1of2_589A7-21-700.IFC_R3.B21.Gen-Elec.20210630.pdf

PDF 15 MB Posted

Attached to
Z2DA--589A7-21-700 EHRM Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C25522R0022
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document outlines a federal contract opportunity for infrastructure upgrades. The solicitation number is 36C25522R0022 and concerns construction project 589A7-21-700 for Electronic Health Records Management Infrastructure Upgrades within Veterans Integrated Service Network 15 of the Department of Veterans Affairs Veterans Health Administration. The opportunity type is a solicitation for upgrades to existing EHRM infrastructure to support continued modernization and improvement of healthcare services for veterans. The response due date and anticipated award date were not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--589A7-21-700 EHRM Infrastructure Upgrades, newest first.
File Type Posted
S02 Bldg 5 Hazardous Materials.pdf PDF
S02 Bldg 26 Hazardous Materials.pdf PDF
S02 Bldg 61 Hazardous Materials.pdf PDF
S02 Bldg 60 Hazardous Materials.pdf PDF
S02 Infection Control Risk Assessment for Hospital Construction and Renovation.pdf PDF
S02 Bldg 20 Hazardous Materials.pdf PDF
S02 Bldg 16 Hazardous Materials.pdf PDF
S02 Bldg 3 Hazardous Materials.pdf PDF
S02 Bldg 11 Hazardous Materials.pdf PDF
S02 Bldg 6 Hazardous Materials.pdf PDF
S02 Bldg 10 Hazardous Materials.pdf PDF
36C25522R0022 0002.pdf PDF
S02 Bldg 1 Hazardous Materials.pdf PDF
S02 Bldg 2 Hazardous Materials.pdf PDF
S02 01 00 00 Appendix A - Bid Form Template.Revision1.20220124.xlsx XLSX spreadsheet
S02 Bldg 19 Hazardous Materials.pdf PDF
S02 Bldg 13 Hazardous Materials.pdf PDF
S02 Bldg 7 Hazardous Materials.pdf PDF
S02 36C25522R0022 Addendum 1 Drawings.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
36C25522R0022 0001.pdf PDF
S02 01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
S02 Specifications 051200 thru 096900.pdf PDF
589A7-21-700.IFC_R3.B61.Telecom.20210630.pdf PDF
2of2_589A7-21-700.IFC_R3.B59.Telecom.20210630.pdf PDF
589A7-21-700.IFC_R3.B29.20210630.pdf PDF
1of2_589A7-21-700.IFC_R3.B26.Gen-Elec.20210630.pdf PDF
2of2_589A7-21-700.IFC_R3.B26.Telecom.20210630.pdf PDF
589A7-21-700.IFC_R3.B19.20210630.pdf PDF
589A7-21-700.IFC_R3.B12.20210630.pdf PDF
589A7-21-700.IFC_R3.B11.20210630.pdf PDF
589A7-21-700.IFC_R3.B04.20210630.pdf PDF
589A7-21-700.IFC_R3.B03.20210630.pdf PDF
S02 Specifications 099100 thru 238123.pdf PDF
589A7-21-700.IFC_R3.B61.Gen-Elec.20210630.pdf PDF
1of2_589A7-21-700.IFC_R3.B59.Gen-Elec.20210630.pdf PDF
589A7-21-700.IFC_R3.B20.20210630.pdf PDF
589A7-21-700.IFC_R3.B05.20210630.pdf PDF
589A7-21-700.IFC_R3.B02.20210630.pdf PDF
1of2_589A7-21-700.IFC_R3.B01.Gen-Elec.20210630.pdf PDF
S02 Specifications 260511 thru 330800.pdf PDF
S02 Specifications 000100 thru 047200.pdf PDF
589A7-21-700.IFC_R3.SITE.20210630.pdf PDF
589A7-21-700.IFC_R3.B62.20210630.pdf PDF
589A7-21-700.IFC_R3.B60.20210630.pdf PDF
589A7-21-700.IFC_R3.B34.20210630.pdf PDF
2of2_589A7-21-700.IFC_R3.B21.Telecom.20210630.pdf PDF
1of2_589A7-21-700.IFC_R3.B16.Gen-Elec.20210630.pdf PDF
2of2_589A7-21-700.IFC_R3.B16.Telecom.20210630.pdf PDF
589A7-21-700.IFC_R3.B13.20210630.pdf PDF
Show all 50

Z2DA--589A7-21-700 EHRM Infrastructure Upgrades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

ROBERT J. DOLE VA MEDICAL CENTER

36C25521C0009 7540-00-181-8326

STAMP

B

IM

/5

A

-2

-7

E H

R M

I n fr a s tr u c tu re U p g ra d e s

W ic h it a

/5

A -2

-7

.E

R H

M .W ic h it a .B

.M E

P .r v t

/1

/2

:3

:1

A

M

G-000

COVER SHEET 589A7-21-700

B21

06/30/21 M. Perkins G. Weaver

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

5500 E. KELLOGG, WICHITA, KANSAS 67218-1607

ISSUED FOR CONSTRUCTION

06/30/21

589A7-21-700 - ELECTRONIC HEALTH RECORDS MANAGEMENT (EHRM)

INFRASTRUCTURE UPGRADES - B21

LOCATION MAP

VICINITY MAP

PROJECT SCOPE OF WORK:

COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND

WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL

CONTRACTOR).

CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION

CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS

CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY

REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY

INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS

SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS

CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND

PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE

VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS.

VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND

DO NOT REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.

