Attch1_3 General Drawings.pdf
PDF 8 MB Posted
- Solicitation number
- 36C25920R0096
About this file
This document provides details for a presolicitation notice for an Emergency Department and Support Expansion project at the Salt Lake City VA Medical Center. The project includes reviewing and refreshing a previous design, and constructing an 18,500 square foot addition for a new emergency department and associated police department. It will also renovate 4,000 square feet for tie ins to the existing building and support areas. The contractor will provide all design and construction services, including architectural, civil, electrical, mechanical, and structural work. The estimated value is between $10-20 million. The solicitation number is 36C25920R0096 and will be posted on July 27, 2020. The project is 100% set aside for service-disabled veteran-owned small businesses. Apparent successful offerors must be verified and listed in Vendor Information Pages database prior to award. The North American Industry Classification System code is 236220 and the small business size standard is $39.5 million. The point of contact is provided for any questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd0003_36C25920R0096 0003.docx | DOCX document | |
| Amd0003_attch2_36C25920R0096_1_updated per Amd0003.pdf | ||
| Amd0003_attch1_RFI_v3.pdf | ||
| Amd0002_attch2_HospitalLayout.pdf | ||
| Amd0002_36C25920R0096 0002.docx | DOCX document | |
| Amd0002_attch1_RFI_v2.pdf | ||
| Amd0001_36C25920R0096 0001.docx | DOCX document | |
| Amd0001_attch1_RFIs.pdf | ||
| Attch8_10 MechDrawings Part 1.pdf | ||
| Attch4_11 Elect Drawings Part 1.pdf | ||
| Attch7_ 9 Plumbing Drawings Part2.pdf | ||
| Attch2_6 Structural Drawings.pdf | ||
| Attch11_8 Arch Drawings Part 2.pdf | ||
| Attch10_7 Arch Drawings Part 1.pdf | ||
| 36C25920R0096_1.docx | DOCX document | |
| Attch13_Past Performance Questionnaire.docx | DOCX document | |
| Attch5_11 Elect Drawings Part 2.pdf | ||
| Attch3_4 Civil Drawings.pdf | ||
| Attch9_8 Fire Protection Drawings.pdf | ||
| Attch6_9 Plumbing Drawings Part 1.pdf | ||
| Attch12_5 Landscape Drawings.pdf | ||
| 36C25920R0096.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 CS001 COVER SHEET
2 CS002 RISK ASSESSMENT
3 CS003 IT CHECKLIST
4 GI001 PROJECT PHASING
5 GI002 PROJECT STANDARDS & ANNOTATION
6 GI101 LIFE SAFETY PLAN
7 GI200 WALL TYPES
8 GI201 WALL TYPES / ROOM SCHEDULE
9 CC101 CIVIL HORIZONTAL CONTROL PLAN
10 CD101 CIVIL DEMOLITION PLAN
11 CE101 CIVIL NOTES AND LEGEND
12 CS101 CIVIL SITE PLAN
13 CS501 CIVIL DETAILS
14 CS502 CIVIL DETAILS
15 CS503 CIVIL DETAILS
16 CG101 CIVIL GRADING PLAN
17 CG102 CIVIL GRADING PLAN
18 CG103 CIVIL GRADING PLAN
19 CU101 CIVIL STORM DRAIN PLAN
20 CU102 CIVIL STORM DRAIN PROFILES
21 CW101 CIVIL RETAINING WALL PLAN
22 LS101 LANDSCAPE PLAN
23 S001 GENERAL STRUCUTRAL NOTES
24 S101 FOOTING AND FOUNDATION PLAN
25 S111 ROOF FRAMING PLANS
26 S201 MOMENT FRAME DETAILS
27 S202 MOMENT FRAME DETAILS
28 S401 DROP OFF CANOPY PLANS AND DETAILS
29 S501 FOOTING AND FOUNDATION DETAILS
30 S502 FOOTING AND FOUNDATION DETAILS
31 S511 FLOOR FRAMING DETIALS
32 S512 FLOOR FRAMING DETAILS
33 S513 FLOOR FRAMING DETAILS
34 S521 ROOF FRAMING DETAILS
35 S522 ROOF FRAMING DETAILS
36 S601 STRUCTURAL SCHEDULES
37 S602 STRUCTURAL SCHEDULES
38 AD101 LEVEL 1 DEMOLITION PLAN
39 AD102 FUTURE ADMINISTRATION AREA DEMOLITION PLAN
40 AE001 PROJECT BID ALTERNATES
41 AE100 DIMENSION CONTROL PLAN
42 AE101 FLOOR PLAN
43 AE101A FLOOR PLAN - AREA A
44 AE101B FLOOR PLAN - AREA B
45 AE101C FLOOR PLAN - AREA C
46 AE101D FLOOR PLAN - AREA D
47 AE102 ADMIN OFFICE FLOOR PLAN
48 AE103 LEVEL 2 DEMOLITION/ FLOOR PLAN
49 AE141 REFLECTED CEILING PLAN
50 AE141A ENLARGED RCP - AREA A
51 AE141B ENLARGED RCP - AREA B
52 AE141C ENLARGED RCP - AREA C
53 AE141D ENLARGED RCP - AREA D
54 AE161 ROOF PLAN
55 AE201 BUILDING ELEVATIONS
56 AE202 BUILDING ELEVATIONS
57 AE301 BUILDING SECTIONS
58 AE302 BUILDING SECTIONS
59 AE303 WALL SECTIONS
60 AE304 WALL SECTIONS
61 AE305 WALL SECTIONS
62 AE451 INTERIOR ELEVATIONS
63 AE452 INTERIOR ELEVATIONS
64 AE453 INTERIOR ELEVATIONS
65 AE454 INTERIOR ELEVATIONS
66 AE455 INTERIOR ELEVATIONS
67 AE456 INTERIOR ELEVATIONS
68 AE501 EXTERIOR DETAILS
69 AE502 EXTERIOR DETAILS
70 AE510 COLUMN DETAILS
71 AE530 DETAILS - ROOF
72 AE540 CEILING DETAILS
73 AE550 DETAILS - DOOR
74 AE551 DETAILS - DOOR
75 AE560 DETAILS - WINDOW
76 AE561 DETAILS - WINDOWS
77 AE570 DETAILS - MILLWORK
78 AE571 DETAILS - MILLWORK
79 AE572 DETAILS - MILLWORK
80 AE601 DOOR SCHEDULE AND TYPES
81 AE602 WINDOW TYPES
82 AI101 FINISH FLOOR PLAN
83 AI501 INTERIOR DETAILS
84 AI601 FINISH SCHEDULE
85 FA101 OVERALL LEVEL 1 FIRE ALARM PLAN
86 FA101A LEVEL 1 FIRE ALARM PLAN - AREA A
87 FA101B LEVEL 1 FIRE ALARM PLAN - AREA B
88 FA101C LEVEL 1 FIRE ALARM PLAN - AREA C
89 FA101D LEVEL 1 FIRE ALARM PLAN - AREA D
90 FA601 FIRE ALARM RISER
91 FX001 FIRE PROTECTION GENERAL INFORMATION
92 FX101 FIRE PROTECTION PLAN
93 FX101A FIRE PROTECTION PLAN - AREA A
94 FX101B FIRE PROTECTION PLAN - AREA B
95 FX101C FIRE PROTECTION PLAN - AREA C
96 FX101D FIRE PROTECTION PLAN - AREA D
97 PE001 PLUMBING COVER SHEET
98 PE501 PLUMBING DETAILS
99 PE601 PLUMBING SCHEDULES
100 PD101 LEVEL 1 PLUMBING PLAN - DEMOLITION
101 PL101 DOMESTIC WATER PIPING PLAN
102 PL101A LEVEL 1 PLUMBING PLAN - DW - AREA A
103 PL101B LEVEL 1 PLUMBING PLAN - DW - AREA B
104 PL101C LEVEL 1 PLUMBING PLAN - DW - AREA C
105 PL101D LEVEL 1 PLUMBING PLAN - DW - AREA D
106 PL102 ADMIN AREA PLUMBING PLANS
107 PL111 DRAIN WASTE AND VENT PLAN
108 PL111A LEVEL 1 PLUMBING PLAN - DWV - AREA A
109 PL111B LEVEL 1 PLUMBING PLAN - DWV - AREA B
110 PL111C LEVEL 1 PLUMBING PLAN - DWV - AREA C
111 PL111D LEVEL 1 PLUMBING PLAN - DWV - AREA D
112 PL112 ROOF PLUMBING PLAN
113 PL121 MEDICAL GAS PIPING PLAN
114 PL121A LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
115 PL121B LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
116 PL121C LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
117 PL121D LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
118 ME001 MECHANICAL COVER SHEET
