About this file

36C25819B0025 0003 S02_ATTACHMENT 37 - CS.pdf

View the file

Other files

File Type Posted
36C25819B0025-0003005.pdf PDF
36C25819B0025-0003008.pdf PDF
36C25819B0025-0003001.pdf PDF
36C25819B0025-0003000.docx DOCX document
36C25819B0025-0003007.pdf PDF
36C25819B0025-0003003.pdf PDF
36C25819B0025-0003004.pdf PDF
36C25819B0025-0003006.pdf PDF
36C25819B0025-0003002.pdf PDF
36C25819B0025-0002004.pdf PDF
36C25819B0025-0002011.pdf PDF
36C25819B0025-0002000.docx DOCX document
36C25819B0025-0002006.pdf PDF
36C25819B0025-0002010.pptx PPTX presentation
36C25819B0025-0002002.pdf PDF
36C25819B0025-0002003.pdf PDF
36C25819B0025-0002009.pdf PDF
36C25819B0025-0002007.pdf PDF
36C25819B0025-0002005.pdf PDF
36C25819B0025-0002012.pdf PDF
36C25819B0025-0002001.pdf PDF
36C25819B0025-0002008.pdf PDF
36C25819B0025-0001001.pdf PDF
36C25819B0025-0001000.docx DOCX document
36C25819B0025-004.pdf PDF
36C25819B0025-013.pdf PDF
36C25819B0025-001.docx DOCX document
36C25819B0025-011.pdf PDF
36C25819B0025-012.pdf PDF
36C25819B0025-009.pdf PDF
36C25819B0025-010.pdf PDF
36C25819B0025-015.pdf PDF
36C25819B0025-005.pdf PDF
36C25819B0025-014.pdf PDF
36C25819B0025-003.pdf PDF
36C25819B0025-016.pdf PDF
36C25819B0025-002.pdf PDF
36C25819B0025-006.pdf PDF
36C25819B0025-007.pdf PDF
36C25819B0025-008.pdf PDF
36C25819B0025-000.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15231 Laguna Canyon Road, Suite 200 Irvine, CA 92618

Tel: 949-417-7550 Fax: 949-585-9391

13220 Evening Creek Drive S Suite 115 San Diego, California 92128-4103 Ph: 858.668.0707 www.reidmiddleton.com Copyright 2019 Reid Middleton, Inc.

c

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Final Submittal

Office of Programs and Project

Management Jerry L.

Pettis VA Medical

Center U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

605-17-500

RENOVATION OF SURGICAL ONCOLOGY,

BLDG 31

VA LOMA LINDA HEALTHCARE SYSTEM

11201 BENTON STREET

LOMA LINDA, CA 92357

JC BP05-27-19

Project Director

VA PG-18-13

EC PROJECT NO. 20170433

C R e v it L o c a l F ile s \V

A L o m a L in d a C

C A

C

E N

T R

A L b p e g a h i.

rv t /2

/2

:1 :0

P

M

CS

COVER SHEET

DEPARTMENT OF VETERANS AFFAIRS

VA LOMA LINDA HEALTHCARE SYSTEM

CANCER CENTER BUILDING #31

RENOVATION OF SURGICAL ONCOLOGY

VA PROJECT NUMBER: 605-17-500

11201 BENTON STREET

LOMA LINDA, CA 92357

VA REPRESENTATIVE APPROVALS

APPROVED: Larry Barrett Energy Engineer, FMS

APPROVED: Shane M. Elliott, MBA Associate Director for Administration

APPROVED: Melissa Lloyd, DPN, MSN-ED, RN, PCCN Associate Director for Patient Care Servicees/Nursing

APPROVED: Michael Ing, MD Chief, Infectious Disease / Infection Control

APPROVED: James Crane Project Manager

APPROVED: Timothy LaFave Chief, Projects Section, FMS

APPROVED: Robert Tanjuakio Chief, Office of Information & Technology (OI&T)/FCIO

APPROVED: Dennis Morin Chief, Police Service

APPROVED: Vacant Chief, Medicine Service

APPROVED: Kenneth Eigen Chief, Facility Management Services (FMS)

APPROVED: Vacant Chief of Staff

APPROVED: Prachi V. Asher, FACHE Assistant Director

APPROVED: Jorge Rivera, M.D.

