Attch7_ 9 Plumbing Drawings Part2.pdf

PDF 18 MB Posted

Attached to
Y1DA--Emergency Department and Support Expansion / 660-800
Solicitation number
36C25920R0096
Issued by

About this file

This document provides details on a federal contract opportunity for construction services. The Department of Veterans Affairs is seeking proposals for the construction of an 18,500 square foot addition to the Salt Lake City VA Medical Center to serve as a new emergency department and associated support areas. The project scope includes architectural, mechanical, electrical, structural, and civil engineering design and construction services to build the new wing and connect it to the existing facility, along with some renovations. Proposals are due on or around July 27, 2020. The contract is set aside for service-disabled veteran-owned small businesses and applicants must be verified and listed in the Vendor Information Pages database to be considered. The estimated value of the contract is between $10-20 million.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4"ø SS

2"ø SS

4"ø SS

2 1/2"ø V

1 1/2"ø V

2 1/2"ø V

2 1/2"ø V

2 1/2"ø V

4"ø SS

4"ø SS 2"ø SS

1 1/2"ø V

4"ø SS

3"ø SS

2"ø SS

1 1/2"ø V

2"ø V 2"ø V

4"ø SS2"ø SS

2"ø V

2 1/2"ø V

2 1/2"ø V

2 1/2"ø V

2 1/2"ø V

1 1/2"ø V

1 1/2"ø V

1 1/2"ø V

1 1/2"ø V

3"ø SS

3"ø SS

2"ø SS

4"ø SS

4"ø SS

P-401

P-104

P-104

P-401

FD-1

P-701 P-104

FD-1

FD-1

1.3 H

E.1

E.1

2.5

M

K

J

EV

EXEX

EW

EUEU

E18

E21 E23 E26

G

2.9

H.8

L

2.1 2.3 2.7

E24

D.8

E26A

F.5

E

E E.5

"ø

R W 4"ø R

W

DN-1

DN-1

"ø

R W

SHARED CONFERENCE

1G43

HALL

1B00G

OFFICE

1B22

HALL

1B00E

ON-CALL

1G41

ER DIRECTOR

1G39

NURSE SUPER.

1G37

HALL

1G00J

DISPATCH

1B45H

HALL

1B45

ARMORY

1B45B

BREAK ROOM

1B45A

IT ROOM

1B47

EVIDENCE

1B45G

OFFICER

1B45.05

OFFICER

1B45.02

OFFICER

1B45.01

Hall

1B43A

OFFICER

1B45.03

OFFICER

1B45.04

OFFICER

1B45.06

OFFICER

1B45.07

CHIEF

1B45E

HOLD

1B43AA

INTERVIEW

1B43B

VESTIBULE

1B43

PSA

1B43A.01

Hall

1B43A

WOMENS WC

1B45C

MENS WC

1B45D

WOMENS SHOWER

1B45CA

CORRIDOR

1G00O

CHARTING

1G00FA

SOILED UTILITY

1G49

BIOMED

1G87

ISOLATION EXAM

1G35

TOILET

1G33B

STORAGE

1B41

STORAGE

1B45F

"ø

R W

MATCHLINE AREA A

MATCHLINE AREA C

MATCHLINE AREA A

MATCHLINE AREA B

P-401

P-701

FD-1

P-413

P-413

P-505

P-401

A

B C

D

DEDUCT ALTERNATE F: SHELL POLICE AREA. COMPLETE THE EXTERIOR WALLS

WITH INSULATION AND VAPOR BARRIER (BUT NO INTERIOR GYPSUM BOARD)

AND ELECTRICAL ROUGH-IN. OTHERWISE SHELL THE AREA. DEMOLISH ALL

ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING FEATURES WITH IN

THE SHELL AS IDENTIFIED IN THE BASE SCOPE OF WORK. DO NOT COMPLETE

ANY OF THE INTERIOR WALLS, DOORS, FINISHES MECHANICAL, ELECTRICAL,

PLUMBING AND FIRE WORK. CONSTRUCT DOOR 1B43 FOR ACCESS TO SHELLED

AREA. SEE AE001 FOR FURTHER INFORMATION.

DEDUCT ALTERNATE G: DEDUCT NEW CONSTRUCTION IN POLICE AREA INCLUDING

NO DEMOLITION OF CURTAIN WALL ENCLOSED EXTRASTITIAL SPACE, NO

MODIFICATIONS TO BRIDGE ABOVE AND ALL ASSOCIATED CIVIL, STRUCTURAL,

ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE WORK.

DEMOLITION OF EXISTING INTERIOR SPACE THAT WOULD COMPRISE NEW POLICE

AREA IS STILL REQUIRED, AND IS TO REMAIN AS IS, AND NOT AFFECTED BY THIS

DEDUCTIVE ALTERNATE. EXTEND NEW EXTERIOR WALL TO FACE OF EXISTING

CURTAIN WALL AND MODIFY STRUCTURE AND ROOF ABOVE. SEE AE001 FOR

FURTHER INFORMATION.

