36C25819B0025-009.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25819B0025
About this file
36C25819B0025 S02 - ATTACHMENT 8 - 605-17-500 Landscape 100 Percent.pdf
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
RAIN BIRD XCZ-LF-100-PRF 4 4/LI-103
LOW FLOW DRIP CONTROL KIT, 1" LOW FLOW VALVE,
3/4" PRESSURE REGULATING RBY FILTER, AND 30PSI
PRESSURE REGULATOR. 0.2GPM-5GPM.PURPLE
VALVE LID.
PIPE TRANSITION POINT ABOVE GRADE 13
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP
TUBING WITH RISER TO ABOVE GRADE INSTALLATION.
RAIN BIRD MDCFPCAP 13 6/LI-103
DRIPLINE FLUSH VALVE PURPLE CAP IN
COMPRESSION FITTING COUPLER. FOR
NON-POTABLE WATER USE.
RAIN BIRD ARV050 3 3/LI-103
1/2" AIR RELIEF VALVE, MADE OF QUALITY
RUST-PROOF MATERIALS, WITH A 6.0" DRIP VALVE BOX
(SEB 7XB EMITTER BOX). USE WITH INSTALLATION
BELOW SOIL. THE VALVE WILL ALLOW AIR TO ESCAPE
THE PIPELINE, THUS PREVENTING WATER HAMMER
OR BLOCKAGE.
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-P-06-18 (18) 3,000 S.F. 2/LI-103
XFS PRESSURE COMPENSATING DRIPLINE W/COPPER
SHIELD TECHNOLOGY. 0.6GPH EMITTERS AT 18.0" O.C.
LATERALS SPACED AT 18.0" APART, WITH EMITTERS
OFFSET FOR TRIANGULAR PATTERN. PURPLE TUBING
FOR NON-POTABLE WATER. SPECIFY XF INSERT
FITTINGS.
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
RAIN BIRD 44-NP 2 1/LI-103
1" BRASS QUICK-COUPLING VALVE, WITH
CORROSION-RESISTANT STAINLESS STEEL SPRING,
LOCKING NON-POTABLE PURPLE RUBBER COVER,
AND 2-PIECE BODY.
HAMMOND UP8301A 1 7/LI-103
CLASS 125 BRONZE BALL VALVE WITH WHEEL
HANDLE, SAME SIZE AS MAINLINE PIPE DIAMETER AT
VALVE LOCATION. SIZE RANGE - 1/4" - 3"
SPLICE BOX FOR EXISTING CONTROL WIRES 1 8/LI-103
IRRIGATION LATERAL LINE: PVC SCHEDULE 40-NP 532.6 L.F. 5/LI-103
IRRIGATION LATERAL LINE: 2" PVC SCHEDULE 40 30.0 L.F. 5/LI-103
IRRIGATION MAINLINE: PVC CLASS 315 SDR 13.5-NP 153.6 L.F. 5/LI-103
PIPE SLEEVE: DUCTILE IRON PIPE- CLASS 350 140.6 L.F. 5/LI-103
P
VALVE NUMBER
VALVE SIZE
VALVE FLOW# #
VALVE CALLOUT
IRRIGATION SCHEDULE
WIRE SLEEVE: 2" PVC SCHEDULE 40
PIPE SLEEVE: 2X SLEEVED PIPE SIZE CPVC SCH 40
AUDIOLOGY CLINIC
21 "
21 "
43 "
1"
2.08 A-1
1"
4.19 A-2
1"
0.65 A-3
1"
6.18 A-4
P.O.C.:
STUB OUT FOR WATER AND CONTROL WIRES LOCATED APPROX. 25
FEET SW CORNER OF BLDG. 31. EXISTING RAINBIRD SATELLITE
CONTROLLER LOCATED NE OF MAIN BUILDING.
CONTRACTOR SHALL BORE UNDER PAVEMENT TO EXTEND MAINLINE.
CONTRACTOR TO UTILIZE EXISTING MAXICOM CONTROLLER: ADDING
ADDITIONAL STATIONS PER THIS PLAN VIA THE EXISTING CONTROL
WIRES INDICATED ABOVE. ALL WORK SHALL BE COORDINATED WITH
VA MAINTENANCE OPERATIONS.
EXISTING 1 14" MAINLINE
EXISTING VALVE AND QUICK COUPLER TO REMAIN
EXISTING LANDSCAPE TO REMAIN
21 "
21 "
21 "
411 "
P
5/20/2019
Signature
Date
A
R
T
H
U
R
D G
Y
I
I
R
E
G
I
S
T
E
R
E
D
L
A
N
DSC
A
P
C
H
I
T
E
C
T
S
T
A
T
O
F
CA
I
F
O
R
N
I
A
E
X
/ 3
728 134th Street SW Suite 200
Everett, Washington 98204
Ph: 425 741-3800 www.reidmiddleton.com
Copyright 2017 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Final Submittal
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
AG CH / NN05-27-2019
Approved:
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center Project Director
VA PG-18-13
Revisions: Date:
3185 C Airway Avenue Costa Mesa, CA 92626 P: 714-545-2898 F: 714-545-2878 bgb-inc.com35% Submittal 09-22-17
65% Submittal 01-31-18 95% Submittal 03-22-19 100% Submittal 05-03-19 Final Submittal 05-27-19
NOTE:
FOR IRRIGATION DETAILS, SEE SHEET LI-102 N O R T H
LI-101
IRRIGATION PLAN
FEET
1" = 10'
10 30 40
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text
DDCV
AutoCAD SHX Text
WV
AutoCAD SHX Text
ICV
AutoCAD SHX Text ICV's
AutoCAD SHX Text
6"FW PIPE (PEN. BLDG.)
AutoCAD SHX Text
WTR VLV/MTR (EXPOSED, NO BOX)
AutoCAD SHX Text
3' DR
AutoCAD SHX Text
SCO
AutoCAD SHX Text
SCO
AutoCAD SHX Text
SCO
AutoCAD SHX Text ICV's
AutoCAD SHX Text
ICV
AutoCAD SHX Text
LP
AutoCAD SHX Text
PKWY DRN.
AutoCAD SHX Text
WV
AutoCAD SHX Text
FH
AutoCAD SHX Text
HC
AutoCAD SHX Text
HC
AutoCAD SHX Text
HC
AutoCAD SHX Text
HC
AutoCAD SHX Text
HC
AutoCAD SHX Text
SWR PIPE STUB UP
AutoCAD SHX Text
SD PIPE STUB UP (1150.47INV)
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
HC STRIPING (TYP.)
AutoCAD SHX Text 1149.4
AutoCAD SHX Text 1148.5
AutoCAD SHX Text 1148.2
AutoCAD SHX Text 1150.3
AutoCAD SHX Text 1150.8
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.3
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1150.7
AutoCAD SHX Text 1149.9
AutoCAD SHX Text 1150.9
AutoCAD SHX Text 1149.6
AutoCAD SHX Text 1149.2
AutoCAD SHX Text 1150.3
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.8
AutoCAD SHX Text 1150.8
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1149.6
AutoCAD SHX Text 1149.59
AutoCAD SHX Text 1150.05
AutoCAD SHX Text 1151.65
AutoCAD SHX Text 1152.28
AutoCAD SHX Text 1152.42
AutoCAD SHX Text 1152.54
AutoCAD SHX Text 1152.44
AutoCAD SHX Text 1152.35
AutoCAD SHX Text 1152.39
AutoCAD SHX Text 1152.98
AutoCAD SHX Text 1152.48
AutoCAD SHX Text 1152.50
AutoCAD SHX Text 1152.30
AutoCAD SHX Text 1152.74
AutoCAD SHX Text 1152.54
AutoCAD SHX Text 1151.80
AutoCAD SHX Text 1152.0
AutoCAD SHX Text 1152.3
AutoCAD SHX Text 1152.01
AutoCAD SHX Text 1151.46
AutoCAD SHX Text 1149.82
AutoCAD SHX Text 1150.25
AutoCAD SHX Text 1148.05
AutoCAD SHX Text 1147.03
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
DCDA
AutoCAD SHX Text
BFD
AutoCAD SHX Text
FDC
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
5/20/2019
Signature
Date
A
R
T
H
I
R
E
G
I
S
T
E
R
N
DSC
A
C
H
I
T
E
C
T
S
T
A
I
F
O
R
N
I
A
E
X
728 134th Street SW Suite 200
Everett, Washington 98204
Ph: 425 741-3800 www.reidmiddleton.com
Copyright 2017 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Final Submittal
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
AG CH / NN05-27-2019
Approved:
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center Project Director
VA PG-18-13
Revisions: Date:
3185 C Airway Avenue Costa Mesa, CA 92626 P: 714-545-2898 F: 714-545-2878 bgb-inc.com35% Submittal 09-22-17
65% Submittal 01-31-18 95% Submittal 03-22-19 100% Submittal 05-03-19 Final Submittal 05-27-19
LI-102
IRRIGATION CALCS AND NOTES
IRRIGATION NOTES:
MAIN LINE PIPING AND CONTROL WIRES UNDER PAVING SHALL BE INSTALLED IN
SEPARATE SLEEVES. MAIN LINE SLEEVE SIZE SHALL BE A MINIMUM OF TWICE
THE DIAMETER OF THE PIPE TO BE SLEEVED OR AS INDICATED ON THE
DRAWINGS. CONTROL WIRE SLEEVES SHALL BE OF SUFFICIENT SIZE FOR THE
REQUIRED NUMBER OF WIRES UNDER PAVING.
