OF1419 Bid Abstract.xlsx
XLSX spreadsheet 74 KB Posted
- Attached to
- Z1DA--Remodel Fort Wayne Chapel 610A4-22-203
- Solicitation number
- 36C25025B0010
About this file
The document is an OF1419 Bid Abstract for a Department of Veterans Affairs solicitation (36C25025B0010) to remodel the Chapel at the Fort Wayne VA Medical Center. The project involves demolition and construction services, with all work to be completed within 183 calendar days from notice to proceed at the Fort Wayne Campus located at 2121 Lake Ave., Fort Wayne, IN 46805.
The bid abstract details 14 contractor bids, with pricing ranging from $451,145 to $979,681. The lowest bid was submitted by Contractor K at $451,145, while the highest bid was from Contractor J at $979,681. All bidders submitted SF 24 bid security at 20%, and all contractors acknowledged 4-6 amendments to the solicitation. The project requires adherence to infection control requirements and potential hazardous material handling, with a non-destructive hazardous materials survey previously conducted. Contractors will provide all necessary labor, equipment, materials, and supervision for the chapel remodeling project.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF1419 Bid Abstract
| BIDS WITHOUT Alternative Bids or Additive and Deductive Items | ||||||||
| ABSTRACT OF OFFERS - CONSTRUCTION | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE OF | 1 | |||
| 36C25025B0010 | 0 | 1/8/24 | 3/17/25 | 12/31/99 | 2 | PAGES | ||
| 4. ISSUING OFFICE |
Department of Veterans Affairs I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
| NCO10 - Indiana, Ohio, and Michigan | Jeffery Hairston | Contract Specialist | ||||
| 8888 Keystone Crossing Drive, Suite 325 | SIGNATURE | DATE SIGNED | ||||
| Indianapolis, IN 46240 | ||||||
| 5. PROJECT TITLE | 8. GOVERNMENT ESTIMATE | 9. OFFERS | ||||
| 610A4-22-203 Remodel Fort Wayne Chapel | (Check A, B or C and complete D, E, and F) | NO. 1 | NO. 2 | |||
| A. OFFEROR | A. OFFEROR | |||||
| A. HIRED LABOR | Contractor A | Contractor B | ||||
| Fort Wayne | Indiana | Indianapolis | Indiana | |||
| B. REASONABLE CONTRACT |
(Without Profit)
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | |||||||||||
| SF 24 20% | SF 24 20% | |||||||||||
| Smith Construction | FOSO Construction | |||||||||||
| 6. NUMBER OF AMENDMENTS ISSUED | X | C. REASONABLE CONTRACT | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | ||||||||
| 6 | (Including Profit) | Yes | 6 | Yes | 6 | |||||||
| 7A. ITEM | ||||||||||||
| NO. | 7B. DESCRIPTION OF OFFERED ITEM | 7C. EST. QUANTITY | D. UNIT | E. UNIT PRICE | F. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | |||
| 1 | Base Bid | 1 | JB | $ 627,430.79 | $ 627,430.79 | $ 621,978.00 | $ 621,978.00 | $ 679,265.00 | $ 679,265.00 | |||
| 0 | ||||||||||||
| 0 | ||||||||||||
| 0 | ||||||||||||
| 5 | ||||||||||||
| 6 | ||||||||||||
| 7 | ||||||||||||
| 8 | ||||||||||||
| 9 | ||||||||||||
| 10 |
| AUTHORIZED FOR LOCAL REPRODUCTION | |||
| Previous edition is usable | NOTE: If more than two offers are received, continue on OF 1419A. | OPTIONAL FORM 1419 (11-88) |
| BIDS WITH Alternative Bids or Additive and Deductive Items | ||||||||
| ABSTRACT OF OFFERS - CONSTRUCTION | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE OF | 1 | |||
| 36C25025B0010 | 0 | 1/8/24 | 3/17/25 | 12/31/99 | 2 | PAGES | ||
| 4. ISSUING OFFICE |
Department of Veterans Affairs I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
| NCO22 - Gilbert Contracting | Jeffery Hairston | Contract Specialist | ||||||
| 8888 Keystone Crossing Drive, Suite 325 | SIGNATURE | DATE SIGNED | ||||||
| Indianapolis, IN 46240 | ||||||||
| 5. PROJECT TITLE | 8. GOVERNMENT ESTIMATE | |||||||
| (Check A, B or C and complete D, E, and F) | 9. OFFERS | |||||||
| 610A4-22-203 Remodel Fort Wayne Chapel | NO. 1 | NO. 2 | ||||||
| A. OFFEROR | A. OFFEROR | |||||||
| A. HIRED LABOR | Contractor A | Contractor B | ||||||
| City | State | City | State | |||||
| B. REASONABLE CONTRACT |
(Without Profit)
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | |||||||||||