DEDUCT ALTERNATE H: DEDUCT NEW CONSTRUCTION IN POLICE AREA INCLUDING

NO DEMOLITION OF CURTAIN WALL ENCLOSED EXTRASTITIAL SPACE, NO

MODIFICATIONS TO BRIDGE ABOVE AND ALL ASSOCIATED CIVIL, STRUCTURAL,

ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE WORK. DO NOT

DEMOLISH ANY EXISTING INTERIOR. EXTEND NEW EXTERIOR WALL TO FACE OF

EXISTING CURTAIN WALL AND MODIFY STRUCTURE AND ROOF ABOVE. SEE AE001

FOR FURTHER INFORMATION.

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL111A

LEVEL 1 PLUMBING PLAN - DWV - AREA A

08-11-2015

SCALE: 3/16" = 1'-0"F2

DRAIN WASTE AND VENT PLAN - AREA A

NORTH

0 2' 4' 8'

SCALE: NTS

KEY PLAN - AREA A

1 CONNECT TO EXISTING SANITARY WASTE PIPING IN THIS APPROXIMATE

LOCATION.

2 CONNECT TO EXISTING PRIMARY ROOF DRAIN PIPING IN THIS APPROXIMATE

LOCATION.

3 4" WASTE PIPE STUBBED UP TO JUST BELOW ROOF DECK WITH CAP FOR FUTURE

CONNECTION.

SHEET KEYNOTES

8-11-15

2"ø SS

3"ø SS

3"ø SS

4"ø SS

1 1/2"ø V

1 1/2"ø V

1 1/2"ø V

1 1/2"ø V

1 1/2"ø V

2"ø SS

1 1/2"ø V

3"ø VTR

2 1/2"ø V

2 1/2"ø V

4"ø SS

2"ø SS

4"ø SS

3"ø SS

1 1/2"ø V

4"ø SS

2"ø SS

2"ø V

2"ø V

2"ø SS

2"ø SS

2"ø V

2"ø V

2"ø V

2 1/2"ø V

2"ø SS

1 1/2"ø V

1 1/2"ø V

2 1/2"ø V

2 1/2"ø V

1 1/2"ø V

4"ø SS

3"ø SS

3"ø SS

P-104

P-401

P-104

P-104

P-503

P-401

P-401

P-401

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

1.3

A

H

B

C

D

E.1

E.1

2.5

EX

R3R2

E18 E21 E23 E26

RC

RC

D.2

2.1 2.3

E24

D.8

E26A

O

O

RA

RA RF

RF

E

E

C.9

C.9

E.5

R1

E.4

DN-2

3"ø RW

"ø

R W

3"ø RW

"ø

R W

3"ø RW

4"ø RW

4" ø R

W

"ø

R W

"ø

R W

4"ø R W

6" ø R

W

HALL

1G00P

NURSE WORK N

1G14

PHYS. WORK

1G16

NURSE WORK S

1G18

TRAUMA ROOM

1G29

TRAUMA ROOM

1G31

STAFF LOUNGE

1G27

EQUIPMENT

1G25

DISASTER/DECON SUPPLY

1G23

DECON ROOM

1G21

EMS SUPPLY

1G19A

STAT LAB

1G00GB

ALCOVE

1G00GA

VESTIBULE

1G00DA

EXAM

1G17

EXAM

1G15

BARIATRIC EXAM

1G08

EXAM

1G10

EXAM

1G12

MEDS

1G22A

CLEAN LINEN

1G22B

UM WK.

1G00E.02

PHARM. WK.

1G00E.01

X-RAY

1G20

SOILED UTILITY

1G49

CHARTING

1G00FA

CORRIDOR

1G00O

ARMORY

1B45B

IT ROOM

1B47

BREAK ROOM

1B45A

MAIL

1G00HA

HALL

1G00H

NURSE SUPER.

1G37

SHARED EDUCATION

1G45

STAFF WC/SHOWER

1G47A

STAFF WC

1G47

ISOLATION EXAM

1G33A

ANTE ROOM

1G33

ISOLATION EXAM

1G35

TOILET

1G33B

MATCHLINE AREA B

MATCHLINE AREA D

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A B

MATCHLINE AREA A

MATCHLINE AREA B

P-413

P-413 P-413

P-413

P-413P-524

P-413

P-413

P-413

ESH-1

FD-2

P-701 P-701

DT-1

P-413

P-413

P-413 P-104

P-413

P-413

P-413

P-505

P-401

P-104

IMB-1

P-401

P-701

P-413

A

B C

D

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL111B

LEVEL 1 PLUMBING PLAN - DWV - AREA B

08-11-2015

SCALE: 3/16" = 1'-0"F1

DRAIN WASTE AND VENT PLAN - AREA B

NORTH

0 2' 4' 8'

SCALE: 1" = 200'-0"

KEY PLAN - AREA B

1 50 GALLON HOLDING TANK. PROVIDE WITH VENT CONNECTION AND TOP PUMP

OUT OPENING. PROVIDE WITH ALARM AT 50% AND 75% FULL. COORDINATE WITH

GC TO PROVIDE MANHOLE COVER.

