Attch7_ 9 Plumbing Drawings Part2.pdf
PDF 18 MB Posted
- Solicitation number
- 36C25920R0096
About this file
This document provides details on a federal contract opportunity for construction services. The Department of Veterans Affairs is seeking proposals for the construction of an 18,500 square foot addition to the Salt Lake City VA Medical Center to serve as a new emergency department and associated support areas. The project scope includes architectural, mechanical, electrical, structural, and civil engineering design and construction services to build the new wing and connect it to the existing facility, along with some renovations. Proposals are due on or around July 27, 2020. The contract is set aside for service-disabled veteran-owned small businesses and applicants must be verified and listed in the Vendor Information Pages database to be considered. The estimated value of the contract is between $10-20 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd0003_36C25920R0096 0003.docx | DOCX document | |
| Amd0003_attch2_36C25920R0096_1_updated per Amd0003.pdf | ||
| Amd0003_attch1_RFI_v3.pdf | ||
| Amd0002_attch2_HospitalLayout.pdf | ||
| Amd0002_36C25920R0096 0002.docx | DOCX document | |
| Amd0002_attch1_RFI_v2.pdf | ||
| Amd0001_36C25920R0096 0001.docx | DOCX document | |
| Amd0001_attch1_RFIs.pdf | ||
| Attch8_10 MechDrawings Part 1.pdf | ||
| Attch4_11 Elect Drawings Part 1.pdf | ||
| Attch2_6 Structural Drawings.pdf | ||
| Attch11_8 Arch Drawings Part 2.pdf | ||
| Attch10_7 Arch Drawings Part 1.pdf | ||
| 36C25920R0096_1.docx | DOCX document | |
| Attch13_Past Performance Questionnaire.docx | DOCX document | |
| Attch5_11 Elect Drawings Part 2.pdf | ||
| Attch1_3 General Drawings.pdf | ||
| Attch3_4 Civil Drawings.pdf | ||
| Attch9_8 Fire Protection Drawings.pdf | ||
| Attch6_9 Plumbing Drawings Part 1.pdf | ||
| Attch12_5 Landscape Drawings.pdf | ||
| 36C25920R0096.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4"ø SS
2"ø SS
4"ø SS
2 1/2"ø V
1 1/2"ø V
2 1/2"ø V
2 1/2"ø V
2 1/2"ø V
4"ø SS
4"ø SS 2"ø SS
1 1/2"ø V
4"ø SS
3"ø SS
2"ø SS
1 1/2"ø V
2"ø V 2"ø V
4"ø SS2"ø SS
2"ø V
2 1/2"ø V
2 1/2"ø V
2 1/2"ø V
2 1/2"ø V
1 1/2"ø V
1 1/2"ø V
1 1/2"ø V
1 1/2"ø V
3"ø SS
3"ø SS
2"ø SS
4"ø SS
4"ø SS
P-401
P-104
P-104
P-401
FD-1
P-701 P-104
FD-1
FD-1
1.3 H
E.1
E.1
2.5
M
K
J
EV
EXEX
EW
EUEU
E18
E21 E23 E26
G
2.9
H.8
L
2.1 2.3 2.7
E24
D.8
E26A
F.5
E
E E.5
"ø
R W 4"ø R
W
DN-1
DN-1
"ø
R W
SHARED CONFERENCE
1G43
HALL
1B00G
OFFICE
1B22
HALL
1B00E
ON-CALL
1G41
ER DIRECTOR
1G39
NURSE SUPER.
1G37
HALL
1G00J
DISPATCH
1B45H
HALL
1B45
ARMORY
1B45B
BREAK ROOM
1B45A
IT ROOM
1B47
EVIDENCE
1B45G
OFFICER
1B45.05
OFFICER
1B45.02
OFFICER
1B45.01
Hall
1B43A
OFFICER
1B45.03
OFFICER
1B45.04
OFFICER
1B45.06
OFFICER
1B45.07
CHIEF
1B45E
HOLD
1B43AA
INTERVIEW
1B43B
VESTIBULE
1B43
PSA
1B43A.01
Hall
1B43A
WOMENS WC
1B45C
MENS WC
1B45D
WOMENS SHOWER
1B45CA
CORRIDOR
1G00O
CHARTING
1G00FA
SOILED UTILITY
1G49
BIOMED
1G87
ISOLATION EXAM
1G35
TOILET
1G33B
STORAGE
1B41
STORAGE
1B45F
"ø
R W
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
P-401
P-701
FD-1
P-413
P-413
P-505
P-401
A
B C
D
DEDUCT ALTERNATE F: SHELL POLICE AREA. COMPLETE THE EXTERIOR WALLS
WITH INSULATION AND VAPOR BARRIER (BUT NO INTERIOR GYPSUM BOARD)
AND ELECTRICAL ROUGH-IN. OTHERWISE SHELL THE AREA. DEMOLISH ALL
ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING FEATURES WITH IN
THE SHELL AS IDENTIFIED IN THE BASE SCOPE OF WORK. DO NOT COMPLETE
ANY OF THE INTERIOR WALLS, DOORS, FINISHES MECHANICAL, ELECTRICAL,
PLUMBING AND FIRE WORK. CONSTRUCT DOOR 1B43 FOR ACCESS TO SHELLED
AREA. SEE AE001 FOR FURTHER INFORMATION.