THIRD-PARTY INSPECTIONS:

CAMPUS MAP

3 1A 1

1B

1C

219 34

4 59

20 13 12

10 11 16

5B

E WATERMAN ST

S E

D G

E M

O O

R S

T

E KELLOGG DR

E KELLOGG AVE

S B

E C

K L E

Y D

R

PROJECT LOCATION

CO: Sean P. Jackson Contracting Officer Department of Veterans Affairs

VISN 15 NCO

3450 S. 4th Street Leavenworth, Kansas 66048

(913) 946-1126

COR: Nick Howard General Engineer Robert J. Dole VAMC & ROC 5500 E. Kellogg, Wichita, KS 67218

(316) 685-2221 x58005

USER: Jeff Schmitt Robert J. Dole VAMC & ROC 5500 E. Kellogg, Wichita, KS 67218

GENERAL NOTES:

1. ALL EXISTING PORTS ARE BEING REPLACED LIKE FOR LIKE ON THIS

PROJECT. DEMO SHEETS HAVE NOT BEEN PROVIDED UNLESS WALL

REVISIONS ARE REQUIRED.

2. WHILE ALL POSSIBLE DUE DILIGENCE WAS PERFORMED THE BIDDERS

ARE REQUIRED TO PROVIDE A 20% ALLOWANCE FOR NEW DATA PORTS.

ALL DEVIATIONS FROM THE DESIGN DOCUMENTS FOR LOCATIONS AND

QUANTITIES OF DATA PORTS ARE REQUIRED TO BE VERIFIED BY THE VA

COR AND A/E. AS AN EXAMPLE, IF 100 DATA DROPS WERE IDENTIFIED AND

DOCUMENTED IN A BUILDING, THE CONTRACTOR SHALL BID 120 DATA

DROPS AND CABLE, CONNECTION, TESTING, AND LABELING FOR THAT

BUILDING. DURING THE COURSE OF THE INSTALLATION THE

CONTRACTOR SHALL IDENTIFY ANY ADDITIONAL DATA PORTS AND ANY

DATA DROPS NOT FOUND TO ENSURE THE AGGREGATE SUM IS

CAPTURED IN THE RECORD DRAWINGS AND THE OWNER HAS AN

ACCURATE COUNT AT THE END OF THE PROJECT.

EXISTING RACK FOR B21 IS IN B06

The purpose of this project is to provide complete recabling within multiple buildings at the Robert J. Dole VA Medical Campus. Multiple buildings on campus include Buildings 1, 1A, 1B, 1C, 2, 3, 4, 5, 5B, 6, 7, 11, 12, 13, 16, 19, 20, 21, 26, 29, 34, 59, 60, 61, 62 and also site infrastructure upgrades. See main project cover cheet for building priority.

This project will include all materials and labor to replace all telecommunications cable, outlets, and as associated equipment for to buildings in this project. The scope also includes replacement of all fiber optic cabling, conduit and providing new conduit, fiber and manholes serving the buildings' Telecommunications Rooms (TR) in accordance with the drawings and specifications.

Un-terminated "future capacity" cables are not permitted. All installed cables shall be terminated at each end and documentation, labeling, and (where applicable) test results provided. This applies to all permanently installed cable types.

Intra-building fiber will be smoke-rated OM4 and all inter-building fiber will be OS-2 single-jacket non-armored fiber.

In addition to replacing all of the communications cabling and additional 15% capacity shall be provided as shown on the drawings and specifications.

All Copper replacement will be CAT 6a. The contractor shall utilize flex-conduit or Electrical Metal Tubing (EMT) conduit in all locations where the cable may touch the interstitial floor. Conduit is not required in the drop-ceiling area nor the walls. Any conduit used will be marked appropriately with “low-voltage/data” at regular intervals to be visible in interstitial spaces with minimal effort.

CAT6A cabling installed for end user devices (terminated at wall plates) will follow the red/blue/yellow standards as outlined in Specification 27 15 00. The facility has a required 1 Gbe connectivity to desktops, and other EUD, and this will include the replacement of wall jacks at EUDs to become CAT6A compliant. All in-building copper cabling will be terminated and labeled in accordance with the drawings and specifications and will be terminated to CAT6A modular jacks capable of accepting and functioning with other modular (i.e.: RJ11) plugs without damage to the jack.

For every TR in the SOW, Contractor shall provide and install new patch panels conforming to EIA/ECA 310-3 dimensions and suitable for mounting in standard equipment racks, with 48 RJ45 jacks aligned in two horizontal rows per patch panel and Labeled in accordance with the drawings and specifications. Contractor shall also supply and label all new CAT6A patch cables for every device in the telecom room, (NOT at the end user device) to be sized and labeled appropriately in accordance with 27 15 00. Each TR shall also be provided with new

Contractor shall provide and install and utilize a series of welded cabling support structures (“ladder racks”) around the perimeter of the telecom room to support the weight of the cable.

No wireless access points will be replaced and will be protected-in-place, only the cabling will be replaced. All cabling for wireless access points will be labeled in accordance with the specifications and shall be purple in color.

The project scope also includes addition of new Computer Room Air- Conditioning split systems with temperature and humidity monitoring station for in un-conditioned TR's and the addition of electrical circuits where needed.

This project utilizes new construction and renovations to meet all EHRM requirements as a stand alone project. Where a TR does not occur on every floor, or the TR does not meet the size specified in the EHRM Standard, it is due to the fact that a compliant TR will be built on that floor with a future project. When that occurs, the future project is referenced but in no way diminishes the effectiveness of the designed solution.

THIS PROJECT MUST BE "STAND ALONE". THAT IS, THE

PROJECT CANNOT DEPEND ON ANOTHER PROJECT OR OTHER

FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE

AND USABLE.