2 PROVIDE MANUAL DIVERTING VALVE. NORMALLY CLOSED. PROVIDE WITH FLOOR

COVER.

3 PROVIDE MANUAL DIVERTING VALVE. NORMALLY OPEN. PROVIDE WITH FLOOR

COVER.

4 4" WASTE PIPE STUBBED UP TO JUST BELOW ROOF DECK WITH CAP FOR FUTURE

CONNECTION.

P F

P-701

P-104

P-104

P-104

P-104

P-104

P-503 P-401

FD-1

P-604

FD-1

FD-1

P-701

FD-1

FD-1

4"ø SS

4"ø SS

1 1/2"ø V

3"ø SS

1 1/2"ø V

2"ø SS

3"ø SS

2 1/2"ø V

2 1/2"ø V

2 1/2"ø V

2"ø V

2 1/2"ø V

1 1/2"ø V

2"ø V 3"ø SS

2"ø SS

4"ø SS 2"ø SS

2 1/2"ø V

1 1/2"ø V

3"ø VTR

1 1/2"ø V

1 1/2"ø V

1 1/2"ø V

1 1/2"ø V

1 1/2"ø V

2"ø SS

2"ø SS

2"ø SS

2"ø SS

2"ø SS

4"ø SS 4"ø SS

4"ø SS3"ø SS

1 1/2"ø V

2 1/2"ø V

2 1/2"ø V

4"ø SS

1 1/2"ø V

2 1/2"ø V

2"ø SS

2"ø SS

4"ø SS

4"ø SS

2 1/2"ø V

1 1/2"ø V

2 1/2"ø V

3"ø VTR

1 1/2"ø V

H

E.1

E.1

2.5E26

G

G

2.92.3 2.7

D.8

E26A

RF

RF

F.5

E

E

C.9

C.9 5

E.5

E.5

F

F.4

E.7

E.4

E.4

DN-2

DN-1

MATCHLINE AREA C

MATCHLINE AREA D

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A B

MATCHLINE AREA A

MATCHLINE AREA C

FS-1

P-413

FS-1

EM ELEC. ROOM

1G83

GENERATOR

1G81

ELECTRICAL ROOM

1G85

BIOMED

1G87

INTERNAL WAITING

1G63

EXAM

1G61

EXAM

1G59

EXAM

1G57

EXAM

1G55

EXAM

1G53

SECLUSION

1G51

HALL

1G00K

CLEAN SUPPLY

1G22D

MH CLINICAL OFFICE

1G24

NOURISHMENT

1G22

HALL

1G00C

EVS

1G22C

CLEAN LINEN

1G22B

MEDS

1G22A

EXAM

1G12

TOILET

1G65

FAST TRACK/EXAM

1G67

FAST TRACK/EXAM

1G69

VIS. TOILET

1G79

CORRIDOR

1G00M

VENDING

1G00MA

IT ROOM

1B47

ARMORY

1B45B

CORRIDOR

1G00O

SOILED UTILITY

1G49

MENS WC

1B45D

MENS SHOWER

1B45DA

1 1/2"ø V

3"ø SS

P-413

P-104

P-413

P-413

P-413

P-401

P-413

P-413

P-413

FD-1

A

B C

D

DEDUCT ALTERNATE K: SHELL RECEPTION, PATIENT WAITING, CONSULT

ROOM, ENROLLMENT, VISITOR TOILET, AND WRAP AROUND CORRIDOR. DO

NOT COMPLETE ANY OF THE INTERIOR WALLS, DOORS, FINISHES,

MECHANICAL, ELECTRICAL, PLUMBING AND FIRE. COMPLETE THE

EXTERIOR WALLS WITH INSULATION AND VAPOR BARRIER (BUT NO

INTERIOR GYPSUM BOARD) AND ELECTRICAL ROUGH-IN. SEE AE001 FOR

FURTHER INFORMATION.

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL111C

LEVEL 1 PLUMBING PLAN - DWV - AREA C

08-11-2015

SCALE: 3/16" = 1'-0"F2

DRAIN WASTE AND VENT PLAN - AREA C

NORTH

0 2' 4' 8'

SCALE: NTS

KEY PLAN - AREA C

1 4" WASTE PIPE STUBBED UP TO JUST BELOW ROOF DECK WITH CAP FOR FUTURE

CONNECTION.