DEDUCT ALTERNATE G: DEDUCT NEW CONSTRUCTION IN POLICE AREA INCLUDING
NO DEMOLITION OF CURTAIN WALL ENCLOSED EXTRASTITIAL SPACE, NO
MODIFICATIONS TO BRIDGE ABOVE AND ALL ASSOCIATED CIVIL, STRUCTURAL,
ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE WORK.
DEMOLITION OF EXISTING INTERIOR SPACE THAT WOULD COMPRISE NEW POLICE
AREA IS STILL REQUIRED, AND IS TO REMAIN AS IS, AND NOT AFFECTED BY THIS
DEDUCTIVE ALTERNATE. EXTEND NEW EXTERIOR WALL TO FACE OF EXISTING
CURTAIN WALL AND MODIFY STRUCTURE AND ROOF ABOVE. SEE AE001 FOR
FURTHER INFORMATION.
DEDUCT ALTERNATE H: DEDUCT NEW CONSTRUCTION IN POLICE AREA INCLUDING
NO DEMOLITION OF CURTAIN WALL ENCLOSED EXTRASTITIAL SPACE, NO
MODIFICATIONS TO BRIDGE ABOVE AND ALL ASSOCIATED CIVIL, STRUCTURAL,
ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE WORK. DO NOT
DEMOLISH ANY EXISTING INTERIOR. EXTEND NEW EXTERIOR WALL TO FACE OF
EXISTING CURTAIN WALL AND MODIFY STRUCTURE AND ROOF ABOVE. SEE AE001
FOR FURTHER INFORMATION.
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL111A
LEVEL 1 PLUMBING PLAN - DWV - AREA A
08-11-2015
SCALE: 3/16" = 1'-0"F2
DRAIN WASTE AND VENT PLAN - AREA A
NORTH
0 2' 4' 8'
SCALE: NTS
KEY PLAN - AREA A
1 CONNECT TO EXISTING SANITARY WASTE PIPING IN THIS APPROXIMATE
LOCATION.
2 CONNECT TO EXISTING PRIMARY ROOF DRAIN PIPING IN THIS APPROXIMATE
LOCATION.
3 4" WASTE PIPE STUBBED UP TO JUST BELOW ROOF DECK WITH CAP FOR FUTURE
CONNECTION.
SHEET KEYNOTES
8-11-15
2"ø SS
3"ø SS
3"ø SS
4"ø SS
1 1/2"ø V
1 1/2"ø V
1 1/2"ø V
1 1/2"ø V
1 1/2"ø V
2"ø SS
1 1/2"ø V
3"ø VTR
2 1/2"ø V
2 1/2"ø V
4"ø SS
2"ø SS
4"ø SS
3"ø SS
1 1/2"ø V
4"ø SS
2"ø SS
2"ø V
2"ø V
2"ø SS
2"ø SS
2"ø V
2"ø V
2"ø V
2 1/2"ø V
2"ø SS
1 1/2"ø V
1 1/2"ø V
2 1/2"ø V
2 1/2"ø V
1 1/2"ø V
4"ø SS
3"ø SS
3"ø SS
P-104
P-401
P-104
P-104
P-503
P-401
P-401
P-401
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
1.3
A
H
B
C
D
E.1
E.1
2.5
EX
R3R2
E18 E21 E23 E26
RC
RC
D.2
2.1 2.3
E24
D.8
E26A
O
O
RA
RA RF
RF
E
E
C.9
C.9
E.5
R1
E.4
DN-2
3"ø RW
"ø
R W
3"ø RW
"ø
R W
3"ø RW
4"ø RW
4" ø R
W
"ø
R W
"ø
R W
4"ø R W
6" ø R
W
HALL
1G00P
NURSE WORK N
1G14
PHYS. WORK
1G16
NURSE WORK S
1G18
TRAUMA ROOM
1G29
TRAUMA ROOM
1G31
STAFF LOUNGE
1G27
EQUIPMENT
1G25
DISASTER/DECON SUPPLY
1G23
DECON ROOM
1G21
EMS SUPPLY
1G19A
STAT LAB
1G00GB
ALCOVE
1G00GA
VESTIBULE
1G00DA
EXAM
1G17
EXAM
1G15
BARIATRIC EXAM
1G08
EXAM
1G10
EXAM
1G12
MEDS
1G22A
CLEAN LINEN
1G22B
UM WK.
1G00E.02
PHARM. WK.
1G00E.01
X-RAY
1G20
SOILED UTILITY
1G49
CHARTING
1G00FA
CORRIDOR
1G00O
ARMORY
1B45B
IT ROOM
1B47
BREAK ROOM
1B45A
1G00HA
HALL
1G00H
NURSE SUPER.
