1G33B
SECLUSION
1G51
OFFICER
1B45.01
OFFICER
1B45.02
OFFICER
1B45.03
CHIEF
1B45E
OFFICER
1B45.07
BIOMED
1G87
ELECTRICAL
ROOM
1G85
ER
DIRECTOR
1G39
ON-CALL
1G41
Room-2 xxx-2
SHARED
EDUCATION
1G45
ARMORY
1B45B
EVIDENCE
1B45G
HALL
1B00G STORAGE
1B41
NURSE
SUPER.
1G37
SHARED
CONFERENCE
1G43
BREAK
ROOM
1B45A
ISOLATION
EXAM
1G35
HOLD
1B43AA
OFFICER
1B45.04
STORAGE
1B45F
HALL-1
1B45-1
WOMENS
SHOWER
1B45CA
WOMENS
WC
1B45C
MENS WC
1B45D
MENS
SHOWER
1B45DA
DISPATCH
1B45H
Space
INTERVIEW
1B43B
VESTIBULE
1B43
ZONE 01-1-B
ZO
N E 01-1-G
ZO
N E 01-1-B 3
H
E.1
2.5
M
K
J
EV
EX
EW
EU
E18 E21 E23 E26
G
2.9
H.8
L
2.1 2.3 2.7E24 E26A
F.5 E
E.5
ZONE 01-1-G
ZONE 01-1-D
ZONE 01-1-B
ZONE 01-1-A
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS -
660-332
FX101A
FIRE PROTECTION PLAN - AREA A
08-11-2015
SCALE: 1/4" = 1'-0"F1
LEVEL 1 FIRE PROTECTION RCP - AREA A
NORTH
0 2' 4' 8' SCALE: NTS
KEY PLAN - AREA A
SHEET KEYNOTES
1 EXISTING COMBINATION STANDPIPE.
2 EXISTING ZONE G CONTROL ASSEMBLY.
3 EXISTING ZONE B CONTROL ASSEMBLY LOCATED IN NEXT STAIRWAY CEILING
SPACE.
4 ISOLATION VALVE FOR NEW REMODEL WORK (RECOMMENDED).
5 INSTITUTIONAL TYPE SPRINKLER.
1. DEDUCT ALTERNATE E: DEDUCT SHARED CONFERENCE, ON-CALL, OFFICES AND
CORRIDOR. SEE SHEET AE001.
2. DEDUCT ALTERNATE F: SHELL POLICE AREA. SEE SHEET AE001.
3. DEDUCT ALTERNATE G: DEDUCT NEW CONSTRUCTION IN POLICE AREA. SEE
SHEET AE001.
STAFF
WC/SHOWER
1G47A
STAFF
LOUNGE
1G27
DISASTER/DECON
SUPPLY
1G23
IT ROOM
1B47
TRAUMA
ROOM
1G29
TRAUMA
ROOM
1G31
STAFF WC
1G47
CHARTING
1G00FA
SOILED
UTILITY
1G49
ANTE
ROOM
1G33
ISOLATION
EXAM
1G33A
TOILET
1G33B
EXAM
1G17
EXAM
1G15
EXAM
1G13
EMS
SUPPLY
1G19A
STAT LAB
1G00GB
ALCOVE
1G00GA
DECON
ROOM
1G21
SHARED
EDUCATION
1G45
ARMORY
1B45B
HALL
1G00P
NURSE
SUPER.
1G37 BREAK
ROOM
1B45A
ISOLATION
EXAM
1G35
EQUIPMENT
1G25
VESTIBULE
1G00DA
PHYS.
WORK-1
1G16-1
PHYS.
WORK-2
1G16-2
NURSE
WORK N
1G14
TOILET
1G06
HALL
1G00C
MEDS
1G22A
NOURISHMENT
1G22
EXAM
1G12
EXAM
1G10
BARIATRIC
EXAM
1G08
TOILET
1G04
CLEAN
LINEN
1G22B
UM WK.
1G00E.02
PHARM.
WK.