P-104

P-104

P-104P-104

P-503 P-401

FD-1

FD-1

FD-1

P-701

FD-1

FD-1

2"ø V

2"ø V

2"ø V

2"ø V

2"ø V

2"ø V

2 1/2"ø V

2 1/2"ø V

4"ø SS

2 1/2"ø V

2 1/2"ø V

2"ø V

2 1/2"ø V

4"ø SS

3"ø SS

4"ø SS

2"ø SS

2"ø SS

2 1/2"ø V

1 1/2"ø V

2"ø SS

1 1/2"ø V

1 1/2"ø V

2 1/2"ø V

2"ø SS

3"ø SS

2"ø SS

2"ø SS

2"ø SS

2"ø SS

R6

R6

R7

R7

E.1

E.1

RG

RD

RB

R4

R3

RC

R5

RE

O

O

RA

RA

RF

RF

RH

E

E

C.9

C.9

E.5

E.5

E.7

E.4

E.4

4"ø R

W

3"ø R

W

"ø

R W

3"ø RW

"ø

R W

3" ø R

W

"ø

R W

4"ø R

W

4"ø R

W

6"ø RW

3"ø RW

4"ø R

W

6" ø R

W

DN-2

DN-1

MATCHLINE AREA B

MATCHLINE AREA D

MATCHLINE AREA C

MATCHLINE AREA D

P-401

P-104

P-401

P-401

P-413

P-413

P-413

P-413

P-413

P-413

P-413

P-413

P-413

P-413

P-604

OB/GYN Exam

1G05

FAMILY CONSULT

1G03

VESTIBULE

1G00A

OB toilet

1G05A

WAITING ROOM

1G01

HALL

1G00

REC / ENROLLMENT / POLICE

1G73

ENROLLMENT

1G75

CORRIDOR

1G00M

VIS. TOILET

1G77

VIS. TOILET

1G79

VENDING

1G00MA

SHOWER

1G65A

FAST TRACK/EXAM

1G67

FAST TRACK/EXAM

1G69

FAST TRACK/EXAM

1G71

TRIAGE

1G00BA

HALL

1G00B

HALL

1G00C

TOILET

1G04

TOILET

1G06

EXAM

1G17

EXAM

1G15

EXAM

1G13

EXAM

1G11

EXAM

1G09

EXAM

1G07

EVS

1G22C 2

A

B C

D

DEDUCT ALTERNATE K: SHELL RECEPTION, PATIENT WAITING, CONSULT

ROOM, ENROLLMENT, VISITOR TOILET, AND WRAP AROUND CORRIDOR. DO

NOT COMPLETE ANY OF THE INTERIOR WALLS, DOORS, FINISHES,

MECHANICAL, ELECTRICAL, PLUMBING AND FIRE. COMPLETE THE

EXTERIOR WALLS WITH INSULATION AND VAPOR BARRIER (BUT NO

INTERIOR GYPSUM BOARD) AND ELECTRICAL ROUGH-IN. SEE AE001 FOR

FURTHER INFORMATION.

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL111D

LEVEL 1 PLUMBING PLAN - DWV - AREA D

08-11-2015

SCALE: 3/16" = 1'-0"F2

DRAIN WASTE AND VENT PLAN - AREA D

NORTH

0 2' 4' 8'

SCALE: 1" = 200'-0"

KEY PLAN - AREA D

1 CONNECT TO EXISTING AREA WELL. SEE CIVIL SITE UTILITY PLAN.

2 4" WASTE PIPE STUBBED UP TO JUST BELOW ROOF DECK WITH CAP FOR FUTURE

CONNECTION.

O D

R D

OD

RD

O D

R D

O D

R D

O D

R D

OD

RD

OD

RD

O D

R D

O D

R D

O D

R D

OD

RD

OD

RD

O D

R D

O D

R D

O D

R D

31 32

R6

R6

R7

R7

1.3

A

H

B

C

D

E.1

2.5

M

K

J

RG

RD

RB

EV

EX

EW

R4

R3

R2

EU

E18 E21 E23 E26

RC

G

D.2

2.9

H.8

L

2.1 2.3 2.7

R5

E24

D.8

E33B

E26A

RE

O

RA

RF

RF

F.5

RH

E

C.9

C.9

E.5

F F.4

E.7

R1

E.4

3"ø R W

3"ø SR W

3"ø RW

3"ø SR W

4"ø SR W

"ø

R W

3" ø R

W

3"ø SR W

3"ø R W

3" ø R

W

4" ø R

W

3" ø R

W

4"ø RW

3"ø SR W

3"ø SRW

"ø

S R

W

3"ø SRW

3"ø RW

4"ø SRW

3"ø RW 3"ø SRW

3"ø SRW

3"ø SRW

3"ø SR W

3"ø RW

3"ø RW

3"ø SRW 4" ø S

R W

3"ø SRW

3"ø RW

3"ø RW

3"ø SRW

3"ø V

3"ø V

3"ø V

3"ø V

MATCHLINE AREA B

MATCHLINE AREA D

MATCHLINE AREA C

MATCHLINE AREA D

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A B

MATCHLINE AREA A

MATCHLINE AREA C

MATCHLINE AREA A

MATCHLINE AREA B

MATCHLINE AREA B

MATCHLINE AREA D

MATCHLINE AREA C

MATCHLINE AREA D

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A B

MATCHLINE AREA A

MATCHLINE AREA C

MATCHLINE AREA A

MATCHLINE AREA B

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL112

ROOF PLUMBING PLAN

08-11-2015

NORTH

0 2' 4' 8'