1G37
SHARED EDUCATION
1G45
STAFF WC/SHOWER
1G47A
STAFF WC
1G47
ISOLATION EXAM
1G33A
ANTE ROOM
1G33
ISOLATION EXAM
1G35
TOILET
1G33B
MATCHLINE AREA B
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA B
P-413
P-413 P-413
P-413
P-413P-524
P-413
P-413
P-413
ESH-1
FD-2
P-701 P-701
DT-1
P-413
P-413
P-413 P-104
P-413
P-413
P-413
P-505
P-401
P-104
IMB-1
P-401
P-701
P-413
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL111B
LEVEL 1 PLUMBING PLAN - DWV - AREA B
08-11-2015
SCALE: 3/16" = 1'-0"F1
DRAIN WASTE AND VENT PLAN - AREA B
NORTH
0 2' 4' 8'
SCALE: 1" = 200'-0"
KEY PLAN - AREA B
1 50 GALLON HOLDING TANK. PROVIDE WITH VENT CONNECTION AND TOP PUMP
OUT OPENING. PROVIDE WITH ALARM AT 50% AND 75% FULL. COORDINATE WITH
GC TO PROVIDE MANHOLE COVER.
2 PROVIDE MANUAL DIVERTING VALVE. NORMALLY CLOSED. PROVIDE WITH FLOOR
COVER.
3 PROVIDE MANUAL DIVERTING VALVE. NORMALLY OPEN. PROVIDE WITH FLOOR
COVER.
4 4" WASTE PIPE STUBBED UP TO JUST BELOW ROOF DECK WITH CAP FOR FUTURE
CONNECTION.
P F
P-701
P-104
P-104
P-104
P-104
P-104
P-503 P-401
FD-1
P-604
FD-1
FD-1
P-701
FD-1
FD-1
4"ø SS
4"ø SS
1 1/2"ø V
3"ø SS
1 1/2"ø V
2"ø SS
3"ø SS
2 1/2"ø V
2 1/2"ø V
2 1/2"ø V
2"ø V
2 1/2"ø V
1 1/2"ø V
2"ø V 3"ø SS
2"ø SS
4"ø SS 2"ø SS
2 1/2"ø V
1 1/2"ø V
3"ø VTR
1 1/2"ø V
1 1/2"ø V
1 1/2"ø V
1 1/2"ø V
1 1/2"ø V
2"ø SS
2"ø SS
2"ø SS
2"ø SS
2"ø SS
4"ø SS 4"ø SS
4"ø SS3"ø SS
1 1/2"ø V
2 1/2"ø V
2 1/2"ø V
4"ø SS
1 1/2"ø V
2 1/2"ø V
2"ø SS
2"ø SS
4"ø SS
4"ø SS
2 1/2"ø V
1 1/2"ø V
2 1/2"ø V
3"ø VTR
1 1/2"ø V
H
E.1
E.1
2.5E26
G
G
2.92.3 2.7
D.8
E26A
RF
RF
F.5
E
E
C.9
C.9 5
E.5
E.5
F
F.4
E.7
E.4
E.4
DN-2
DN-1
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
FS-1
P-413
FS-1
EM ELEC. ROOM
1G83
GENERATOR
1G81
ELECTRICAL ROOM
1G85
BIOMED
1G87
INTERNAL WAITING
1G63
EXAM
1G61
EXAM
1G59
EXAM
1G57
EXAM
1G55
EXAM
1G53
SECLUSION
1G51
HALL
1G00K
CLEAN SUPPLY
1G22D
MH CLINICAL OFFICE
1G24
NOURISHMENT
1G22
HALL
1G00C
EVS
1G22C
CLEAN LINEN
1G22B
MEDS
1G22A
EXAM
1G12
TOILET
1G65
FAST TRACK/EXAM
1G67
FAST TRACK/EXAM
1G69
VIS. TOILET
1G79
CORRIDOR
1G00M
VENDING
1G00MA
IT ROOM
1B47
ARMORY
1B45B
CORRIDOR
1G00O
SOILED UTILITY
1G49
MENS WC
1B45D
MENS SHOWER
1B45DA
1 1/2"ø V
3"ø SS
P-413
P-104
P-413
P-413
P-413
P-401
P-413
P-413
P-413
FD-1
A
B C
D
DEDUCT ALTERNATE K: SHELL RECEPTION, PATIENT WAITING, CONSULT
ROOM, ENROLLMENT, VISITOR TOILET, AND WRAP AROUND CORRIDOR. DO
NOT COMPLETE ANY OF THE INTERIOR WALLS, DOORS, FINISHES,
MECHANICAL, ELECTRICAL, PLUMBING AND FIRE. COMPLETE THE
EXTERIOR WALLS WITH INSULATION AND VAPOR BARRIER (BUT NO
INTERIOR GYPSUM BOARD) AND ELECTRICAL ROUGH-IN. SEE AE001 FOR
FURTHER INFORMATION.
