36C25819B0025-0003009.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25819B0025
About this file
36C25819B0025 0003 S02_ATTACHMENT 37 - CS.pdf
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15231 Laguna Canyon Road, Suite 200 Irvine, CA 92618
Tel: 949-417-7550 Fax: 949-585-9391
13220 Evening Creek Drive S Suite 115 San Diego, California 92128-4103 Ph: 858.668.0707 www.reidmiddleton.com Copyright 2019 Reid Middleton, Inc.
c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Final Submittal
Office of Programs and Project
Management Jerry L.
Pettis VA Medical
Center U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
605-17-500
RENOVATION OF SURGICAL ONCOLOGY,
BLDG 31
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON STREET
LOMA LINDA, CA 92357
JC BP05-27-19
Project Director
VA PG-18-13
EC PROJECT NO. 20170433
C R e v it L o c a l F ile s \V
A L o m a L in d a C
C A
C
E N
T R
A L b p e g a h i.
rv t /2
/2
:1 :0
P
M
CS
COVER SHEET
DEPARTMENT OF VETERANS AFFAIRS
VA LOMA LINDA HEALTHCARE SYSTEM
CANCER CENTER BUILDING #31
RENOVATION OF SURGICAL ONCOLOGY
VA PROJECT NUMBER: 605-17-500
11201 BENTON STREET
LOMA LINDA, CA 92357
VA REPRESENTATIVE APPROVALS
APPROVED: Larry Barrett Energy Engineer, FMS
APPROVED: Shane M. Elliott, MBA Associate Director for Administration
APPROVED: Melissa Lloyd, DPN, MSN-ED, RN, PCCN Associate Director for Patient Care Servicees/Nursing
APPROVED: Michael Ing, MD Chief, Infectious Disease / Infection Control
APPROVED: James Crane Project Manager
APPROVED: Timothy LaFave Chief, Projects Section, FMS
APPROVED: Robert Tanjuakio Chief, Office of Information & Technology (OI&T)/FCIO
APPROVED: Dennis Morin Chief, Police Service
APPROVED: Vacant Chief, Medicine Service
APPROVED: Kenneth Eigen Chief, Facility Management Services (FMS)
APPROVED: Vacant Chief of Staff
APPROVED: Prachi V. Asher, FACHE Assistant Director
APPROVED: Jorge Rivera, M.D.
Chief, Surgical Service
APPROVED: Angel Osirupu-el Chief, EMS
APPROVED: Per Project Project Engineer/COR, FMS
SHEET INDEX
SHEET
NUMBER SHEET NAME
I601 INTERIOR FINISHES SCHEDULE AND DETAILS
STRUCTURAL
SI-001 GENERAL NOTES
SI-002 GENERAL NOTES
SI-003 SPECIAL INSPECTION SCHEDULE
SI-004 ABBREVIATIONS AND SYMBOLS
SB-101 OVERALL FOUNDATION FRAMING PLAN
SB-101A AREA A - FOUNDATION FRAMING PLAN
SB-101B AREA B - FOUNDATION FRAMING PLAN