LATERAL LINE PIPING UNDER PAVING SHALL BE PVC SCHEDULE 40 PIPE AND
SHALL BE INSTALLED PRIOR TO PAVING.
PIPE SIZES SHALL CONFORM TO THOSE SHOWN ON DRAWINGS. NO
SUBSTITUTIONS OF SMALLER PIPE SIZES SHALL BE PERMITTED, BUT
SUBSTITUTIONS OF LARGER SIZES MAY BE APPROVED. ALL DAMAGED AND
REJECTED PIPE SHALL BE REMOVED FROM THE SITE AT THE SAID TIME OF
REJECTION.
FINAL LOCATION OF THE AUTOMATIC CONTROLLER SHALL BE APPROVED BY THE
OWNER'S REPRESENTATIVE.
120 V.A.C. ELECTRICAL POWER SOURCE AT CONTROLLER LOCATION SHALL BE
PROVIDED BY OTHERS. THE IRRIGATION CONTRACTOR SHALL MAKE THE FINAL
CONNECTION FROM THE ELECTRICAL SOURCE TO THE CONTROLLER.
SPRINKLER HEADS SHALL BE PERPENDICULAR TO FINISH GRADE UNLESS
OTHERWISE SPECIFIED.
THE IRRIGATION CONTRACTOR SHALL FLUSH ALL DRIPLINES AND ADJUST
VALVES FOR OPTIMUM PERFORMANCE.
THIS DESIGN IS DIAGRAMMATIC. ALL PIPING, VALVES, ETC., SHOWN WITHIN
PAVED AREAS IS FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN
PLANTING AREAS WHEREVER POSSIBLE. THE CONTRACTOR SHALL LOCATE ALL
VALVES IN SHRUB AREAS.
IT IS THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO BECOME
FAMILIAR WITH ALL GRADE DIFFERENCES, LOCATION OF WALLS, RETAINING
WALLS, STRUCTURES AND UTILITIES. THE IRRIGATION CONTRACTOR SHALL
REPAIR OR REPLACE ITEMS DAMAGED BY WORK. SHALL ALSO COORDINATE
WORK WITH OTHER CONTRACTORS FOR THE LOCATION AND INSTALLATION OF
PIPE SLEEVES AND LATERALS THROUGH WALLS, UNDER ROADWAYS AND
PAVING, ETC.
DO NOT WILLFULLY INSTALL THE SPRINKLER SYSTEM AS SHOWN ON THE
DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT UNKNOWN OBSTRUCTIONS,
GRADE DIFFERENCES OR DIFFERENCES IN THE AREA DIMENSIONS EXIST THAT
MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. SUCH
OBSTRUCTIONS OR DIFFERENCES SHOULD BE BROUGHT TO THE ATTENTION OF
THE OWNER'S AUTHORIZED REPRESENTATIVE. IN THE EVENT THIS NOTIFICATION
IS NOT PERFORMED, THE IRRIGATION CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR ANY REVISIONS NECESSARY.
SPRINKLER EQUIPMENT NOT OTHERWISE DETAILED OR SPECIFIED SHALL BE
INSTALLED AS PER MANUFACTURER'S RECOMMENDATIONS AND
SPECIFICATIONS.
REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILED INFORMATION.
CONTRACTOR TO VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON THE
PLANS AT THE SITE PRIOR TO COMMENCEMENT WITH ANY WORK UNDER THIS
CONTRACT.
THE CONTRACTOR SHALL CARRY ALL WORKMAN'S COMPENSATION, PUBLIC
LIABILITY AND PROPERTY DAMAGE INSURANCE AS REQUIRED BY THE OWNER.
INSTALL ALL EQUIPMENT AND MATERIALS AS SHOWN ON THE DRAWINGS AND
PER THE SPECIFICATIONS.
PRIOR TO COMMENCEMENT OF WORK THE CONTRACTOR SHALL CONTACT THE
LANDSCAPE ARCHITECT AND COORDINATE ALL INSPECTIONS
EXTREME CARE SHALL BE EXERCISED IN EXCAVATING AND WORKING NEAR
EXISTING UTILITIES. CONTRACTOR SHALL VERIFY THE LOCATION AND
CONDITION OF ALL UTILITIES AND BE RESPONSIBLE FOR DAMAGE TO ANY
UTILITIES.
THE CONTRACTOR SHALL PROTECT WORK FROM DAMAGE AND THEFT AND
REPLACE ALL DAMAGED OR STOLEN PARTS AT THEIR EXPENSE UNTIL THE WORK
IS ACCEPTED IN WRITING BY THE OWNER.
THIS SYSTEM DESIGN IS BASED ON THE REGULATED OPERATING PRESSURE AND
THE MAXIMUM FLOW DEMAND SHOWN ON THE IRRIGATION DRAWINGS AT EACH
POINT OF CONNECTION.
THE CONTRACTOR SHALL KEEP THE PREMISES CLEAN AND FREE OF EXCESS
EQUIPMENT, MATERIALS AND RUBBISH.
PRESSURE LINES SHALL BE TESTED UNDER HYDROSTATIC PRESSURE OF 150 PSI
FOR TWO HOURS AND SHALL BE PROVEN WATER TIGHT.
IRRIGATION WORK SHALL BE GUARANTEED BY THE CONTRACTOR AS TO
MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FOLLOWING THE
DATE OF FINAL ACCEPTANCE OF THE WORK.
MATERIALS AND EQUIPMENT SHALL CONFORM TO APPLICABLE STATE OF
CALIFORNIA AND LOCAL CODES.
DRIPLINE TUBING NOTES
1. THE PIPE TRANSITION POINT SHALL CONNECT TO A PVC PIPE
HEADER.
2. CONNECT DRIPLINE TUBING TO COMPRESSION TRANSITION
FITTING FROM POLYPIPE TO PVC.
3. POLYPIPE SHALL RUN IN STRAIGHT LINES AND END AT A PVC
EXHAUST HEADER.
4. DO NOT LOOP, WRAP OR COIL POLYPIPE IN PLANTING AREAS.
5. WHERE POLYPIPE NEEDS TO CONNECT TO POLYPIPE, USE
COMPRESSION TEE FITTINGS.
6. POLYPIPE SHALL BE BURIED A MIN. 2" BELOW GRADE SO TOP
OF GRADE IS ABOVE THE TOP OF THE PIPE.
7. USE DRIPLINE STAKES TO SECURE DRIPLINE IN TRENCHES.
8. FLUSH CAPS / VALVES SHALL BE PLACED AT THE LOW POINT
OF THE SYSTEM, PREFERABLY WHERE DRAINS ARE LOCATED
AND NOT ADJACENT TO THE BUILDING.
9. ONE AIR RELIEF VALVE SHALL BE INSTALLED PER DRIP VALVE
AT THE HIGH POINT OF THE SYSTEM
CONTROLLER NOTE:
CONTRACTOR TO UTILIZE EXISTING MAXICOM CONTROLLER
LOCATED IN THE MAIN BUILDING: ADD ADDITIONAL STATIONS
PER THE IRRIGATION PLAN/LI-101 VIA THE EXISTING CONTROL
WIRES. ALL WORK SHALL BE COORDINATED WITH VA
MAINTENANCE OPERATIONS.
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
RAIN BIRD XCZ-LF-100-PRF 4 4/LI-103
LOW FLOW DRIP CONTROL KIT, 1" LOW FLOW VALVE,
3/4" PRESSURE REGULATING RBY FILTER, AND 30PSI
PRESSURE REGULATOR. 0.2GPM-5GPM.PURPLE
VALVE LID.