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL111C
LEVEL 1 PLUMBING PLAN - DWV - AREA C
08-11-2015
SCALE: 3/16" = 1'-0"F2
DRAIN WASTE AND VENT PLAN - AREA C
NORTH
0 2' 4' 8'
SCALE: NTS
KEY PLAN - AREA C
1 4" WASTE PIPE STUBBED UP TO JUST BELOW ROOF DECK WITH CAP FOR FUTURE
CONNECTION.
P-104
P-104
P-104P-104
P-503 P-401
FD-1
FD-1
FD-1
P-701
FD-1
FD-1
2"ø V
2"ø V
2"ø V
2"ø V
2"ø V
2"ø V
2 1/2"ø V
2 1/2"ø V
4"ø SS
2 1/2"ø V
2 1/2"ø V
2"ø V
2 1/2"ø V
4"ø SS
3"ø SS
4"ø SS
2"ø SS
2"ø SS
2 1/2"ø V
1 1/2"ø V
2"ø SS
1 1/2"ø V
1 1/2"ø V
2 1/2"ø V
2"ø SS
3"ø SS
2"ø SS
2"ø SS
2"ø SS
2"ø SS
R6
R6
R7
R7
E.1
E.1
RG
RD
RB
R4
R3
RC
R5
RE
O
O
RA
RA
RF
RF
RH
E
E
C.9
C.9
E.5
E.5
E.7
E.4
E.4
4"ø R
W
3"ø R
W
"ø
R W
3"ø RW
"ø
R W
3" ø R
W
"ø
R W
4"ø R
W
4"ø R
W
6"ø RW
3"ø RW
4"ø R
W
6" ø R
W
DN-2
DN-1
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
P-401
P-104
P-401
P-401
P-413
P-413
P-413
P-413
P-413
P-413
P-413
P-413
P-413
P-413
P-604
OB/GYN Exam
1G05
FAMILY CONSULT
1G03
VESTIBULE
1G00A
OB toilet
1G05A
WAITING ROOM
1G01
HALL
1G00
REC / ENROLLMENT / POLICE
1G73
ENROLLMENT
1G75
CORRIDOR
1G00M
VIS. TOILET
1G77
VIS. TOILET
1G79
VENDING
1G00MA
SHOWER
1G65A
FAST TRACK/EXAM
1G67
FAST TRACK/EXAM
1G69
FAST TRACK/EXAM
1G71
TRIAGE
1G00BA
HALL
1G00B
HALL
1G00C
TOILET
1G04
TOILET
1G06
EXAM
1G17
EXAM
1G15
EXAM
1G13
EXAM
1G11
EXAM
1G09
EXAM
1G07
EVS
1G22C 2
A
B C
D
DEDUCT ALTERNATE K: SHELL RECEPTION, PATIENT WAITING, CONSULT
ROOM, ENROLLMENT, VISITOR TOILET, AND WRAP AROUND CORRIDOR. DO
NOT COMPLETE ANY OF THE INTERIOR WALLS, DOORS, FINISHES,
MECHANICAL, ELECTRICAL, PLUMBING AND FIRE. COMPLETE THE
EXTERIOR WALLS WITH INSULATION AND VAPOR BARRIER (BUT NO
INTERIOR GYPSUM BOARD) AND ELECTRICAL ROUGH-IN. SEE AE001 FOR
FURTHER INFORMATION.
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL111D
LEVEL 1 PLUMBING PLAN - DWV - AREA D
08-11-2015
SCALE: 3/16" = 1'-0"F2
DRAIN WASTE AND VENT PLAN - AREA D
NORTH
0 2' 4' 8'
SCALE: 1" = 200'-0"
KEY PLAN - AREA D
1 CONNECT TO EXISTING AREA WELL. SEE CIVIL SITE UTILITY PLAN.
2 4" WASTE PIPE STUBBED UP TO JUST BELOW ROOF DECK WITH CAP FOR FUTURE
CONNECTION.