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

SIGNATURE DATE: 06/30/2021

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

Revisions: Date:

/3

0/

/3

0/ accordance with 27 15 00. Each TR shall also be provided with new four-post racks with minimum 40% spare capacity for future expansion. All racks and patch panels will be labeled in accordance with Specification 27 15 00.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/5

A

-2

-7

E H

R M

I n fr a s tr u c tu re U p g ra d e s

W ic h it a

/5

A -2

-7

.E

R H

M .W ic h it a .B

.M E

P .r v t

/1

/2

:3

:1

A

M

G-001

DRAWING INDEX 589A7-21-700

B21

06/30/21 M. Perkins G. Weaver

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

5500 E. KELLOGG, WICHITA, KANSAS 67218-1607

- DRAWING INDEX -

SHEET

NUMBER SHEET NAME

INCLUDED IN

30% DD

INCLUDED IN

60% DD

INCLUDED IN

95% DD

INCLUDED IN

100% DD

ISSUED FOR

CONSTRUCTION

GENERAL

G-000 COVER SHEET Yes Yes Yes Yes Yes

G-001 DRAWING INDEX No Yes Yes Yes Yes

G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes Yes

G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS Yes Yes Yes Yes Yes

G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes Yes

ARCHITECTURAL

A-001 SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes Yes

A-401 ARCHITECTURAL ENLARGED PLANS - FIRST LEVEL Yes Yes Yes Yes Yes

A-501 ARCHITECTURAL ROOF PLAN & DETAILS Yes Yes Yes Yes Yes

A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS Yes Yes Yes Yes Yes

A-512 ARCHITECTURAL PARTITION HEAD DETAILS Yes Yes Yes Yes Yes

A-531 ARCHITECTURAL CEILING DETAILS Yes Yes Yes Yes Yes

INTERIORS

IN101 INTERIOR FINISH PLAN, SIGNAGE AND SCHEDULES Yes Yes Yes Yes Yes

FIRE PROTECTION

FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes Yes

FX101 FIRE PROTECTION PLAN – FIRST LEVEL No Yes Yes Yes Yes

FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes Yes

MECHANICAL

M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes Yes

M-101 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes Yes

M-501 MECHANICAL DETAILS AND SCHEDULES Yes Yes Yes Yes Yes

M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS Yes Yes Yes Yes Yes

M-802 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes

M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes Yes

ELECTRICAL

E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes Yes

E-101 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes Yes

E-501 ELECTRICAL DETAILS AND SCHEDULES No Yes Yes Yes Yes

E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes Yes

E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes Yes

TELECOMMUNICATION

T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes Yes

T-101 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes Yes

T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes Yes

T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes Yes

T-601 TELECOMMUNICATIONS RISER DIAGRAMS Yes Yes Yes Yes Yes

T-602 TELECOMMUNICATIONS FIBER RISER DIAGRAM - EXISTING Yes Yes Yes Yes Yes

T-603 TELECOMMUNICATIONS FIBER RISER DIAGRAM - NEW Yes Yes Yes Yes Yes

T-701 TELECOMMUNICATION SCHEDULES Yes Yes Yes Yes Yes

T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes Yes

T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes Yes

Revisions: Date:

/3

0/

/3

0/

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/5

A

-2

-7

E H

R M

I n fr a s tr u c tu re U p g ra d e s

W ic h it a

/5

A -2

-7

.E

R H

M .W ic h it a .B

.M E

P .r v t

/2

/2

:4

:3

P

M

G-010

GENERAL PROJECT NOTES 589A7-21-700

B21

06/30/21 M. Perkins G. Weaver

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

5500 E. KELLOGG, WICHITA, KANSAS 67218-1607

Revisions: Date:

GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES

GENERAL SEALANT / CAULKING NOTES

GENERAL DEMOLITION AND PHASING NOTES

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR

TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS

AND THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN

CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND

COR IMMEDIATELY.

4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES

AND LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL

KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER

AND PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS

NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF

WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL DISCREPANCIES

SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL

VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.

REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK

RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE

CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,

PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE CONTRACT.

HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.

12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING STAGING

AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,

INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.

13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S

WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION

IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH

FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.

14. PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND COR, BETWEEN

DISSIMILAR METALS. SEE SPECIFICATIONS.

15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE

SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR

MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER

MATERIAL AS APPROVED BY ARCHITECT AND COR.

16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,

MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL

AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.

17. ANY CUTTING/WELDING WILL REQUIRE DAILY BURN PERMITS TO BE COORDINATED WITH COR.

SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.

18. AN AIR QUALITY PERMIT WILL BE REQUIRED FOR THE GENERATOR FOR THIS PROJECT. THE

CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH THE WICHITA VA AND AIR QUALITY

AUTHORITY HAVING JURISDICTION.

FIRE LIFE SAFETY NOTES

1. IF ENCOUNTERED, FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING

CONSTRUCTION MUST BE RESTORED TO THEIR ORIGINAL CONDITION.

2. FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE RESISTIVE

ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF EGRESS, TEMPORARY

CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.

3. VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED APRIL 6, 2017,

REQUIRES VA MASTER SPECIFICATIONS, DIVISION 1 - GENERAL REQUIREMENTS, SECTION 01

35 26 - SAFETY REQUIREMENTS MADE SPECIFIC FOR THE ASSOCIATED CONSTRUCTION

WORK.

FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION

1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL TIMES

PER LOCAL FIRE DEPARTMENT.

2. FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL

TIMES AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.

3. FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE

NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE FIRE

MARSHAL OR LOCAL FIRE DEPARTMENT.

4. COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.

5. CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH LOCAL FIRE CODES.

6. FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER LOCAL

FIRE CODES.

7. REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES.

TEMPORARY EXITING SHALL BE APPROVED BY THE STATE FIRE MARSHAL OR BY THE LOCAL

FIRE DEPARTMENT.

8. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.

9. PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAMERETARDANT.

10. SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN

REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS

MAY BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.

11. ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT VEHICLE

ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE PRIOR TO AND

DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE COORDINATED WITH LOCAL

FIRE DEPARTMENT IN THE FIELD.

1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTACT ARCHITECT AND COR PRIOR

TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM

DIMENSIONS WITH ARCHITECT AND COR PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.

2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE

THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS

CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS

REQUIRED.

3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR

ELEVATIONS.

4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS. MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN

DIMENSIONAL INFORMATION RELATED TO EQUIPMENT SIZES AND CLEARANCES.

5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD

MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").

FLOOR PLAN DIMENSIONS

1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE

FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM

OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS SHOWN.

2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF

MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.

3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").

4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY

SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR

MAKES THE PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.

5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH"

OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL

DIMENSIONS.

6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES

AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR

WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS

(2.5"-DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=4.0")

7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE

FACES OF FINISHES.

8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION

REQUIRED.

ROOF PLAN DIMENSIONS

1. UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE

DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE TO A

FIXED WALL AND LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT PENETRATIONS

BETWEEN JOISTS.

2. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT RAILS, HVAC EQUIPMENT, SCREEN WALLS, ANTENNAS, WALK PADS, LADDERS, SCUPPER LOCATIONS, ETC., MAY BE LOCATED FROM MECHANICAL AND

ELECTRICAL DRAWINGS OR LOCATED BY SCALING. CONFIRM ALL ROOF ITEM DIMENSIONS WITH THE

ARCHITECT AND COR PRIOR TO CONSTRUCTION.

VERTICAL DIMENSIONS

1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).

2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF

DECKING OR SHEATHING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.

3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN

LOAD-BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS).

HEIGHT REFERENCES SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION

4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO.

EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL

PENETRATIONS, UNO.

5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION

(FFE) NEXT TO IT.

1. HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.

2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.

4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE WALL

AND/OR ROOF.

5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA WITH TEMPORARY ACCESSIBLE PARKING AND PUBLIC ACCESS WITH OWNER PRIOR TO CONSTRUCTION. PROTECT PARKING SIGNAGE WITHIN PROJECT AREA.

6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.

7. CONTRACTOR TO PROVIDE INFECTION CONTROL PLAN AS REQUIRED BY MEMORANDUM 111-40, SUBJ: VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED APRIL 6, 2017. SUBMIT TO COR PRIOR

TO START OF WORK.

FIRE ALARM

1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH CLASS "a" PROTECTION OF

THE INTERNATIONAL BUILDING CODE.

2. SUBMIT FOUR SETS OF PLANS TO STATE FIRE MARSHAL FOR APPROVAL PRIOR TO THE INSTALLATION.

3. SUBMITTAL SHALL INCLUDE FM LISTING NUMBER FOR ALL COMPONENTS, A SINGLE-LINE DIAGRAM SHOWING PRIMARY POWER, EMERGENCY POWER RISER DIAGRAM, DETAILS OF TROUBLE SUPERVISION &

POWER LIMITED/NON POWER LIMITED CIRCUITRY, FLOOR PLANS SHOWING LOCATION OF ALL

COMPONENTS AND METHOD OF ALARM TRANSMISSION TO STATE FIRE MARSHAL OR LOCAL FIRE

DEPARTMENT.

4. THE FIRE ALARM SYSTEM SHALL CONFORM TO IFC 2012 STANDARDS AND APPLICABLE NFPA STANDARDS.

FIRE ALARM SHOP DRAWINGS SHALL BE SUBMITTED TO STATE MARSHAL FOR APPROVAL PRIOR TO INSTALLATION. UPON COMPLETION OF THE INSTALLATION OF THE FIRE ALARM SYSTEM, A SATISFACTORY TEST OF THE ENTIRE SYSTEM WILL BE PERFORMED IN THE PRESENCE OF THE ENFORCING AGENCY.

FIRE EXTINGUISHERS

1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE

EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH

EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL

EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.

2. FOR TELECOMMUNICATIONS ROOMS (TR), THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE THE NEW LOCATION WITH THE COR.

FIRE SPRINKLER SYSTEM

1. EXISTING FIRE SPRINKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED. CONTRACTOR

TO VERIFY THE EXACT SIZE AND LOCATION IN FIELD.

2. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH 2016 NFPA 13.

3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE

PERMISSIBLE.

FIRE & SMOKE DAMPERS

1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.

2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM. THE OFFICE BUILDING IS EQUIPPED WITH A FIRE

SPRINKLER AND FIRE ALARM SYSTEM.

EXIT AND EMERGENCY LIGHTING

1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE

DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW THE THRESHOLD.

2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC GUIDELINES.

RATED DOOR AND WINDOW ASSEMBLIES

1. THE ROOM BUILDING IS EQUIPPED WITH RATED DOOR ASSEMBLIES. EXISTING RATINGS ARE TO BE MAINTAINED. NEW RATED DOORS SHALL CLEARLY LABEL DOOR AND FRAME RATING, DO NOT PAINT.

FIRE STOPPING

1. FIRE STOPPING IS REQUIRED.

GENERAL

1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED MANNER.

2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES AND ADHESIVES

NORMALLY APPLIED.

3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY

NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84.

