About this file

36C25819B0025 0003 S02_ATTACHMENT 29 - AD103.pdf

View the file

Other files

File Type Posted
36C25819B0025-0003005.pdf PDF
36C25819B0025-0003008.pdf PDF
36C25819B0025-0003009.pdf PDF
36C25819B0025-0003000.docx DOCX document
36C25819B0025-0003007.pdf PDF
36C25819B0025-0003003.pdf PDF
36C25819B0025-0003004.pdf PDF
36C25819B0025-0003006.pdf PDF
36C25819B0025-0003002.pdf PDF
36C25819B0025-0002004.pdf PDF
36C25819B0025-0002011.pdf PDF
36C25819B0025-0002000.docx DOCX document
36C25819B0025-0002006.pdf PDF
36C25819B0025-0002010.pptx PPTX presentation
36C25819B0025-0002002.pdf PDF
36C25819B0025-0002003.pdf PDF
36C25819B0025-0002009.pdf PDF
36C25819B0025-0002007.pdf PDF
36C25819B0025-0002005.pdf PDF
36C25819B0025-0002012.pdf PDF
36C25819B0025-0002001.pdf PDF
36C25819B0025-0002008.pdf PDF
36C25819B0025-0001001.pdf PDF
36C25819B0025-0001000.docx DOCX document
36C25819B0025-004.pdf PDF
36C25819B0025-013.pdf PDF
36C25819B0025-001.docx DOCX document
36C25819B0025-011.pdf PDF
36C25819B0025-012.pdf PDF
36C25819B0025-009.pdf PDF
36C25819B0025-010.pdf PDF
36C25819B0025-015.pdf PDF
36C25819B0025-005.pdf PDF
36C25819B0025-014.pdf PDF
36C25819B0025-003.pdf PDF
36C25819B0025-016.pdf PDF
36C25819B0025-002.pdf PDF
36C25819B0025-006.pdf PDF
36C25819B0025-007.pdf PDF
36C25819B0025-008.pdf PDF
36C25819B0025-000.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD

CC

AA

D.3D.3

C.2

B.4

A.6

2.2

2.2

1.2

1.2

1.6

1.6

C.6C.6

BB

A.8A.8

SOILED UTILITY

2C-123

EXAM 13

2C-121

EXAM 12

2C-119

EXAM 11

2C-117

BREAK ROOM

2C-115

EXAM 10

2C-113

EXAM 9

2C-111

EXAM 8

2C-109

EXAM 7

2C-107

EMS CLOSET

2C-102

PATIENT TOILET(M)

2C-110

PATIENT TOILET(F)

2C-108

STAFF WOMEN'S TOILET

2C-106

STAFF MEN'S TOILET

2C-104

ELEVATOR AND WAITING

2B-100

IT

IT-2

ELEC

EL-2

SOILED UTILITY ROOM

2A-108 CLEAN/ LINEN ROOM

2A-106

MEDICATION ROOM

2A-104

ROOF ACCESS

2A-107

SHARED OFFICE

2A-109

ISOLATION ROOM

2A-105A

ISOLATION ROOM ANTE

2A-105

ISOLATION TOILET

2A-105B

PAT TOILET

2A-101E

NOURISH

NS

2A-101C

NS

2A-101B

NS

2A-101A

INFUSION

2A-101

WHEELCHAIR ALCOVE

2A-103

UNISEX RESTROOM

2A-102

OFFICE PHARMACY

2C-128

CONFERENCE ROOM

2C-130

PHYSICIAN WORKROOM

2C-124

CORRIDOR

C2-2

CORRIDOR

C2-1

ELEV

OPEN TO BELOW

SHARED

STAIR

SCOPE OF WORK

LOCKERS

2C-100

EXISTING CLG

SUB WAITING

2B-101

AREAS THAT WILL REQUIRE

CEILING DEMO FOR

INSTALLATION OF ROOFTOP

MECHANICAL SCREENING

STRUCTURE.