119 ME501 MECHANICAL DETAILS
120 ME601 MECHANICAL SCHEDULES
121 ME602 MECHANICAL SCHEDULES
122 MD101 MECHANICAL DUCTWORK DEMOLTION
123 MD102 MECHANICAL PIPING DEMOLTION
124 MD103 ROOF MECHANICAL PLAN - DEMOLITION
125 MH101 LEVEL 1 MECHANICAL PLAN
126 MH101A LEVEL 1 MECHANICAL PLAN - AREA A
127 MH101B LEVEL 1 MECHANICAL PLAN - AREA B
128 MH101C LEVEL 1 MECHANICAL PLAN - AREA C
129 MH101D LEVEL 1 MECHANICAL PLAN - AREA D
130 MH102 ROOF MECHANICAL PLAN
131 MH103 NEW ADMIN AREA MECHANICAL PLAN
132 MH104 LEVEL 2 MECHANICAL PLANS
133 MH105 MECHANICAL ZONING PLAN
134 MH301 MECHANICAL SECTIONS
135 MH701 MECHANICAL ISOMETRICS
136 MH702 MECHANICAL ISOMETRICS
137 MH901 VRF CONTROLS SHCEMATICS
138 MH902 VRF CONTROLS SHCEMATICS
139 MP101 LEVEL 1 MECHANICAL PIPING PLAN
140 MP101A LEVEL 1 MECHANICAL PIPING PLAN - AREA A
141 MP101B LEVEL 1 MECHANICAL PIPING PLAN - AREA B
142 MP101C LEVEL 1 MECHANICAL PIPING PLAN - AREA C
143 MP101D LEVEL 1 MECHANICAL PIPING PLAN - AREA D
144 MP102 ROOF MECHANICAL PIPING PLAN
145 EE001 SYMBOL LEGEND, ABBREVIATIONS, AND GENERAL NOTES
146 EE501 ELECTRICAL DETAILS
147 EE502 ELECTRICAL DETAILS
148 EE503 ELECTRICAL DETAILS
149 EE701 TYPICAL MOUNTING HEIGHT DETAILS
150 ED101 LEVEL 1 DEMOLITION PLAN
151 ED102 LEVEL 1 DEMOLITION PLAN - ADMIN AREA
152 ES101 ELECTRICAL SITE PLAN
153 ES102 SITE LIGHTING CALCULATION PLAN
154 EP101A LEVEL 1 POWER PLAN - AREA A
155 EP101B LEVEL 1 POWER PLAN - AREA B
156 EP101C LEVEL 1 POWER PLAN - AREA C
157 EP101D LEVEL 1 POWER PLAN - AREA D
158 EP102 LEVEL 1 POWER PLAN - ADMIN AREA
159 EP111A LEVEL 1 MECHANICAL POWER PLAN - AREA A
160 EP111B LEVEL 1 MECHANICAL POWER PLAN - AREA B
161 EP111C LEVEL 1 MECHANICAL POWER PLAN - AREA C
162 EP111D LEVEL 1 MECHANICAL POWER PLAN - AREA D
163 EP112 ROOF MECHANICAL POWER PLAN
164 EP401 ENLARGED TYPICAL EXAM ROOM
165 EP402 ENLARGED TYPICAL TRAUMA ROOM
166 EP601 ONE-LINE DIAGRAM
167 EP602 PANEL SCHEDULES
168 EP603 PANEL SCHEDULES
169 EP604 EQUIPMENT SCHEDULE
170 EL101A LEVEL 1 LIGHTING PLAN - AREA A
171 EL101B LEVEL 1 LIGHTING PLAN - AREA B
172 EL101C LEVEL 1 LIGHTING PLAN - AREA C
173 EL101D LEVEL 1 LIGHTING PLAN - AREA D
174 EL111A LEVEL 1 LIGHTING CALCULATION PLAN - AREA A
175 EL111B LEVEL 1 LIGHTING CALCULATION PLAN - AREA B
176 EL111C LEVEL 1 LIGHTING CALCULATION PLAN - AREA C
177 EL111D LEVEL 1 LIGHTING CALCULATION PLAN - AREA D
178 EL601 LIGHTING FIXTURE SCHEDULE
179 ET101A LEVEL 1 TELECOMMUNICATIONS PLAN - AREA A
180 ET101B LEVEL 1 TELECOMMUNICATIONS PLAN - AREA B
181 ET101C LEVEL 1 TELECOMMUNICATIONS PLAN - AREA C
182 ET101D LEVEL 1 TELECOMMUNICATIONS PLAN - AREA D
183 ET601 TELECOM DIAGRAMS
184 EY101A LEVEL 1 AUXILIARY PLAN - AREA A
185 EY101B LEVEL 1 AUXILIARY PLAN - AREA B
186 EY101C LEVEL 1 AUXILIARY PLAN - AREA C
187 EY101D LEVEL 1 AUXILIARY PLAN - AREA D
188 EY601 AUXILIARY DIAGRAMS
189 EY602 AUXILIARY DIAGRAMS
190 EN101A LEVEL 1 NURSE CALL PLAN - AREA A
191 EN101B LEVEL 1 NURSE CALL PLAN - AREA B
192 EN101C LEVEL 1 NURSE CALL PLAN - AREA C
193 EN101D LEVEL 1 NURSE CALL PLAN - AREA D
194 EN601 NURSE CALL DIAGRAMS
195 EK101 LIGHTNING PROTECTION PLAN
196 EK501 LIGHTNING PROTECTION DETAILS
197 EK502 GROUNDING DETAILS
E n tr y
S e c o n d L e v e l
Entry First Level
H o s p ita l M a in
E n tr y
E m e rg e n c y E n tr a n c e
FH DRIVE
4 74
INV 1.4
G
RATE 4
.77
NO
ACC
ES
S
W ah le n
W ay
K is te rs
S tr ee t
W M
C O
S
C O
S D
S D
IBIB
IB
IB
S D
S D
S D
S
E
W
D
S
D
D
D
FU T U
RE F UE L
TAN
K
ELEC ELEC
ELEC
ELEC
SS
WT
(1)
CVB
CVB
(1)
CVB
(1)
CVB
CVB
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGNSIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
CB
DR
10+00.00
11+00.00
12+00.00
13+00.00
14+00.00
15+00.00
16+00.00
16+48.17
R AM P
R AM P
1 2: 1
1 2: 1
R AM P
1 2: 1
R AM P1 2: 1
288.0
44.0
44.0
88.0
302 TOTAL PARKING STALLS
INCLUDING 7 ADA STALLS
TH
RU
D
RIVE
31 TOTAL PARKING STALLS INCLUDING
2 ADA STALLS
D
RIVE
AT
M
D
D
D
DR
AIN
DR
AIN
VE
NT
Dog Kennel Line
Cartwasher Line
T2
T1
A
PH
G
E
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
SSM H
SDM H
SDM H
CO
SDM H
EX
IST
ING
CH
ILLE
R
E
XI
S
T
IN
G
C H
IL
L E
R
K is te rs
S tr ee t
Kisters Street
W ah le n
W ay
Baker Street
Hall Street
Bennion Blvd.
V al de z
D ri ve
FUTURE
PARKING
STRUCTURE
H
NE
W
10' G
AT
E
CU
E
D
C
B
A
P O L E
F L A G
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
HENARD SOUTHERN
660-332
CS001
COVER SHEET
08-11-2015
SCALE: NTS1
VICINITY PLAN
ASSISTANT DIRECTOR ENGINEERING
DIRECTOR ENGINEERING
ASSOCIATE DIRECTOR / CLINICAL OPERATIONS
ASSOCIATE DIRECTOR / PATIENT SERVICES
CHIEF OF STAFF
ASSOCIATE DIRECTOR / ADMINISTRATIVE OPERATIONS
DIRECTOR
OPERATIONS AND MAINTENANCE SUPERVISOR
OPERATIONS SUPERVISOR
BOILER PLANT
STEAM
PLUMBING
ELECTRICAL
ELECTRONIC INSTRUMENT CONTROLS
HVAC
NORTH
NORTH
TRUE PROJECT
PROJECT
LOCATION
URGENT CARE AND
SUPPORT EXPANSION
660-302
GEORGE E. WAHLEN
DEPARTMENT OF VETERANS AFFAIRS
MEDICAL CENTER
500 FOOTHILL DRIVE
SALT LAKE CITY, UTAH 84112
2015-08-11
SHEET INDEX
FINANCIAL MANAGEMENT SERVICE
20150811
INFECTION CONTROL
SAFETY OFFICER
PATIENT SAFETY
GREEN ENVIRONMENTAL MANAGEMENT
SYSTEMS (GEMS) COORDINATOR
EMERGENCY MANAGEMENT
VA POLICEAFGE Representative
CONTRACTING OFFICER
OCCUPATIONAL HEALTH
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
HENARD SOUTHERN
660-332
CS002
RISK ASSESSMENT
08-11-2015
Construction Standards for New and Existing Areas
Containing Information Systems Equipment and/or Wiring
Construction
Documents Compliant
THESE STANDARDS APPLY TO THE FOLLOWING: COMPUTER ROOMS, TELEPHONE SWITCH ROOMS,
COMMUNICATIONS/DATA CLOSETS CONTAINING IT EQUIPMENT AND/OR WIRING
1 Physical Access
YES__ NO__ NA__
a. Windows with access to facilities that contain information systems, below 12 m (40 ft.) from ground level or the roof of a lower abutment, or less than 7.5 m (25 ft.) from windows of an adjoining building, or accessible by a building ledge leading to
YES__ NO__ NA__
b. Windows that require security mesh screening, the security screen mesh consists of #304 stainless steel woven mesh 0.7 mm
(0.028 in.) wire diameter, with tensile strength of 15 kg/mm (800 pounds per lineal inch).