PIPE TRANSITION POINT ABOVE GRADE 13
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP
TUBING WITH RISER TO ABOVE GRADE INSTALLATION.
RAIN BIRD MDCFPCAP 13 6/LI-103
DRIPLINE FLUSH VALVE PURPLE CAP IN
COMPRESSION FITTING COUPLER. FOR
NON-POTABLE WATER USE.
RAIN BIRD ARV050 3 3/LI-103
1/2" AIR RELIEF VALVE, MADE OF QUALITY
RUST-PROOF MATERIALS, WITH A 6.0" DRIP VALVE BOX
(SEB 7XB EMITTER BOX). USE WITH INSTALLATION
BELOW SOIL. THE VALVE WILL ALLOW AIR TO ESCAPE
THE PIPELINE, THUS PREVENTING WATER HAMMER
OR BLOCKAGE.
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-P-06-18 (18) 3,000 S.F. 2/LI-103
XFS PRESSURE COMPENSATING DRIPLINE W/COPPER
SHIELD TECHNOLOGY. 0.6GPH EMITTERS AT 18.0" O.C.
LATERALS SPACED AT 18.0" APART, WITH EMITTERS
OFFSET FOR TRIANGULAR PATTERN. PURPLE TUBING
FOR NON-POTABLE WATER. SPECIFY XF INSERT
FITTINGS.
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
RAIN BIRD 44-NP 2 1/LI-103
1" BRASS QUICK-COUPLING VALVE, WITH
CORROSION-RESISTANT STAINLESS STEEL SPRING,
LOCKING NON-POTABLE PURPLE RUBBER COVER,
AND 2-PIECE BODY.
HAMMOND UP8301A 1 7/LI-103
CLASS 125 BRONZE BALL VALVE WITH WHEEL
HANDLE, SAME SIZE AS MAINLINE PIPE DIAMETER AT
VALVE LOCATION. SIZE RANGE - 1/4" - 3"
SPLICE BOX FOR EXISTING CONTROL WIRES 1 8/LI-103
IRRIGATION LATERAL LINE: PVC SCHEDULE 40-NP 532.6 L.F. 5/LI-103
IRRIGATION LATERAL LINE: 2" PVC SCHEDULE 40 30.0 L.F. 5/LI-103
IRRIGATION MAINLINE: PVC CLASS 315 SDR 13.5-NP 153.6 L.F. 5/LI-103
PIPE SLEEVE: DUCTILE IRON PIPE- CLASS 350 140.6 L.F. 5/LI-103
P
VALVE NUMBER
VALVE SIZE
VALVE FLOW# #
VALVE CALLOUT
IRRIGATION SCHEDULE
WIRE SLEEVE: 2" PVC SCHEDULE 40
PIPE SLEEVE: 2X SLEEVED PIPE SIZE CPVC SCH 40
AutoCAD SHX Text F
LOW VOLTAGE WIRES, 3 MAXIMUM.
WIRES PASS THROUGH GROOVES IN
TUBE LID TO ALLOW LID TO CLOSE.
CLOSE TUBE LID AFTER WIRE IS
INSERTED INTO TUBE.
POLY TUBE PRE-FILLED WITH
WATERPROOF GEL.
LOCK TABS PREVENT WIRE REMOVAL
ONCE CONNECTOR IS INSERTED.
SCOTCHLOK ELECTRICAL SPRING
CONNECTOR. WIRES SHALL BE
PRE-STRIPPED OF 1/2 INCH OF THE
INSULATION PRIOR TO INSERTION INTO THE
CONNECTOR. TWIST CONNECTOR ON TO
WIRES TO SEAT FIRMLY.
SCOTCHLOK CONNECTOR AND WIRES
INSERTED INTO TUBE UNTIL THE
CONNECTOR PASSES LOCK TABS.
NOTE:
WIRE CONNECTOR SHALL BE A 3M DBY - 6 DIRECT BURY SPLICE KIT.
IT SHALL INCLUDE A SCOTCHLOK Y SPRING CONNECTOR, A POLYPROPYLENE TUBE,
AND A WATERPROOF SEALING GEL. TUBE SHALL BE SUPPLIED PREFILLED WITH GEL.
SPLICE KIT SHALL BE USED TO ELECTRICALLY CONNECT 2-3 #14 OR 2 #12
PRE-STRIPPED COPPER WIRES. LARGER WIRES OR GREATER QUANTITIES OF WIRES
SHALL REQUIRE A LARGER APPROVED WIRE CONNECTION.
WIRE CONNECTION
SCALE: N.T.S. SECTION
FINISH GRADE
PEA GRAVEL BACKFILL
(ONE CUBIC FOOT MINIMUM)
RECTANGULAR VALVE BOX
REFER TO SPECIFICATIONS
WIRE LABEL
CONTROL AND/OR COMMON WIRE. MAKE
WATERPROOF WIRE CONNECTION PER DETAIL '9'.
FILTER FABRIC
SPLICE BOX
SCALE: N.T.S. SECTION
M
I N
1 FINISH GRADE
M
I N
2 PVC UNION
3 RECTANGULAR PLASTIC VALVE BOX,
W/ LOCKING PURPLE PLASTIC
COVER BRANDED "GV"
4 GATE VALVE OR BALL VALVE W/
ROUND HANDLE (AS SPECIFIED)
5 PVC MAIN LINE
6 PVC MALE SCH 80 ADAPTER ( 2
REQUIRED)
7 ONE CUBIC FOOT 3/4" CRUSHED ROCK.
8 8" DIA. CL. 160 PVC SLEEVE W/ FLARED
BOTTOM CONTACTING SUPPLY LINE.
1 3
NOTE:
INSTALL VALVE BOX SO THAT TOP OF COVER IS 2" ABOVE FINISH
GRADE IN GROUND COVER AREAS AND 1/2" IN TURF AREAS
9 PVC FEMALE ADAPTER
10 FILTER FABRIC
11 PURPLE CHRISTY ID TAG
(ID-MAX-P-2-RC-006)
BALL OR GATE VALVE - 2 1/2" OR LESS (RECLAIMED)
SCALE: N.T.S. SECTION
M
I N
NOTE:
TEFLON TAPE ALL CONNECTIONS
QUICK COUPLER
SCALE: N.T.S. SECTION
FINISH GRADE IN TURF AREAS1
PLASTIC ROUND VALVE BOX WITH
BOLT DOWN COVER, USE STAINLESS
BOLT NUT AND WASHER. HEAT
BRAND "QC" ONTO LID. SEE LEGEND
/ SPECS FOR BOX COLOR
QUICK COUPLER KEY WITH MALE
HOSE BIB CONNECTION AS SHOWN,
KEY MUST CLEAR VALVE BOX
FINISH GRADE IN SHRUB AREAS4
QUICK COUPLER VALVE SEE LEGEND
FOR SPEC.
STAINLESS PUNCH LOK CLAMPS (2
REQ.)