PATCH TO MATCH EXISTING

ADJACENT CEILING

(E) EXAM 13

(E) CLEAN

(E) PHARMACY

EXISTING ACT TO BE

REMOVED8

LEGEND

6' - 11 1/2"

DEMOLITION GENERAL NOTES (TYP.)

1. COORDINATE ALL WORK IN THIS AREA WITH

CONTRACTING OFFICERS' REPRESENTATIVE TO MINIMIZE

IMPACT TO THE OPERATION.

2. THE UTILITY LINES WITHIN THE DEMOLITION AREA THAT

WILL REMAIN ARE TO BE PROTECTED / REROUTED.

IF DISCONNECTION IS REQUIRED, THEN CONTRACTOR

MUST REMOVE FROM CONTROL PROGRAM (HVAC, FIRE,

NURSE CALL, ETC.)

3. WHERE PARTITIONS ARE BEING REMOVED, REMOVE ALL

(E) POWER AND SIGNAL TO POINT OF ORIGIN. RELOCATE /

REROUTE UTILITIES, PIPING / CONDUITS, LIGHT SWITCHES

AND THERMOSTAT AS REQUIRED.

4. (E) FLOOR - NOT LEVEL, FLOAT (E) FLOOR LEVEL, PRIOR

TO INSTALLATION OF NEW FLOORING.

5. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND

DEMOLITIONS AT THE FACILITY PRIOR TO BIDDING ON THE

PROJECT AND NOTIFY THE GOVERNMENT IMMEDIATELY

OF ANY DISCREPANCIES.

6. REFER TO OTHER DISCIPLINE DRAWINGS FOR EXTENT OF

WORK FOR RESPECTIVE TRADES.

7. (E) FIRE SPRINKLER SYSTEM TO BE PROTECTED,

REPAIRED ADJUSTED AND CLEANED FOR NEW LAYOUT,

NEW SPRINKLER HEADS TO BE INSTALLED.

8. (E) FIRE ALARM SYSTEM, SEE FIRE ALARM DRAWINGS.

9. (E) PUBLIC ADDRESS SYSTEM TO BE PROTECTED,

REPAIRED, ADJUSTED AND CLEANED FOR NEW LAYOUT.

10. (E) CAMERAS, SIGNAGE & WINDOW COVERING, TO BE

SALVAGED AND RETURNED TO THE GOVERNMENT.

11. REPAIR ALL DAMAGE CAUSED BY DEMOLITION

OPERATIONS AND MATCH ORIGINAL CONDITIONS.

12. (E) PLASTER FINISH IN DEMOLITION MAY REQUIRE

RESPIRATORS.

13. DEMOLITION ACTIVITIES MAY CAUSE DUST, VIBRATION

AND NOISE; DISTURBING THE OCCUPANTS OF THE

BUILDING. THIS WORK MAY BE REQUIRED TO BE

PERFORMED DURING GOVERNMENT / RESIDENTS

UNOCCUPIED HOURS.

14. NO OPENINGS, POCKETS, NOTCHES, BLOCKOUTS,

ETC. ARE ALLOWED IN STRUCTURAL ELEMENTS UNLESS

DETAILED ON DRAWINGS. NOTIFY CONTRACTOR OF ANY

OPENINGS, POCKETS, ETC., SHOWN BY OTHER

DRAWINGS BUT NOT SHOWN ON STRUCTURAL

DRAWINGS.

A. AT (E) SHEAR WALLS: REMOVE AND REPLACE GYP.

BOARD / FINISH ONLY (NON-STRUCTURAL ELEMENTS).

15. THE CONTRACTOR SHALL PROVIDE ALL MEASURES

NECCESSARY TO PROTECT THE STRUCTURE DURING

CONSTRUCTION. SUCH MEASURES INCLUDE, BUT NOT

LIMITED TO: BRACING, SHORING, ETC. OBSERVATION

VISITS TO THE SITE BY OWNER, ARCHITECT OR ENGINEER

SHALL NOT INCLUDE THE INSPECTION OF BRACING,

SHORING, ETC.