YES__ NO__ NA__
c. Doors to data communications areas containing information systems equipment and/or wiring shall be 45 mm (1-3/4 in.) solid core hardwood or hollow steel construction.
YES__ NO__ NA__
d. Dutch (a door divided horizontally such that the bottom half may remain shut while the top half opens) or half doors are not permitted in data communications areas containing information systems equipment and/or wiring.
YES__ NO__ NA__ e. Removable hinge pins on door exteriors shall be retained with set pins or spot-welded, preventing their removal.
YES__ NO__ NA__
f. Where mechanical lock systems are used, installed lock sets allow for single motion egress (user must make only one motion in order to open a door, typically by turning a knob or pushing a lever or attached bar) to exit.
YES__ NO__ NA__
g. For glass doors or doors with glass panes that have mechanical lock systems and are NOT set in steel frames, one of the two locks a jimmy proof rim dead lock.
YES__ NO__ NA__
h. Doors that have mechanical lock systems shall be fitted with a lock that is contained within the door, NOT attached to the surface of the door.
YES__ NO__ NA__
i. For doors that have mechanical lock systems, the day lock on the main door shall be automatically locking, with a minimum 19 mm (3/4 in.) dead bolt and inside thumb latch.
YES__ NO__ NA__ j. Electronic (magnetic) locking systems include a “request to exit” sensor and a “push to exit” manual lock release switch.
YES__ NO__ NA__
k. Interstitial (space between two parts or areas) overhead areas, which may enable entry into a secure room from an unsecured room, must be barricaded by the installation of a suitably secure partition which prevents “up and over” access.
YES__ NO__ NA__
l. Interstitial areas beneath raised floors, which may enable entry into a secure room from an unsecured room, must be barricaded by the installation of a suitably secure partition which prevents access.
YES__ NO__ NA__
m. Ventilation grills on doors and air circulation ducts that exceed 0.06 m 2 (100 square inches) and may enable entry into a secure room from an unsecured room must be reinforced to prevent their removal from outside the room.
YES__ NO__ NA__
n. Other possible access means, such as dumbwaiter shafts, roof or wall ventilator housings, trapdoors, etc., shall be secured by appropriate means.
YES__ NO__ NA__
o. Room door lock keys and day lock combinations must NOT be mastered (as defined in VHA Supplement, MP-3, Part I, Chapter 2, Maintenance and Operations).
2 Intrusion Detection YES__ NO__ NA__ a. There must be an intrusion detection system.
YES__ NO__ NA__
b. The intrusion detection equipment must operate on principles OTHER THAN narrow beam interception, door contacts, microwave, or photoelectric eye.
YES__ NO__ NA__
c. The intrusion detection equipment must have both an internal, automatic charging DC standby power supply and a primary AC power operation.
YES__ NO__ NA__
d. The intrusion detection equipment must have a remote, key operated activation/deactivation switch installed outside the room and adjacent to the room entrance door frame and/or a central alarm ON-OFF control in the security guard office.
YES__ NO__ NA__ e. The intrusion detection equipment must have an automatic reset capability following intrusion detection.
YES__ NO__ NA__
f. The intrusion detection equipment must have a local alarm level of 80 dB (min) to 90 dB (max) within the configuration of the protected area?
YES__ NO__ NA__
g. The intrusion detection equipment must have an integral capability for the attachment of wiring for remote alarm and intrusion indicator equipment (visual or audio)?
3 Electrical Safety/Security
YES__ NO__ NA__ a. The area containing information systems must have an emergency electrical shutoff switch.
YES__ NO__ NA__ b. The emergency shutoff switch shall be easily located and in plain sight.
YES__ NO__ NA__ c. The emergency shutoff switch shall be protected by a plastic cover to prevent accidental activation.
YES__ NO__ NA__ d. The site shall provide a long-term alternate power supply for the information system.
YES__ NO__ NA__ e. The site must consistently provide an emergency power capability for the information system on an ongoing basis.
YES__ NO__ NA__
f. The site must provide a short-term uninterruptible power supply (UPS) to facilitate an orderly shutdown of the information system in the event of a primary power source loss.
YES__ NO__ NA__ g. The site must employ an automatic emergency lighting system that activates in the event of a power outage.
YES__ NO__ NA__ h. The automatic emergency lighting system must properly cover emergency exits and evacuation routes.
5 Fire Safety/Security
YES__ NO__ NA__
a. The area containing information systems must employ fire detection devices/systems that activate in the event of a fire.
YES__ NO__ NA__ b. The area containing information systems must employ fire extinguishers in accordance with site policy.
YES__ NO__ NA__ c. Fire extinguishers must be in obvious locations and easily accessible.
6 Temperature/Humidity
YES__ NO__ NA__ a. Temperature and humidity sensors must exist in areas containing information systems.
7 Water damage/security
YES__ NO__ NA__ a. No water pipes may be located in the ceiling above the information system.
YES__ NO__ NA__ b. No bathrooms, kitchens, or other facilities with running water may be positioned above the information system.
YES__ NO__ NA__
c. Facilities that contain information systems must have a raised or false floor, and water sensors located below the floor.
8 Location of information systems
YES__ NO__ NA__
a. The site positions information system components within the facility to minimize potential damage from physical and environmental hazards.
INFORMATION RESOURCE MANAGEMENT
INFORMATION SECURITY OFFICER
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
HENARD SOUTHERN
660-332
CS003
IT CHECKLIST
08-11-2015
CO
BRIC
K W
ALL
W
SD
S
SD
S S
URGENT CARE ADDITION
DROP O
FF A
REA
AMBULANCE
DROP OFF
EXISTING VA FACILITY
BENIO
N D
RIV
E
GATE
GATE
BIKE RACKS
ADMINISTRATION
PHASE 2
SEE SHEETS AD101, AE101
PHASE 1
SEE SHEETS AD102 AE102
TRACY D.
STOCKING
NO.
135781
S
T A
E OF U
H
TAT
A R C H
I T E
C
TL
IC
E
N S E D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
8/11/2015
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
Banks Green
660-332
GI001
PROJECT PHASING
08-11-2015
1" = 30'-0"GI001
1 Site N O R T H
SEE BID ALTERNATE SUMMARY ON SHEET AE001
ADA APPROVED SIGNS SOAP DISPENSER -
TYPICAL
MIRROR W/ S.S.
FRAME
42" GRAB BAR
CLEAR FLOOR
SPACE
PLAN VIEW
FIRE EXTINGUISHER
PROTRUSION
FROM WALL
M
IN
M
IN
M A
X
M
IN
DRINKING FOUNTAIN
ADA SIGNS ACCESSORIES
MAX
4"
6" MAX8" MIN.
19" MAX
17" MIN.
S P
O U
T H
T
M A
X
M
IN
5" MAX
TOILET TISSUE
DISPENSER TYP.
36" GRAB BAR
SANITARY NAPKIN
DISPOSAL UNIT
SANITARY NAPKIN
DISPENSER UNIT
PAPER TOWEL
DISPENSER TYP.
HAND DRYER
M
IN
M A
X
B .O
. M
IR
R O
R S
U R
F A
C E
M A
X
41" MAX
39" MIN.
36" MAX
12" MAX
54" MIN.
" 2
M A
X
M
IN
M A
X
M
IN
M
IN
36" MIN.
12" MIN.
24" MIN.
S
ID
E
F O
R W
A R
D
LAV. SINK URINAL ADA TOILETADA DRINKING
FOUNTAIN
PLAN SECTION - A
3'-0" MIN.
FIRE EXTINGUISHER CABINET
WALL FRAMING - SEE
WALL TYPE
MAX.
1' - 6"
MIN
1' - 6"
M
IN
M
IN
PULL SIDE PUSH SIDE
MIN
1' - 0"
M
IN
PUSH SIDE,
DOOR PROVIDED
WITH BOTH
CLOSER AND LATCH
FINISH FLOOR FINISH FLOOR
BABY CHANGING TABLE
TRANSFER TYPE SHOWER
1' - 6"
3' - 0"
M A
X
M
IN
MIN.
4' - 0"
GRAB BAR
ADAAG COMPLIANT FOLDING
SHOWER SEAT. MOUNT TO WALL
W/ RECOMMNEDED BACKING
CLEAR FLOOR
SPACE
CONTROL WALL
SEAT WALL
BACK WALL
MAX.
