36C25526R0159 0001.docx

DOCX document 34 KB Posted

Attached to
Z2DA--589A4-25-102, Install Dedicated Pharmacy Air Handler Federal contract opportunity
Solicitation number
36C25526R0159
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This is an Amendment (Standard Form 30) to Solicitation 36C25526R0159 issued by the Department of Veterans Affairs Network Contracting Office for the installation of a dedicated pharmacy air handler at the Columbia, Missouri VA Medical Center (Project 589A4-25-102). The amendment extends the deadline for receipt of offers to September 8, 2026, at 2:00 PM CDT and revises proposal submittal instructions and corrects the closing date on the SF1442 form.

The solicitation is a Lowest Price Technically Acceptable (LPTA) competition under FAR Part 15.103-2. Offerors must submit a single package containing a technical proposal (Volume 1) and price proposal (Volume 2) with an SF1442, bid bond per FAR 52.228-1, and required appendices. Technical acceptability is evaluated across seven factors: relevant past performance of the prime contractor (minimum one project, maximum three, valued at $1,000,000+ completed within five years, involving HVAC renovations to occupied medical facilities); technical construction experience of the prime contractor (minimum two projects, $1,000,000+, similar scope); technical experience of the mechanical subcontractor (NAICS 238220, five years' experience, hospital plumbing systems); technical experience of the structural steel designer/fabricator/erector (five years' experience, two prior hospital installations); technical experience of the Direct Digital Controls subcontractor (five years' experience, Tridium Niagara N4 and BACNET certifications, two prior hospital installations and two service contract references); technical qualifications of proposed key staffing (Project Manager, Quality Control Manager, Site Safety Officer, and Site Superintendent, each with minimum five years' experience and project references); and a comprehensive contractor safety plan addressing OSHA compliance, infection control risk assessment protocols, and active hospital work procedures. The prime contractor must self-perform at least 85% of general construction work (or 75% for special trade contractors) with the remainder subcontracted only to certified SDVOSBs or VOSBs. Award will be made to the lowest-priced proposal meeting or exceeding technical acceptability standards. Material and labor cost breakdowns by specification division, plus overhead, profit, and bond costs, must be included in the price proposal.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--589A4-25-102, Install Dedicated Pharmacy Air Handler, newest first.
File Type Posted
07 81 00 Applied Fireproofing.pdf PDF
36C25526R0159 0004.pdf PDF
Final Drawings Part-2.pdf PDF
PRE-BID SIGN IN ROSTER.pdf PDF
Final Drawings Part-3.pdf PDF
Final Drawings Part-1.pdf PDF
36C25526R0159 0003.docx DOCX document
finish schedule from specs.pdf PDF
01 00 10 - MEDICAL CENTER REQUIREMENTS RX.pdf PDF
07_8100-001_Fireproofing_Mfr_Literature.pdf PDF
589a4-25-102_Addendum 02_260828.pdf PDF
01 00 00 General Requirements RX.pdf PDF
36C25526R0159 0002.docx DOCX document
Finish schedule from drawings.pdf PDF
01 33 23- Shop Drawings Product DAta and Samples.pdf PDF
Phasing info.pdf PDF
01 32 16-15 Project Schedules RX.pdf PDF
01 91 00 General Commissioning Requirements RX.pdf PDF
S02-Final Specifications 1068 pages.pdf PDF
36C25526R0159.docx DOCX document
P09-Final Drawings Part-2 Pages 37.pdf PDF
P09-Final Drawings Part-1 Pages 37.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-13-2026 589A4-25-102 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25526R0159

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-08-2026 2:00PM CDT X Install Dedicated Pharmacy Air Handler, 589A4-25-102 The purpose of this amendment is to correct the following:

a. Correct the closing date stated on page 1 of SF1442 section 13.a. to 9-8-2026 due by 2:00PM CDT.

b. The Proposal Submittal instructions have been revised and included within this amendment.

c. All other terms and conditions remain unchanged.

CONTINUATION PAGE

FOR LOWEST PRICE TECHNICALLY ACCEPTABLE COMPETITION

SOLICITATION: 36C25526R0159

PROJECT: FCA-Install Dedicated Pharmacy Air Handler project # 589A4-25-102 LOCATION: Department of Veteran Affairs, Columbia, Missouri VAMC

1. PREPARATION AND SUBMITTAL OF PROPOSALS

a. GENERAL INFORMATION.

