VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx

DOCX document 31 KB Posted

Attached to
Z2DA--589A7-21-700 EHRM Infrastructure Upgrades
Solicitation number
36C25522R0022
Issued by

About this file

This document outlines supplemental contract requirements for combatting COVID-19 for the Department of Veterans Affairs Veterans Health Administration. Contractors working in or traveling to VA locations must ensure their employees comply with documentation and screening requirements. Documentation of vaccination status or negative COVID-19 test results within three days are required for entry, and contractors must notify the COR if performance is impacted by denied entry. On-site contractor employees are also subject to daily COVID-19 screening using the screening tool. Contractors working off-site but having direct patient contact must self-screen daily using the tool. Contractors must protect any collected health or personal identity information according to federal privacy laws.

View the file

Other files

File Type Posted
S02 Bldg 4 Hazardous Materials.pdf PDF
S02 Bldg 60 Hazardous Materials.pdf PDF
S02 Bldg 11 Hazardous Materials.pdf PDF
S02 Bldg 16 Hazardous Materials.pdf PDF
S02 Bldg 12 Hazardous Materials.pdf PDF
S02 589A7-21-700 EHRM Wichita-Pre Bid Presentation.pdf PDF
S02 Bldg 3 Hazardous Materials.pdf PDF
S02 Bldg 6 Hazardous Materials.pdf PDF
S02 Bldg 61 Hazardous Materials.pdf PDF
S02 Bldg 5 Hazardous Materials.pdf PDF
S02 Bldg 10 Hazardous Materials.pdf PDF
S02 Bldg 20 Hazardous Materials.pdf PDF
S02 Bldg 34 Hazardous Materials.pdf PDF
S02 Infection Control Risk Assessment for Hospital Construction and Renovation.pdf PDF
S02 Bldg 26 Hazardous Materials.pdf PDF
36C25522R0022 0002.pdf PDF
S02 Bldg 19 Hazardous Materials.pdf PDF
S02 Bldg 2 Hazardous Materials.pdf PDF
S02 01 00 00 Appendix A - Bid Form Template.Revision1.20220124.xlsx XLSX spreadsheet
S02 Bldg 1 Hazardous Materials.pdf PDF
S02 Bldg 7 Hazardous Materials.pdf PDF
S02 Bldg 13 Hazardous Materials.pdf PDF
PreProposal Conference Site Visit Agenda - EHRM.doc DOC document
S02 589A7-21-700 EHRM Pre-Bid Sign In Sheet.pdf PDF
S02 36C25522R0022 Addendum 1 Drawings.pdf PDF
36C25522R0022 0001.pdf PDF
S02 Past Performance Questionnaire 36C25522R0002 Project 589A7-21-700.pdf PDF
36C25522R0022.pdf PDF
S02 Specifications 099100 thru 238123.pdf PDF
2of2_589A7-21-700.IFC_R3.B26.Telecom.20210630.pdf PDF
589A7-21-700.IFC_R3.B19.20210630.pdf PDF
589A7-21-700.IFC_R3.B20.20210630.pdf PDF
589A7-21-700.IFC_R3.B03.20210630.pdf PDF
2of2_589A7-21-700.IFC_R3.B16.Telecom.20210630.pdf PDF
2of2_589A7-21-700.IFC_R3.B01.Telecom.20210630.pdf PDF
1of2_589A7-21-700.IFC_R3.B16.Gen-Elec.20210630.pdf PDF
589A7-21-700.IFC_R3.B06.20210630.pdf PDF
589A7-21-700.IFC_R3.B12.20210630.pdf PDF
589A7-21-700.IFC_R3.B02.20210630.pdf PDF
2of2_589A7-21-700.IFC_R3.B07.Telecom.20210630.pdf PDF
1of2_589A7-21-700.IFC_R3.B07.Gen-Elec.20210630.pdf PDF
589A7-21-700.IFC_R3.B13.20210630.pdf PDF
1of2_589A7-21-700.IFC_R3.B26.Gen-Elec.20210630.pdf PDF
S02 Specifications 051200 thru 096900.pdf PDF
589A7-21-700.IFC_R3.B29.20210630.pdf PDF
1of2_589A7-21-700.IFC_R3.B21.Gen-Elec.20210630.pdf PDF
589A7-21-700.IFC_R3.B61.Gen-Elec.20210630.pdf PDF
589A7-21-700.IFC_R3.B11.20210630.pdf PDF
589A7-21-700.IFC_R3.B61.Telecom.20210630.pdf PDF
2of2_589A7-21-700.IFC_R3.B59.Telecom.20210630.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Supplemental Contract Requirements for Combatting COVID-19

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, contractors shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

1. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.

Last Updated on Thursday, January 13, 2022

File details come from the government source that posted it. Updated .