4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH- PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE LATCH, MEASURED FROM THE LEADING EDGE OF

THE DOOR.

5. LEVEL FLOOR OR LANDING: THIS STRUCTURE IS AN UN-OCCUPIED BUILDING AND NOT REQUIRED TO BE

ACCESSIBLE.

6. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED:

A. INTERIOR DOORS - 5 lbs.

B. EXTERIOR DOORS - 8.5 lbs.

C. FIRE DOORS - 15 lbs.

7. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED

WITH A UL APPROVED METHOD AND MATERIAL APPROVED BY BUILDING.

1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE

PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION

MANUAL FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR

REPAINTING WORK.

2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR

SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING,

SURFACE TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND

REMOVAL OF OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER

TYPES OF PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND

FACTORY PRIMING.

3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT

INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT

PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED

TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS

(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,

UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE ITEMS

MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL

NOTES. THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.

4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND EXTERIOR

EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED METAL

SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL

WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND MECHANICAL WORK IN

ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED OTHERWISE IN THE

PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND PLUMBING WORK IS

COVERED IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.

5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF

MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE

INTENDED OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.

6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE SURFACE IS

LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE

ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.

7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED

FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT

PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND

EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET

PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM

OR SURFACE, CONTACT THE ARCHITECT FOR INSTRUCTIONS PRIOR TO PAINTING.

8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL

SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER,

BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.

9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS

WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED

AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL

CONCRETE IN PIPE SPACE.

10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY

IF PAINTED.

11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.

12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.

1. THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE

EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS.

PROPER PRIMING MUST BE USED WITH SEALANTS.

2. THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER

PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS

AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS.

IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE

USED, CONTACT THE ARCHITECT.

3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND

VERTICAL CONCRETE JOINTS AND AS NOTED.

4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL

BE USED AT MASONRY AND CONCRETE CONTROL JOINTS.

5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE

PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT

UNLESS NOTED OTHERWISE.

6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.

7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED

EQUIPMENT FRAMES AND EXPOSED SUPPORTS.

8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL

MATERIALS (TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).

9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.

10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.

11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE

ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.

12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.

/3

0/

/3

0/

WEEKLY

CHANGED

OR MORE AS

NEEDED

PRE-FILTER

FLEX

DUCT

MONTHLY

CHANGED

HEPA FILTER

HEPA NEGATIVE

AIR UNIT

PROVIDE STICKY MATS (CHANGED

END OF EVERY SHIFT OR MORE IF

NECESSARY TO MAINTAIN

CLEANLINESS).

INDICATOR SHALL BE AT -0.03 OR

GREATER (VERIFY DAILY). IF NOT

VERIFY ALL OPENING SUCH AS DOOR

ARE CLOSED AND/OR CHANGE OUR

NEGATIVE AIR PRE-FILTER.

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT.

A

V

O

TAPE ALL SERVICES TO

PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PROVIDE TEMPORARY

ENCLOSURE AT AREAS

TO REMAIN

OPERATIONAL, SEE

DETAIL (STARC SYSTEMS

OR EQUAL)

D7

G-011

Sim

EXISTING RACK TO

BE REPLACED

NEW RACK IN

TEMPORARY LOCATION

LOCATED ADJACENT TO

EXISTING RACK OR IN

ADJACENT CORRIDOR.

IF CORRIDOR IS USED,

PROVIDE INFECTION

CONTROLS FOR THAT

AREA.

PROVIDE NEW

HEPA FILTER AT

THE BEGINNING OF

CONSTRUCTION

TEMPORARY WALL,

STARC SYSTEMS OR

EQUAL

FLOOR LINE

CEILING SYSTEM

AS SCHEDULED

EXISTING

STRUCTURE

FIRE RATED PLASTIC

TO PREVENT DUST

INSTALL PRIOR TO

CONSTRUCTION

/1

F

IN

IS

H E

D F

L O

O R

T O

U N

D E

R S

ID

E

O F

S T

R U

C T

U R

E

V E

R

IF

Y F

L O

O R

T O

F L O

O R

H E

IG

H

T

SPRINKLER

SYSTEM TO

REMAIN

INFECTION CONTROL / DUST

CONTROL PARTITION /

BARRIER

INFECTION CONTROL/DUST

CONTROL EGRESS DOOR NON-

TRANSFERRING MULTI-

SHEETED ADHESIVE FLOOR

PADS

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

STICKY

MAT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/5

A

-2

-7

E H

R M

I n fr a s tr u c tu re U p g ra d e s

W ic h it a

/5

A -2

-7

.E

R H

M .W ic h it a .B

.M E

P .r v t

/1

/2

:3

:2

A

M

G-011

GENERAL INFECTION CONTROL NOTES AND

SYMBOLS

589A7-21-700

B21

06/30/21 M. Perkins K. Luke

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

5500 E. KELLOGG, WICHITA, KANSAS 67218-1607

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT

(ICRA) PROCEDURES AS PER THE ROBERT J. DOLE VA

MEDICAL CENTER ICRA PLAN AND AS DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE (COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS

PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES

(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD

TO THE CONSTRUCTION SITE SHALL BE POSTED AS PER

THE ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO

BEGINNING WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS

SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER

WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO

CONSTRUCTION AREAS AND REQUIRE ALL

CONSTRUCTION PERSONNEL TO PASS THROUGH THIS

ROOM TO BE VACUUMED WITH HEPA VACUUM CLEANER

PRIOR TO LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL

FOR OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION

AREAS; REVIEW WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION

AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,

THROUGHOUT DURATION OF PROJECT USING HEPA

EQUIPPED AIR FILTRATION UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM

THE OTHER AREAS OF THE MEDICAL CENTER; NO

RETURN AIR OR EXHAUST SHALL PASS INTO THE AREAS

OUTSIDE THE CONSTRUCTION AREA. ISOLATE HVAC

SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT

CONTAMINATION OF EXISTING DUCT SYSTEM.