Selection of an offeror for contract award will be made on the basis of an assessment of each offeror’s response to the Request for Proposal (RFP). Proposals submitted by Teaming Arrangements other than VA Joint Ventures will not be considered.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. As a Request for Proposals (RFP) based on Lowest Price Technically Acceptable (LPTA) Source Selection Process, in accordance with Federal Acquisition Regulation (FAR) Part 15.103-2, the VA will make the award based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-price factors. The Seven (7) evaluation factors for determination of technical acceptability consist of:

1. Relevant Past Performance of Prime Contractor;
2. Technical Construction Experience of Prime Contractor;
3.Technical Experience of Mechanical Subcontractor;

4.Technical Experience of Structural Steel experience of the structural Steel (Designer/Fabricator and erector) 5.Technical Construction Experience of the Direct Digital Controls subcontractor;

6. Technical Qualifications of Proposed Key Staffing

7. Contractor Safety Plan to include Infection Control Risk Assessments and implemented control measures

NOTE: Failure to comply with the RFP requirements may be grounds to eliminate the proposal from further consideration for contract award.

b. THE OFFER.

The submission of the documentation specified below will constitute the Offeror’s acceptance of the terms and conditions of the RFP, including the Plans & Specifications for the construction of this project. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.

c. AWARD BASED ON INITIAL OFFERS.

Pursuant to clause 52.215-1 (included by reference), the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.202(a) (2)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price, and technical qualifications standpoint. The VA reserves the right to conduct negotiations if the Contracting Officer later determines such discussions to be necessary.

d. NUMBER OF COPIES TO SUBMIT. Offerors shall submit a SINGLE PACKAGE to the address shown in Block 8 of the Standard Form 1442. The package shall include:

(a) One (1) Envelope, Volume 1 Technical Proposal ( Technical proposal, Appendix 2) and Volume 2 Price Proposal ( SF1442, Bid Bond, Appendix 1)

Marked: ORIGINAL - RESPONSE TO RFP – 36C25526R0159 Install Dedicated Pharmacy Air Handler (589A4-25-102) This envelope is to contain the signed original copies of the documents listed below;

2. DOCUMENTS TO SUBMIT.

The original documents to be included in the envelope identified above consist of:

a. STANDARD FORM 1442. Submit the SF 1442 issued under this solicitation, with Blocks 10 (DUNS Number) and Blocks 14 through 20 properly filled-out by the Offeror. Include acknowledgment of any and all Amendments that may have been issued, either by: (1) listing them in Block 19 of the SF 1442, or (2) including copies of the Amendment document(s) (Standard Form 30) with Blocks 8 and 15 filled in and signed, or (3) including signed acknowledgement in the form of a separate letter that includes a reference to the solicitation and amendment numbers. NOTE: Failure to acknowledge any and all Amendments issued pursuant to this solicitation may be cause for rejection of your offer.

b. OFFER GUARANTEE (BID BOND). In accordance with solicitation provision FAR RFO Part 52.228-1, Bid Guarantee, failure to furnish a bid guarantee, in the proper form and amount, by the deadline established for submitting offers, may be cause for rejection of the offer.

a. Appendix 1- Calculation Worksheet for Self-Performed and Subcontracted Work. Contractor shall complete and sign form, or your proposal will not be evaluated and will be ineligible for award.

b. Appendix 2 - VAAR 852.219-75 - VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction. This form must be completed and signed or your proposal will not be evaluated and will be ineligible for award.

c. DOCUMENTATION OF TECHNICAL ACCEPTABILITY. Proposals received in response to this solicitation will be evaluated in accordance with procedures outlined in Federal Acquisition Regulations FAR RFO Part 15.103-2 for the Lowest Price Technically Acceptable (LPTA) Offer.

The following significant Evaluation Factors will be used as the basis for determining Technical Acceptability:

1. Relevant Past Performance of Prime Contractor;

2. Technical Construction Experience of Prime Contractor;
3.Technical Experience of Mechanical subcontractor;

4.Technical Experience of Structural Steel experience of the structural Steel (Designer/Fabricator and erector) 5.Technical Construction Experience of the Direct Digital Controls subcontractor;

6. Technical Qualifications of Proposed Key Staffing

7. Contractor Safety Plan to include Infection Control Risk Assessments and implemented control measures NOTE: Failure to comply with the RFP requirements may be grounds to eliminate the proposal from further consideration for contract award.