SCALE: 3/32" = 1'-0"F2

ROOF DRAIN, WASTE, AND VENT PLAN

SCALE: NTS

KEY PLAN - URGENT CARE

P F

STAFF WC/SHOWER

1G47A

STAFF LOUNGE

1G27

EQUIPMENT

1G25

DISASTER/DECON SUPPLY

1G23

DECON ROOM

1G21

EMS SUPPLY

1G19A

STAT LAB

1G00GB

TRAUMA ROOM

1G29

TRAUMA ROOM

1G31

ISOLATION EXAM

1G33A

ISOLATION EXAM

1G35

EXAM

1G17

EXAM

1G15

EXAM

1G13

EXAM

1G11

EXAM

1G09

EXAM

1G07

BARIATRIC EXAM

1G08

EXAM

1G10

EXAM

1G12

MEDS

1G22A

TOILET

1G04

TOILET

1G06

CLEAN SUPPLY

1G22D

MH CLINICAL OFFICE

1G24

HALL

1G00C FAST TRACK/EXAM

1G71

FAST TRACK/EXAM

1G69

FAST TRACK/EXAM

1G67

TOILET

1G65

VIS. TOILET

1G79

VIS. TOILET

1G77

EXAM

1G61

EXAM

1G59

EXAM

1G57

EXAM

1G53

SOILED UTILITY

1G49

IT ROOM

1B47

ARMORY

1B45B

OFFICER

1B45.01

CHIEF

1B45E

OFFICER

1B45.07

OFFICER

1B45.05

OFFICER

1B45.04

STORAGE

1B45F

NURSE SUPER.

1G37

ER DIRECTOR

1G39

ON-CALL

1G41

SHARED CONFERENCE

1G43

ALCOVE

1G00GA

REC / ENROLLMENT / POLICE

1G73

WAITING ROOM

1G01

VESTIBULE

1G00A

PHYS. WORK

1G16

NURSE WORK S

1G18

STORAGE

1B41

VESTIBULE

1G00DA

BIOMED

1G87

STAFF WC

1G47

SHARED EDUCATION

1G45

EVIDENCE

1B45G

MAIL

1G00HA

CHARTING

1G00FA

GENERATOR

1G81

HALL

1B00G

X-RAY

1G20

ANTE ROOM

1G33

SECLUSION

1G51

EXAM

1G55

UM WK.

1G00E.02

PHARM. WK.

1G00E.01

BREAK ROOM

1B45A

OFFICER

1B45.02

OFFICER

1B45.03

MENS WC

1B45D

WOMENS WC

1B45C

ELECTRICAL ROOM

1G85

EM ELEC. ROOM

1G83

OB toilet

1G05A

DISPATCH

1B45H

VESTIBULE

1B43

PSA

1B43A.01

HOLD

1B43AA

INTERVIEW

1B43B

CLEAN LINEN

1G22B

EVS

1G22C

NURSE WORK/ FAST TRACK

1G02

ZVB-1

ZVB-2

LPA-5

ZVB-3

ZVB-4

ZVB-5

ZVB-6

LPA-1

LPA-6

LPA-4

LPA-3

INTERNAL WAITING

1G63

REC / ENROLLMENT / POLICE

1G73

2 1/2"ø MG-VAC

1 1/4"ø MG-AIR

1"ø MG-O2

LPA-2

31 32

R6

R6

R7

R7

1.3

A

H

B

B

C

D

E.1

E.1

2.5

M

K

J

RG

RD

RB

EV

EX

EW

R4

R4

R3

R2

EU

E18

E21 E23 E26

RC

RC

G

D.2

2.9

H.8

L

2.1 2.3 2.7

R5

E24

D.8

E33B

E26A

RE

O

RA

RA

RF

RF

F.5

RH

RH

E

E

C.9

C.9

E.5

F F.4

E.7

R1

E.4

MGMA

MGO-2

MGO-2

MGO-2

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

MGO-1

MGO-4

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

MGO-4

MGO-3

MGO-3

MGO-3

FAMILY CONSULT

1G03

OB/GYN Exam

1G05

NURSE WORK N

1G14

1/2"ø MG-O2 1/2"ø MG-AIR

1"ø MG-VAC

1/2"ø MG-O2 1/2"ø MG-AIR

1"ø MG-VAC

1"ø MG-O2 1"ø MG-AIR

2"ø MG-VAC

MATCHLINE AREA B

MATCHLINE AREA D

MATCHLINE AREA C

MATCHLINE AREA D

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A B

MATCHLINE AREA A

MATCHLINE AREA C

MATCHLINE AREA A

MATCHLINE AREA B

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL121

MEDICAL GAS PIPING PLAN

08-11-2015

SCALE: 3/32" = 1'-0"F3

OVERALL MEDICAL GAS PIPING PLAN

NORTH

0 6' 12' 24' SCALE: NTS

KEY PLAN - OVERALL

1 CONNECT TO EXISTING MEDICAL GAS PIPING IN ROOM ACROSS FROM ELEVATOR

APPROXIMATELY 100' AWAY. NEW MEDICAL GAS PIPING IS LARGER THAN

EXISTING.