O D
R D
OD
RD
O D
R D
O D
R D
O D
R D
OD
RD
OD
RD
O D
R D
O D
R D
O D
R D
OD
RD
OD
RD
O D
R D
O D
R D
O D
R D
31 32
R6
R6
R7
R7
1.3
A
H
B
C
D
E.1
2.5
M
K
J
RG
RD
RB
EV
EX
EW
R4
R3
R2
EU
E18 E21 E23 E26
RC
G
D.2
2.9
H.8
L
2.1 2.3 2.7
R5
E24
D.8
E33B
E26A
RE
O
RA
RF
RF
F.5
RH
E
C.9
C.9
E.5
F F.4
E.7
R1
E.4
3"ø R W
3"ø SR W
3"ø RW
3"ø SR W
4"ø SR W
"ø
R W
3" ø R
W
3"ø SR W
3"ø R W
3" ø R
W
4" ø R
W
3" ø R
W
4"ø RW
3"ø SR W
3"ø SRW
"ø
S R
W
3"ø SRW
3"ø RW
4"ø SRW
3"ø RW 3"ø SRW
3"ø SRW
3"ø SRW
3"ø SR W
3"ø RW
3"ø RW
3"ø SRW 4" ø S
R W
3"ø SRW
3"ø RW
3"ø RW
3"ø SRW
3"ø V
3"ø V
3"ø V
3"ø V
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL112
ROOF PLUMBING PLAN
08-11-2015
NORTH
0 2' 4' 8'
SCALE: 3/32" = 1'-0"F2
ROOF DRAIN, WASTE, AND VENT PLAN
SCALE: NTS
KEY PLAN - URGENT CARE
P F
STAFF WC/SHOWER
1G47A
STAFF LOUNGE
1G27
EQUIPMENT
1G25
DISASTER/DECON SUPPLY
1G23
DECON ROOM
1G21
EMS SUPPLY
1G19A
STAT LAB
1G00GB
TRAUMA ROOM
1G29
TRAUMA ROOM
1G31
ISOLATION EXAM
1G33A
ISOLATION EXAM
1G35
EXAM
1G17
EXAM
1G15
EXAM
1G13
EXAM
1G11
EXAM
1G09
EXAM
1G07
BARIATRIC EXAM
1G08
EXAM
1G10
EXAM
1G12
MEDS
1G22A
TOILET
1G04
TOILET
1G06
CLEAN SUPPLY
1G22D
MH CLINICAL OFFICE
1G24
HALL
1G00C FAST TRACK/EXAM
1G71
FAST TRACK/EXAM
1G69
FAST TRACK/EXAM
1G67
TOILET
1G65
VIS. TOILET
1G79
VIS. TOILET
1G77
EXAM
1G61
EXAM
1G59
EXAM
1G57
EXAM
1G53
SOILED UTILITY
1G49
IT ROOM
1B47
ARMORY
1B45B
OFFICER
1B45.01
CHIEF
1B45E
OFFICER
1B45.07
OFFICER
1B45.05
OFFICER
1B45.04
STORAGE
1B45F
NURSE SUPER.
1G37
ER DIRECTOR
1G39
ON-CALL
1G41
SHARED CONFERENCE
1G43
ALCOVE
1G00GA
REC / ENROLLMENT / POLICE
1G73
WAITING ROOM
1G01
VESTIBULE
1G00A
PHYS. WORK
1G16
NURSE WORK S
1G18
STORAGE
1B41
VESTIBULE
1G00DA
BIOMED
1G87
STAFF WC
1G47
SHARED EDUCATION
1G45
EVIDENCE
1B45G
1G00HA
CHARTING
1G00FA
GENERATOR
1G81
HALL
1B00G
X-RAY
1G20
ANTE ROOM
1G33
SECLUSION
1G51
EXAM
1G55
UM WK.
1G00E.02
PHARM. WK.
1G00E.01
BREAK ROOM
1B45A
OFFICER
1B45.02
OFFICER
1B45.03
MENS WC
1B45D
WOMENS WC
1B45C
ELECTRICAL ROOM
1G85
EM ELEC. ROOM
1G83
OB toilet
1G05A
DISPATCH
1B45H
VESTIBULE
1B43
PSA
1B43A.01
HOLD
1B43AA
INTERVIEW
1B43B
CLEAN LINEN
1G22B
EVS
1G22C
NURSE WORK/ FAST TRACK
1G02
ZVB-1
ZVB-2
LPA-5
ZVB-3
ZVB-4
ZVB-5
ZVB-6
LPA-1
LPA-6
LPA-4
LPA-3
INTERNAL WAITING
1G63
REC / ENROLLMENT / POLICE
1G73
2 1/2"ø MG-VAC
1 1/4"ø MG-AIR
1"ø MG-O2
LPA-2
31 32
R6
R6
R7
R7
1.3
A
H
B
B
C
D
E.1
E.1
2.5
M
K
J
RG
RD
RB
EV
EX
EW
R4
R4
R3
R2
EU
E18
E21 E23 E26
RC
RC
G
D.2
2.9
H.8
L
2.1 2.3 2.7
R5
E24
D.8
E33B
E26A
RE
O
RA
RA
RF
RF
F.5
RH
RH
E
E
C.9
C.9
E.5
F F.4
E.7
R1
E.4
MGMA
MGO-2
MGO-2
MGO-2
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
MGO-1
MGO-4
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
MGO-4
MGO-3
MGO-3
MGO-3
FAMILY CONSULT
1G03
OB/GYN Exam
1G05
NURSE WORK N
1G14
1/2"ø MG-O2 1/2"ø MG-AIR
1"ø MG-VAC
1/2"ø MG-O2 1/2"ø MG-AIR
1"ø MG-VAC
1"ø MG-O2 1"ø MG-AIR
2"ø MG-VAC
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL121
MEDICAL GAS PIPING PLAN
08-11-2015
SCALE: 3/32" = 1'-0"F3
OVERALL MEDICAL GAS PIPING PLAN
NORTH
0 6' 12' 24' SCALE: NTS
KEY PLAN - OVERALL
1 CONNECT TO EXISTING MEDICAL GAS PIPING IN ROOM ACROSS FROM ELEVATOR
APPROXIMATELY 100' AWAY. NEW MEDICAL GAS PIPING IS LARGER THAN
EXISTING.