| SF24?/20%? | SF24?/20%? | |||||||||||
| Bid Company Name | Bid Company Name | |||||||||||
| 6. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | |||||||||
| 6 | (Including Profit) | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | |||||||
| 7A. ITEM | ||||||||||||
| NO. | 7B. DESCRIPTION OF OFFERED ITEM | 7C. EST. QUANTITY | D. UNIT | E. UNIT PRICE | F. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | |||
| 1 | CLIN 01 Lump Sum Price | 1 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 2 | CLIN 02 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 3 | CLIN 03 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 4 | CLIN 04 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 5 | CLIN 05 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 6 | CLIN 06 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 7 | CLIN 07 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 8 | CLIN 08 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 9 | CLIN 09 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 10 | CLIN 10 Lump Sum Price | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| AUTHORIZED FOR LOCAL REPRODUCTION | |||
| Previous edition is usable | NOTE: If more than two offers are received, continue on OF 1419A. | OPTIONAL FORM 1419 (11-88) |
INTERNAL Bid worksheet
| ABSTRACT OF OFFERS | *CS fills in the orange sections- Recorder only fill out the yellow highlighted section | |
| Bid Recorder: | Jeffery Hairston | |
| Address: | 8888 Keystone Crossing Drive, Suite 325 | |
| City/State/Zipcode | Indianapolis, IN 46240 | |
| Solicitation No. : | 36C25025B0010 | |
| Solicitation Issued Date | 1/8/24 | |
| Number of Amendments Issued | 6 | |
| Opening Date: | 3/17/25 | 14:00 |
| Pages : | 2 | |
| Project Title: (General Description): | 610A4-22-203 Remodel Fort Wayne Chapel |
| OF1419 PAGE : 1 | OF1419 PAGE : 2 | OF1419 PAGE : 3 | |||||||||||||||||||||||||||||
| BIDS WITHOUT Alternative Bids or Additive and Deductive Items | |||||||||||||||||||||||||||||||
| No:1 | No:2 | No:3 | No:4 | No:5 | No:6 | No:7 | No:8 | No:9 | No:10 | No:11 | No:12 | No:13 | No:14 | ||||||||||||||||||
| OFFEROR : | Contractor A | Contractor B | Contractor C | Contractor D | Contractor E | Contractor F | Contractor G | Contractor H | Contractor I | Contractor J | Contractor K | Contractor L | Contractor M | Contractor N | |||||||||||||||||
| City and State | Fort Wayne | Indiana | Indianapolis | Indiana | Louisville | Kentucky | Berlin | Connecticut | Celina | Ohio | Fraser | Michigan | Marietta | Georgia | Tipp City | Ohio | Sun City Center | Florida | Hampton | Virginia | Mt. Clemens | Michigan | The Villages | Florida | Fort Wayne | Indiana | Frederick | Maryland | |||
| Bid Security (Type and Amount) | SF 24 20% | Smith Construction | SF 24 20% | FOSO Construction | SF 24 20% | AACON | SF 24 20% | AmeriTech | SF 24 20% | Armcorp Construction | SF 24 20% | B&B Industries | SF 24 20% | B2 Constructors | SF 24 20% | Calvary Contracting | SF 24 20% | Beckwith Services | SF 24 20% | KMC Solutions | SF 24 20% | RB Construction Company | SF 24 20% | MW Cole Construction | None | Stapleton Enterprises | SF 24 20% | Walker Federal Services | |||
| Amendments Aknowledged (All or none) | Yes | 6 | Yes | 6 | Yes | 6 | YES | 6 | YES | 6 | YES | 6 | YES | 6 | YES | 6 | YES | 6 | YES | 6 | YES | 6 | YES | 6 | YES | 6 | YES | 4 | |||
| Grand Total | $ 621,978.00 | $ 679,265.00 | $ 962,000.00 | $ 590,000.00 | $ 495,740.00 | $ 474,015.94 | $ 588,271.00 | $ 545,343.00 | $ 549,000.00 | $ 979,681.00 | $ 451,145.00 | $ 535,000.00 | $ 740,000.00 | $ 664,721.00 | |||||||||||||||||
| 1 | Base Bid | 1 | JB | $ 621,978.00 | $ 621,978.00 | $ 679,265.00 | $ 679,265.00 | $ 962,000.00 | $ 962,000.00 | $ 590,000.00 | $ 590,000.00 | $ 495,740.00 | $ 495,740.00 | $ 474,015.94 | $ 474,015.94 | $ 588,271.00 | $ 588,271.00 | $ 545,343.00 | $ 545,343.00 | $ 549,000.00 | $ 549,000.00 | $ 979,681.00 | $ 979,681.00 | $ 451,145.00 | $ 451,145.00 | $ 535,000.00 | $ 535,000.00 | $ 740,000.00 | $ 740,000.00 | $ 664,721.00 | $ 664,721.00 |