1' - 3"
M A
X
M A
X
M A
X
M
IN
M A
X
M
IN
CONTROL WALL
SIDE WALL
ADAAG COMPLIANT SHOWER
VALVE AND HAND HELD SHOWER
WAND
GRAB BAR
CONTROL AREA
SHOWER SEAT ON
OPPISITE WALL
GRAB BAR - 18" LENGTH
MINIMUM
SYMBOLS
DETAIL
NUMBER
C4
A402
SHEET
SECTION
NUMBER
SHEET
D5
A402
BUILDING
SECTION
NUMBER
SHEET
D5
A402
INTERIOR
ELEVATION
ELEVATION
NUMBER
B1
A302
SHEET
ROOM TAG
ROOM NAME
ROOM NUMBER
NEW RESIDENT
ROOM
KEYED NOTEX
S
118A
X WINDOW MARK100A DOOR MARK
MATERIALS
BATT INSULATION
CONTINUOUS ROUGH WOOD
ROUGH WOOD BLOCKING
FINISH WOOD
CAST-IN-PLACE OR
PRE-CAST CONCRETE
GYPSUM DRYWALL
STEEL
A/C Air Conditioning ACOUST. Acoustical ADJ. Adjustable ALLOW. Allowance ALUM. Aluminum ANOD. Anodized APPROP. Appropriate APPROX. Approximate
B.U.R. Built up roof BLDG. Building BLK. Block BRK. Brick
C.I. Cast Iron C.J. Control Joint C.M.U. Concrete Masonry Unit CLG. Ceiling COL. Column COOR. Coordinate CONC. Concrete CONST. Construction CONTR. Contractor CONT. Continuous
D.F. Drinking Fountain DIA. Diameter DIM. Dimension DN. Down DWG. Drawing DWG. Drawings DTL. Detail
EA. Each E.F. Exhaust Fan E.I.F.S Exterior Insulation Finish System E.J. Expansion Joint ELECT. Electric, Electrical ELEV. Elevation EQ. Equal E.W. Each Way EXIST. Existing EXT. Exterior
F.D. Floor Drain F.E. Fire Extinguisher FDN. Foundation FIN. Finish
ABBREVIATIONS
FLR. Floor F.C.I.C Furnished by Contractor -
Installed by Contractor F.O.I.C. Furnished by Owner - Installed by Contractor F.O.I.O. Furnished by Owner - Installed by Owner F.R. Fire Rated F.S.R. Flexible Sheet Roofing FTG. Footing
G Gas G.I. Galvanized Iron GA. Gauge GAL. Galvanized GRD. Grade G.B. Gypsum Board G.L.B. Glued Laminated Beam
H.B. Hose bib HD. Head H.M. Hollow Metal HORIZ. Horizontal
I.D. Inside Diameter INCL. Included INT. Interior IRRIG. Irrigation INSUL. Insulation
M.R. Moisture Resistant MFR. Manufacturer MAX. Maximum MECH. Mechanical MIN. Minute M.D.F. Medium Density Fiberboard
N.I.C. Not in contract N.T.S. Not to scale NO. Number # Number
O.C. On Center O.D. Outside Diameter OFD. Overflow Drain OPN'G Opening OPHD Opposite Hand
P.L. Plastic Laminate PLYWD Plywood PNT. Paint
PNTD. Painted PTD. Painted PR. Pair PROJ. Project
R.C.M.U. Reinforced Concrete Masonry Unit
R.D. Rood Drain REG. Regular R.S. Rough-sawn RAD. Radius REINF. Reinforcing REQ'D Required REV. Revised, Revision, Reversed RM. Room R.O. Rough Opening
S.L. Sewer Line S.C. Solid Core SCHED. Schedule SD. Schedule SHT. Sheet SIM. Similar SPEC. Specification STD. Standard STL. Steel STRUCT. Structural SYST. System
T&B Top and Bottom T&G Tongue and groove T.O. Top of T.O.F. Top of footing T.O.W. Top of wall TYP. Typical T.S. Steel Tube Column
U.N.O. Unless Noted Otherwise
VERT. Vertical
WD. Wood W/ With W.P. Waterproof W.R. Water resistant W.W.F. Welded wire fabric W.W.M. Welded wire mesh
DEMOLITION PLAN LEGEND
= WALL TO BE DEMOLISHED
= WALL TO REMAIN
= DOOR TO BE DEMOLISHED
= DOOR TO REMAIN
= SLAB TO BE DEMOLISHED
= BLDG. TO BE DEMOLISHED
= TUNNEL FOUNDATION
SYSTEM TO BE DEMOLISHED.
CONC. TUNNEL IS APPROX. 5 FT.
WIDE x 5 FT DEEP W/ CONC.
WALLS AND FLR. SLAB.
TRACY D.
STOCKING
NO.
135781
S
T A
E OF U
H
TAT
A R C H
I T E
C
TL
IC
E
N S E D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
8/11/2015
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
Banks Green
660-332
GI002
PROJECT STANDARDS & ANNOTATION
08-11-2015
3/8" = 1'-0"GI002
1 MOUNTING HEIGHTS
3/8" = 1'-0"GI002
2 ADA SHOWER REQUIREMENTS
3/8" = 1'-0"GI002
3 SYMBOL LEGEND
(E)
ZO
N
E D
ZO
N
E B
ZONE H
ZONE D
ZONE G
ZONE H
ZONE GZONE B
E E
HE
EA
E
E
E
EA
EA
FEC
FEC
FEC
FEC
FEC
148'
114' 93'
110'
0'
3'
120'
113'
106'
4'
85'
EA
STAFFSTAFFSTAFFSTAFF
WC/SHOWERWC/SHOWERWC/SHOWERWC/SHOWER
1G47A
STAFFSTAFFSTAFFSTAFF
LOUNGELOUNGELOUNGELOUNGE
1G27
EQUIPMENTEQUIPMENTEQUIPMENTEQUIPMENT
1G25
DISASTER/DECONDISASTER/DECONDISASTER/DECONDISASTER/DECON
SUPPLYSUPPLYSUPPLYSUPPLY
1G23
DECONDECONDECONDECON
ROOMROOMROOMROOM
1G21
EMSEMSEMSEMS
SUPPLYSUPPLYSUPPLYSUPPLY
1G19A
STAT LABSTAT LABSTAT LABSTAT LAB
1G00GB
TRAUMATRAUMATRAUMATRAUMA
ROOMROOMROOMROOM
1G29
TRAUMATRAUMATRAUMATRAUMA
ROOMROOMROOMROOM
1G31
ISOLATIONISOLATIONISOLATIONISOLATION
EXAMEXAMEXAMEXAM
1G33A
ISOLATIONISOLATIONISOLATIONISOLATION
EXAMEXAMEXAMEXAM
1G35
EXAMEXAMEXAMEXAM
1G17
EXAMEXAMEXAMEXAM
1G15
EXAMEXAMEXAMEXAM
1G13
EXAMEXAMEXAMEXAM
1G11
EXAMEXAMEXAMEXAM
1G09
EXAMEXAMEXAMEXAM
1G07
BARIATRICBARIATRICBARIATRICBARIATRIC
EXAMEXAMEXAMEXAM
1G08
EXAMEXAMEXAMEXAM
1G10
EXAMEXAMEXAMEXAM
1G12
MEDSMEDSMEDSMEDS
1G22A
TOILETTOILETTOILETTOILET
1G04
TOILETTOILETTOILETTOILET
1G06
CLEANCLEANCLEANCLEAN
SUPPLYSUPPLYSUPPLYSUPPLY
1G22D
MHMHMHMH
CLINICALCLINICALCLINICALCLINICAL
OFFICEOFFICEOFFICEOFFICE
1G24
HALLHALLHALLHALL
1G00C FASTFASTFASTFAST
TRACK/EXAMTRACK/EXAMTRACK/EXAMTRACK/EXAM
1G71
FASTFASTFASTFAST
TRACK/EXAMTRACK/EXAMTRACK/EXAMTRACK/EXAM
1G69
FASTFASTFASTFAST
TRACK/EXAMTRACK/EXAMTRACK/EXAMTRACK/EXAM
1G67
TOILETTOILETTOILETTOILET
1G65
VIS. TOILETVIS. TOILETVIS. TOILETVIS. TOILET
1G79
VIS. TOILETVIS. TOILETVIS. TOILETVIS. TOILET
1G77
EXAMEXAMEXAMEXAM
1G61
EXAMEXAMEXAMEXAM
1G59
EXAMEXAMEXAMEXAM
1G57
EXAMEXAMEXAMEXAM
1G53
SOILEDSOILEDSOILEDSOILED
UTILITYUTILITYUTILITYUTILITY
1G49
IT ROOMIT ROOMIT ROOMIT ROOM
1B47
ARMORYARMORYARMORYARMORY
1B45B
OFFICEROFFICEROFFICEROFFICER
1B45.01
CHIEFCHIEFCHIEFCHIEF
1B45E
OFFICEROFFICEROFFICEROFFICER
1B45.07
OFFICEROFFICEROFFICEROFFICER
1B45.05
OFFICEROFFICEROFFICEROFFICER
1B45.04STORAGESTORAGESTORAGESTORAGE
1B45F
NURSENURSENURSENURSE
SUPER.SUPER.SUPER.SUPER.
