SOILED UTILITY
2C-123
EXAM 13
2C-121
EXAM 12
2C-119
EXAM 11
2C-117
BREAK ROOM
2C-115
EXAM 10
2C-113
EXAM 9
2C-111
EXAM 8
2C-109
EXAM 7
2C-107
EMS CLOSET
2C-102
PATIENT TOILET(M)
2C-110
PATIENT TOILET(F)
2C-108
STAFF WOMEN'S TOILET
2C-106
STAFF MEN'S TOILET
2C-104
ELEVATOR AND WAITING
2B-100
IT
IT-2
ELEC
EL-2
SOILED UTILITY ROOM
2A-108 CLEAN/ LINEN ROOM
2A-106
MEDICATION ROOM
2A-104
ROOF ACCESS
2A-107
SHARED OFFICE
2A-109
ISOLATION ROOM
2A-105A
ISOLATION ROOM ANTE
2A-105
ISOLATION TOILET
2A-105B
PAT TOILET
2A-101E
NOURISH
NS
2A-101C
NS
2A-101B
NS
2A-101A
INFUSION
2A-101
WHEELCHAIR ALCOVE
2A-103
UNISEX RESTROOM
2A-102
OFFICE PHARMACY
2C-128
CONFERENCE ROOM
2C-130
PHYSICIAN WORKROOM
2C-124
CORRIDOR
C2-2
CORRIDOR
C2-1
ELEV
OPEN TO BELOW
SHARED
STAIR
SCOPE OF WORK
LOCKERS
2C-100
EXISTING CLG
SUB WAITING
2B-101
AREAS THAT WILL REQUIRE
CEILING DEMO FOR
INSTALLATION OF ROOFTOP
MECHANICAL SCREENING
STRUCTURE.
PATCH TO MATCH EXISTING
ADJACENT CEILING
(E) EXAM 13
(E) CLEAN
(E) PHARMACY
EXISTING ACT TO BE
REMOVED8
LEGEND
6' - 11 1/2"
DEMOLITION GENERAL NOTES (TYP.)
1. COORDINATE ALL WORK IN THIS AREA WITH
CONTRACTING OFFICERS' REPRESENTATIVE TO MINIMIZE
IMPACT TO THE OPERATION.
2. THE UTILITY LINES WITHIN THE DEMOLITION AREA THAT
WILL REMAIN ARE TO BE PROTECTED / REROUTED.
IF DISCONNECTION IS REQUIRED, THEN CONTRACTOR
MUST REMOVE FROM CONTROL PROGRAM (HVAC, FIRE,
NURSE CALL, ETC.)
3. WHERE PARTITIONS ARE BEING REMOVED, REMOVE ALL
(E) POWER AND SIGNAL TO POINT OF ORIGIN. RELOCATE /
REROUTE UTILITIES, PIPING / CONDUITS, LIGHT SWITCHES
AND THERMOSTAT AS REQUIRED.
4. (E) FLOOR - NOT LEVEL, FLOAT (E) FLOOR LEVEL, PRIOR
TO INSTALLATION OF NEW FLOORING.
5. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND
DEMOLITIONS AT THE FACILITY PRIOR TO BIDDING ON THE
PROJECT AND NOTIFY THE GOVERNMENT IMMEDIATELY
OF ANY DISCREPANCIES.
6. REFER TO OTHER DISCIPLINE DRAWINGS FOR EXTENT OF
WORK FOR RESPECTIVE TRADES.
7. (E) FIRE SPRINKLER SYSTEM TO BE PROTECTED,
REPAIRED ADJUSTED AND CLEANED FOR NEW LAYOUT,
NEW SPRINKLER HEADS TO BE INSTALLED.
8. (E) FIRE ALARM SYSTEM, SEE FIRE ALARM DRAWINGS.
9. (E) PUBLIC ADDRESS SYSTEM TO BE PROTECTED,
REPAIRED, ADJUSTED AND CLEANED FOR NEW LAYOUT.
10. (E) CAMERAS, SIGNAGE & WINDOW COVERING, TO BE
SALVAGED AND RETURNED TO THE GOVERNMENT.
11. REPAIR ALL DAMAGE CAUSED BY DEMOLITION
OPERATIONS AND MATCH ORIGINAL CONDITIONS.
12. (E) PLASTER FINISH IN DEMOLITION MAY REQUIRE
RESPIRATORS.
13. DEMOLITION ACTIVITIES MAY CAUSE DUST, VIBRATION
AND NOISE; DISTURBING THE OCCUPANTS OF THE
BUILDING. THIS WORK MAY BE REQUIRED TO BE
PERFORMED DURING GOVERNMENT / RESIDENTS
UNOCCUPIED HOURS.