SF-101 ROOF FRAMING PLAN
SS-201 SCREEN WALL ELEVATION
SS501 DETAILS & SECTIONS
SS-502 DETAILS & SECTIONS
MECHANICAL
ML-100 HVAC SYMBOLS AND ABREVIATIONS
MD-112 MECHANICAL SECOND FLOOR MECHANICAL DEMOLITION PLANS
MH-111 MECHANICAL FIRST FLOOR PLAN
MH-112 MECHANICAL SECOND FLOOR PLAN
MH-113 MECHANICAL ROOF PLAN
MP-111 FIRST FLOOR HYDRONIC PIPING PLAN
MP-112 SECOND FLOOR HYDRONIC PIPING PLAN
MH-201 HVAC DETAILS
MH-202 HVAC DETAILS
MH-203 HVAC SCHEDULES
MH-204 HVAC DETAILS
MH-301 ANDOVER CONTINUUM CONTROL SEQUENCES
PLUMBING
PL-100 ABBREVIATIONS, SYMBOLS AND NOTES
PL-101 PLUMBING FIXTURES SCHEDULE
PL-111 FIRST FLOOR PLUMBING PLAN
PL-112 SECOND FLOOR PLUMBING PLAN
PL-201 PLUMBING DETAILS
PL-301 PLUMBING RISER DIAGRAM
ELECTRICAL
E-001 ELECTRICAL - SYMBOLS, LEGEND, ABBREVIATIONS AND NOTES
ED-101B FIRST FLOOR PARTIAL LIGHTING DEMOLITION PLAN B
ED-102 SECOND FLOOR PARTIAL LIGHTING DEMOLITION PLAN
ED-103B FIRST FLOOR POWER DEMOLITION PLAN
ED-105 SECOND FLOOR POWER DEMOLITION PLAN
ED-106B FIRST FLOOR PARTIAL SPECIAL SYSTEMS DEMOLITION PLAN B
E-101A FIRST FLOOR PARTIAL LIGHTING PLAN A
E-101B FIRST FLOOR PARTIAL LIGHTING PLAN B
E-102 SECOND FLOOR PARTIAL LIGHTING PLAN AREA A
E-104A FIRST FLOOR PARTIAL POWER PLAN AREA A
E-104B FISRT FLOOR PARTIAL POWER PLAN AREA B
E-105 SECOND FLOOR POWER PLAN AREA A
E-106A FIRST FLOOR PARTIAL SPECIAL SYSTEMS PLAN AREA A
E-106B FIRST FLOOR PARTIAL SPECIAL SYSTEMS PLAN AREA B
E-108 SECOND FLOOR PARTIAL SPECIAL SYSTEMS PLAN AREA A
E-109 ROOF POWER PLAN AREA A
E-401 ENLARGED POWER FLOOR PLANS
E-501 DETAILS
E-502 DETAILS
E-600 SINGLE LINE DIAGRAM
E-700 FEEDER AND LIGHTING FIXTURE SCHEDULE
E-701 SCHEDULES
E-702 SCHEDULES
E-703 SCHEDULES
E-704 SCHEDULES
E-705 SCHEDULES
E-706 SCHEDULES
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
CS COVER SHEET
GI-001 ABBREVIATIONS & SYMBOL LIST
GI-101 MOUNTING HEIGHTS & CLEARANCE
LIFE SAFETY
LS-101 FIRST FLOOR LIFE SAFETY/ EXITING PLAN
LS-102 SECOND FLOOR LIFE SAFETY/ EXITING PLAN
CIVIL
V-101 EXISTING CONDITIONS PLAN
CD-101 DEMOLITION & EROSION PLAN
CG-101 GRADING AND DRAINAGE PLAN
CP-101 PAVING AND SIGNAGE PLAN
C-501 DETAILS
LANDSCAPE
LI-101 IRRIGATION PLAN
LI-102 IRRIGATION NOTES, CALCS AND NOTES
LI-103 IRRIGATION DETAILS
LP-101 PLANTING PLAN
LP-102 PLANTING DETAILS
PHASING
PH-01 PHASING PLANS
ARCHITECTURAL
AD101 OVERALL FIRST FLOOR DEMOLITION PLAN