1G37
ERERERER
DIRECTORDIRECTORDIRECTORDIRECTOR
1G39
ON-CALLON-CALLON-CALLON-CALL
1G41
SHAREDSHAREDSHAREDSHARED
CONFERENCECONFERENCECONFERENCECONFERENCE
1G43
ALCOVEALCOVEALCOVEALCOVE
1G00GA
REC /REC /REC /REC /
ENROLLMENTENROLLMENTENROLLMENTENROLLMENT
/ POLICE/ POLICE/ POLICE/ POLICE
1G73
WAITINGWAITINGWAITINGWAITING
ROOMROOMROOMROOM
1G01
VESTIBULEVESTIBULEVESTIBULEVESTIBULE
1G00A
PHYS.PHYS.PHYS.PHYS.
WORKWORKWORKWORK
1G16
NURSENURSENURSENURSE
WORK SWORK SWORK SWORK S
1G18
STORAGESTORAGESTORAGESTORAGE
1B41
VESTIBULEVESTIBULEVESTIBULEVESTIBULE
1G00DA
BIOMEDBIOMEDBIOMEDBIOMED
1G87
STAFF WCSTAFF WCSTAFF WCSTAFF WC
1G47
SHAREDSHAREDSHAREDSHARED
EDUCATIONEDUCATIONEDUCATIONEDUCATION
1G45
EVIDENCEEVIDENCEEVIDENCEEVIDENCE
1B45G
MAILMAILMAILMAIL
1G00HA
CHARTINGCHARTINGCHARTINGCHARTING
1G00FA
GENERATORGENERATORGENERATORGENERATOR
1G81
HALLHALLHALLHALL
1B00G
X-RAYX-RAYX-RAYX-RAY
1G20
ANTE ROOMANTE ROOMANTE ROOMANTE ROOM
1G33
SECLUSIONSECLUSIONSECLUSIONSECLUSION
1G51
EXAMEXAMEXAMEXAM
1G55
UM WK.UM WK.UM WK.UM WK.
1G00E.02
PHARM. WK.PHARM. WK.PHARM. WK.PHARM. WK.
1G00E.01
BREAKBREAKBREAKBREAK
ROOMROOMROOMROOM
1B45A
OFFICEROFFICEROFFICEROFFICER
1B45.02
OFFICEROFFICEROFFICEROFFICER
1B45.03
MENS WCMENS WCMENS WCMENS WC
1B45D
WOMENSWOMENSWOMENSWOMENS
WCWCWCWC
1B45C
ELECTRICALELECTRICALELECTRICALELECTRICAL
ROOMROOMROOMROOM
1G85
EM ELEC.EM ELEC.EM ELEC.EM ELEC.
ROOMROOMROOMROOM
1G83
OB toiletOB toiletOB toiletOB toilet 1G05A
DISPATCHDISPATCHDISPATCHDISPATCH
1B45H
VESTIBULEVESTIBULEVESTIBULEVESTIBULE
1B43
PSAPSAPSAPSA
1B43A.01
HOLDHOLDHOLDHOLD
1B43AA
INTERVIEWINTERVIEWINTERVIEWINTERVIEW
1B43B
TOILETTOILETTOILETTOILET
1G33B
WOMENSWOMENSWOMENSWOMENS
SHOWERSHOWERSHOWERSHOWER
1B45CA
MENSMENSMENSMENS
SHOWERSHOWERSHOWERSHOWER
1B45DA
ENROLLMENTENROLLMENTENROLLMENTENROLLMENT
1G75
CLEANCLEANCLEANCLEAN
LINENLINENLINENLINEN
1G22B
EVSEVSEVSEVS
1G22C
NURSENURSENURSENURSE
WORK/ FASTWORK/ FASTWORK/ FASTWORK/ FAST
TRACKTRACKTRACKTRACK
1G02
INTERNALINTERNALINTERNALINTERNAL
WAITINGWAITINGWAITINGWAITING
1G63
HALLHALLHALLHALL
1G00K
CORRIDORCORRIDORCORRIDORCORRIDOR
1G00N
CORRIDORCORRIDORCORRIDORCORRIDOR
1G00O
HALLHALLHALLHALL
1B45
HallHallHallHall 1B43A
HALLHALLHALLHALL
1B00E
HALLHALLHALLHALL
1G00J
HALLHALLHALLHALL
1G00I
HALLHALLHALLHALL
1G00G
HALLHALLHALLHALL
1G00D
CORRIDORCORRIDORCORRIDORCORRIDOR
1G00M
OB/GYNOB/GYNOB/GYNOB/GYN
ExamExamExamExam 1G05
TRIAGETRIAGETRIAGETRIAGE
1G00BA
FAMILYFAMILYFAMILYFAMILY
CONSULTCONSULTCONSULTCONSULT
1G03
HALLHALLHALLHALL
1G00P
NURSENURSENURSENURSE
WORK NWORK NWORK NWORK N
1G14
HALLHALLHALLHALL
1G00F
HALLHALLHALLHALL
1G00E
NOURISHMENTNOURISHMENTNOURISHMENTNOURISHMENT
1G22
OFFICEROFFICEROFFICEROFFICER
1B45.06
OFFICEOFFICEOFFICEOFFICE
1B22
VENDINGVENDINGVENDINGVENDING
1G00MA
FIRE RISERFIRE RISERFIRE RISERFIRE RISER
CLOSETCLOSETCLOSETCLOSET
1G19B
HALLHALLHALLHALL
1G00
HALLHALLHALLHALL
1G00H
HALLHALLHALLHALL
1G00B
SHOWERSHOWERSHOWERSHOWER
1G65A
BENNIO
N B
LVD.
GATE
1 HR FIRE
LIFE SAFETY LEGEND
2 HR FIRE/SMOKE BARRIER
FIRE EXTINGUISHER CAB
EXISTING FIRE EXTINGUISHER CAB
(E)
GRAPHIC DESIGNATION DESCRIPTION
FEC
FEC
PATH OF EGRESS
FEC TRAVEL DISTANCE
EXITSE
HE HORIZONTAL EXIT
EA EXIT ACCESS
APPLICABLE CODES
LIFE SAFETY: NFPA 101 LIFE SAFETY CODE, 2012
HEALTHCARE FACILITY: NFPA 99 HEALTHCARE FACILITIES CODE, 2012
NT'L FIRE CODES: NFPA
BUILDING CODE:IBC 2012 WITH STATE AMENDMENTS 7/1/13
ACCESSIBILITY CODE: ABAAS; VA BARRIER FREE DESIGN GUIDE
ELECTRICAL CODE: NEC 2011
MECHANICAL CODE:ASHRAE 62.1-2004
PLUMBING CODE: IPC 2012
ENERGY CODE: IECC 2009
GUIDELINES: FGI GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF
HEALTH CARE FACILITIES, 2010
NFPA 101 CODE ANALYSIS
Chapter 4 GENERAL
Life Safety Compliance : Prescriptive-Based Option (4.4.2)
Chapter 6 CLASSIFICATION OF OCCUPANCY & HAZARD OF CONTENTS
Health Care: (6.1.5)
Ambulatory Care: (6.1.6)
Note: The initial occupancy of the ER space is Ambulatory Healthcare. However, the facility wants the flexibility to upgrade the occupancy of Zone G and adjacent zones. As such, the fire rating protection of the structural steel, the occupancy separation of Zone G and the fire protection rating of certain rooms in Zone G that would be considered “Hazardous Area” in a Healthcare occupancy, are being constructed at the outset to meet Healthcare occupancy requirements.
Additionally, the structure is designed for a future second floor addition. It is anticipated that the occupancy of the second floor will be Business. The roof structure is concrete in metal deck to provide a 2 hour separation between the first and second floor.
Existing Construction: Assumed - Type II (222)
New Construction 18.1.6.1 - Type II (222)
Fire resistance for building elements (Table 8.2.1.2):
Fire Spray Requirements:
All primary structural frame components "column & beams" in new work area shall be protected with spray-on fire proofing or equivalent gypsum board. Fire proofing to be inspected by independent testing agency.
Building Element Rating Req'd Provided Exterior Bearing Wall: 2 hr N/A Interior Bearing Wall: 2 hr N/A Columns:
-Wide Flange UL X676 2 hr 2 hr -Tube Steel UL X676 2 hr 2 hr Beams, Girders, Trusses:UL P719 2 hr 2 hr Floor Construction: 2 hr N/A S.O.G Roof Construction:UL P719 1 hr 2 hr Exterior Non-Bearing Wall: 0 hr 0 hr
6.2 Hazard of Contents: Low Hazard
Chapter 7 MEANS OF EGRESS Occupant Load (7.3.1.2):
- Ambulatory Care: 100 sf / occ.