BRASS NIPPLE (LENGTH AS REQ.)7
BRASS TRIPLE SWING JOINT (SIZE
PER QVC) USE TWO SCH 80 STREET
ELLS, ONE THREADED ELL FOR
ASSEMBLY
MAINLINE (SEE LEGEND/SPECS.)9
#4 x 36" REBAR STAKE10
LANDSCAPE FILTER FABRIC11
3/4" ROCK, 1 CUBIC FT12
1 TYPICAL DRIP LINE SYSTEM LAYOUT
SCALE: 1" = 1" PLAN
NOTE:
TRIANGULAR SPACE
EMITTERS AS SHOWN
BELOW
16 73
F
A
M
N
M
X
M
I N
M
I N
M
I N
M
I N
M
I N
TO LATERAL
TO AIR RELIEF /
FLUSH VALVE
TO AIR RELIEF / FLUSH
VALVE / LATERAL
TYPICAL DRIPLINE SECTION
PVC LATERAL TO SUPPLY HEADER PIPE TRANSITION FROM SUPPLY HEADER TO DRIP TUBING
12 13 1 1415
1 10 11
13 15
PRESSURE-COMPENSATING IN-LINE EMITTER TUBING: SEE
LEGEND
PVC SUPPLY HEADER2
PVC RISER FROM 12" LATERAL TO 4" SUPPLY HEADER - SEE
DETAIL, THIS SHEET
PIPE TRANSITION POINT FROM PVC HEADER TO EMITTER
TUBING
PVC MAINLINE - SEE PLAN6
XERIGATION CONTROL VALVE - SEE LEGEND7
FLUSH VALVE AT LOW POINT OF SYSTEM - SEE LEGEND8
AIR RELIEVE VALVE AT HIGH POINT OF SYSTEM - SEE
LEGEND
½" COMP X ¾" MPT ADAPTER10
SCH 40 PVC TEE (SxSxT)11
BARB x BARB TEE12
TOP OF MULCH (SEE SPECS)13
TIE DOWN STAKE @ 6'-0" O.C. AND AT BENDS AND ENDS.14
FINISHED GRADE15
TOP SOIL COVER16
PVC SCH 4017
TOP OF MULCH
SUBTERRANEAN EMITTER BOX:
RAINBIRD SEB-7XB OR EQUAL
RAINBIRD AIR RELIEF VALVE KIT
OR EQUAL
3" MINIMUM DEPTH OF ¾"
WASHED GRAVEL
PVC HEADER - SEE TYPICAL DRIPLINE
SYSTEM DETAIL, THIS SHEET
FINISH GRADE
1 2
PVC SCH 40 TEE SxSxT
AIR RELIEF VALVE TO PVC HEADER
SCALE: N.T.S. VIEW
SAND BACKFILL
SCH. 40 P.V.C. OR
SCH 80, SEE NOTES
ABOVE, 2X LINE SIZE
CONTROL WIRES USE
SEPARATE P.V.C. SCH
40 SLEEVE UNDER
ALL PAVING 2 ½" MIN.
MAINLINE
MAIN LINE
CONTROL WIRES
TAPED AT 10'
INTERVALS
BELOW MAINLINE
MAIN LINE AND CONTROL WIRES
IN AVERAGE SOIL CONDITIONS
DIMENSION (PIPE)
UP TO 2 1/2" SIZE
3" - 5 1/2" SIZE
A
18"
24"
MAIN LINE & CONTROL
WIRES UNDER PAVING
DIMENSION A
B
24" 4"
LATERAL PIPES
DIMENSION
ALL HEADS (UNLESS
OTHERWISE SPEC'D)
A
12"
FINISH SURFACE
PAVING
SUBBASE
FINISH GRADE
FINISH GRADE
LATERAL LINE-
SEE SECTION
'B' FOR
UNDER
PAVING
CONDITION.
SECTION C
SECTION A
SECTION B
NOTE: TRENCHES TO BE WIDE ENOUGH TO ALLOW 4" MIN.
HORIZONTAL CLEARANCE BETWEEN PARALLEL PIPES. COMPACT
TRENCH BACKFILL TO COMPACTION SAME AS ADJACENT AREAS
AND TO 90% COMPACTION IN PAVED AREAS.
'A' IS MEASURED
BELOW AGGREGATE
BASE OF PAVING
SECTION A SECTION B
SECTION C
B
B
B
A
A
A
PIPE SLEEVING AND TRENCHING
SCALE: N.T.S. SECTION
6" SIZE or GREATER 24"
SLEEVES UNDER ROADS / PAVING:
6" DIA OR LESS 36" COVER
GREATER THAN 6" 48" COVER
SCH 80 PVC
SLEEVES UNDER PAVING(NON-ROAD)
LESS THAN 3" DIA. 18" COVER
3" - 5 1/2" 24" COVER
6" OR GREATER 36" COVER
SCH 40 PVC
WARNING TAPE -
SEE NOTE BELOW
1 TOP SOIL COVER
TOP OF MULCH (SEE SPECS)
3 7-INCH VALVE BOX
RAIN BIRD SEB-7XB
4 RAINBIRD 'MDCFP' FLUSH CAP
5 RAINBIRD 'MDCFCOUP' COUPLING
6 'BLANK' LANDSCAPE DRIPLINE
TUBING
12 3
7 BRICK (1 OF 2)
8 3-INCH MINIMUM DEPTH OF
3/4-INCH WASHED GRAVEL
NOTE:
ALLOW A MIN. OF 6-INCHES OF
DRIPLINE TUBING IN BOX IN
ORDER TO DIRECT FLUSHED
WATER OUTSIDE VALVE BOX.
5 9 6
9 RAINBIRD 'MDMPT' ADAPTER
FROM PVC TO COUPLER
MANUAL FLUSH CAP CONNECT TO PVC HEADER
SCALE: N.T.S. VIEW
6XERIGATION CONTROL ZONE KIT - LOW FLOW
SCALE: 1" = 1" VIEW
13 14 15
16 17 5 19
FINISH GRADE / TOP OF MULCH1
VALVE BOX WITH COVER: JUMBO SIZE
HEAT BRAND 'RCV' AND CONTROLLER
STATION # ONTO LID.
30-INCH LINEAR LENGHT OF WIRE,
COILED
WATERPROOF CONNECTION4
FILTER FABRIC5
CHRISTY ID TAG6
REMOTE CONTROL VALVE (INCLUDED
ON CONTROL ZONE KIT) SEE PLAN
FOR SIZE.
PRESSURE REGULATING QUICK
FILTER (INCLUDED IN CONTROL ZONE
KIT)
PVC SCH 40 FEMALE ADAPTOR9
LATERAL PIPE (TO SYSTEM)10
PVC SCH 80 NIPPLE (2-INCH LENGTH,
HIDDEN) AND PVC SCH 40 ELL
PVC SCH 40 ELL12
PVC SCH 80 NIPPLE (2-INCH LENGTH,
HIDDEN) AND PVC SCH 40 ELL
PVC SCH 40 TEE OR ELL14
MAINLINE PIPE15
3-INCH MIN. DEPTH OF 3/4-INCH
WASHED GRAVEL
1" X 3/4" REDUCING COUPLING17
PVC UNION18
BRICK (1 OF 4)19
5/20/2019
Signature
Date
A
R
T
H
I
R
E
G
I
S
T
E
R
N
DSC
A
C
H
I
T
E
C
T
S
T
A
I
F
O
R
N
I
A
E
X
728 134th Street SW Suite 200
Everett, Washington 98204
Ph: 425 741-3800 www.reidmiddleton.com
Copyright 2017 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Final Submittal
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
AG CH / NN05-27-2019
Approved:
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center Project Director
VA PG-18-13
Revisions: Date:
3185 C Airway Avenue Costa Mesa, CA 92626 P: 714-545-2898 F: 714-545-2878 bgb-inc.com35% Submittal 09-22-17
65% Submittal 01-31-18 95% Submittal 03-22-19 100% Submittal 05-03-19 Final Submittal 05-27-19
LI-103
IRRIGATION DETAILS
AutoCAD SHX Text
OFF
ON
AUDIOLOGY CLINIC
A
A
A
A
A
A
AS
AS
AS
AS
AS
AS
AS
AS
AS
ASAS
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A
A
A
A
A
A
A
A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A
AA
A
A
AA
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
Ad
Ad
Ad
Ad
Ad
A
A
A
A
A
A
A A
A
A
A A
A
A
A
A
A
A
A
A
A
A
A
PI-101
PI-102
PI-102
PI-102
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A
A A A
A
A
A
A
A
A
AS
A
A
A
A
A
A
A
A
A
A
A
A
A A
A
A
A
A
A
A A
A
A
A
A
A
AA
A
A
A
A
A
A
A
A
A
AA
A
A
A
A
A
A
A
A
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
A
A A
A
A A
A
A A
A
A
AA
A
A A
A
A
AA
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
PI-102
A
A A
A
A
A
A
A
A
A
A
A
PI-102 PI-102
PI-101
PI-103
PI-103
TREES BOTANICAL NAME / COMMON NAME SIZE WUCOLS QTY DETAIL
PRUNUS CAMPANULATA / TAIWAN CHERRY 24" BOX MEDIUM 11 B/LP-102
SHRUBS BOTANICAL NAME / COMMON NAME SIZE WUCOLS QTY DETAIL
AGAVE AMERICANA / CENTURY PLANT 24"BOX LOW 1 A/LP-102
AGAVE DESMETTIANA `VARIEGATA` / VARIEGATED AGAVE 15 GAL LOW 15 A/LP-102
AGAVE VICTORIAE-REGINAE / QUEEN VICTORIA AGAVE 5 GAL LOW 233 A/LP-102
CAESALPINIA PULCHERRIMA `PHOENIX` / PHOENIX BIRD OF PARADISE 15 GAL LOW 1 A/LP-102
HESPERALOE PARVIFLORA `BRAKELIGHTS` TM / BRAKELIGHTS RED YUCCA 5 GAL LOW 94 A/LP-102
MISCANTHUS SINENSIS `LITTLE ZEBRA` / SILVER GRASS 5 GAL MEDIUM 22 A/LP-102
PENNISETUM SETACEUM `RUBRUM DWARF` / DWARF PURPLE LEAVED FOUNTAIN GRASS 5 GAL MEDIUM 12 A/LP-102
STRELITZIA REGINAE / BIRD OF PARADISE 5 GAL MEDIUM 36 A/LP-102
GROUND COVERS BOTANICAL NAME / COMMON NAME SIZE WUCOLS SPACING QTY DETAIL
DECOMPOSED GRANITE MULCH-GOLD / 3`` DEPTH 3" DEEP 3,400 SF
ROCK MULCH / 3`` DEPTH 3" DEEP 386 SF
GREY - TO MATCH EXISTING/TO BE PLACED IN A 2` WIDE AREA ADJACENT TO THE
BUILDING
A
Ad
A
A
AS
PLANT SCHEDULE
PLANTING KEYNOTES
SYMBOL DESCRIPTION DETAIL
REMOVE AND DISPOSE EXISTING GRAY ROCK MULCH.