NOTE: There is a realistic possibility that some offerors may choose to submit the same construction project as a qualifying example for both the past performance and the technical experience evaluation factors. This is not prohibited, but the supporting documentation must demonstrate that the submitted projects absolutely do comply with the specific minimal requirements, identified below, for each separate evaluation factor.

FACTOR 1: Relevant Past Performance of Prime Contractor.

To be evaluated to determine if an offeror has acceptable relevant past performance, offerors should identify no less than ONE (1), and no more than THREE (3), previously-awarded, and completed construction contracts, which were issued by either: Federal, State, or Local Government Agencies; and/or Private Organizations. To be evaluated as Relevant Past Performance, the construction contracts submitted by offerors must involve:

A. Work as a prime under the same NAICS code as this solicitation (236220, General Construction Contractors), that involved mechanical construction projects for medical facilities, with emphasis on HVAC renovations to occupied medical facilities.

B. A dollar magnitude equal to, or greater than $1,000,000.00;
C. Work that was 100% completed within a time period of no more than FIVE (5) years prior to the date of submitting this proposal. If the contract/work is incomplete, or was completed more than five years prior to the date of submitting this proposal, it will not be deemed relevant.

For each of the submitted Relevant Past Performance contracts, provide the following information:

(1) The name of the construction contract, and the contract ID number;

(2) The name of the contracting agency or organization the contract was awarded by;

(3) The date of the construction contract award and the contract award amount in dollars;

(4) The date of the construction contract completion, and the final contract amount, in dollars;

(5) A brief description of the construction contract scope of work; and
(6) Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).

Factor 1 SPECIAL NOTE for Offerors That May Lack Past Performance Information: In accordance with FAR RFO Part 15.202 (c) (3) , in the case of an offeror that is without a record of relevant past performance, or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. Such offerors may submit relevant past performance information regarding: predecessor companies; key personnel who have relevant experience; or subcontractors that will be performing major or critical aspects of this requirement; provided that such information is relevant to the construction in this solicitation. Offerors may provide information on problems encountered on the identified contracts and the offeror’s corrective actions. The government also reserves the right to consider past performance information from all available sources, in addition to any information submitted by offerors.

FACTOR 2: Technical Construction Experience of Prime Contractor.

To be Technically Acceptable, offerors must provide evidence that they have the technical qualifications and experience needed to meet the technical performance requirements of this project. Offerors must submit no less than TWO (2) examples of their technical construction experience with projects that involved technical requirements similar to the requirements of this project. The construction project submitted must involve:

A. Work as a prime under the same NAICS code as this solicitation (236220, General Construction), that involved mechanical construction projects for medical facilities, with emphasis on HVAC renovations to occupied medical facilities.

B. Work of a dollar magnitude equal to, or greater than $1,000,000.00. If offering subcontracted work as proof of technical construction experience, offerors must submit evidence that supports the magnitude of the work they performed as a subcontractor.

C. Work that was of a similar nature to the scope of work for this project. This is defined as work performed at medical facilities, with emphasis on Heating and Air Conditioning replacements to occupied medical facilities. If an offeror chooses to submit experience that was not conducted at medical facilities, with emphasis on renovations to occupied medical facility, they must explain how the nature and complexity of the work conducted involved technical construction requirements equivalent to that described in the Plans & Specifications of this solicitation.

General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

For each of the submitted Technical Construction Experience projects, provide the following information:

(1) The name and location of the construction project;
(2) The performance period, including the starting and completion dates;

(3) The total cost of the project in dollars;

(4) The percentage of total labor self-performed by the offeror's employees; and

(5) A brief description of the construction project scope of work, which explains how the project involved work as a prime contractor under NAICS Code 236220 involving construction work that was technically similar to the project work under this Solicitation.

FACTOR 3: TECHNICAL EXPERIENCE OF THE MECHANICAL SUBCONTRACTOR.

Offerors must provide evidence of technical experience of Plumbing/HVAC work is self-performed or provide subcontractor technical qualifications and experience needed to meet the technical performance requirements of this project. To be evaluated as Technical Experience, the information submitted by offerors must involve the following:

A. Work under the NAICS Code 238220 (Plumbing, Heating, and Air-Conditioning Contractors)

B. Ability to meet the technical requirements of plumbing specification Division 22 requirements. Residential experience does not qualify.