Occupant Count:
- Ambulatory Care: 20,470 sf / 100 = 205 occ.
Egress Capacity (7.3.3):
Stairways:
- Required: 205 occ. (0.3") = 61.5 inches
- Provided:
N/A N/A
Level Components:
- Required: 205 occ. (0.2") = 41 inches min.
- Provided:
Doors: 33" min clear width per leaf Corridors: 72" min Horizontal Exits: 92" x 1 exit = 92 inches
Number of Means of Egress: (7.4) 2 required 3 provided
Arrangement of Means of Egress: (7.5)
Dead End Corridors (38.2.5.2): 50 ft maximum
Common Path of Travel (38.2.5.3.1): 100 ft maximum
Travel Distance (38.2.6.3): 200' maximum
Corridors (38.3.6.1 with sprinkler system): No Rating Openings: No Rating
Vertical Openings:
Floor Smoke Barriers (8.6.1) Floors shall be constructed as smoke barriers Shafts (8.6.5) 1-hour fire barrier
Fire Doors & Windows: (Table 8.3.4.2)
Elevator Hoistways: 1-hr Stairways: 1-hr 1-hr Fire Barriers: 3/4-hr 2-hr Fire Barriers: 1-1/2-hr Smoke Barriers: 1/3-hr
Chapter 9 FIRE PROTECTION SYSTEMS Fire Sprinkler system to be provided per 903.1
Hazardous Areas (18.3.2):
Boiler & Fuel-Fired Heater Rooms: 1-hr Physical Plant Maint. Shops 1-hr Soiled Linen over 64 gallons: 1-hr Storage Rooms >100 SF - 1-hr
CODE ANLYSIS
GENERAL NOTES
A. STENCIL "1 HOUR FIRE BARRIER" ON BOTH SIDES OF 1-HOUR RATED WALLS ABOVE
CEILING AT 4'-0" INTERVALS.
B. STENCIL "2 HOUR FIRE BARRIER" ON BOTH SIDES OF 2-HOUR RATED WALLS ABOVE
CEILING AT 4'-0" INTERVALS.
C. STENCIL "SMOKE BARRIER" ON BOTH SIDES OF SMOKE BARRIER WALLS ABOVE
CEILING AT 4'-0" INTERVALS.
TRACY D.
STOCKING
NO.
135781
S
T A
E OF U
H
TAT
A R C H
I T E
C
TL
IC
E
N S E D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
8/11/2015
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
Banks Green
660-332
GI101
LIFE SAFETY PLAN
08-11-2015
3/32" = 1'-0"GI101
1 Level 1 - FIRE & SMOKE
KEYNOTE - LIFE SAFETY
1 2 HOUR ENCLOSURE WHERE HATCHED - SEE SECTION 4/A301 FOR DETAIL
2 EDGE OF EXISTING 3 STORY BUILDING ABOVE
3 EXISTING 2 HOUR STAIR SHAFT
OCCUPANCY / FIRE ZONE
ZONE B 20,390 GSF AMBULATORY CARE
ZONE D 19,650 GSF AMBULATORY CARE
ZONE G 17.350 GSF AMBULATORY CARE
ZONE H 11,940 GSF AMBULATORY CARE
N O R T H
5/8" GYP. BOARD BOTH SIDES
3-5/8" METAL STUD - @ 16" O.C
3-5/8" METAL CHANNEL RUNNER
ACOUSTICAL SEALANT - EA. SIDE
2" SOUND ATTENUATION
BLANKET
DEFLECTION TRACK
TOP RUNNER
2 LAYERS
1/2" TYPE 'X' GYP.
2 -1/2" METAL CH STUD - @ 16" O.C
2 -1/2" METAL CHANNEL RUNNER
1" TYPE X GYP.
SHAFT SIDE
GI201
F3
5/8" GYP. BOARD BOTH SIDES
6" METAL STUD - @ 16" O.C
6" METAL CHANNEL RUNNER
DEFLECTION TRACK
TOP RUNNER
5/8" TYPE "X" GYP. BOARD
BOTH SIDES
6" METAL STUD - @ 16" O.C
6" METAL CHANNEL RUNNER
2" SOUND ATTENUATION
BLANKET
ACOUSTICAL SEALENT
GI201
F1
5/8" GYP. BOARD
2 1/2 "METAL STUD - @ 16" O.C
2 1/2" METAL CHANNEL RUNNER
2" SOUND ATTENUATION
BLANKET
5/8" GYP. BOARD
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL RUNNER
DEFLECTION TRACK
TOP RUNNER
6"
5/8" TYPE 'X' GYP. BOARD
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL RUNNER
TOP RUNNER
3 5/8" DIAGONAL METAL STUD BRACING
@ 48" O.C. STAGGERED
5/8" TYPE 'X' GYP. BOARD BOTH SIDES
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL RUNNER
ACOUSTICAL SEALANT - EA. SIDE
2" SOUND ATTENUATION
BLANKET
GI201
F1
2 LAYERS OF
5/8" TYPE 'X' GYP. BOARD
BOTH SIDES
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL RUNNER
ACOUSTICAL SEALANT
2" SOUND ATTENUATION
BLANKET
GI201
F3
5/8" GYP. BOARD
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL RUNNER
R19 THERMAL INSULATION
CONCRETE WALL
GI201
F1
5/8" TYPE 'X' GYP. BOARD
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL
RUNNER
TOP RUNNER
3 5/8" DIAGONAL METAL
STUD BRACING @ 48"
O.C. STAGGERED
ACOUSTICAL SEALANT
EACH SIDE
10"
6"
5/8" GYP. BOARD BOTH SIDES
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL RUNNER
3 5/8" DIAGONAL METAL
STUD BRACING @ 48" O.C.
STAGGERED
6"
TOP RUNNER
1/2" TYPE 'X' GYP.
2 -1/2" METAL CH STUD - @ 16" O.C
2 -1/2" METAL CHANNEL RUNNER
1" TYPE X GYP.
SHAFT SIDE
GI201
F1
5/8" GYP. BOARD BOTH SIDES
6" METAL STUD - @ 16" O.C
3-5/8" METAL CHANNEL RUNNER
ACOUSTICAL SEALANT - EA. SIDE
2" SOUND ATTENUATION
BLANKET
DEFLECTION TRACK
TOP RUNNER
5/8" GYP. BOARD BOTH SIDES
6" METAL STUD - @ 16" O.C
6" METAL CHANNEL RUNNER
TOP RUNNER
1. PARTIITION-CEILING-DOOR-DUCT SYSTEM ACOUTSTIC DESIGN
a. Acoustical Isolation: Design the sound resistant enclosures of the following spaces to suppress generated noise and provide a satisfactory degree of acoustical isolation for adjacent occupied spaces. Achieve a minimum Sound Transmission Class (STC) rating of 45.
NOTE: When the VA Hospital Building System (VAHBS) is used, achieve the required rating using construction such as a double layer of 16 mm (5/8 in.) gypsum board (GB) on both sides of 100 mm (4 in.) nominal metal studs and 64 mm (2 1/2 in.) sound attenuation blankets between the studs. These should extend above conventional lay‑in ceilings to the underside of walk‑on deck/platforms.
(1) Mental Health treament rooms.
b. Speech Privacy. Design the sound resistant enclosures of the following spaces to assure speech privacy and achieve an STC rating of 40 (45 for space marked with an asterisk).
(1) Conference rooms.
(2) Consultation offices.
(3) Examination and Treatment Rooms.
(4) Individual Offices in Mental Health Service.
NOTE: Partition and ceiling construction should be similar to Paragraph 1.a., except that for spaces requiring an STC value of 40, use only a single layer of gypsum board on both sides.
2. Mechanical and Electrical Items: Properly locate, detail, and caulk or insulate penetrations of the sound resistant enclosure by electrical boxes, light fixtures, air conditioning or ventilating ducts and grills, and other mechanical and electrical components to suppress generated noise or provide speech privacy (where applicable). Evaluate equipment and mechanical rooms for noise problems and provide recommendations during the design phase as to additional sound attenuation required. In the analysis, list the possible flanking paths for noise transmission and the methods recommended to prevent this leakage through the enclosure.