CONTRACTOR TO INSTALL 3" ROCK(SEE LEGEND ABOVE) TO
MATCH EXISTING ADJACENT BUILDING. CONTRACTOR SHALL
PROVIDE SAMPLE OF ADJACENT ROCK MULCH TO SUPPLIER
TO MATCH COLOR/SIZE/TYPE - INSTALL PER ROCK MULCH
DETAIL `C` ON SHEET LP-102
ROOT BARRIER C/LP-102
PI-101
PI-102
PI-103
REFERENCE NOTES SCHEDULE
NOTE:
CONTRACTOR TO INSTALL MIRAFI 140N NON WOVEN FILTER FABRIC
UNDER ALL MULCH IN ALL PLANTING AREAS. INSTALL PER
MANUFACTURERS RECOMMENDATIONS.
5/20/2019
Signature
Date
A
R
T
H
I
R
E
G
I
S
T
E
R
N
DSC
A
C
H
I
T
E
C
T
S
T
A
I
F
O
R
N
I
A
E
X
728 134th Street SW Suite 200
Everett, Washington 98204
Ph: 425 741-3800 www.reidmiddleton.com
Copyright 2017 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Final Submittal
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
AG CH / NN05-27-2019
Approved:
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center Project Director
VA PG-18-13
Revisions: Date:
3185 C Airway Avenue Costa Mesa, CA 92626 P: 714-545-2898 F: 714-545-2878 bgb-inc.com35% Submittal 09-22-17
65% Submittal 01-31-18 95% Submittal 03-22-19 100% Submittal 05-03-19 Final Submittal 05-27-19
NOTE:
FOR PLANTING DETAILS, SEE SHEET LP-102 N O R T H
LP-101
PLANTING PLAN
FEET
1" = 10'
10 30 40
NOTE:
TREES SHALL NOT EXCEED 20' IN HEIGHT
AutoCAD SHX Text
DDCV
AutoCAD SHX Text
WV
AutoCAD SHX Text
ICV
AutoCAD SHX Text ICV's
AutoCAD SHX Text
SDMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
6"FW PIPE (PEN. BLDG.)
AutoCAD SHX Text
WTR VLV/MTR (EXPOSED, NO BOX)
AutoCAD SHX Text
3' DR
AutoCAD SHX Text
SCO
AutoCAD SHX Text
SCO
AutoCAD SHX Text
SCO
AutoCAD SHX Text ICV's
AutoCAD SHX Text
ICV
AutoCAD SHX Text
LP
AutoCAD SHX Text
PKWY DRN.
AutoCAD SHX Text
WV
AutoCAD SHX Text 4"x4"CLM.(TYP.)
AutoCAD SHX Text
FH
AutoCAD SHX Text
HC
AutoCAD SHX Text
HC
AutoCAD SHX Text
HC
AutoCAD SHX Text
HC
AutoCAD SHX Text
HC
AutoCAD SHX Text
SWR PIPE STUB UP
AutoCAD SHX Text
SD PIPE STUB UP (1150.47INV)
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
HC STRIPING (TYP.)
AutoCAD SHX Text 1149.4
AutoCAD SHX Text 1148.5
AutoCAD SHX Text 1148.2
AutoCAD SHX Text 1150.3
AutoCAD SHX Text 1150.8
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.3
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1150.7
AutoCAD SHX Text 1149.9
AutoCAD SHX Text 1150.9
AutoCAD SHX Text 1149.6
AutoCAD SHX Text 1150.3
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1150.6
AutoCAD SHX Text 1150.8
AutoCAD SHX Text 1150.8
AutoCAD SHX Text 1150.5
AutoCAD SHX Text 1149.6
AutoCAD SHX Text 1149.59
AutoCAD SHX Text 1150.05
AutoCAD SHX Text 1151.65
AutoCAD SHX Text 1152.28
AutoCAD SHX Text 1152.42
AutoCAD SHX Text 1152.54
AutoCAD SHX Text 1152.44
AutoCAD SHX Text 1152.35
AutoCAD SHX Text 1152.39
AutoCAD SHX Text 1152.98
AutoCAD SHX Text 1152.48
AutoCAD SHX Text 1152.50
AutoCAD SHX Text 1152.30
AutoCAD SHX Text 1152.74
AutoCAD SHX Text 1152.54
AutoCAD SHX Text 1151.80
AutoCAD SHX Text 1152.0
AutoCAD SHX Text 1152.01
AutoCAD SHX Text 1151.46
AutoCAD SHX Text 1149.82
AutoCAD SHX Text 1150.25
AutoCAD SHX Text 1148.05
AutoCAD SHX Text 1147.03
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
DCDA
AutoCAD SHX Text
BFD
AutoCAD SHX Text
FDC
AutoCAD SHX Text D
AutoCAD SHX Text Y
H
ROOT BARRIER
SCALE: NTS PLAN VIEW / SECTION
CL
S E
E N
O
TE
6'-0" 6'-0"
1"
" NOTE:
ROOT BARRIER IS
REQUIRED WHERE
TREE IS 6'-0" OR LESS
FROM EDGE OF
HARDSCAPE.
SECTION
PLAN
HARDSCAPE1
ROOT BARRIER (SEE
SPECS)
TRENCH FOR ROOT
BARRIER ALONG EDGE
OF HARDSCAPE MAY BE
SAME AS IRRIGATION
TRENCH WHERE
APPLICABLE (BACKFILL
SAME AS ADJACENT
MATERIAL)
SET TOP OF ROOT
BARRIER 1" BELOW
FINISH GRADE
TREE PLANTING PER
PLANS AND DETAILS
TYPAR BIOBARRIER
FABRIC ON INSIDE OF
ROOT BARRIER
C GRAVEL MULCH
SCALE: 1" = 1'-0" SECTION
3" M
IN
. 1 3
3" MINIMUM GRAVEL MULCH OR DECOMPOSED GRANITE - SEE CONSTRUCTION PLAN1
CONTRACTOR TO INSTALL MIRAFI 140N NON WOVEN FILTER FABRIC UNDER ALL ROCK
MULCH IN ALL PLANTING AREAS. INSTALL WITH GALVANIZED STAPLES AT 4' O.C. WITH
12" OVERLAP.
ADJACENT HARDSCAPE - SEE CONSTRUCTION PLAN3
COMPACTED SUBGRADE PER GEO-TECHNICAL SOILS REPORT RECOMMENDATIONS5
D
NOTE:
PROVIDE HUMATE PLUS CONDITIONER (AVAILABLE THROUGH
TRI-C ENTERPRISES (800) 927-3311) EVENLY DISTRIBUTED
THROUGH BACKFILL AT A RATE OF:
1 TSP / 1 GAL.
1 TBL / 5 GAL.
3 TBL / 15 GAL.
2 x DIAMETER
1 1, 5 OR 15 GALLON SHRUB
2 2" LAYER OF MULCH EXCEPT
@ ROOT CROWN
3 WATER BASIN
4 AMENDED SOIL FOR PLANTING -
SEE PLANTING SPECIFICATIONS
5 PLANT PIT EXCAVATION, FLARE
SIDES 60°
6 NATIVE SOIL MANTLE
7 PLANT TABLETS:
TRI-C MYCO TABS
(2) PER 1 GAL
(8) PER 5 GAL
(16) PER 15 GAL
SHRUB PLANTING
SCALE: N.T.S. SECTION
A TREE PLANTING - DOUBLE STAKE (24"-36" BOX)
SCALE: N.T.S. SECTION
PLANT PIT EXCAVATION,
SCARIFY BOTTOM & SIDES
OF PITS - FLARE TO 60°
UNAMENDED FRIABLE SOIL
MANTLE
TREE (SEE PLANTING PLAN)
CINCH TIE BY V.I.T.