2 CAPPED AND VALVED STUB OUTS FOR FUTURE.
3 CEILING MOUNTED BOOM MEDICAL GAS CONNECTIONS.
SHEET KEYNOTES
SCALE: 1/32" = 1'-0"F1
MEDICAL GAS PIPING TIE IN LOCATION
1.3 H
E.1
E.1
2.5
M
K
J
EV
EX
EW
EU
E18
E21 E23 E26
G
2.9
H.8
L
2.1 2.3 2.7
E24
D.8
E26A
F.5
E
E E.5
/2 "ø
M G
-V A
C
3/4"ø M G -VAC1/2"ø M
G -A
IR1/2"ø M G -O
1/2"ø MG-O2 1/2"ø MG-AIR
1"ø MG-VAC
1" ø M
G -V
AC
1/ 2" ø M G -A
IR
1/ 2" ø M
G -O
1"ø MG-O2
3/4"ø MG-AIR
1 1/2"ø MG-VAC
HALL
1B45
OFFICER
1B45.01
OFFICER
1B45.02
OFFICER
1B45.03
OFFICER
1B45.04
OFFICER
1B45.05
EVIDENCE
1B45G
STORAGE
1B45F
PSA
1B43A.01
VESTIBULE
1B43
HOLD
1B43AA
INTERVIEW
1B43B
OFFICER
1B45.06
OFFICER
1B45.07
CHIEF
1B45E
Hall
1B43A
WOMENS WC
1B45C
MENS WC
1B45D
MENS SHOWER
1B45DA
BIOMED
1G87
CORRIDOR
1G00O
SOILED UTILITY
1G49
IT ROOM
1B47
ARMORY
1B45B
BREAK ROOM
1B45A
ER DIRECTOR
1G39
HALL
1B00E
ON-CALL
1G41
HALL
1G00J
SHARED CONFERENCE
1G43
HALL
1B00G
STORAGE
1B41
1G00HA
HALL
1G00H
TOILET
1G33B
ISOLATION EXAM
1G35
CHARTING
1G00FA
HALL
1G00P
SHARED EDUCATION
1G45
HALL
1G00I
NURSE SUPER.
1G37
DISPATCH
1B45H
/4 "ø
M G
-A
IR
"ø
M G
-O
MGO-3
ZVB-6
MGMA
LPA-5
MATCHLINE AREA A
MATCHLINE AREA C
MATCHLINE AREA A
MATCHLINE AREA B
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL121A
LEVEL 1 MEDICAL GAS PIPING PLAN - AREA
A
08-11-2015
SCALE: 3/16" = 1'-0"F2
MEDICAL GAS PIPING PLAN - AREA A
NORTH
0 2' 4' 8' SCALE: NTS
KEY PLAN - AREA A
1 CONNECT TO MEDICAL GAS PIPING IN ROOM ACROSS FROM ELEVATORS.
2 PL121B FOR CONTINUATION
1.3
A
H
B
C
D
E.1
E.1
2.5
EXEX
R3R2
E18 E21 E23 E26
RC
RC
D.2
2.1 2.3E24
D.8
E26A
O
RA
RA RF
RF
E
E
C.9
C.9
E.5
R1
E.4
MGMA
LPA-5ZVB-6
LPA-6
LPA-1
ZVB-1
LPA-2
ZVB-2
LPA-3
ZVB-3
/2"ø
M G
-O
/2
"ø M
G -A
IR
/4
"ø M
G -V
A C
"ø
M G
-V A
C
/2
"ø M
G -A
IR
/2"ø
M G
-O
1/2"ø M G-A
IR
1"ø M
G-V
AC
/2"ø M
G -V
A C
/4
"ø M
G -A
IR
"ø
M G
-O
1/2"ø MG-O2
1/2"ø MG-AIR
1"ø MG-VAC
1/ 2" ø M
G -O
1/ 2" ø M G -A
IR
1" ø M
G -V
AC
1/2"ø MG-O2
1/2"ø MG-AIR 1"ø MG-VAC
1" ø M
G -V
AC
1/ 2" ø M G -A
IR
1/ 2" ø M
G -O
1"ø MG-O2
1"ø MG-AIR
2"ø MG-VAC
1" ø M
G -O
1" ø M
G -A
IR 2"
ø M
G -V
AC
1"ø M G -VAC1/2"ø M
G -A
IR
1/2"ø M
G -O
3/4"ø M G
-VAC
1" ø M
G -V
AC
1/ 2" ø M G -A
IR
1/ 2" ø M G -O
1/2"ø M G -O
1/2"ø M G -A
IR
3/4"ø M G
-VAC
/2 "ø
M G
-V A
C
/4 "ø
M G
-A
IR
"ø
M G
-O
3/4"ø M
G-O
1/2"ø M
G-O
MGO-1
MGO-3
MGO-4
MGO-4
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
1 1/2"ø MG-VAC
3/4"ø MG-AIR
1"ø MG-O2
1"ø MG-O2
3/4"ø MG-AIR
1 1/2"ø MG-VAC
EXAM
1G10
EXAM
1G12
BARIATRIC EXAM
1G08
TOILET
1G06
TOILET
1G04
CLEAN LINEN
1G22B
MEDS
1G22A
EXAM
1G15
EXAM
1G13
HALL
1G00D
NURSE WORK N
1G14
PHYS. WORK
1G16
HALL
1G00E
EXAM
1G17
VESTIBULE
1G00DA
ALCOVE
1G00GA
STAT LAB
1G00GB
EMS SUPPLY
1G19A
DECON ROOM
1G21
DISASTER/DECON SUPPLY
1G23
HALL
1G00G
EQUIPMENT
1G25
STAFF LOUNGE
1G27
TRAUMA ROOM
1G29
TRAUMA ROOM
1G31
ANTE ROOM
1G33
ISOLATION EXAM
1G33A
ISOLATION EXAM
1G35
TOILET
1G33B
STAFF WC/SHOWER
1G47A
STAFF WC
1G47
SHARED EDUCATION
1G45
HALL
1G00I
HALL
1G00H
1G00HA
NURSE SUPER.