STC RATINGS
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
8/11/2015
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
Checker Green
660-332
GI200
WALL TYPES
08-11-2015
LINE OF DECK
LINE OF FINISH CEILING
LINE OF FINISH FLOOR
1 UL LISTING NA
FIRE RATING NA 2 UL LISTING U415
FIRE RATING 2-HOUR 3 UL LISTING NA
FIRE RATING NA 5
UL LISTING U419
FIRE RATING 1-HOUR
UL LISTING NA
FIRE RATING NON-RATED
SHAFT WALL
UL LISTING NA
FIRE RATING NON-RATED 10
UL LISTING NA
FIRE RATING NON-RATED
UL LISTING NA
FIRE RATING NON-RATED 12
UL LISTING U419
FIRE RATING 1-HOUR
LINE OF DECK
LINE OF FINISH CEILING
LINE OF FINISH FLOOR
UL LISTING U419
FIRE RATING 2-HOUR
LINE OF DECK
LINE OF FINISH CEILING
LINE OF FINISH FLOOR
UL LISTING U419
FIRE RATING 1-HOUR
UL LISTING U415
FIRE RATING 1-HOUR
UL LISTING NA
FIRE RATING NON-RATED
LINE OF DECK
LINE OF FINISH CEILING
LINE OF FINISH FLOOR
UL LISTING NA
FIRE RATING NON-RATED
LINE OF DECK
LINE OF FINISH CEILING
LINE OF FINISH FLOOR
UL LISTING NA
FIRE RATING NON-RATED
TRACY D.
STOCKING
NO.
135781
S
T A
E OF U
H
TAT
A R C H
I T E
C
TL
IC
E
N S E D
8/11/2015
5/8" TYPE X. GYP. BOARD BOTH SIDES
3-5/8" METAL STUD - @ 16" O.C
3-5/8" METAL CHANNEL RUNNER
ACOUSTICAL SEALANT - EA. SIDE
2" SOUND ATTENUATION
BLANKET
DEFLECTION TRACK
TOP RUNNER
SECURITY MESH
2 LAYERS OF
5/8" TYPE 'X' GYP. BOARD
BOTH SIDES
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL RUNNER
ACOUSTICAL SEALANT
2" SOUND ATTENUATION
BLANKET
SECURITY MESH
GI201
F3
LAYERS OF
5/8" GYP. BOARD
BOTH SIDES
3 5/8" METAL STUD - @ 16" O.C
3 5/8" METAL CHANNEL RUNNER
ACOUSTICAL SEALANT
2" SOUND ATTENUATION
BLANKET
SECURITY MESH
SEE PLAN FOR DIM.
9" U.N.O.
3/4" TYPE 'X' GYP. BOARD
4" METAL CH STUD - @ 16"
O.C
3 5/8" METAL CHANNEL RUNNER
2" SOUND ATTENUATION
BLANKET
1" TYPE 'X' GYP. BOARD
3" THERMAFIBER SAFB
INSULATION
GI201
F3
5/8" GYPSUM BOARD
7/8" HAT CHANNEL - @ 16" O.C
FIRE SAFING
METAL STUD
SEE WALL TYPE
METAL ROOF DECK
PARALLEL WITH FLUTES
ONE HOUR FIRE
AND SMOKE RESISTANT
UL-HW-D-0028
12" PIECE OF
5/8" TYPE 'X'
GYP. BD.
1-LAYER OF
TYPE 'X' GYP. BD.
DEFLECTION TRACK
FILL VOIDS BETWEEN METAL
DECK & PLATE WITH MINERAL
WOOL
SEALANT
FIRE SAFING
METAL STUD
SEE WALL TYPE
METAL ROOF DECK
PARALLEL WITH FLUTES
ONE HOUR FIRE
AND SMOKE RESISTANT
UL-HW-D-0028
12" PIECE OF
5/8" TYPE 'X'
GYP. BD.
1-LAYER OF
TYPE 'X' GYP. BD.
DEFLECTION TRACK
FILL VOIDS BETWEEN METAL
DECK & PLATE WITH MINERAL
WOOL
FLUTE COVER PLATE
3/ 4"
1/
2"
3/ 4"
1'
1'
3/ 4"
1/
2"
3/ 4"
FIRE SAFING
METAL STUD
SEE WALL TYPE
METAL ROOF DECK
PARALLEL WITH FLUTES
TWO HOUR FIRE
AND SMOKE RESISTANT
UL-HW-D-0264
12" PIECE OF
5/8" TYPE 'X'
GYP. BD.
2-LAYERS OF
TYPE 'X' GYP. BD.
DEFLECTION TRACK
FILL VOIDS BETWEEN METAL
DECK & PLATE WITH MINERAL
WOOL
SEALANT
FIRE SAFING
METAL STUD
SEE WALL TYPE
12" PIECE OF
5/8" TYPE 'X'
GYP. BD.
2-LAYERS OF
TYPE 'X' GYP. BD.
DEFLECTION TRACK
FILL VOIDS BETWEEN METAL
DECK & PLATE WITH MINERAL
WOOL
SEALANT
METAL ROOF DECK
PARALLEL WITH FLUTES
TWO HOUR FIRE
AND SMOKE RESISTANT
UL-HW-D-0264
3/ 4"
1/
2"
3/ 4"
1'
3/ 4"
1/
2"
3/ 4"
1'
16 GA. GALV. STEEL
PLATE, CONT.
16 GA. GALV. STEEL
PLATE, CONT.
PROVIDE 1/8" MIN. SEALANT - SRAYED
OR TROWELD ON EACH SIDE, TYP.
TRACY D.
STOCKING
NO.
135781
S
T A
E OF U
H
TAT
A R C H
I T E
C
TL
IC
E
N S E D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
8/11/2015
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
Banks Green
660-332
GI201
WALL TYPES / ROOM SCHEDULE
08-11-2015
UL LISTING U419
FIRE RATING 1-HOUR 17
UL LISTING U419
FIRE RATING 2-HOUR 18
UL LISTING NA
FIRE RATING NON-RATED
ROOM SCHEDULE
Room # Name Area Program
Area
1G00J HALL 97 SF
1G00K HALL 367 SF
1G00M CORRIDOR 649 SF
1G00MA VENDING 32 SF 80 SF
1G00O CORRIDOR 393 SF
1G00P HALL 602 SF
1G01 WAITING ROOM 478 SF 300 SF
1G03 FAMILY CONSULT 107 SF 140 SF
1G04 TOILET 59 SF 60 SF
1G05 OB/GYN Exam 167 SF 160 SF
1G05A OB toilet 44 SF 60 SF
1G06 TOILET 71 SF 60 SF
1G07 EXAM 138 SF 140 SF
1G08 BARIATRIC EXAM 140 SF 140 SF
1G09 EXAM 139 SF 140 SF
1G10 EXAM 138 SF 140 SF
1G11 EXAM 139 SF 140 SF
1G12 EXAM 134 SF 140 SF
1G13 EXAM 139 SF 140 SF
1G14 NURSE WORK N 125 SF 150 SF
1G15 EXAM 138 SF 140 SF
1G16 PHYS. WORK 416 SF 520 SF
1G17 EXAM 139 SF 140 SF
1G18 NURSE WORK S 126 SF 150 SF
1G19A EMS SUPPLY 108 SF 220 SF
1G19B FIRE RISER CLOSET 4 SF 10 SF
1G20 X-RAY 61 SF
1G21 DECON ROOM 257 SF 150 SF
1G22 NOURISHMENT 315 SF 80 SF
1G22A MEDS 132 SF 100 SF
1G22B CLEAN LINEN 110 SF 60 SF
1G22C EVS 65 SF 60 SF
1G22D CLEAN SUPPLY 152 SF 120 SF
1G23 DISASTER/DECON SUPPLY 109 SF 160 SF
1G24 MH CLINICAL OFFICE 100 SF 140 SF
1G25 EQUIPMENT 158 SF 80 SF
1G27 STAFF LOUNGE 328 SF 200 SF
1G29 TRAUMA ROOM 313 SF 350 SF
1G31 TRAUMA ROOM 309 SF 350 SF
1G33 ANTE ROOM 46 SF
1G33A ISOLATION EXAM 139 SF 140 SF
1G33B TOILET 57 SF 60 SF
1G35 ISOLATION EXAM 115 SF 140 SF
1G37 NURSE SUPER. 102 SF 120 SF
1G39 ER DIRECTOR 104 SF 120 SF
1G41 ON-CALL 86 SF 120 SF
1G43 SHARED CONFERENCE 305 SF 250 SF
1G45 SHARED EDUCATION 81 SF 100 SF
1G47 STAFF WC 62 SF 60 SF
1G47A STAFF WC/SHOWER 85 SF 60 SF
1G49 SOILED UTILITY 80 SF 80 SF
1G51 SECLUSION 137 SF 80 SF
1G53 EXAM 101 SF 140 SF
1G55 EXAM 124 SF 140 SF
1G57 EXAM 124 SF 140 SF
1G59 EXAM 140 SF 140 SF
1G61 EXAM 140 SF 140 SF
1G63 INTERNAL WAITING 260 SF 200 SF
1G65 TOILET 50 SF 60 SF
1G65A SHOWER 30 SF
1G67 FAST TRACK/EXAM 110 SF 140 SF
1G69 FAST TRACK/EXAM 110 SF 140 SF
1G71 FAST TRACK/EXAM 110 SF 140 SF
1G73 REC / ENROLLMENT / POLICE 151 SF 240 SF
1G75 ENROLLMENT 55 SF 120 SF
1G77 VIS. TOILET 52 SF 60 SF
1G79 VIS. TOILET 43 SF 60 SF
1G81 GENERATOR 336 SF
1G83 EM ELEC. ROOM 302 SF 300 SF
1G85 ELECTRICAL ROOM 133 SF 150 SF
1G87 BIOMED 107 SF
2B25-1 BIO. MED. 39 SF
ROOM SCHEDULE
Room # Name Area Program
Area
1A00 HALL 219 SF
1A21 RECEPTION 134 SF 310 SF
1A21A STORAGE 52 SF
1A23 CORRIDOR 686 SF
1A23.01 CUBICLE 79 SF
1A23.02 CUBICLE 76 SF
1A23.03 CUBICLE 74 SF
1A23.04 CUBICLE 75 SF
1A23.05 CUBICLE 73 SF
1A23.06 CUBICLE 74 SF
1A23.07 CUBICLE 72 SF
1A23.08 BREAK ROOM 93 SF
1A23.09 CUBICLE 74 SF
1A23.10 DIRECTORS SECRETARY 60 SF
1A23.11 CUBICLE 55 SF