K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS

AND VISITORS SO THEY DO NOT EXIT THROUGH THE

CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO

THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION

AREA-DO NOT ENTER".

L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS

AND KEEP A CURRENT HOT WORK PERMIT ON SITE.

M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO

MAKE SURE THEY REMAIN EFFECTIVE.

N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.

ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS

AND/OR CONTAINERS.

O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS

FROM PIPES AND CONDUITS APPROPRIATELY AND

IMMEDIATELY TO MAINTAIN DUST PROTECTION AND

NEGATIVE AIR PRESSURE.

P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST

MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN

WIPING RAGS FOR CLEANING FINE DUST FROM FLOORS

AND ADJACENT OCCUPIED AREAS. ANY DUST TRACKED

OUTSIDE OF CONSTRUCTION AREA SHALL BE CLEANED

IMMEDIATELY.

Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION

AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH

DISINFECTANT, REMOVE CONSTRUCTION BARRIERS

(UPON APPROVAL). PATCH OR REPAIR ANY DAMAGE

FROM CONSTRUCTION BARRIER REMOVAL AND REMOVE

ISOLATION OF VAC SYSTEM.

R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

STEP 1: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

IDENTIFY THE TYPE OF CONSTRUCTION PROJECT

ACTIVITY (TYPE A–D)

TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.

TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES

THAT CREATE MINIMAL DUST.

TYPE C: WORK THAT GENERATES A MODERATE TO

HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES.

TYPE D: MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS.

STEP 2: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE

AFFECTED.

IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,

SELECT THE HIGHER RISK GROUP.

STEP 3: (CONTRACTOR A SHALL SUBMIT FOR EACH BUILDING )

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,

HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION

PROJECT TYPE (A, B, C, D) ON THE FOLLOWING

MATRIX, TO FIND THE CLASS OF PRECAUTIONS (I, II,

III OR IV) OR LEVEL OF INFECTION CONTROL

ACTIVITIES REQUIRED.

STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT

AREA, ASSESSING POTENTIAL IMPACT.

BELOW ABOVE NORTH SOUTH EAST WEST

_______________________RISK GROUP_____________________

LOW N/A N/A LOW LOW N/A

STEP 5: MECHANICAL ROOM

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE,

PATIENT ROOMS, MEDICATION ROOM, AND SO ON.

STEP 6: IDENTIFY ISSUES RELATED TO: VENTILATION,

PLUMBING, AND ELECTRICAL IN TERMS OF THE

OCCURRENCE OF PROBABLE OUTAGES.

STEP 7. IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 8. CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS

THERE A RISK DUE TO COMPROMISING STRUCTURAL

INTEGRITY (FOR EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 9. WORK HOURS: CAN OR WILL THE WORK BE DONE

DURING NON-PATIENT-CARE HOURS?

STEP 10. DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 11. DO THE PLANS ALLOW FOR THE REQUIRED NUMBER

AND TYPE OF HAND-WASHING SINKS?

STEP 12. DOES THE INFECTION PREVENTION AND CONTROL

STAFF AGREE WITH THE MINIMUM NUMBER OF SINKS FOR

THIS PROJECT? (VERIFY AGAINST FACILITY GUIDELINES

INSTITUTE (FGI) DESIGN AND CONSTRUCTION GUIDELINES

FOR TYPES AND AREA.)

STEP 13. DOES THE INFECTION PREVENTION AND CONTROL

STAFF AGREE WITH THE PLANS RELATIVE TO CLEAN AND

SOILED UTILITY ROOMS?

STEP 14. PLAN TO DISCUSS THE FOLLOWING CONTAINMENT

ISSUES WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC

FLOW, HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

CLASS I - PRECAUTIONS REQUIRED DURING CONSTRUCTION:

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUCT.

2. IMMEDIATELY REPLACE CEILING TILE IF DISPLACED.

CLASS I - PRECAUTIONS UPON COMPLETION:

1. CLEAN WORK AREA UPON COMPLETION OF TASK.

2. REMOVE ALL VISIBLE DEBRIS WITH A WET TOWEL AND/OR

MOP.

3. ENVIRONMENTAL MANAGEMENT SERVICE TO WIPE WORK

SURFACES AND FLOORS WITH DISINFECTANT.

CLASS II - PRECAUTIONS REQUIRED DURING CONSTRUCTION:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST

FROM DISPERSING INTO ATMOSPHERE

2. WATER-MIST WORK SURFACES TO CONTROL DUST WITH

CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. PLACE STICKY MAT AT ENTRANCE AND EXIT OF WORK

AREA.

5. REMOVE AND ISOLATE HVAC SYSTEM IN AREAS WHERE

WORK ID BEING PERFORMED.

6. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

CLASS II - PRECAUTIONS UPON COMPLETION:

1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS

3. WET MOP AND/OR VACUUM WITH HEPA FILTER BEFORE

LEAVING WORK AREA.

4. RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

5. ENVIRONMENTAL MANAGEMENT SERVICE SHALL WIPE

WORK SURFACES AND FLOORS WITH DISINFECTANT.