2 CAPPED AND VALVED STUB OUTS FOR FUTURE.

3 CEILING MOUNTED BOOM MEDICAL GAS CONNECTIONS.

SHEET KEYNOTES

SCALE: 1/32" = 1'-0"F1

MEDICAL GAS PIPING TIE IN LOCATION

1.3 H

E.1

E.1

2.5

M

K

J

EV

EX

EW

EU

E18

E21 E23 E26

G

2.9

H.8

L

2.1 2.3 2.7

E24

D.8

E26A

F.5

E

E E.5

/2 "ø

M G

-V A

C

3/4"ø M G -VAC1/2"ø M

G -A

IR1/2"ø M G -O

1/2"ø MG-O2 1/2"ø MG-AIR

1"ø MG-VAC

1" ø M

G -V

AC

1/ 2" ø M G -A

IR

1/ 2" ø M

G -O

1"ø MG-O2

3/4"ø MG-AIR

1 1/2"ø MG-VAC

HALL

1B45

OFFICER

1B45.01

OFFICER

1B45.02

OFFICER

1B45.03

OFFICER

1B45.04

OFFICER

1B45.05

EVIDENCE

1B45G

STORAGE

1B45F

PSA

1B43A.01

VESTIBULE

1B43

HOLD

1B43AA

INTERVIEW

1B43B

OFFICER

1B45.06

OFFICER

1B45.07

CHIEF

1B45E

Hall

1B43A

WOMENS WC

1B45C

MENS WC

1B45D

MENS SHOWER

1B45DA

BIOMED

1G87

CORRIDOR

1G00O

SOILED UTILITY

1G49

IT ROOM

1B47

ARMORY

1B45B

BREAK ROOM

1B45A

ER DIRECTOR

1G39

HALL

1B00E

ON-CALL

1G41

HALL

1G00J

SHARED CONFERENCE

1G43

HALL

1B00G

STORAGE

1B41

MAIL

1G00HA

HALL

1G00H

TOILET

1G33B

ISOLATION EXAM

1G35

CHARTING

1G00FA

HALL

1G00P

SHARED EDUCATION

1G45

HALL

1G00I

NURSE SUPER.

1G37

DISPATCH

1B45H

/4 "ø

M G

-A

IR

"ø

M G

-O

MGO-3

ZVB-6

MGMA

LPA-5

MATCHLINE AREA A

MATCHLINE AREA C

MATCHLINE AREA A

MATCHLINE AREA B

A

B C

D

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL121A

LEVEL 1 MEDICAL GAS PIPING PLAN - AREA

A

08-11-2015

SCALE: 3/16" = 1'-0"F2

MEDICAL GAS PIPING PLAN - AREA A

NORTH

0 2' 4' 8' SCALE: NTS

KEY PLAN - AREA A

1 CONNECT TO MEDICAL GAS PIPING IN ROOM ACROSS FROM ELEVATORS.

2 PL121B FOR CONTINUATION

1.3

A

H

B

C

D

E.1

E.1

2.5

EXEX

R3R2

E18 E21 E23 E26

RC

RC

D.2

2.1 2.3E24

D.8

E26A

O

RA

RA RF

RF

E

E

C.9

C.9

E.5

R1

E.4

MGMA

LPA-5ZVB-6

LPA-6

LPA-1

ZVB-1

LPA-2

ZVB-2

LPA-3

ZVB-3

/2"ø

M G

-O

/2

"ø M

G -A

IR

/4

"ø M

G -V

A C

"ø

M G

-V A

C

/2

"ø M

G -A

IR

/2"ø

M G

-O

1/2"ø M G-A

IR

1"ø M

G-V

AC

/2"ø M

G -V

A C

/4

"ø M

G -A

IR

"ø

M G

-O

1/2"ø MG-O2

1/2"ø MG-AIR

1"ø MG-VAC

1/ 2" ø M

G -O

1/ 2" ø M G -A

IR

1" ø M

G -V

AC

1/2"ø MG-O2

1/2"ø MG-AIR 1"ø MG-VAC

1" ø M

G -V

AC

1/ 2" ø M G -A

IR

1/ 2" ø M

G -O

1"ø MG-O2

1"ø MG-AIR

2"ø MG-VAC

1" ø M

G -O

1" ø M

G -A

IR 2"