PRODUCTS (4) PER TREE.
SECURE TO LODGEPOLE W/
GALV. NAIL
(2) 2 1/2" DIA. LODGE POLE
PINE TREE STAKE - INSTALL
NO CLOSER THAN 2" FROM
ROOTBALL
MULCH SPECIFICATIONS,
EXCEPT AT ROOT CROWN
ROOT CROWN
AMENDED SOIL IN UPPER
12" OF PLANT PIT - 100%
NON-COMPACTED NATIVE
SOIL BELOW (UNLESS
OTHERWISE SPEC'D)
PLANT TABLETS:
TRI-C MYCO TABS
(22) PER 24" BOX OR EQUAL
SURROUNDING SOIL
M
I N
2x DIA. OF
ROOTBALL
ARBOR GUARD FOR ALL
TREES INSTALLED IN TURF
- 24" DIA. CIRCLE CUT OUT
W/ 2" MULCH.
NOTE:
ALIGN STAKES PARALLEL TO
PREVAILING WIND. TREES
CLOSER THAN 5' FROM
PAVING TO RECEIVE 24" H
APPROVED ROOT BARRIER.
STAKES: 12' LONG WITH 30"
BURIED
B
5/20/2019
Signature
Date
A
R
T
H
I
R
E
G
I
S
T
E
R
N
DSC
A
C
H
I
T
E
C
T
S
T
A
I
F
O
R
N
I
A
E
X
728 134th Street SW Suite 200
Everett, Washington 98204
Ph: 425 741-3800 www.reidmiddleton.com
Copyright 2017 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Final Submittal
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
AG CH / NN05-27-2019
Approved:
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center Project Director
VA PG-18-13
Revisions: Date:
3185 C Airway Avenue Costa Mesa, CA 92626 P: 714-545-2898 F: 714-545-2878 bgb-inc.com35% Submittal 09-22-17
65% Submittal 01-31-18 95% Submittal 03-22-19 100% Submittal 05-03-19 Final Submittal 05-27-19
LP-102
PLANTING DETAILS
PLANTING NOTES:
PRE-PLANT WEED CONTROL:
1. IF LIVE PERENNIAL WEEDS EXIST ON SITE AT THE BEGINNING OF
WORK, SPRAY WITH A NON-SELECTIVE SYSTEMIC CONTACT
HERBICIDE, AS RECOMMENDED AND APPLIED BY AN APPROVED
LICENSED LANDSCAPE PEST CONTROL ADVISOR AND APPLICATOR.
LEAVE SPRAYED PLANTS INTACT FOR AT LEAST FIFTEEN (15) DAYS
TO ALLOW SYSTEMIC KILL.
2. CLEAR AND REMOVE THESE EXISTING WEEDS BY MOWING OR
GRUBBING OFF ALL PLANT PARTS AT LEAST 1/4" BELOW THE
SURFACE OF THE SOIL OVER THE ENTIRE AREA TO BE PLANTED.
3. AFTER IRRIGATION SYSTEM IS OPERATIONAL, APPLY WATER FOR
FIVE (5) TO TEN (10) DAYS AS NEEDED, TO ACHIEVE WEED
GERMINATION. APPLY CONTACT HERBICIDES AND WAIT AS NEEDED
BEFORE PLANTING. REPEAT, IF REQUIRED BY OWNER.
4. MAINTAIN SITE WEED FREE UNTIL FINAL ACCEPTANCE BY OWNER
UTILIZING MECHANICAL AND CHEMICAL TREATMENT.
GENERAL NOTES:
1. CONTRACTOR SHALL LOCATE ALL STORM DRAIN, GAS, ELECTRICAL
AND ALL OTHER UTILITY LINES IN FIELD PRIOR TO THE INSTALLATION
OF TREES. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT OF
ANY CONFLICT WITH TREE LOCATIONS AND STORM DRAIN/UTILITY
LINES. ADJUSTMENTS WILL BE MADE ACCORDINGLY.
2. INSTALL ROCK MULCH AS SPECIFIED. MULCH SHALL MATCH
EXISTING ADJACENT ROCK ON SITE AND AS APPROVED BY V.A.
PROJECT MANAGER.
3. SOIL AMENDMENTS SHALL BE USED FOR INCREASED SOIL
PENETRATION AND PLANT HEALTH. SOIL AMENDMENTS AND
QUANTITIES SHALL BE BASED ON FINAL HORTICULTURAL SOILS
ANALYSIS THROUGH A QUALIFIED AGRICULTURAL LABORATORY. SEE
SPECIFICATIONS, FOR GENERAL PURPOSE SPECIFICATION. A
MINIMUM OF 2 CUBIC YARDS OF SOIL AMENDMENT SHALL BE USED
PER 1000 SQUARE FEET OF PLANTER AREA. SUCH AMENDMENT
SHALL BE TILLED TO A 6" DEPTH.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTINUOUS
PROTECTION OF ALL PLANT MATERIALS ON-SITE UNTIL TURNOVER.
5. THE PLACEMENT OF ALL TREES, SHRUBS, GROUNDCOVERS AND
VINES SHALL BE REVIEWED BY THE LANDSCAPE ARCHITECT PRIOR
TO PLANTING. ANY TREE OR SHRUB THAT IS PLANTED WITHOUT
PRIOR REVIEW IS SUBJECT TO REMOVAL AND RELOCATION IF
DEEMED NECESSARY. ALL PLANT MATERIAL SHALL BE SUBJECT TO
INSPECTION AND APPROVAL BY LANDSCAPE ARCHITECT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECT
PLANT HEIGHTS ABOVE GRADE.
7. ALL SPECIMEN TREES ARE TO BE PRUNED AFTER PLANTING BY
LANDSCAPE CONTRACTOR.
8. LANDSCAPE ARCHITECT SHALL OVERSEE ALL PRUNING OPERATIONS.
9. ALL PLANTS SHALL MEET THE REQUIREMENTS OF THE CALIFORNIA
NURSERY ASSOCIATION WITH REGARD TO SIZE AND CONDITION.
TREE PLANTING NOTES:
1. ALL TREES SHALL BE STAKED / GUYED PER APPROVED LANDSCAPE
STANDARD DETAILS. SEE PLANTING DETAIL SHEET.
2. CONTRACTOR SHALL LOCATE ALL STORM DRAIN AND UTILITY LINES
IN FIELD PRIOR TO THE INSTALLATION OF TREES. CONTRACTOR
SHALL NOTIFY LANDSCAPE ARCHITECT OF ANY CONFLICT WITH TREE
LOCATIONS AND STORM DRAIN/UTILITY LINES. ADJUSTMENTS WILL
BE MADE ACCORDINGLY.
ROOT BARRIER NOTE:
ALL TREES PLANTED WITHIN 5'-0" OF HARDSCAPE AREAS (I.E., WALLS,
SIDEWALKS, BUILDINGS, STRUCTURES, ETC.) SHALL BE PLANTED WITH
ROOT BARRIERS. BARRIER SHALL EXTEND A MINIMUM OF 5'-0" ON EACH
SIDE OF TRUNK. PROVIDE 18" DEEP ROOT BARRIER ADJACENT TO PAVING.
PROVIDE 24" DEEP ROOT BARRIER ADJACENT TO CURB. SEE PLANTING
DETAIL SHEET FOR ROOT BARRIER DETAIL.
PLANT QUANTITIES:
CONTRACTOR SHALL NOTE THAT THE QUANTITIES ON PLANT LEGEND
HAVE BEEN PROVIDED FOR REFERENCE ONLY. CONTRACTOR SHALL
PROVIDE HIS OWN QUANTITIES FOR BID PREPARATION. ANY
DISCREPANCIES IN PLANT QUANTITIES AND SIZES SHALL BE BROUGHT TO
THE ATTENTION OF THE LANDSCAPE ARCHITECT.