C. Products or services of proposed manufacturer, suppliers and installers of Division 22 specifications as follows:

1. Subcontractor is currently and regularly engaged in fabrication, and installation of plumbing systems for hospitals. Residential plumbing does not qualify. Provide documentation for fabrication and installation of plumbing for hospitals.

2. Subcontractor has technical qualifications of at least five years of successful experience. Provide documentation and a list of facilities with knowledgeable and qualified points of contact who can verify these qualifications.

3. Submit a list of two or more prior, related installations where this subcontractor’s work has performed satisfactorily together under conditions of normal use. The list shall include projects that have been in operation for a period of not less than two years preceding the date of this solicitation; include the names and addresses of contact where installations took place and who are familiar with the contractor’s performance.

Special Note: During the period of performance of the Contract, the Contractor shall make NO substitutions of the Subcontractors unless the substitution is approved by the contracting officer in advance of the change. Any replacement Subcontractor shall have equal or better qualifications subject to the approval of the Contracting Officer (See FAR clause 52.244-2 Subcontracts).

FACTOR 4: TECHNICAL EXPERIENCE OF THE STRUCTURAL STEEL (DESIGNER/FABRICATOR AND ERECTOR) SUBCONTRACTOR.

Offerors must provide evidence that the Structural Steel subcontractor has the technical qualifications and experience needed to meet the technical performance requirements of this project. To be evaluated as technical experience, the information submitted by offerors must involve the following:

A. Ability to meet the technical requirements of specification sections for structural steel framing.

B. Products or services of proposed manufacturer, suppliers and installers as follows:

1. Structural Steel subcontractor is currently and regularly engaged in design, fabrication, and installation of structural steel framing.

2. Structural Steel subcontractor has technical qualifications of at least five years of continuous experience. Provide documentation of trained supervisory personnel, installation personnel, and fabricators used to complete installation of structural steel.

3. Proposed Structural Steel subcontractor shall submit a list of two or more prior hospital installations. The list shall include the names and addresses of the Medical Center, project title and point of contact’s name and telephone numbers.

Factor 5 Special Note: When an offeror submits its proposal in response to this Request for Proposals, and the name and experience of a specific subcontractor is a required evaluation factor, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.

FACTOR 5: TECHNICAL EXPERIENCE OF THE DIRECT DIGITAL CONTROLS SUBCONTRACTOR.

Offerors must provide evidence that the Direct Digital Controls subcontractor has the technical qualifications and experience needed to meet the technical performance requirements of this project. To be evaluated as technical experience the information submitted by offerors must involve the following:

A. Work under the NAICS code 238220, Plumbing, Heating, and Air-Conditioning Contractor.

B. Ability to meet the technical requirements of specification section 23 09 23, Direct-Digital Control system for HVAC.

C. Products or services of proposed manufacturer, suppliers and installers as follows:

1. Direct Digital Controls contractor is currently and regularly engaged in design, fabrication, and installation of HVAC control systems for hospital and/or medical centers usage. Provide documentation of the listed requirements.

2. Directs Digital Controls contractor has technical qualifications of at least five years of experience. Provide documentation of trained supervisory personnel, installation personnel, and facilities used to complete installation of control systems as required by contract documents.

3. Proposed Direct Digital Controls contractor shall submit a list of two or more prior hospital installations where all the contractor controls equipment they propose to furnish on this project has performed satisfactorily together under conditions of normal use. The list shall include projects that have been in operation for a period of not less than two years preceding the date of these specifications; include the names and addresses of the Medical Center and the names of the Medical Center COR or Contracting Officer point of contact.

4. Direct Digital Controls contractor shall submit a list of two or more medical centers or hospitals where contractor is providing service contract support services. The list shall include projects that have been in operation for a period of not less than two years preceding the date of these specifications; include the names and addresses of the Medical Center and the names of the Medical Center COR or Contracting Officer point of contact.

5. The Direct Digital Controls contractor shall submit proof of Tridium Niagara N4 and BACNET certifications by submitting training certification.

Special Note: During the period of performance of the Contract, the Contractor shall make NO substitutions of the Direct Digital Controls Subcontractors unless the substitution is approved by the contracting officer in advance of the change. Any replacement Subcontractor shall have equal or better qualifications subjected to the approval of the Contracting Officer (See FAR clause 52.244-2 Subcontracts).

FACTOR 6: TECHNICAL QUALIFICATIONS OF PROPOSED KEY STAFFING.