Chief, Surgical Service

APPROVED: Angel Osirupu-el Chief, EMS

APPROVED: Per Project Project Engineer/COR, FMS

SHEET INDEX

SHEET

NUMBER SHEET NAME

I601 INTERIOR FINISHES SCHEDULE AND DETAILS

STRUCTURAL

SI-001 GENERAL NOTES

SI-002 GENERAL NOTES

SI-003 SPECIAL INSPECTION SCHEDULE

SI-004 ABBREVIATIONS AND SYMBOLS

SB-101 OVERALL FOUNDATION FRAMING PLAN

SB-101A AREA A - FOUNDATION FRAMING PLAN

SB-101B AREA B - FOUNDATION FRAMING PLAN

SF-101 ROOF FRAMING PLAN

SS-201 SCREEN WALL ELEVATION

SS501 DETAILS & SECTIONS

SS-502 DETAILS & SECTIONS

MECHANICAL

ML-100 HVAC SYMBOLS AND ABREVIATIONS

MD-112 MECHANICAL SECOND FLOOR MECHANICAL DEMOLITION PLANS

MH-111 MECHANICAL FIRST FLOOR PLAN

MH-112 MECHANICAL SECOND FLOOR PLAN

MH-113 MECHANICAL ROOF PLAN

MP-111 FIRST FLOOR HYDRONIC PIPING PLAN

MP-112 SECOND FLOOR HYDRONIC PIPING PLAN

MH-201 HVAC DETAILS

MH-202 HVAC DETAILS

MH-203 HVAC SCHEDULES

MH-204 HVAC DETAILS

MH-301 ANDOVER CONTINUUM CONTROL SEQUENCES

PLUMBING

PL-100 ABBREVIATIONS, SYMBOLS AND NOTES

PL-101 PLUMBING FIXTURES SCHEDULE

PL-111 FIRST FLOOR PLUMBING PLAN

PL-112 SECOND FLOOR PLUMBING PLAN

PL-201 PLUMBING DETAILS

PL-301 PLUMBING RISER DIAGRAM

ELECTRICAL

E-001 ELECTRICAL - SYMBOLS, LEGEND, ABBREVIATIONS AND NOTES

ED-101B FIRST FLOOR PARTIAL LIGHTING DEMOLITION PLAN B

ED-102 SECOND FLOOR PARTIAL LIGHTING DEMOLITION PLAN

ED-103B FIRST FLOOR POWER DEMOLITION PLAN

ED-105 SECOND FLOOR POWER DEMOLITION PLAN

ED-106B FIRST FLOOR PARTIAL SPECIAL SYSTEMS DEMOLITION PLAN B

E-101A FIRST FLOOR PARTIAL LIGHTING PLAN A

E-101B FIRST FLOOR PARTIAL LIGHTING PLAN B

E-102 SECOND FLOOR PARTIAL LIGHTING PLAN AREA A

E-104A FIRST FLOOR PARTIAL POWER PLAN AREA A

E-104B FISRT FLOOR PARTIAL POWER PLAN AREA B

E-105 SECOND FLOOR POWER PLAN AREA A

E-106A FIRST FLOOR PARTIAL SPECIAL SYSTEMS PLAN AREA A

E-106B FIRST FLOOR PARTIAL SPECIAL SYSTEMS PLAN AREA B

E-108 SECOND FLOOR PARTIAL SPECIAL SYSTEMS PLAN AREA A

E-109 ROOF POWER PLAN AREA A

E-401 ENLARGED POWER FLOOR PLANS

E-501 DETAILS

E-502 DETAILS

E-600 SINGLE LINE DIAGRAM

E-700 FEEDER AND LIGHTING FIXTURE SCHEDULE

E-701 SCHEDULES

E-702 SCHEDULES

E-703 SCHEDULES

E-704 SCHEDULES

E-705 SCHEDULES

E-706 SCHEDULES

SHEET INDEX

SHEET

NUMBER SHEET NAME

GENERAL

CS COVER SHEET

GI-001 ABBREVIATIONS & SYMBOL LIST

GI-101 MOUNTING HEIGHTS & CLEARANCE

LIFE SAFETY

LS-101 FIRST FLOOR LIFE SAFETY/ EXITING PLAN

LS-102 SECOND FLOOR LIFE SAFETY/ EXITING PLAN

CIVIL

V-101 EXISTING CONDITIONS PLAN

CD-101 DEMOLITION & EROSION PLAN

CG-101 GRADING AND DRAINAGE PLAN

CP-101 PAVING AND SIGNAGE PLAN

C-501 DETAILS

LANDSCAPE

LI-101 IRRIGATION PLAN