PLANT INSTALLATION
1. ALL PLANTS SHALL BE VERIFIED BY LANDSCAPE ARCHITECT BY
ON-SITE INSPECTION OR THROUGH PHOTOGRAPHS FROM NURSERY
PRIOR TO PLANTING. PLANTS MAY BE SUBJECT TO REPLACEMENT
BY THE DISCRETION OF THE LANDSCAPE ARCHITECT.
2. PRIOR TO PLANTING, PLANTS SHALL BE LOCATED ABOVE GRADE ON
SITE IN THEIR CONTAINERS IN THE LOCATION OF FINAL PLANTING
PER THE APPROVED PLANTING PLAN.
3. THE LANDSCAPE ARCHITECT SHALL BE NOTIFIED WITHIN 48 HOURS
TO INSPECT THE FINAL LOCATIONS FOR ALL PLANT MATERIAL .
MAINTENANCE
1. ALL LANDSCAPE AND IRRIGATION SHALL BE MAINTAINED FOR A
PERIOD OF 90 DAYS AFTER INITIAL INSTALLATION, UNLESS
OTHERWISE AGREED UPON IN WRITING. THE CONTRACTOR SHALL
PROVIDE A ONE (1) YEAR WARRANTY ON SURVIVAL OF ALL PLANT
MATERIAL.
2. MAINTENANCE SHALL NOT BE TURNED OVER IN PHASES, UNLESS
OTHERWISE AGREED UPON IN WRITING.
3. SEE MAINTENANCE SPECIFICATIONS SHEET FOR COMPLETE
MAINTENANCE REQUIREMENTS, SCHEDULE AND TURN OVER.
UP
139 SF
ELEC
EL-1
148 SF
MECHANICAL
D O
O R28
180 36"
5.6"
STAIR
69 18
.7
DOOR
.8
DOOR
.6
69 OCC.
STAIR
D O
O R120
180 36"
24"
1HR
1HR
H
R
H
R
FH
NIC
18 SF
MECHANICAL
1109A
DOOR
2 21
0.
4"
68 SF
ELEV MACHINE
EM
EXAM 1
1A-115
EXAM 2
1A-113
EXAM 4
1A-109
WORKROOM
1A-107
TRIAGE - BARIATRIC
1A-102
EXAM 5
1A-112
STAFF TOILET
1A-122 CLEAN LINEN
1A-128
OFFICE-PROGRAM MGR
1B-208
OFFICE-2 RESIDENT
1B-209
QI OFFICE
1B-212
LOUNGE
1B-214
OFFICE-SOCIAL CASE MGR
1B-207
PUBLIC TOILET (M)
1B-218
PUBLIC TOILET (F)
1B-216
CORRIDOR
C1-1
HOUSEKEEPING
1B-217
ELEV
25 OCC.
28 OCC.
109 SF
ELEV LOBBY
EL 2
TUMOR REGISTER
1B-215
91 OCC.
GURNEY WAITING
25 OCC.
2HR
H
R
2HR
H
R
1HR
H
R
H
R
TRIAGE
1A-105
FELLOW HOTEL WK
1A-119
WORKSTATIONS
1A-121
WORKSTATIONS-MD
1A-123
CHIEF OFFICE
1A-125
OFFICE-PHARMACIST
1A-127
CLEAN UTILITY
1A-129
GAS STORAGE
1A-117
ALCOVE, PRINT
1A-124
1351 SF
WAITING
1B-201
NURSE WORK
1A-104
PROCEDURE
1A-132
MED ROOM
1A-110
PATIENT TOILET
1A-101
TRIAGE
1A-103
SOILED UTILITY
1A-130
EXAM 6
1A-114
STORAGE
1B-206COPY
1B-205
STAFF TOILET
1B-211
CORRIDOR
C1-2
1HR
H
R
1HR
H
R
H
R
2HR
2HR
EXAM 3
1A-111
1HR
CORRIDOR
C1-5
CORRIDOR
C1-6
CORRIDOR
C1-3
CORRIDOR
C1-4
KEY PLAN
BA
N
SYMBOLS LEGEND
EXISTING BUILDING
OCCUPANTS / ROOM
D O
O
RX
X" X"
X.X"
ACTUAL CUMULATIVE POPULATION
WIDTH REQ'D BY CODE BASED ON
ACTUAL CUMULATIVE POPULATION
ACTUAL WIDTH PROVIDED
POPULATION PERMITTED BASED
ON WIDTH PROVIDED
1 HR. RATED ASSUMBLY
XX
FIRE EXTINGUISHER CABINETFEC
ASSUMED IMAGINARY LINE PER
IBC 2009 CH. 7, SEC 705.3
"...BUILDINGS ON THE SAME LOT
SHALL BE ASSUMED TO HAVE AN
IMAGINARY LINE BETWEEN
THEM..."
PATH OF EGRESS
2 HR. RATED ASSUMBLY
SPRINKLER RISERR
DOUBLE CHECK VALVE & FIRE
DEPARTMENT CONNECTION
FH FIRE HYDRANT
15231 Laguna Canyon Road, Suite 200 Irvine, CA 92618
Tel: 949-417-7550 Fax: 949-585-9391
N
13220 Evening Creek Drive S Suite 115 San Diego, California 92128-4103 Ph: 858.668.0707 www.reidmiddleton.com Copyright 2019 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Final Submittal
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
JC BP05-27-19
Project Director
Scale:
VA PG-18-1335% Submittal 09-22-17
65% Submittal
95% Submittal
01-31-18
03-22-19
05-03-19100% Submittal
EC PROJECT NO. 20170433
05-27-19Final Submittal
C R e v it L o c a l F ile s \V
A L o m a L in d a C
C A
C
E N
T R
A L b p e g a h i.
rv t /2
/2
:0
:0
A
M
As indicated
LS-101
FIRST FLOOR LIFE SAFETY/
EXITING PLAN
1/8" = 1'-0"
CODE COMPLIANCE DIAGRAM - LEVEL 01
OCCUPANCY SCHEDULE - LEVEL 01
Number Name Occupancy Area Occupancy
Factor Occupant
Load Required
Exits
1A-101 PATIENT TOILET 61 SF 100 1 1
1A-102 TRIAGE - BARIATRIC 115 SF 100 1 1
1A-103 TRIAGE 92 SF 100 1 1
1A-104 NURSE WORK 103 SF 100 3
1A-105 TRIAGE 95 SF 100 1 1
1A-107 WORKROOM 313 SF 100 9 1
1A-109 EXAM 4 112 SF 100 2 1
1A-110 MED ROOM 62 SF 100 1 1
1A-111 EXAM 3 107 SF 100 2 1
1A-112 EXAM 5 113 SF 100 2 1
1A-113 EXAM 2 114 SF 100 2 1
1A-114 EXAM 6 110 SF 100 2 1
1A-115 EXAM 1 108 SF 100 2 1
1A-116 CRASH CART 9 SF N/A
1A-117 GAS STORAGE 47 SF 300 1 1
1A-119 FELLOW HOTEL WK 145 SF 100 4 1
1A-121 WORKSTATIONS 134 SF 100 4 1
1A-122 STAFF TOILET 67 SF 100 1 1
1A-123 WORKSTATIONS-MD 136 SF 100 3 1
1A-124 ALCOVE, PRINT 6 SF N/A
1A-125 CHIEF OFFICE 113 SF 100 1 1
1A-127 OFFICE-PHARMACIST 90 SF 100 2 1
1A-128 CLEAN LINEN 23 SF 300 1 1
1A-129 CLEAN UTILITY 62 SF 300 1 1
1A-130 SOILED UTILITY 60 SF 300 1 1
1A-132 PROCEDURE 141 SF 100 2 1
1B-201 WAITING 1351 SF 15 88 2
1B-205 COPY 91 SF 100 1 1
1B-206 STORAGE 74 SF 300 1 1
1B-207 OFFICE-SOCIAL CASE MGR 115 SF 100 1 1
1B-208 OFFICE-PROGRAM MGR 108 SF 100 2 1
1B-209 OFFICE-2 RESIDENT 99 SF 100 2 1
1B-210 STAFF LOCKERS 22 SF N/A
1B-211 STAFF TOILET 62 SF 100 1 1
1B-212 QI OFFICE 219 SF 100 2 1
1B-214 LOUNGE 134 SF 15 9 1
1B-215 TUMOR REGISTER 138 SF 100 3 1
1B-216 PUBLIC TOILET (F) 60 SF 100 1 1
1B-217 HOUSEKEEPING 88 SF 300 1 1
1B-218 PUBLIC TOILET (M) 63 SF 100 1 1
1109 MECHANICAL 148 SF 300 1 1
1109A MECHANICAL 18 SF 300 1 1
B-203 RECEPTION 168 SF 100 3
EL ELEV LOBBY 109 SF 100 2 1
EL-1 ELEC 139 SF 300 1 1
EM ELEV MACHINE 68 SF 300 1 1
GRN-1 GURNEY WAITING 51 SF N/A
Revisions: Date:
DN
FEC
FEC
F E
C
CGCG
CGCG
CG
CG CG
CGCG
CG
CG
CG
CG
CG
KEY PLAN
N
SYMBOLS LEGEND
EXISTING BUILDING
OCCUPANTS / ROOM
D O
O
RX
X" X"
X.X"
ACTUAL CUMULATIVE POPULATION
WIDTH REQ'D BY CODE BASED ON
ACTUAL CUMULATIVE POPULATION
ACTUAL WIDTH PROVIDED
POPULATION PERMITTED BASED
ON WIDTH PROVIDED
1 HR. RATED ASSUMBLY
XX
FIRE EXTINGUISHER CABINETFEC
ASSUMED IMAGINARY LINE PER
IBC 2009 CH. 7, SEC 705.3
"...BUILDINGS ON THE SAME LOT
SHALL BE ASSUMED TO HAVE AN
IMAGINARY LINE BETWEEN
THEM..."