14. NO OPENINGS, POCKETS, NOTCHES, BLOCKOUTS,
ETC. ARE ALLOWED IN STRUCTURAL ELEMENTS UNLESS
DETAILED ON DRAWINGS. NOTIFY CONTRACTOR OF ANY
OPENINGS, POCKETS, ETC., SHOWN BY OTHER
DRAWINGS BUT NOT SHOWN ON STRUCTURAL
DRAWINGS.
A. AT (E) SHEAR WALLS: REMOVE AND REPLACE GYP.
BOARD / FINISH ONLY (NON-STRUCTURAL ELEMENTS).
15. THE CONTRACTOR SHALL PROVIDE ALL MEASURES
NECCESSARY TO PROTECT THE STRUCTURE DURING
CONSTRUCTION. SUCH MEASURES INCLUDE, BUT NOT
LIMITED TO: BRACING, SHORING, ETC. OBSERVATION
VISITS TO THE SITE BY OWNER, ARCHITECT OR ENGINEER
SHALL NOT INCLUDE THE INSPECTION OF BRACING,
SHORING, ETC.
16. SEE ALL DISCIPLINE DRAWINGS FOR LOCATION AND SIZE
OF PIPE, VENT, DUCT AND OTHER SIMILAR OPENINGS AND
EMBEDDED OR ATTACHED ITEMS.
17. PROVIDE SHUT-OFF VALVES, ETC. TO MAINTAIN UTILITY
SERVICE OUTSIDE THE AREA OF WORK.
18. SEE NEW WORK PLANS FOR NEW LAYOUT.
19. (E) FIXED EQUIPMENT WHICH IS TO REMAIN IN THE AREA
OF WORK DURING CONSTRUCTION SHALL BE COVERED,
PROTECTED AND SEALED.
20. (E) WARRANTIES AND MAINTENANCE AGREEMENT TO
REMAIN INTACT - EG. ROOFING AND (E) ROOF MOUNTED
EQUIPMENT AND PNEUMATIC TUBE OPERATION.
21. (E) MEDICAL GAS SYSTEM, SEE PLUMBING DRAWINGS.
22. (E) NURSE CALL SYSTEM, SEE ELECTICAL DRAWINGS.
23. (E) WIRELESS SYSTEM INCLUDING ANTENNA, SEE
ELECTRICAL DRAWINGS.
24. ALL SHUT DOWNS OF UTILITIES ARE SUBJECT TO 21 DAY
NOTICE.
NOTE:
(E) FURNITURE, FIXTURE AND EQUIPMENT NOT SHOWN
FOR CLARITY, ARE TO BE SALVAGED AND RETURNED TO
THE VA IN (E) CONTITION, TYP.
ASBESTOS AND LEAD PAINT
NO ASBESTOS OR LEAD (END OF PROJECT CERTIFICATION OF
NO ASBESTOS OR LEAD IN NEWLY CONSTRUCTED AREAS
REQUIRED).
REMOVE EXISTING INTERIOR PARTITION
REMOVE EXISTING INTERIOR DOOR
REMOVE EXISTING CASEWORK
CAREFULLY REMOVE, SALVAGE AND STORE EXISTING
PASS THROUGH WINDOW FOR REINSTALLATION
5 REMOVE EXISTING CORNER GUARD
6 REMOVE EXISTING CEILING AND DEVICES TO THE EXTENT
SHOWN. PROTECT ADJACENT AREA TO REMAIN.
7 REMOVE EXISTING CEILING, INCLUDING LIGHT FIXTURES,
REGISTERS,ETC.
8 EXISTING CEILING TO REMAIN.
9 EXISTING LIGHT FIXTURES TO BE SWITCHED BETWEEN
(E) EXAM ROOM 13 AND (E) CLEAN ROOM.
KEY PLAN
N
15231 Laguna Canyon Road, Suite 200 Irvine, CA 92618
Tel: 949-417-7550 Fax: 949-585-9391
13220 Evening Creek Drive S Suite 115 San Diego, California 92128-4103 Ph: 858.668.0707 www.reidmiddleton.com Copyright 2019 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Final Submittal
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
JC BP05-27-19
Project Director
VA PG-18-13
EC PROJECT NO. 20170433
C R e v it L o c a l F ile s \V
A L o m a L in d a C
C A
C
E N
T R
A L b p e g a h i.
rv t /2
/2
:4 :3
P
M
AD103
OVERALL SECOND FLOOR CEILING
DEMOLITION PLAN
3/16" = 1'-0"1
OVERALL SECOND FLOOR CEILING
DEMOLITION PLAN
1Revisions: Date:
35% Submittal 09-22-17
65% Submittal 01-31-18
95% Submittal 03-22-19
100% Submittal 05-03-19
Final Submittal 05-27-19
. Amendment No. 2 08.20.191
| Sheets |
| AD103 - OVERALL SECOND FLOOR CEILING DEMOLITION PLAN |
File details come from the government source that posted it.