CLASS III - PRECAUTIONS REQUIRED DURING CONSTRUCTION:

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK

IS BEING DONE TO PREVENT CONTAMINATION OF DUCT

SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,

PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA

OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT)

BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. NEGATIVE PRESSURE MONITORING DEVICES SHOULD BE

VISIBLE FROM OUTSIDE THE WORK SITE AND READINGS

SHOULD BE DOCUMENTED AT LEAST DAILY.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

6. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT OF

WORK AREA.

7. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

CLASS III - PRECAUTIONS UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE SAFETY

DEPARTMENT AND INFECTION PREVENTION AND CONTROL

AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL

MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH CLEANER/DISINFECTANT.

5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK

WAS PERFORMED.

CLASS IV - PRECAUTIONS REQUIRED DURING

CONSTRUCTION:

1. INSTALL AND MAINTAIN CONSTRUCTION CRITICAL

BARRIERS AND CEILING PROTECTION.

2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

3. SEAL DOORS OPENING TO ADJACENT AREAS WITH

DUCT TAPE.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

5. BLOCK OFF AND SEAL HVAC REGISTERS, GRILLES AND

ANY OPENINGS IN DUCTWORK TO REMAIN

6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

7. NEGATIVE PRESSURE MONITORING DEVICES SHOULD

BE VISIBLE FROM OUTSIDE THE WORK SITE AND

READINGS SHOULD BE DOCUMENTED AT LEAST DAILY.

8. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT

IN TIGHTLY COVERED CONTAINERS.

9. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT

OF WORK AREA.

10. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS.

11. PROVIDE MONITORING AND CLEARANCE SAMPLES FOR

MOLD/ASBESTOS.

12. CONSTRUCT ANTEROOM AND REQUIRE ALL

PERSONNEL TO PASS THROUGH THIS ROOM SO THEY

CAN BE VACUUMED USING A HEPA VACUUM CLEANER

BEFORE LEAVING WORK SITE OR THEY CAN WEAR

CLOTH OR PAPER COVERALLS THAT ARE REMOVED

EACH TIME THEY LEAVE WORK SITE.

13. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED

TO WEAR SHOE COVERS. SHOE COVERS MUST BE

CHANGED EACH TIME THE WORKER EXITS THE WORK

AREAS.

CLASS IV - PRECAUTIONS UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE SAFETY

DEPARTMENT AND INFECTION PREVENTION AND

CONTROL AND THOROUGHLY CLEANED BY THE

ENVIRONMENTAL MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT

IN TIGHTLY COVERED CONTAINERS.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE

COVERING UNLESS SOLID LID.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

6. WET MOP AREA WITH CLEANER/DISINFECTANT.

7. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE

WORK WAS PERFORMED.

INFECTION CONTROL RISK

ASSESSMENT:

NTS

B7

INFECTION CONTROL MEASURES, TYPICAL CONSTRUCTION LAYOUT

NTS

D7

INFECTION CONTROL MEASURES, TEMPORARY WALL SECTION

1. PROJECT SPECIFIC PLANS ARE REQUIRED FOR THIS PROJECT. CONTRACTOR TO SUBMIT

INFECTIOUS CONTROL PLAN, SAFETY PLAN AND QUALITY CONTROL PLAN PRIOR TO

CONSTRUCTION. THE CONTRACTOR SHALL MEET AND DISCUSS EXTENT OF ABATEMENT WITH

ALL PARTIES TO COORDINATE WITH THE FACILITY INFECTION CONTROL TO CONDUCT AN

INFECTION CONTROL RISK ASSESSMENT PRIOR TO BEGINNING ANY ABATEMENT, REMOVAL,

AND / OR REPAIRS PER MCM 111-40.

2. THE CONTRACTOR SHALL WRITE THE ASBESTOS HAZARD ABATEMENT PLAN (AHAP) AND

DEVELOP A SCHEDULE FOR APPROVAL BY THE VETERANS PROFESSIONAL INDUSTRIAL

HYGIENIST (VPIH).

3. THE CONTRACTOR SHALL PERFORM NEGATIVE EXPOSURE ASSESSMENTS (NEA) AND

MONITORING PER OSHA 1926.1101(f) FOE EACH REMOVAL WORK OPERATION IN EACH WORK

AREA.

4. THE CONTRACTOR SHALL MONITOR AND SAMPLE AIRBORNE ASBESTOS LEVEL PER OSHA

1926.1101 UTILIZING THE POINT COUNT METHOD (PCM). SITE VISITS AND INSPECTIONS OF

CONTAINMENT BARRIERS, ANTE-ROOMS, HEPA EQUIPMENT AND CONTROL EQUIPMENT SHALL

BE PER THE ASBESTOS HAZARD ABATEMENT PLAN.

5. THE CONTRACTOR SHALL PERFORM THE ABATEMENT CLOSEOUT AND CERTIFICATION OF

COMPLIANCE AND FINAL AIR CLEARANCE TESTING WITH VETERANS PROFESIONAL INDUSTRIAL

HYGIENIST AS PER SPECIFICATION SECTION 02 82 11.

6. THE CONTRACTOR SHALL MAINTAIN SAFETY DATA SHEETS.

7. THE CONTRACTOR SHALL STORE, TRANSPORT, REMOVE ANY MATERIAL AND WASTE, AND

CLEAN WORK AREA UPON COMPLETION OF EACH ABATEMENT.

8. THE CONTRACTOR SHALL MAINTAIN INTEGRITY OF ALL FIRE OR SMOKE RESISTANT

PENETRATIONS THAT ARE AFFECTED BY WORK WITHIN AREA. REMOVE AND REPLACE OR

REPAIR ANY UNSATISFACTORY SEALS WITHIN AREAS OF WORK. REPORT AREAS AND

UNSATISFACTORY CONDITIONS THAT ARE NOT IN SCOPE PROMPTLY TO COR.