1G37
BREAK ROOM
1B45A ARMORY
1B45B
IT ROOM
1B47
CORRIDOR
1G00O
CHARTING
1G00FA
SOILED UTILITY
1G49
NURSE WORK S
1G18
PHARM. WK.
1G00E.01
UM WK.
1G00E.02
X-RAY
1G20
MATCHLINE AREA B
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA B
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL121B
LEVEL 1 MEDICAL GAS PIPING PLAN - AREA
B
08-11-2015
SCALE: 3/16" = 1'-0"F2
MEDICAL GAS PIPING PLAN - AREA B
NORTH
0 2' 4' 8'
1 SEE PL121A FOR CONTINUATION
2 SEE PL121C FOR CONTINUATION
3 SEE PL121D FOR CONTINUATION
4 NEW MEDICAL GAS MASTER ALARM PANEL. TIE INS IN TO BE DONE IN OTHER
PROJECT. COORDINATE REQUIREMENTS WITH OTHER PROJECT PRIOR TO
ORDERING OR INSTALLING.
SHEET KEYNOTES
SCALE: NTS
KEY PLAN - AREA B
H H
E.1
E.1
2.5E26 G
G
2.92.3 2.7
D.8
E26A
RF
RF F.5
E
E
C.9
C.9 5
E.5
E.5
F
F.4
E.7E.4
E.4
MGO-1
MGO-1
MGO-1
MGO-1
MGO-1
MGO-1
MGO-1
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
EM ELEC. ROOM
1G83
ELECTRICAL ROOM
1G85
BIOMED
1G87
MENS WC
1B45D
MENS SHOWER
1B45DA
WOMENS SHOWER
1B45CA
IT ROOM
1B47
ARMORY
1B45B
CORRIDOR
1G00O
SOILED UTILITY
1G49
SECLUSION
1G51
EXAM
1G53
EXAM
1G55
EXAM
1G57
EXAM
1G59
EXAM
1G61
INTERNAL WAITING
1G63
CORRIDOR
1G00M
VENDING
1G00MA
SHOWER
1G65A
VIS. TOILET
1G79
TOILET
1G65
FAST TRACK/EXAM
1G67
CLEAN SUPPLY
1G22D
MH CLINICAL OFFICE
1G24
X-RAY
1G20
PHARM. WK.
1G00E.01
UM WK.