16. SEE ALL DISCIPLINE DRAWINGS FOR LOCATION AND SIZE

OF PIPE, VENT, DUCT AND OTHER SIMILAR OPENINGS AND

EMBEDDED OR ATTACHED ITEMS.

17. PROVIDE SHUT-OFF VALVES, ETC. TO MAINTAIN UTILITY

SERVICE OUTSIDE THE AREA OF WORK.

18. SEE NEW WORK PLANS FOR NEW LAYOUT.

19. (E) FIXED EQUIPMENT WHICH IS TO REMAIN IN THE AREA

OF WORK DURING CONSTRUCTION SHALL BE COVERED,

PROTECTED AND SEALED.

20. (E) WARRANTIES AND MAINTENANCE AGREEMENT TO

REMAIN INTACT - EG. ROOFING AND (E) ROOF MOUNTED

EQUIPMENT AND PNEUMATIC TUBE OPERATION.

21. (E) MEDICAL GAS SYSTEM, SEE PLUMBING DRAWINGS.

22. (E) NURSE CALL SYSTEM, SEE ELECTICAL DRAWINGS.

23. (E) WIRELESS SYSTEM INCLUDING ANTENNA, SEE

ELECTRICAL DRAWINGS.

24. ALL SHUT DOWNS OF UTILITIES ARE SUBJECT TO 21 DAY

NOTICE.

NOTE:

(E) FURNITURE, FIXTURE AND EQUIPMENT NOT SHOWN

FOR CLARITY, ARE TO BE SALVAGED AND RETURNED TO

THE VA IN (E) CONTITION, TYP.

ASBESTOS AND LEAD PAINT

NO ASBESTOS OR LEAD (END OF PROJECT CERTIFICATION OF

NO ASBESTOS OR LEAD IN NEWLY CONSTRUCTED AREAS

REQUIRED).

REMOVE EXISTING INTERIOR PARTITION

REMOVE EXISTING INTERIOR DOOR

REMOVE EXISTING CASEWORK

CAREFULLY REMOVE, SALVAGE AND STORE EXISTING

PASS THROUGH WINDOW FOR REINSTALLATION

5 REMOVE EXISTING CORNER GUARD

6 REMOVE EXISTING CEILING AND DEVICES TO THE EXTENT

SHOWN. PROTECT ADJACENT AREA TO REMAIN.

7 REMOVE EXISTING CEILING, INCLUDING LIGHT FIXTURES,

REGISTERS,ETC.

8 EXISTING CEILING TO REMAIN.

9 EXISTING LIGHT FIXTURES TO BE SWITCHED BETWEEN

(E) EXAM ROOM 13 AND (E) CLEAN ROOM.

KEY PLAN

N

15231 Laguna Canyon Road, Suite 200 Irvine, CA 92618

Tel: 949-417-7550 Fax: 949-585-9391

13220 Evening Creek Drive S Suite 115 San Diego, California 92128-4103 Ph: 858.668.0707 www.reidmiddleton.com Copyright 2019 Reid Middleton, Inc.

c

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Final Submittal

Office of Programs and Project

Management Jerry L.

Pettis VA Medical

Center U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

605-17-500

RENOVATION OF SURGICAL ONCOLOGY,

BLDG 31

VA LOMA LINDA HEALTHCARE SYSTEM

11201 BENTON STREET

LOMA LINDA, CA 92357

JC BP05-27-19

Project Director

VA PG-18-13

EC PROJECT NO. 20170433

C R e v it L o c a l F ile s \V

A L o m a L in d a C

C A

C

E N

T R

A L b p e g a h i.

rv t /2

/2

:4 :3

P

M

AD103

OVERALL SECOND FLOOR CEILING

DEMOLITION PLAN

3/16" = 1'-0"1

OVERALL SECOND FLOOR CEILING

DEMOLITION PLAN

1Revisions: Date:

35% Submittal 09-22-17

65% Submittal 01-31-18

95% Submittal 03-22-19

100% Submittal 05-03-19

Final Submittal 05-27-19

. Amendment No. 2 08.20.191

Sheets
AD103 - OVERALL SECOND FLOOR CEILING DEMOLITION PLAN