To be Technically Acceptable, qualified offerors must submit a detailed resume of each key individual identified below. This will be evaluated to determine if they have the appropriate technical training and or previous construction experience to meet the technical requirements of a project of this nature. Project Manager and Site Superintendent cannot be the same person. No one individual can perform more than two of the staffing positions below:

(a) Project Manager – Must have a minimum of 5 years experience as a project manager; must provide a minimum of 3 projects with similar scope of this project. Provide the name of the construction contract and the contract ID number; the name of the contracting agency or organization the contract was awarded by; the date of the construction contract award and the contract award amount in dollars; the date of the construction contract completion and the final contract amount, in dollars; a brief description of the construction contract scope of work; and, identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable). (Project Manager and Site Superintendent cannot be the same person.)
(b) Quality Control manager – Provide a minimum of 3 projects with similar scope of this project they have acted as the QC manager. Provide the name of the construction contract and the contract ID number; the name of the contracting agency or organization the contract was awarded by; the date of the construction contract award; a brief description of the construction contract scope of work and the QC program that was implemented; and, identify at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
(c)Site Safety Officer – Must have a minimum of 5 years of experience as a safety officer and provide a list of safety training completed, including, at a minimum: life safety, scaffold safety, OSHA 30, fall protection training, crane/rigging safety. Provide a minimum of 3 projects with similar scope of this project where they acted as safety officer. Provide the name of the construction contract and the contract ID number, and the name of the contracting agency or organization the contract was awarded by. Provide a brief description of the construction contract scope of work and how the safety program was implemented, and identify at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable). Shall provide OSHA 30 certificate with resume.

(d) Site Superintendent – Must have a minimum of 5 years experience as a site superintendent and must have OSHA 30 training. Provide at least 3 projects as a site superintendent with similar scope of this project. Provide the name of the construction contract and the contract ID number; the name of the contracting agency or organization the contract was awarded by; the date of the construction contract award and the contract award amount in dollars; the date of the construction contract completion and the final contract amount, in dollars; a brief description of the construction contract scope of work; and, identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).( Project Manager and Site Superintendent cannot be the same person.) Shall provide OSHA 30 certificate with resume.

Special Note: During the period of performance of the Contract, the Contractor shall make NO substitutions of the Key Staffing unless the substitution is necessitated by illness, death, or termination of employment. The contractor shall notify the contracting officer, in writing within five (5) calendar days after the occurrence of any of these events. Any replacement of Key Staffing shall have equal or better qualifications subjected to the approval by the contracting officer.

FACTOR 7: CONTRACTOR SAFETY PLAN TO INCLUDE INFECTION CONTROL RISK ASSESSMENT AND IMPLEMENTED CONTROL MEASURES Offerors must provide a construction safety plan:

1. The contractor's Safety Plan shall be evaluated for their compliance with local/State/Federal rules and regulations and the company's consideration of safety of its employees and the general public. The contractor's Safety Plan at the minimum shall address their safety policy, commitment to safety, detailed disciplinary action to be taken with respect to employees violating safety requirements, personnel safety responsibilities, personnel safety training, personal protective equipment, accident / incident reporting procedure and investigations, and emergency procedures guidelines.

2. The contractor’s Safety Plan shall address their plan for completing all contract work on and around an active hospital without impact to patient care and completing all work in accordance with all construction documents and all local/State/Federal rules and regulations.

3. Plan shall demonstrate an understanding of the infection control risk assessment (ICRA) process, requirements and shall demonstrate how appropriate controls will be in place, and monitored.

d. PRICE PROPOSAL.

Price is to be submitted on page 3 of the solicitation. Offerors must provide a price for each bid item. In addition, offerors shall include a breakdown of material and labor costs, by specification division for each bid item. Overhead, profit and bond costs shall be added after a subtotal of materials and labor costs has been calculated see Appendix 1.

3. BASIS OF AWARD.

VA will make the award based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-price factors. Note that offers that are not technically acceptable cannot be selected, regardless of price.

4. Special Contract Requirements

SUBSTITUTIONS OF SUBCONTRACTORS AND / OR KEY PERSONNEL

A. When an offeror submits its proposal in response to this Request for Proposals, and key personnel who are proposed to work on the project are required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.

B. When an offeror submits its proposal in response to this Request for Proposals, and the name and experience of a specific subcontractor is a required evaluation factor, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.

Install Dedicated Pharmacy Air Handler, 589A-25-102, Amendment 001 to Solicitation 36C25526R0159

File details come from the government source that posted it. Updated .