LI-102 IRRIGATION NOTES, CALCS AND NOTES

LI-103 IRRIGATION DETAILS

LP-101 PLANTING PLAN

LP-102 PLANTING DETAILS

PHASING

PH-01 PHASING PLANS

ARCHITECTURAL

AD101 OVERALL FIRST FLOOR DEMOLITION PLAN

AD102 OVERALL SECOND FLOOR DEMOLTION PLAN

AD103 OVERALL SECOND FLOOR CEILING DEMOLITION PLAN

AE100 OVERALL FIRST FLOOR PLAN

AE101 FIRST FLOOR PARTIAL PLAN A

AE102 FIRST FLOOR PARTIAL PLAN B

AE103 OVERALL SECOND FLOOR PLAN

AE104 SECOND FLOOR PARTIAL PLAN A

AE106 OVERALL FIRST FLOOR RCP

AE107 FIRST FLOOR PARTIAL RCP A

AE108 FIRST FLOOR PARTIAL RCP B

AE109 OVERALL SECOND FLOOR RCP

AE110 SECOND FLOOR PARTIAL RCP A

AE115 OVERALL ROOF PLAN

A301 EXTERIOR DETAILS

A302 PARTITION TYPES

A303 FRAMING DETAILS

A304 MILLWORK DETAILS

A305 DOORS AND WINDOWS

A306 CEILING DETAILS

A307 CEILING DETAILS

A308 DETAILS

AE401 INTERIOR ELEVATIONS

AE402 INTERIOR ELEVATIONS

AE403 INTERIOR ELEVATIONS

AE404 INTERIOR ELEVATIONS

AE405 TOILET ROOM PLANS & ELEVATIONS

AE406 TOILET ROOM PLANS & ELEVATIONS

AE601 DOOR & WINDOW SCHEDULE

EQUIPMENT & FURNITURE

Q101 OVERALL EQUIPMENT FIRST FLOOR LAYOUT PLAN

Q102 EQUIPMENT FIRST FLOOR LAYOUT PARTIAL PLAN A

Q103 EQUIPMENT FIRST FLOOR LAYOUT PARTIAL PLAN B

Q104 OVERALL EQUIPMENT SECOND FLOOR LAYOUT PLAN

Q105 EQUIPMENT SECOND FLOOR LAYOUT PARTIAL PLAN A

Q601 EQUIPMENT SCHEDULE

Q602 EQUIPMENT SCHEDULE

INTERIORS

I101 FIRST FLOOR FLOORING PLAN

I102 SECOND FLOOR FLOORING PLAN

I103 FIRST FLOOR WALL FINISH PLAN

I104 SECOND FLOOR WALL FINISH PLAN

PROJECT DATA

THE CONTRACTOR SHALL ABIDE BY ALL CURRENT CITY AND COUNTY GOVERNING

ORDINANCES AND CODES, INCLUDED BUT NOT LIMITED TO:

APPLICABLE CODES

2015 IBC, 2015 INTERNATIONAL BUILDING CODE, PREPARED BY THE

INTERNATIONAL CODE COUNCIL, WASHINGTON, D.C.

NFPA 10,13,14,20,72,101

APPLICABLE STANDARDS

VA STANDARD H-18-8 - SEISMIC DESIGN REQUIREMENTS, AUGUST 2013, U.S.

DEPARTMENT OF VETERAN AFFAIRS, OFFICE OF CONSTRUCTION & FACILITIES

MANAGEMENT

VA STANDARD PG- 18-10 - DESIGN MANUALS, 2014, U.S. DEPARTMENT OF

VETERAN AFFAIRS, OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT

USP 797

USP 800

OWNER'S REPRESENTATIVE

DEPARTMENT OF VETERANS AFFAIRS

11201 BENTON STREET

LOMA LINDA, CA 92357

GENERAL ENGINEER, FMS PROJECTS

VA LOMA LINDA HEALTHCARE SYSTEM

CONTACT JAMES CRANE

E-MAIL James.crane2@va.gov

PHONE 909.825.7084 X5527

CIVIL & STRUCTURAL ENGINEER

MECHANICAL, ELECTRICAL, COMMISSIONING ENGINEER

COST ENGINEER AND CONSTRUCTION SCHEDULING

ARCHITECT

SHEET INDEX

BUILDING INFORMATION

11201 BENTON STREET

LOMA LINA, CA 92357

SUMMARY OF WORK

PROJECT ADDRESS

PROJECT TEAM

CODES

REID MIDDLETON, INC.