ø M

G -V

AC

1"ø M G -VAC1/2"ø M

G -A

IR

1/2"ø M

G -O

3/4"ø M G

-VAC

1" ø M

G -V

AC

1/ 2" ø M G -A

IR

1/ 2" ø M G -O

1/2"ø M G -O

1/2"ø M G -A

IR

3/4"ø M G

-VAC

/2 "ø

M G

-V A

C

/4 "ø

M G

-A

IR

"ø

M G

-O

3/4"ø M

G-O

1/2"ø M

G-O

MGO-1

MGO-3

MGO-4

MGO-4

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

1 1/2"ø MG-VAC

3/4"ø MG-AIR

1"ø MG-O2

1"ø MG-O2

3/4"ø MG-AIR

1 1/2"ø MG-VAC

EXAM

1G10

EXAM

1G12

BARIATRIC EXAM

1G08

TOILET

1G06

TOILET

1G04

CLEAN LINEN

1G22B

MEDS

1G22A

EXAM

1G15

EXAM

1G13

HALL

1G00D

NURSE WORK N

1G14

PHYS. WORK

1G16

HALL

1G00E

EXAM

1G17

VESTIBULE

1G00DA

ALCOVE

1G00GA

STAT LAB

1G00GB

EMS SUPPLY

1G19A

DECON ROOM

1G21

DISASTER/DECON SUPPLY

1G23

HALL

1G00G

EQUIPMENT

1G25

STAFF LOUNGE

1G27

TRAUMA ROOM

1G29

TRAUMA ROOM

1G31

ANTE ROOM

1G33

ISOLATION EXAM

1G33A

ISOLATION EXAM

1G35

TOILET

1G33B

STAFF WC/SHOWER

1G47A

STAFF WC

1G47

SHARED EDUCATION

1G45

HALL

1G00I

HALL

1G00H

MAIL

1G00HA

NURSE SUPER.

1G37

BREAK ROOM

1B45A ARMORY

1B45B

IT ROOM

1B47

CORRIDOR

1G00O

CHARTING

1G00FA

SOILED UTILITY

1G49

NURSE WORK S

1G18

PHARM. WK.

1G00E.01

UM WK.

1G00E.02

X-RAY

1G20

MATCHLINE AREA B

MATCHLINE AREA D

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A B

MATCHLINE AREA A

MATCHLINE AREA B

A

B C

D

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL121B

LEVEL 1 MEDICAL GAS PIPING PLAN - AREA

B

08-11-2015

SCALE: 3/16" = 1'-0"F2

MEDICAL GAS PIPING PLAN - AREA B

NORTH

0 2' 4' 8'

1 SEE PL121A FOR CONTINUATION

2 SEE PL121C FOR CONTINUATION

3 SEE PL121D FOR CONTINUATION

4 NEW MEDICAL GAS MASTER ALARM PANEL. TIE INS IN TO BE DONE IN OTHER

PROJECT. COORDINATE REQUIREMENTS WITH OTHER PROJECT PRIOR TO

ORDERING OR INSTALLING.

SHEET KEYNOTES

SCALE: NTS

KEY PLAN - AREA B

H H

E.1

E.1

2.5E26 G

G

2.92.3 2.7

D.8

E26A

RF

RF F.5

E

E

C.9

C.9 5

E.5

E.5

F

F.4

E.7E.4

E.4

MGO-1

MGO-1

MGO-1

MGO-1

MGO-1

MGO-1

MGO-1

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

EM ELEC. ROOM

1G83

ELECTRICAL ROOM

1G85

BIOMED

1G87

MENS WC

1B45D

MENS SHOWER

1B45DA

WOMENS SHOWER

1B45CA

IT ROOM

1B47

ARMORY

1B45B

CORRIDOR

1G00O

SOILED UTILITY

1G49

SECLUSION

1G51

EXAM

1G53

EXAM

1G55

EXAM

1G57

EXAM

1G59

EXAM

1G61

INTERNAL WAITING

1G63

CORRIDOR

1G00M

VENDING

1G00MA

SHOWER

1G65A

VIS. TOILET

1G79

TOILET

1G65

FAST TRACK/EXAM

1G67

CLEAN SUPPLY

1G22D

MH CLINICAL OFFICE

1G24

X-RAY

1G20

PHARM. WK.

1G00E.01

UM WK.

1G00E.02

EXAM

1G12

MEDS

1G22A

CLEAN LINEN

1G22B

EVS

1G22C

NOURISHMENT

1G22

HALL

1G00C

HALL

1G00C

TOILET

1G04

ZVB-4

LPA-4

ZVB-5

LPA-5

1" ø M

G -O

1/

2" ø M

G -A

IR

1/

2" ø M

G -V

AC

1/

2" ø M

G -V

AC

1/ 2" ø M

G -A

IR

1" ø M

G -O

1 1/4"ø M G

-VAC

1"ø M G -O

1/2"ø M G

-AIR

1"ø M G

-VAC

1/2"ø M G -A

IR

3/4"ø M G -O

MGO-2

1/ 2" ø M G -O

3/ 4" ø M G -V

AC

1/ 2" ø M

G -A

IR

1/ 2" ø M G -O

1/2"ø M G -O

3/ 4" ø M G -V

AC

1/ 2" ø M

G -A

IR

1/ 2" ø M G -O

3/4"ø M G -O

1/2"ø M

G -A

IR

1"ø M G

-VAC

1/

4" ø M

G -V

AC

1/ 2" ø M

G -A

IR

3/ 4" ø M

G -O

1/ 2" ø M

G -O

3/ 4" ø M G -V

AC 1/

2" ø M

G -A

IR

3/4"ø M G -O

1 1/2"ø M G

-VAC

3/4"ø M G -A

IR

1 1/2"ø M G

-VAC

3/4"ø M G

-AIR

1"ø M G -O

1" ø M

G -A

IR

2" ø M

G -V

AC1"

ø M

G -O

MATCHLINE AREA C

MATCHLINE AREA D

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A B

MATCHLINE AREA A

MATCHLINE AREA C

A

B C

D

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL121C

LEVEL 1 MEDICAL GAS PIPING PLAN - AREA

C

08-11-2015

SCALE: 3/16" = 1'-0"F2

MEDICAL GAS PIPING PLAN - AREA C

NORTH

0 2' 4' 8'