AD102 OVERALL SECOND FLOOR DEMOLTION PLAN
AD103 OVERALL SECOND FLOOR CEILING DEMOLITION PLAN
AE100 OVERALL FIRST FLOOR PLAN
AE101 FIRST FLOOR PARTIAL PLAN A
AE102 FIRST FLOOR PARTIAL PLAN B
AE103 OVERALL SECOND FLOOR PLAN
AE104 SECOND FLOOR PARTIAL PLAN A
AE106 OVERALL FIRST FLOOR RCP
AE107 FIRST FLOOR PARTIAL RCP A
AE108 FIRST FLOOR PARTIAL RCP B
AE109 OVERALL SECOND FLOOR RCP
AE110 SECOND FLOOR PARTIAL RCP A
AE115 OVERALL ROOF PLAN
A301 EXTERIOR DETAILS
A302 PARTITION TYPES
A303 FRAMING DETAILS
A304 MILLWORK DETAILS
A305 DOORS AND WINDOWS
A306 CEILING DETAILS
A307 CEILING DETAILS
A308 DETAILS
AE401 INTERIOR ELEVATIONS
AE402 INTERIOR ELEVATIONS
AE403 INTERIOR ELEVATIONS
AE404 INTERIOR ELEVATIONS
AE405 TOILET ROOM PLANS & ELEVATIONS
AE406 TOILET ROOM PLANS & ELEVATIONS
AE601 DOOR & WINDOW SCHEDULE
EQUIPMENT & FURNITURE
Q101 OVERALL EQUIPMENT FIRST FLOOR LAYOUT PLAN
Q102 EQUIPMENT FIRST FLOOR LAYOUT PARTIAL PLAN A
Q103 EQUIPMENT FIRST FLOOR LAYOUT PARTIAL PLAN B
Q104 OVERALL EQUIPMENT SECOND FLOOR LAYOUT PLAN
Q105 EQUIPMENT SECOND FLOOR LAYOUT PARTIAL PLAN A
Q601 EQUIPMENT SCHEDULE
Q602 EQUIPMENT SCHEDULE
INTERIORS
I101 FIRST FLOOR FLOORING PLAN
I102 SECOND FLOOR FLOORING PLAN
I103 FIRST FLOOR WALL FINISH PLAN
I104 SECOND FLOOR WALL FINISH PLAN
PROJECT DATA
THE CONTRACTOR SHALL ABIDE BY ALL CURRENT CITY AND COUNTY GOVERNING
ORDINANCES AND CODES, INCLUDED BUT NOT LIMITED TO:
APPLICABLE CODES
2015 IBC, 2015 INTERNATIONAL BUILDING CODE, PREPARED BY THE
INTERNATIONAL CODE COUNCIL, WASHINGTON, D.C.
NFPA 10,13,14,20,72,101
APPLICABLE STANDARDS
VA STANDARD H-18-8 - SEISMIC DESIGN REQUIREMENTS, AUGUST 2013, U.S.
DEPARTMENT OF VETERAN AFFAIRS, OFFICE OF CONSTRUCTION & FACILITIES
MANAGEMENT
VA STANDARD PG- 18-10 - DESIGN MANUALS, 2014, U.S. DEPARTMENT OF
VETERAN AFFAIRS, OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
USP 797
USP 800
OWNER'S REPRESENTATIVE
DEPARTMENT OF VETERANS AFFAIRS
11201 BENTON STREET
LOMA LINDA, CA 92357
GENERAL ENGINEER, FMS PROJECTS
VA LOMA LINDA HEALTHCARE SYSTEM
CONTACT JAMES CRANE
E-MAIL James.crane2@va.gov
PHONE 909.825.7084 X5527
CIVIL & STRUCTURAL ENGINEER
MECHANICAL, ELECTRICAL, COMMISSIONING ENGINEER
COST ENGINEER AND CONSTRUCTION SCHEDULING
ARCHITECT
SHEET INDEX
BUILDING INFORMATION
11201 BENTON STREET
LOMA LINA, CA 92357
SUMMARY OF WORK
PROJECT ADDRESS
PROJECT TEAM
CODES
REID MIDDLETON, INC.