1A23.12 CUBICLE 60 SF
1A23A ASSOCIATE DIRECTOR FOR
QUALITY AND SAFETY
160 SF
1A23B ASSOCIATE DIRECTOR FOR
PATIENT CARE SERVICES
159 SF
1A23C CHEIF OF COMMUNICATIONS 76 SF
1A23D CONSULTATION 76 SF
1A23E DIRECTOR 192 SF
1A23F CHIEF OF STAFF 149 SF
1A23G ASSOCIATE DIRECTOR 123 SF
1A23H BOARD ROOM 892 SF
1AB STAIR 296 SF
1B00E HALL 334 SF
1B00G HALL 119 SF
1B22 OFFICE 127 SF
1B41 STORAGE 64 SF
1B43 VESTIBULE 100 SF
1B43A Hall 276 SF 60 SF
1B43A.01 PSA 59 SF
1B43AA HOLD 33 SF 60 SF
1B43B INTERVIEW 50 SF
1B45 HALL 200 SF
1B45.01 OFFICER 55 SF 60 SF
1B45.02 OFFICER 61 SF 60 SF
1B45.03 OFFICER 47 SF 60 SF
1B45.04 OFFICER 47 SF 60 SF
1B45.05 OFFICER 46 SF 60 SF
1B45.06 OFFICER 45 SF 60 SF
1B45.07 OFFICER 71 SF 60 SF
1B45A BREAK ROOM 104 SF 80 SF
1B45B ARMORY 107 SF 60 SF
1B45C WOMENS WC 58 SF 80SF
1B45CA WOMENS SHOWER 37 SF 75 SF
1B45D MENS WC 117 SF 80 SF
1B45DA MENS SHOWER 49 SF 75 SF
1B45E CHIEF 116 SF 150 SF
1B45F STORAGE 33 SF
1B45G EVIDENCE 61 SF 30 SF
1B45H DISPATCH 154 SF
1B47 IT ROOM 102 SF 80 SF
1G00 HALL 400 SF 200 SF
1G00A VESTIBULE 170 SF 260 SF
1G00B HALL 150 SF
1G00BA TRIAGE 114 SF 140 SF
1G00C HALL 700 SF
1G00D HALL 255 SF
1G00DA VESTIBULE 173 SF 160 SF
1G00E HALL 527 SF
1G00E.01 PHARM. WK. 33 SF
1G00E.02 UM WK. 32 SF
1G00FA CHARTING 41 SF
1G00G HALL 269 SF
1G00GA ALCOVE 322 SF 120 SF
1G00GB STAT LAB 60 SF 100 SF
1G00H HALL 71 SF
1G00HA MAIL 49 SF
1G00I HALL 159 SF
LINE OF DECK
LINE OF FINISH CEILING
LINE OF FINISH FLOOR
UL LISTING U415 SEGMENT C
FIRE RATING 2 HOUR
UL LISTING U419
FIRE RATING 1-HOUR
3" = 1'-0"GI201
F1 1-HR FIRE RATED WALL HEAD DETAIL
3" = 1'-0"GI201
F3 2-HR FIRE RATED WALL HEAD DETAIL
| CS000 - COVER |
| Sheets |
| CS000 - COVER |
| CS001 - COVER SHEET |
| Sheets |
| CS001 - COVER SHEET |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: CS001 - COVER SHEET |
| CS002 - RISK ASSESSMENT |
| Sheets |
| CS002 - RISK ASSESSMENT |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: CS002 - RISK ASSESSMENT |
| CS003 - IT CHECKLIST |
| Sheets |
| CS003 - IT CHECKLIST |
| 20140045-Elec Central_pss@spectrum-engineers.com |
| Sheet: CS003 - IT CHECKLIST |
| P01 - Architectural Final Set - Copy.pdf |
| VAMC Urgent Care_CD_MGreen - Sheet - GI001 - PROJECT PHASING |
| VAMC Urgent Care_CD_MGreen - Sheet - GI002 - PROJECT STANDARDS & ANNOTATION |
| VAMC Urgent Care_CD_MGreen - Sheet - GI101 - LIFE SAFETY PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - GI200 - WALL TYPES |
| VAMC Urgent Care_CD_MGreen - Sheet - GI201 - WALL TYPES - ROOM SCHEDULE |
| VAMC Urgent Care_CD_MGreen - Sheet - AD101 - LEVEL 1 DEMOLITION PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AD102 - FUTURE ADMINISTRATION AREA DEMOLITION PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AE001 - PROJECT BID ALTERNATES |
| VAMC Urgent Care_CD_MGreen - Sheet - AE100 - DIMENSION CONTROL PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AE101 - FLOOR PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AE101A - FLOOR PLAN - AREA A |
| VAMC Urgent Care_CD_MGreen - Sheet - AE101B - FLOOR PLAN - AREA B |
| VAMC Urgent Care_CD_MGreen - Sheet - AE101C - FLOOR PLAN - AREA C |
| VAMC Urgent Care_CD_MGreen - Sheet - AE101D - FLOOR PLAN - AREA D |
| VAMC Urgent Care_CD_MGreen - Sheet - AE102 - ADMIN OFFICE FLOOR PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AE103 - LEVEL 2 DEMOLITION- FLOOR PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AE141 - REFLECTED CEILING PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AE141A - ENLARGED RCP - AREA A |
| VAMC Urgent Care_CD_MGreen - Sheet - AE141B - ENLARGED RCP - AREA B |
| VAMC Urgent Care_CD_MGreen - Sheet - AE141C - ENLARGED RCP - AREA C |
| VAMC Urgent Care_CD_MGreen - Sheet - AE141D - ENLARGED RCP - AREA D |
| VAMC Urgent Care_CD_MGreen - Sheet - AE161 - ROOF PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AE201 - BUILDING ELEVATIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE202 - BUILDING ELEVATIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE301 - BUILDING SECTIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE302 - BUILDING SECTIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE303 - WALL SECTIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE304 - WALL SECTIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE305 - WALL SECTIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE451 - INTERIOR ELEVATIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE452 - INTERIOR ELEVATIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE453 - INTERIOR ELEVATIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE454 - INTERIOR ELEVATIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE455 - INTERIOR ELEVATIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE456 - INTERIOR ELEVATIONS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE501 - EXTERIOR DETAILS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE502 - EXTERIOR DETAILS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE510 - COLUMN DETAILS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE530 - DETAILS - ROOF |
| VAMC Urgent Care_CD_MGreen - Sheet - AE540 - CEILING DETAILS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE550 - DETAILS - DOOR |
| VAMC Urgent Care_CD_MGreen - Sheet - AE551 - DETAILS - DOOR |
| VAMC Urgent Care_CD_MGreen - Sheet - AE560 - DETAILS - WINDOW |
| VAMC Urgent Care_CD_MGreen - Sheet - AE561 - DETAILS - WINDOWS |
| VAMC Urgent Care_CD_MGreen - Sheet - AE570 - DETAILS - MILLWORK |
| VAMC Urgent Care_CD_MGreen - Sheet - AE571 - DETAILS - MILLWORK |
| VAMC Urgent Care_CD_MGreen - Sheet - AE572 - DETAILS - MILLWORK |
| VAMC Urgent Care_CD_MGreen - Sheet - AE601 - DOOR SCHEDULE AND TYPES |
| VAMC Urgent Care_CD_MGreen - Sheet - AE602 - WINDOW TYPES |
| VAMC Urgent Care_CD_MGreen - Sheet - AI101 - FINISH FLOOR PLAN |
| VAMC Urgent Care_CD_MGreen - Sheet - AI501 - INTERIOR DETAILS |
| VAMC Urgent Care_CD_MGreen - Sheet - AI601 - FINISH SCHEDULE |
File details come from the government source that posted it. Updated .