1G00E.02
EXAM
1G12
MEDS
1G22A
CLEAN LINEN
1G22B
EVS
1G22C
NOURISHMENT
1G22
HALL
1G00C
HALL
1G00C
TOILET
1G04
ZVB-4
LPA-4
ZVB-5
LPA-5
1" ø M
G -O
1/
2" ø M
G -A
IR
1/
2" ø M
G -V
AC
1/
2" ø M
G -V
AC
1/ 2" ø M
G -A
IR
1" ø M
G -O
1 1/4"ø M G
-VAC
1"ø M G -O
1/2"ø M G
-AIR
1"ø M G
-VAC
1/2"ø M G -A
IR
3/4"ø M G -O
MGO-2
1/ 2" ø M G -O
3/ 4" ø M G -V
AC
1/ 2" ø M
G -A
IR
1/ 2" ø M G -O
1/2"ø M G -O
3/ 4" ø M G -V
AC
1/ 2" ø M
G -A
IR
1/ 2" ø M G -O
3/4"ø M G -O
1/2"ø M
G -A
IR
1"ø M G
-VAC
1/
4" ø M
G -V
AC
1/ 2" ø M
G -A
IR
3/ 4" ø M
G -O
1/ 2" ø M
G -O
3/ 4" ø M G -V
AC 1/
2" ø M
G -A
IR
3/4"ø M G -O
1 1/2"ø M G
-VAC
3/4"ø M G -A
IR
1 1/2"ø M G
-VAC
3/4"ø M G
-AIR
1"ø M G -O
1" ø M
G -A
IR
2" ø M
G -V
AC1"
ø M
G -O
MATCHLINE AREA C
MATCHLINE AREA D
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A B
MATCHLINE AREA A
MATCHLINE AREA C
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL121C
LEVEL 1 MEDICAL GAS PIPING PLAN - AREA
C
08-11-2015
SCALE: 3/16" = 1'-0"F2
MEDICAL GAS PIPING PLAN - AREA C
NORTH
0 2' 4' 8'
SCALE: NTS
KEY PLAN - AREA C
1 SEE PL121B FOR CONTINUATION
R6
R6
R7
R7
E.1
E.1
RG
RD
RB
R4
R3
R3
RC
RC
R5
R5
RE
O
O
RA
RA
RF
RF
RH
E
E
C.9
C.9
E.5
E.5
E.7
E.4
E.4
ZVB-4
LPA-4
MGO-3
MGO-5
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
MGO-3
1"ø M
G-V
AC
1/2"ø M
G-A
IR
3/4"ø M
G-O
1 1/4"ø M G-V
AC
1/2"ø M
G-A
IR
3/4"ø M
G-O
/2"ø M
G -V
A C
/4
"ø M
G -A
IR
"ø
M G
-O
3/4"ø M
G-O
1/2"ø M G-A
IR
1"ø M
G-V
AC
3/4"ø M
G-V
AC
1/2"ø M
G-A
IR
1/2"ø M
G-O
1/
2" ø M
G -V
AC
1/ 2" ø M
G -A
IR
1" ø M
G -O
1 1/2"ø M G
-VAC
1/2"ø M G
-AIR
1"ø M G -O
1 1/4"ø M G
-VAC
1/2"ø M G
-AIR
1"ø M G -O
1"ø M G
-VAC
1/2"ø M G -A
IR
1/2"ø M G -O
OB/GYN Exam
1G05
EXAM
1G07
EXAM
1G09
EXAM
1G11
EXAM
1G13
EXAM
1G15
HALL
1G00D
TOILET
1G06
TOILET
1G04
HALL
1G00C
FAMILY CONSULT
1G03
OB toilet
1G05A
REC / ENROLLMENT / POLICE
1G73
TRIAGE
1G00BA
HALL
1G00B
VESTIBULE
1G00A
WAITING ROOM
1G01
HALL
1G00
ENROLLMENT
1G75
FAST TRACK/EXAM
1G71
FAST TRACK/EXAM
1G69
CORRIDOR
1G00M
FAST TRACK/EXAM
1G67
VIS. TOILET
1G77
VIS. TOILET
1G79
SHOWER
1G65A
VENDING
1G00MA
MATCHLINE AREA B
MATCHLINE AREA D
MATCHLINE AREA C
MATCHLINE AREA D
MGO-2
MGO-2
MGO-2
MGO-1
A
B C
D
A
B
C
D
E
F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
IN
A L C
O N
S T
R U
C T
IO
N
D O
C U
M E
N T
S
CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:
Revisions: Date:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Dwg. _____ of _____197
URGENT CARE AND SUPPORT EXPANSION
VAMC SALT LAKE CITY, UTAH 84148
BOOGAARD GARTELL
660-332
PL121D
LEVEL 1 MEDICAL GAS PIPING PLAN - AREA
D
08-11-2015
SCALE: 3/16" = 1'-0"1
MEDICAL GAS PIPING PLAN - AREA D
NORTH
0 2' 4' 8'
SCALE: NTS
KEY PLAN - AREA D
1 SEE PL121B FOR CONTINUATION.
2 SEE PL121C FOR CONTINUATION.
| PE001 - PLUMBING COVER SHEET |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PE501 - PLUMBING DETAILS |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PE601 - PLUMBING SCHEDULES |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL101 - DOMESTIC WATER PIPING PLAN |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL111 - DRAIN WASTE AND VENT PLAN |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL121 - MEDICAL GAS PIPING PLAN |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
| Sheets |
| PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION |
| PE001 - PLUMBING COVER SHEET |
| PE501 - PLUMBING DETAILS |
| PE601 - PLUMBING SCHEDULES |
| PL101 - DOMESTIC WATER PIPING PLAN |
| PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A |
| PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B |
| PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C |
| PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D |
| PL102 - ADMIN AREA PLUMBING PLANS |
| PL111 - DRAIN WASTE AND VENT PLAN |
| PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A |
| PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B |
| PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C |
| PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D |
| PL112 - ROOF PLUMBING PLAN |
| PL121 - MEDICAL GAS PIPING PLAN |
| PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A |
| PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B |
| PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C |
| PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D |
File details come from the government source that posted it. Updated .