PATH OF EGRESS
2 HR. RATED ASSUMBLY
SPRINKLER RISERR
DOUBLE CHECK VALVE & FIRE
DEPARTMENT CONNECTION
FH FIRE HYDRANT
EMS CLOSET
2C-102
STAFF MEN'S TOILET
2C-104
PHYSICIAN WORKROOM
2C-124
BREAK ROOM
2C-115
SOILED UTILITY
2C-123
PATIENT TOILET(F)
2C-108
EXAM 14
2C-112
EXAM 14
ELEV
EXAM 13
2C-121
CHIEF OFFICE
2C-126
CONFERENCE ROOM
2C-130
OFFICE PHARMACY
2C-128
STAFF WOMEN'S TOILET
2C-106
ELEVATOR AND WAITING
2B-100
ELEC
EL-2
NS
2A-101A
INFUSION
2A-101
NS
2A-101C
PAT TOILET
2A-101E
WHEELCHAIR ALCOVE
2A-103
CLEAN/ LINEN ROOM
2A-106
UNISEX RESTROOM
2A-102
NOURISH
MEDICATION ROOM
2A-104
ROOF ACCESS
2A-107
SOILED UTILITY ROOM
2A-108
IT
IT-2
69 OCC
EXISTING
STAIR TO BE
SHARED
NIC
26 OCC.
D O
O R59
180 36"
11.8"
17 OCC.
22 OCC.
STAIR
69 18
.7
42 OCC.
O
C C
STAIR
EXAM 10
2C-113
EXAM 9
2C-111
EXAM 8
2C-109
EXAM 7
2C-107
EXAM 11
2C-117
EXAM 12
2C-119
ISOLATION ROOM
2A-105A
SHARED OFFICE
2A-109
ISOLATION TOILET
2A-105B
PATIENT TOILET(M)
2C-110
63 OCC.
S
NS
2A-101B
ISOLATION ROOM ANTE
2A-105
CORRIDOR
C2-2
LOCKERS
2C-100
CORRIDOR
C2-1
14212
2 2 2 2
1 1 1 1
2HR
H
R
2HR
H
R
2HR
2HR
H
R
H
R
HD ANTE ROOM
2C-120
NON-HD ANTE ROOM
2C-116
NON HD COMPOUNDING
2C-118
WORK AREA
2C-125
DONNING ROOM
2C-114
SUB WAITING
2B-101
H
R
H
R
2HR
2HR
2HR
2HR
H
R
H
R
15231 Laguna Canyon Road, Suite 200 Irvine, CA 92618
Tel: 949-417-7550 Fax: 949-585-9391
N
13220 Evening Creek Drive S Suite 115 San Diego, California 92128-4103 Ph: 858.668.0707 www.reidmiddleton.com Copyright 2019 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Final Submittal
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
JC BP05-27-19
Project Director
Scale:
VA PG-18-1335% Submittal 09-22-17
65% Submittal
95% Submittal
01-31-18
03-22-19
05-03-19100% Submittal
EC PROJECT NO. 20170433
05-27-19Final Submittal
C R e v it L o c a l F ile s \V
A L o m a L in d a C
C A
C
E N
T R
A L b p e g a h i.
rv t /2
/2
:0
:2
A
M
As indicated
LS-102
SECOND FLOOR LIFE SAFETY/
EXITING PLAN
1/8" = 1'-0"
CODE COMPLIANCE DIAGRAM - LEVEL 02
OCCUPANCY SCHEDULE - LEVEL 02
Number Name Occupancy Area Occupancy
Factor Occupant
Load Required
Exits
2A-101A NS 168 SF 100 2 1
2A-101B NS 78 SF 100 1 1
2A-101C NS 66 SF 100 2 1
2A-101E PAT TOILET 60 SF 100 1 1
2A-102 UNISEX RESTROOM 53 SF 100 1 1
2A-103 WHEELCHAIR ALCOVE 50 SF 100 1 1
2A-103D NOURISH 14 SF 100 1 1
2A-104 MEDICATION ROOM 63 SF 100 1 1
2A-105 ISOLATION ROOM ANTE 66 SF 100 1 1
2A-105A ISOLATION ROOM 139 SF 100 2 1
2A-105B ISOLATION TOILET 61 SF 100 1 1
2A-106 CLEAN/ LINEN ROOM 99 SF 300 1 1
2A-107 ROOF ACCESS 43 SF 300 1 1
2A-108 SOILED UTILITY ROOM 76 SF 300 1 1
2A-109 SHARED OFFICE 135 SF 100 2 1
2B-100 ELEVATOR AND WAITING 200 SF 100 2 1
2B-101 SUB WAITING 249 SF 15 17 1
2C-100 LOCKERS 90 SF N/A
2C-102 EMS CLOSET 58 SF 300 1 1
2C-104 STAFF MEN'S TOILET 63 SF 100 1 1
2C-106 STAFF WOMEN'S TOILET 57 SF 100 1 1
2C-107 EXAM 7 115 SF 100 2 1
2C-108 PATIENT TOILET(F) 59 SF 100 1 1
2C-109 EXAM 8 118 SF 100 2 1
2C-110 PATIENT TOILET(M) 58 SF 100 1 1
2C-111 EXAM 9 103 SF 100 2 1
2C-112 EXAM 14 EXAM 14 112 SF 100 2 1
2C-113 EXAM 10 118 SF 100 2 1
2C-114 DONNING ROOM 64 SF 100 1 1
2C-115 BREAK ROOM 172 SF 15 12 1
2C-116 NON-HD ANTE ROOM 87 SF 100 2 1
2C-117 EXAM 11 106 SF 100 2 1
2C-118 NON HD COMPOUNDING 75 SF 100 2 1
2C-119 EXAM 12 111 SF 100 2 1
2C-120 HD ANTE ROOM 113 SF 100 2 1
2C-121 EXAM 13 115 SF 100 2 1
2C-122 HD COMPOUNDING 82 SF
2C-123 SOILED UTILITY 81 SF 300 1 1
2C-124 PHYSICIAN WORKROOM 172 SF 100 2 1
2C-125 WORK AREA 193 SF 100 3 1
2C-126 CHIEF OFFICE 115 SF 100 2 1
2C-128 OFFICE PHARMACY 116 SF 100 2 1
2C-130 CONFERENCE ROOM 200 SF 15 14 1
C2-1 CORRIDOR 294 SF N/A
C2-1 CORRIDOR 520 SF N/A
C2-2 CORRIDOR 178 SF N/A
C2-2 CORRIDOR 164 SF N/A
EL-2 ELEC 38 SF 300 1 1
IT-2 IT 120 SF 300 1 1
S2-1 STAIR 294 SF N/A
Revisions: Date:
| LI-101 - IRRIGATION PLAN |
| LI-102 - IRRIGATION CALCS AND NOTES |
| LI-103 - IRRIGATION DETAILS |
| LP-101 - PLANTING PLAN |
| LP-102 - PLANTING DETAILS |
| LS-101 - FIRST FLOOR LIFE SAFETY_ EXITING PLAN |
| LS-102 - SECOND FLOOR LIFE SAFETY_ EXITING PLAN |
File details come from the government source that posted it.