These are architectural construction drawings for HVAC ductwork demolition and installation at a Veterans Health Administration (VA) facility located in Oklahoma City, Oklahoma. The project involves modifications to the inpatient pharmacy and compounding areas at the VA Hospital on Harry Struman Drive in Columbia, Missouri.

The drawings specify night shift work requirements in the inpatient pharmacy, with operations beginning no earlier than 6 PM. Key scope items include running new supply ductwork entirely outside the pharmacy space, running return ductwork up to the wall of the inpatient pharmacy, demolishing old return infrastructure and installing new return systems within the pharmacy space, cutting over existing supply and return connections, and conducting testing and balancing with commissioning. The contractor must provide pre-balance testing on ACA/AHU systems coordinated with VA personnel, and provide pre-balance testing on basement compounding and level compounding areas with pre-testing reports to VA for final balancing. The contractor is responsible for final system balance testing to match prescribed values on construction drawings and provide balancing reports to VA for approval. All building systems must remain fully operational throughout construction, with temporary shutdowns requiring minimum 5-day advance coordination with VA. The design team includes Spur Design LLC as the architect/engineer, with consultation from H+E Engineering, Rated Engineering (fire protection), and other specialists. The drawings are preliminary and not for construction purposes.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--589A4-25-102, Install Dedicated Pharmacy Air Handler, newest first.
File Type Posted
07 81 00 Applied Fireproofing.pdf PDF
36C25526R0159 0004.pdf PDF
Final Drawings Part-3.pdf PDF
Final Drawings Part-1.pdf PDF
36C25526R0159 0003.docx DOCX document
Final Drawings Part-2.pdf PDF
PRE-BID SIGN IN ROSTER.pdf PDF
07_8100-001_Fireproofing_Mfr_Literature.pdf PDF
589a4-25-102_Addendum 02_260828.pdf PDF
01 00 00 General Requirements RX.pdf PDF
36C25526R0159 0002.docx DOCX document
01 32 16-15 Project Schedules RX.pdf PDF
01 91 00 General Commissioning Requirements RX.pdf PDF
Finish schedule from drawings.pdf PDF
01 33 23- Shop Drawings Product DAta and Samples.pdf PDF
finish schedule from specs.pdf PDF
01 00 10 - MEDICAL CENTER REQUIREMENTS RX.pdf PDF
36C25526R0159 0001.docx DOCX document
S02-Final Specifications 1068 pages.pdf PDF
36C25526R0159.docx DOCX document
P09-Final Drawings Part-2 Pages 37.pdf PDF
P09-Final Drawings Part-1 Pages 37.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHACMOCLASPW

Typewritten Text Night Shift Do as much of the new ductwork install as can be accomplished.

Take Down compounding room final demo & new ductwork connections

TAB

Commissioning Compounding room restored to service

1st floor Phasing
3rd floor Overlay

File details come from the government source that posted it. Updated .