9. SAFETY (ILSM) PLAN IS REQUIRED. ICRA REQUIREMENTS MUST BE INCLUDED. PROVIDE

SIGNAGE SUBMITTAL PRIOR TO THE START OF WORK.

10. CONTRACTOR TO ENSURE DOOR IS LOCKED AND CLOSED WHEN NOT IN USE. CONTRACTOR

SHALL KEEP ALL DOORS SECURE IN ALL AREAS AT ALL TIMES.

11. CONTRACTOR TO VERIFY QUANTITIES AND LOCATIONS OF EXISTING DUCTWORK, PIPING, AND

EQUIPMENT THAT REQUIRES ABATEMENT PRIOR TO

COMMENCEMENT OF WORK.

12. CONTRACTOR WILL BE HELD RESPONSIBLE IF ACM IS USED ON THIS PROJECT.

ALL WORK TO REMOVE AND REPLACE ACM WILL BE AT THEIR COST IF ACM IS

USED.

13. CONTRACTOR TO PREPARE AND MAINTAIN A WASTE MANIFEST PER VA ACM ABATEMENT

REQUIREMENTS IN THE SPECIFICATIONS.

GENERAL ABATEMENT NOTES

APPLICABLE STANDARDS:

1. DEPARTMENT OF VETERANS AFFAIRS (VA) EXPERIENCE

A. ASSESSING AND IMPLEMENTING INFECTION CONTROL RISK ASSESSMENT (ICRA)

2. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) TRAINING

A. OSHA 30-HOUR FOR ALL EMPLOYEES

B. TITLE 29 CFR 1926.1101 - CONSTRUCTION STANDARD FOR ASBESTOS

C. TITLE 29 CFR 1910.132 - PERSONAL PROTECTIVE EQUIPMENT

D. TITLE 29 CFR 1910.134 - RESPIRATORY PROTECTION

E. TITLE 29 CFR 1926 - CONSTRUCTION INDUSTRY STANDARDS

F. TITLE 29 CFR 1910.20 - ACCESS TO EMPLOYEE EXPOSURE AND MEDICAL RECORDS

G. TITLE 29 CFR 1910.1200 - HAZARD COMMUNICATION

H. TITLE 29 CFR 1910.151 - MEDICAL AND FIRST AID

I. TITLE 29 CFR 1910.151 – ASBESTOS

3. ENVIRONMENTAL PROTECTION AGENCY (EPA) PERMITS, TRAINING, AND CERTIFICATIONS

A. 40 CFR 61 SUBPART A AND M (REVISED SUBPART B) - NATIONAL EMISSION STANDARD

FOR HAZARDOUS AIR POLLUTANTS –ASBESTOS–PERMIT

B. 40 CFR 763.80 - ASBESTOS HAZARD EMERGENCY RESPONSE ACT(AHERA) TRAINING AND

CERTIFICATION

I. AHERA ASBESTOS REMOVAL CONTRACTOR – CLASS I, II, III, AND IV

II. AHERA SUPERVISOR TRAINING FOR THE SUPERVISOR - CLASS I, II, III, AND IV

4. DEPARTMENT OF TRANSPORTATION (DOT) PERMITS AND LICENSES

A. TITLE 49 CFR 100 - 185 – TRANSPORTATION

COVID SAFETY REQUIREMENTS FOR CONSTRUCTION

1. ADHERE TO REQUIRED COVID-SAFE PRACTICES FOR ALL EMPLOYERS:

• LIMIT OPERATIONS TO REMOTE WORK TO THE GREATEST EXTENT POSSIBLE.

• ARRANGE WORKPLACE TO PROVIDE FOR 6 FEET OF DISTANCE BETWEEN

INDIVIDUALS WHEREVER POSSIBLE.

• CLOSE COMMON AREAS WHERE PERSONNEL ARE LIKELY TO CONGREGATE

WHEREVER POSSIBLE OR MODIFY THEM TO MINIMIZE CONTACT.

• PROVIDE FOR ALL MEETINGS TO TAKE PLACE REMOTELY WHENEVER POSSIBLE.

• ENSURE ALL EMPLOYEES HAVE FACE COVERINGS OR MASKS AND WEAR THEM IN

THE WORKPLACE AT ALL TIMES WHEN IN THE PRESENCE OF OTHERS, EXCEPT

WHEN EATING, DRINKING OR SWIMMING, OR UNLESS OTHERWISE ADVISED BY A

HEALTH CARE PROVIDER.

• TRAIN ALL EMPLOYEES ON DAILY CLEANING AND DISINFECTING PROTOCOL,

HYGIENE, AND RESPIRATORY ETIQUETTE (E.G., COVERING COUGHS).

• MAKE HANDWASHING, SANITIZER, AND OTHER HYGIENE SUPPORT AVAILABLE TO

EMPLOYEES. NOTE: THE USE OF GLOVES IS NOT A SUBSTITUTE FOR FREQUENT

HANDWASHING.

• SCREEN EMPLOYEES BEFORE THEY ENTER THE WORKPLACE EACH DAY

(VERBALLY OR WITH A WRITTEN FORM OR TEXT- BASED OR OTHER APP). SEND

EMPLOYEES HOME WHO ARE EXPERIENCING THE FOLLOWING COVID-19

SYMPTOMS RELATED TO COVID-19 AND DIRECT THEM TO OBTAIN FREE TESTING

THROUGH THE HYPERLINK "https://www.coronavirus.kdheks.gov/" DEPARTMENT OF

HEALTH.

•…

This is the start of the file's text. The full file is on GovTribe.