These are architectural construction drawings for HVAC ductwork demolition and installation at a Veterans Health Administration (VA) facility located in Oklahoma City, Oklahoma. The project involves modifications to the inpatient pharmacy and compounding areas at the VA Hospital on Harry Struman Drive in Columbia, Missouri.
The drawings specify night shift work requirements in the inpatient pharmacy, with operations beginning no earlier than 6 PM. Key scope items include running new supply ductwork entirely outside the pharmacy space, running return ductwork up to the wall of the inpatient pharmacy, demolishing old return infrastructure and installing new return systems within the pharmacy space, cutting over existing supply and return connections, and conducting testing and balancing with commissioning. The contractor must provide pre-balance testing on ACA/AHU systems coordinated with VA personnel, and provide pre-balance testing on basement compounding and level compounding areas with pre-testing reports to VA for final balancing. The contractor is responsible for final system balance testing to match prescribed values on construction drawings and provide balancing reports to VA for approval. All building systems must remain fully operational throughout construction, with temporary shutdowns requiring minimum 5-day advance coordination with VA. The design team includes Spur Design LLC as the architect/engineer, with consultation from H+E Engineering, Rated Engineering (fire protection), and other specialists. The drawings are preliminary and not for construction purposes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 07 81 00 Applied Fireproofing.pdf | ||
| 36C25526R0159 0004.pdf | ||
| Final Drawings Part-3.pdf | ||
| Final Drawings Part-1.pdf | ||
| 36C25526R0159 0003.docx | DOCX document | |
| Final Drawings Part-2.pdf | ||
| PRE-BID SIGN IN ROSTER.pdf | ||
| 07_8100-001_Fireproofing_Mfr_Literature.pdf | ||
| 589a4-25-102_Addendum 02_260828.pdf | ||
| 01 00 00 General Requirements RX.pdf | ||
| 36C25526R0159 0002.docx | DOCX document | |
| 01 32 16-15 Project Schedules RX.pdf | ||
| 01 91 00 General Commissioning Requirements RX.pdf | ||
| Finish schedule from drawings.pdf | ||
| 01 33 23- Shop Drawings Product DAta and Samples.pdf | ||
| finish schedule from specs.pdf | ||
| 01 00 10 - MEDICAL CENTER REQUIREMENTS RX.pdf | ||
| 36C25526R0159 0001.docx | DOCX document | |
| S02-Final Specifications 1068 pages.pdf | ||
| 36C25526R0159.docx | DOCX document | |
| P09-Final Drawings Part-2 Pages 37.pdf | ||
| P09-Final Drawings Part-1 Pages 37.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHACMOCLASPW
Typewritten Text Night Shift Do as much of the new ductwork install as can be accomplished.
Take Down compounding room final demo & new ductwork connections
TAB
Commissioning Compounding room restored to service