SCALE: NTS

KEY PLAN - AREA C

1 SEE PL121B FOR CONTINUATION

R6

R6

R7

R7

E.1

E.1

RG

RD

RB

R4

R3

R3

RC

RC

R5

R5

RE

O

O

RA

RA

RF

RF

RH

E

E

C.9

C.9

E.5

E.5

E.7

E.4

E.4

ZVB-4

LPA-4

MGO-3

MGO-5

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

MGO-3

1"ø M

G-V

AC

1/2"ø M

G-A

IR

3/4"ø M

G-O

1 1/4"ø M G-V

AC

1/2"ø M

G-A

IR

3/4"ø M

G-O

/2"ø M

G -V

A C

/4

"ø M

G -A

IR

"ø

M G

-O

3/4"ø M

G-O

1/2"ø M G-A

IR

1"ø M

G-V

AC

3/4"ø M

G-V

AC

1/2"ø M

G-A

IR

1/2"ø M

G-O

1/

2" ø M

G -V

AC

1/ 2" ø M

G -A

IR

1" ø M

G -O

1 1/2"ø M G

-VAC

1/2"ø M G

-AIR

1"ø M G -O

1 1/4"ø M G

-VAC

1/2"ø M G

-AIR

1"ø M G -O

1"ø M G

-VAC

1/2"ø M G -A

IR

1/2"ø M G -O

OB/GYN Exam

1G05

EXAM

1G07

EXAM

1G09

EXAM

1G11

EXAM

1G13

EXAM

1G15

HALL

1G00D

TOILET

1G06

TOILET

1G04

HALL

1G00C

FAMILY CONSULT

1G03

OB toilet

1G05A

REC / ENROLLMENT / POLICE

1G73

TRIAGE

1G00BA

HALL

1G00B

VESTIBULE

1G00A

WAITING ROOM

1G01

HALL

1G00

ENROLLMENT

1G75

FAST TRACK/EXAM

1G71

FAST TRACK/EXAM

1G69

CORRIDOR

1G00M

FAST TRACK/EXAM

1G67

VIS. TOILET

1G77

VIS. TOILET

1G79

SHOWER

1G65A

VENDING

1G00MA

MATCHLINE AREA B

MATCHLINE AREA D

MATCHLINE AREA C

MATCHLINE AREA D

MGO-2

MGO-2

MGO-2

MGO-1

A

B C

D

A

B

C

D

E

F o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

IN

A L C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

CONSULTANTS: ARCHITECT / ENGINEERS: SEAL:

Revisions: Date:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Dwg. _____ of _____197

URGENT CARE AND SUPPORT EXPANSION

VAMC SALT LAKE CITY, UTAH 84148

BOOGAARD GARTELL

660-332

PL121D

LEVEL 1 MEDICAL GAS PIPING PLAN - AREA

D

08-11-2015

SCALE: 3/16" = 1'-0"1

MEDICAL GAS PIPING PLAN - AREA D

NORTH

0 2' 4' 8'

SCALE: NTS

KEY PLAN - AREA D

1 SEE PL121B FOR CONTINUATION.

2 SEE PL121C FOR CONTINUATION.

PE001 - PLUMBING COVER SHEET
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PE501 - PLUMBING DETAILS
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PE601 - PLUMBING SCHEDULES
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL101 - DOMESTIC WATER PIPING PLAN
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL111 - DRAIN WASTE AND VENT PLAN
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL112 - ROOF PLUMBING PLAN
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL121 - MEDICAL GAS PIPING PLAN
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D
Sheets
PD101 - LEVEL 1 PLUMBING PLAN - DEMOLITION
PE001 - PLUMBING COVER SHEET
PE501 - PLUMBING DETAILS
PE601 - PLUMBING SCHEDULES
PL101 - DOMESTIC WATER PIPING PLAN
PL101A - LEVEL 1 PLUMBING PLAN - DW - AREA A
PL101B - LEVEL 1 PLUMBING PLAN - DW - AREA B
PL101C - LEVEL 1 PLUMBING PLAN - DW - AREA C
PL101D - LEVEL 1 PLUMBING PLAN - DW - AREA D
PL102 - ADMIN AREA PLUMBING PLANS
PL111 - DRAIN WASTE AND VENT PLAN
PL111A - LEVEL 1 PLUMBING PLAN - DWV - AREA A
PL111B - LEVEL 1 PLUMBING PLAN - DWV - AREA B
PL111C - LEVEL 1 PLUMBING PLAN - DWV - AREA C
PL111D - LEVEL 1 PLUMBING PLAN - DWV - AREA D
PL112 - ROOF PLUMBING PLAN
PL121 - MEDICAL GAS PIPING PLAN
PL121A - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA A
PL121B - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA B
PL121C - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA C
PL121D - LEVEL 1 MEDICAL GAS PIPING PLAN - AREA D

File details come from the government source that posted it. Updated .