13220 EVENING CREEK DRIVE, SUITE 115
SAN DIEGO, CA 92128
CONTACT DAVID B. SWANSON, P.E., S.E. Principal E-MAIL dswanson@reidmiddleton.com
PHONE (425) 508-7971
CONTACT DARIN K. AVEYARD, P.E., S.E., Project Manager & Structural Engineer E-MAIL daveyard@reidmiddleton.com
PHONE (858) 859-4274
CONTACT MARK A. DAVIS, P.E., Civil Engineer E-MAIL mdavis@reidmiddleton.com
PHONE (425) 248-2916
EWING COLE
DISCOVERY BUSINESS CENTER
15231 LAGUNA CANYON ROAD, SUITE 200
IRVINE, CA 92618
CONTACT MICHAEL LEHMAN
E-MAIL MLEHMAN@EWINGCOLE.COM
PHONE (949) 417-6489
DAV ENERGY
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
CONTACT ALEX BOUCHER, MEP PM/QA
E-MAIL ALEXANDER.BOUCHER@DAVENERGY.COM
PHONE (240) 499-5981
CONTACT JOHN LOPEZ, ELEC ENGINEER
E-MAIL JJLOPEZ@LOPEZENGINEERING.COM
PHONE (619) 275-5658
CUMMING
15015 AVE. OF SCIENCE, SUITE 160
SAN DIEGO, CA 92128
CONTACT ASHOK PATEL
E-MAIL APATEL@CCORPUSA.COM
PHONE (858) 485-6765
LANDSCAPE ARCHITECT
BGB DESIGN GROUP
3185 C AIRWAY AVE
COSTA MESA, CA 92626
CONTACT PAUL BETTENHAUSEN
E-MAIL PBETTENHAUSEN@BGB-INC.COM
PHONE (949) 246-0463
VICINITY MAP
CAMPUS MAP
1. RENOVATION OF EXISTING PHARMACY AT THE SECOND FLOOR WHICH INCLUDES A 125 SF ADDITIONAL
SPACE AT A TOTAL AREA OF 700 SF.
2. TOTAL FIRST FLOOR RENOVATION 8,580 DGSF INCLUDES RENOVATION OF FIRST FLOOR EXISTING SHELL SPACE LEFT WING CLINICAL SPACE AT A TOTAL OF 3,950 SF AND RIGHT WING NON-CLINICAL SPACE AT A
TOTAL OF 3,850 SF, LOBBY 780 SF.
BUSINESS GROUP B OCCUPANCY
INCLUDES:
EXAMINATION ROOMS
ADMINISTRATION OFFICES
CLINICAL SUPPORT ROOMS
PUBLIC SPACE, WAITING AND RECEPTION
CONSTRUCTION TYPE:
TYPE IIB
FIRE SPRINKLER SYSTEM:
FULLY SPRINKLERED PER NFPA 13
BUILDING AREA: 18,309 SF
BUILDING HEIGHT: 2-STORIES, 32'-6" (PARAPET)
U.S. Department of Veterans Affairs
APPROVED: Barbara Fallen, FACHE Medical Center Director
APPROVED: Cindy Angula Quality Management Chief
APPROVED: Robert McCaray Safety Manager
APPROVED: Michael Choi Chief, Fiscal Service
APPROVED: Samineh Sam Chief, Pharmacy Service
APPROVED: Ricky Bard Chief, Hospital Administrative Service
APPROVED: Joseph Catrucco Chief, Logistics Service
APPROVED: Alex Yi, MD Chief, Imaging Service
APPROVED: Per Project Contracting Officer
APPROVED: John Byrne, M.D.O.
ACOS, Educational Service
APPROVED: Deanna Callahan Program Manager, Informatics
APPROVED: Vacant Chief, VA Canteen Services
APPROVED:
APPROVED:
APPROVED: Alan Jacobson, MD ACOS, Research
VA
ACC
CBC
Exe (34)
Bldg 2
Bldg 1
Revisions: Date:
35% Submittal 09-22-17
65% Submittal 01-31-18
95% Submittal 03-22-19
100% Submittal 05-03-19
Final Submittal 05-27-19
. Amendment No. 2 08.20.19
| Sheets |
| CS - COVER SHEET |
File details come from the government source that posted it.