1G00E.01
X-RAY
1G20
1.3
A
H
B
C
D
E.1
2.5
EX
R2
E18 E21 E23 E26
RC
D.2
2.1 2.3E24
D.8
E26A
RA
RF
E
C.9
R1
E.4
ZONE 01-1-G
ZONE 01-1-D
ZONE 01-1-B
ZONE 01-1-A
ZO
N E 01-1-G
ZO
N E 01-1-D
MATCHLINE AREA B
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA B
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA B
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA B
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA B
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA B
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS -
660-332
FX101B
FIRE PROTECTION PLAN - AREA B
08-11-2015
SCALE: 1/4" = 1'-0"F1
LEVEL 1 FIRE PROTECTION RCP - AREA B
NORTH
0 2' 4' 8' SCALE: NTS
KEY PLAN - AREA B
SHEET KEYNOTES
1 DRY-PIPE RISER FOR EXTERIOR CANOPY PROTECTION.
2 USE CONCEALED SPRINKLERS IN THIS AREA. COORDINATE WITH ARCHITECT FOR
COVER PLATE COLORS.
FAST
TRACK/EXAM
1G67
EXAM
1G59
IT ROOM
1B47
INTERNAL
WAITING
1G63
VIS. TOILET
1G79
TOILET
1G65
SOILED
UTILITY
1G49
SECLUSION
1G51
EXAM
1G53
EXAM
1G55
EXAM
1G57
GENERATOR
1G81
BIOMED
1G87
ELECTRICAL
ROOM
1G85
Mechanical xxx
EXAM
1G61
CORRIDOR
1G00N
WOMENS
SHOWER
1B45CA
MENS WC
1B45D
MENS
SHOWER
1B45DA
HALL
1G00C
MEDS
1G22A
EVS
1G22C
NOURISHMENT
1G22
MH
CLINICAL
OFFICE
1G24
EXAM
1G12
CLEAN
SUPPLY
1G22D
CLEAN
LINEN
1G22B
UM WK.
1G00E.02
PHARM.
WK.
1G00E.01
X-RAY
1G20
ZO
N E 01-1-G
ZO
N E 01-1-B
H
E.1
2.5
E26
G
2.92.3 2.7
D.8
E26A
F.5
E
C.9 5 E.5
F
F.4
E.7
E.4
ZONE 01-1-B
ZONE 01-1-A
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS -
660-332
FX101C
FIRE PROTECTION PLAN - AREA C
08-11-2015
SCALE: 1/4" = 1'-0"F1
LEVEL 1 FIRE PROTECTION RCP - AREA C
SCALE: NTS
KEY PLAN - AREA C
NORTH
0 2' 4' 8'
SHEET KEYNOTES
1 USE CONCEALED SPRINKLERS IN THIS AREA. COORDINATE WITH ARCHITECT FOR
COVER PLATE COLORS.
2 INSTITUTIONAL TYPE SPRINKLER.
1. DEDUCT ALTERNATE K: SHELL RECEPTION, PATIENT WAITING, CONSULT ROOM,
ENROLLMENT, VISITOR TOILET, AND WRAP AROUND CORRIDOR. SEE SHEET
FAST
TRACK/EXAM
1G71
TRIAGE
1G00BA
FAST
TRACK/EXAM
1G69
FAST
TRACK/EXAM
1G67
VIS. TOILET
1G77
Room-1 xxx-1
VIS. TOILET
1G79
TOILET
1G65
OB toilet xxx
EXAM
1G17
EXAM
1G15
EXAM
1G13
EXAM
1G11
EXAM
1G09
EXAM
1G07
OB/GYN
Exam
1G05
FAMILY
CONSULT
1G03
REC /
ENROLLMENT
/ POLICE
1G73
VESTIBULE
1G00A
WAITING
ROOM
1G01
TOILET
1G06
HALL
1G00C
EVS
1G22C
TOILET
1G04
CLEAN
LINEN
1G22B
R6
R7
E.1
RG
RD
RB
R4
R3
RC
R5
RE
O
RA
RF
RH
E
C.9
E.5
E.4
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
DUBOIS -
660-332
FX101D
FIRE PROTECTION PLAN - AREA D
08-11-2015
SCALE: 1/4" = 1'-0"F1
LEVEL 1 FIRE PROTECTION RCP - AREA D
SCALE: NTS
KEY PLAN - AREA D
NORTH
0 2' 4' 8'
SHEET KEYNOTES
1 HORIZONTAL SIDEWALLS AT CEILING. RUN VERTICAL PIPING IN WALL SPACE.
2 LOCATE PIPING IN "TUNNEL" ACROSS VESTIBULE.
3 USE CONCEALED SPRINKLERS IN THIS AREA. COORDINATE WITH ARCHITECT FOR
COVER PLATE COLORS.