13220 EVENING CREEK DRIVE, SUITE 115

SAN DIEGO, CA 92128

CONTACT DAVID B. SWANSON, P.E., S.E. Principal E-MAIL dswanson@reidmiddleton.com

PHONE (425) 508-7971

CONTACT DARIN K. AVEYARD, P.E., S.E., Project Manager & Structural Engineer E-MAIL daveyard@reidmiddleton.com

PHONE (858) 859-4274

CONTACT MARK A. DAVIS, P.E., Civil Engineer E-MAIL mdavis@reidmiddleton.com

PHONE (425) 248-2916

EWING COLE

DISCOVERY BUSINESS CENTER

15231 LAGUNA CANYON ROAD, SUITE 200

IRVINE, CA 92618

CONTACT MICHAEL LEHMAN

E-MAIL MLEHMAN@EWINGCOLE.COM

PHONE (949) 417-6489

DAV ENERGY

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

CONTACT ALEX BOUCHER, MEP PM/QA

E-MAIL ALEXANDER.BOUCHER@DAVENERGY.COM

PHONE (240) 499-5981

CONTACT JOHN LOPEZ, ELEC ENGINEER

E-MAIL JJLOPEZ@LOPEZENGINEERING.COM

PHONE (619) 275-5658

CUMMING

15015 AVE. OF SCIENCE, SUITE 160

SAN DIEGO, CA 92128

CONTACT ASHOK PATEL

E-MAIL APATEL@CCORPUSA.COM

PHONE (858) 485-6765

LANDSCAPE ARCHITECT

BGB DESIGN GROUP

3185 C AIRWAY AVE

COSTA MESA, CA 92626

CONTACT PAUL BETTENHAUSEN

E-MAIL PBETTENHAUSEN@BGB-INC.COM

PHONE (949) 246-0463

VICINITY MAP

CAMPUS MAP

1. RENOVATION OF EXISTING PHARMACY AT THE SECOND FLOOR WHICH INCLUDES A 125 SF ADDITIONAL

SPACE AT A TOTAL AREA OF 700 SF.

2. TOTAL FIRST FLOOR RENOVATION 8,580 DGSF INCLUDES RENOVATION OF FIRST FLOOR EXISTING SHELL SPACE LEFT WING CLINICAL SPACE AT A TOTAL OF 3,950 SF AND RIGHT WING NON-CLINICAL SPACE AT A

TOTAL OF 3,850 SF, LOBBY 780 SF.

BUSINESS GROUP B OCCUPANCY

INCLUDES:

EXAMINATION ROOMS

ADMINISTRATION OFFICES

CLINICAL SUPPORT ROOMS

PUBLIC SPACE, WAITING AND RECEPTION

CONSTRUCTION TYPE:

TYPE IIB

FIRE SPRINKLER SYSTEM:

FULLY SPRINKLERED PER NFPA 13

BUILDING AREA: 18,309 SF

BUILDING HEIGHT: 2-STORIES, 32'-6" (PARAPET)

U.S. Department of Veterans Affairs

APPROVED: Barbara Fallen, FACHE Medical Center Director

APPROVED: Cindy Angula Quality Management Chief

APPROVED: Robert McCaray Safety Manager

APPROVED: Michael Choi Chief, Fiscal Service

APPROVED: Samineh Sam Chief, Pharmacy Service

APPROVED: Ricky Bard Chief, Hospital Administrative Service

APPROVED: Joseph Catrucco Chief, Logistics Service

APPROVED: Alex Yi, MD Chief, Imaging Service

APPROVED: Per Project Contracting Officer

APPROVED: John Byrne, M.D.O.

ACOS, Educational Service

APPROVED: Deanna Callahan Program Manager, Informatics

APPROVED: Vacant Chief, VA Canteen Services

APPROVED:

APPROVED:

APPROVED: Alan Jacobson, MD ACOS, Research

VA

ACC

CBC

Exe (34)

Bldg 2

Bldg 1

Revisions: Date:

35% Submittal 09-22-17

65% Submittal 01-31-18

95% Submittal 03-22-19

100% Submittal 05-03-19

Final Submittal 05-27-19

. Amendment No. 2 08.20.19

Sheets
CS - COVER SHEET

File details come from the government source that posted it.