4 INSTITUTIONAL TYPE SPRINKLER.
1. DEDUCT ALTERNATE K: SHELL RECEPTION, PATIENT WAITING, CONSULT ROOM,
ENROLLMENT, VISITOR TOILET, AND WRAP AROUND CORRIDOR. SEE SHEET
| FA101 - OVERALL LEVEL 1 FIRE ALARM PLAN |
| Sheets |
| FA101 - OVERALL LEVEL 1 FIRE ALARM PLAN |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: FA101 - OVERALL LEVEL 1 FIRE ALARM PLAN |
| FA101A - LEVEL 1 FIRE ALARM PLAN - AREA A |
| Sheets |
| FA101A - LEVEL 1 FIRE ALARM PLAN - AREA A |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: FA101A - LEVEL 1 FIRE ALARM PLAN - AREA A |
| FA101B - LEVEL 1 FIRE ALARM PLAN - AREA B |
| Sheets |
| FA101B - LEVEL 1 FIRE ALARM PLAN - AREA B |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: FA101B - LEVEL 1 FIRE ALARM PLAN - AREA B |
| FA101C - LEVEL 1 FIRE ALARM PLAN - AREA C |
| Sheets |
| FA101C - LEVEL 1 FIRE ALARM PLAN - AREA C |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: FA101C - LEVEL 1 FIRE ALARM PLAN - AREA C |
| FA101D - LEVEL 1 FIRE ALARM PLAN - AREA D |
| Sheets |
| FA101D - LEVEL 1 FIRE ALARM PLAN - AREA D |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: FA101D - LEVEL 1 FIRE ALARM PLAN - AREA D |
| FA601 - FIRE ALARM RISER |
| Sheets |
| FA601 - FIRE ALARM RISER |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: FA601 - FIRE ALARM RISER |
| FX001 - FIRE PROTECTION GENERAL INFORMATION |
| Sheets |
| FX001 - FIRE PROTECTION GENERAL INFORMATION |
| 20140045 Mech Central_pss@spectrum-engineers.com |
| Sheet: FX001 - FIRE PROTECTION GENERAL INFORMATION |
| FX101 - FIRE PROTECTION PLAN |
| Sheets |
| FX101 - FIRE PROTECTION PLAN |
| 20140045 Mech Central_pss@spectrum-engineers.com |
| Sheet: FX101 - FIRE PROTECTION PLAN |
| FX101A - FIRE PROTECTION PLAN - AREA A |
| Sheets |
| FX101A - FIRE PROTECTION PLAN - AREA A |
| 20140045 Mech Central_pss@spectrum-engineers.com |
| Sheet: FX101A - FIRE PROTECTION PLAN - AREA A |
| FX101B - FIRE PROTECTION PLAN - AREA B |
| Sheets |
| FX101B - FIRE PROTECTION PLAN - AREA B |
| 20140045 Mech Central_pss@spectrum-engineers.com |
| Sheet: FX101B - FIRE PROTECTION PLAN - AREA B |
| FX101C - FIRE PROTECTION PLAN - AREA C |
| Sheets |
| FX101C - FIRE PROTECTION PLAN - AREA C |
| 20140045 Mech Central_pss@spectrum-engineers.com |
| Sheet: FX101C - FIRE PROTECTION PLAN - AREA C |
| FX101D - FIRE PROTECTION PLAN - AREA D |
| Sheets |
| FX101D - FIRE PROTECTION PLAN - AREA D |
| 20140045 Mech Central_pss@spectrum-engineers.com |
| Sheet: FX101D - FIRE PROTECTION PLAN - AREA D |
File details come from the government source that posted it. Updated .