| $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 451,145.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 740,000.00 | $ - 0 | $ 664,721.00 | ||||||||||
| $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 451,145.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 740,000.00 | $ - 0 | $ 664,721.00 | ||||||||||
| $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 451,145.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 740,000.00 | $ - 0 | $ 664,721.00 | ||||||||||
| 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 664,721.00 | |||||||
| 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 664,721.00 | |||||||
| 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 664,721.00 | |||||||
| 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 664,721.00 | |||||||
| 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 664,721.00 | |||||||
| 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | $ - 0 | $ 535,000.00 | $ - 0 | $ 664,721.00 | |||||||
| INITIALLY UNACCEPTABLE - NO BID BOND | INITIALLY UNACCEPTABLE DUE TO AMENDMENTS NOT BEING ACKNOWLEDGED | ||||||||||||||||||||||||||||||
| OF1419 PAGE : 1 | OF1419 PAGE : 2 | OF1419 PAGE : 3 | |||||||||||||||||||||||||||||
| BIDS WITH Alternative Bids or Additive and Deductive Items | |||||||||||||||||||||||||||||||
| No:1 | No:2 | No:3 | No:4 | No:5 | No:6 | No:7 | No:8 | No:9 | No:10 | ||||||||||||||||||||||
| OFFEROR : | Contractor A | Contractor B | Contractor C | Contractor D | Contractor E | Contractor F | Contractor G | Contractor H | Contractor I | Contractor J | |||||||||||||||||||||
| City and State | City | State | City | State | City | State | City | State | City | State | City | State | City | State | City | State | City | State | City | State | |||||||||||
| Bid Security (Type and Amount) | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | SF24?/20%? | Bid Company Name | |||||||||||
| Amendments Aknowledged (All or none) | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | |||||||||||
| Grand Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||
| 1 | CLIN 01 Lump Sum Price | 1 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 2 | CLIN 02 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 3 | CLIN 03 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 4 | CLIN 04 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 5 | CLIN 05 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 6 | CLIN 06 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 7 | CLIN 07 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 8 | CLIN 08 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 9 | CLIN 09 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 10 | CLIN 10 Lump Sum Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| BIDS WITHOUT Alternative Bids or Additive and Deductive Items | |||||
| DO NOT TYPE IN THESE BLOCKS | Construction IGCE | BIDS - LOWEST TO HIGHEST | |||
| EACH | TOTAL | Contractor A | $ - 0 | ||
| Base Bid | $ - 0 | Contractor B | $ - 0 | ||
| 0 | Contractor C | $ - 0 | |||
| 0 | Contractor D | $ - 0 | |||
| 0 | Contractor E | $ - 0 | |||
| Contractor F | $ - 0 | ||||
| Apparent Lowest Bidder | Contractor G | $ - 0 | |||
| Contractor K | $ 451,145.00 | Contractor H | $ - 0 | ||
| Contractor I | $ - 0 | ||||
| Contractor J | $ - 0 |
| BIDS WITH Alternative Bids or Additive and Deductive Items | |||||
| DO NOT TYPE IN THESE BLOCKS | Construction IGCE | $ - 0 | BIDS - LOWEST TO HIGHEST | ||
| EACH | TOTAL | Contractor A | $ - 0 | ||
| CLIN 01 Lump Sum Price | $ - 0 | $ - 0 | Contractor B | $ - 0 | |
| CLIN 02 Lump Sum Price | $ - 0 | $ - 0 | Contractor C | $ - 0 | |
| CLIN 03 Lump Sum Price | $ - 0 | $ - 0 | Contractor D | $ - 0 | |
| CLIN 04 Lump Sum Price | $ - 0 | $ - 0 | Contractor E | $ - 0 | |
| CLIN 05 Lump Sum Price | $ - 0 | $ - 0 | Contractor F | $ - 0 | |
| CLIN 06 Lump Sum Price | $ - 0 | $ - 0 | Contractor G | $ - 0 | |
| CLIN 07 Lump Sum Price | $ - 0 | $ - 0 | Contractor H | $ - 0 | |
| CLIN 08 Lump Sum Price | $ - 0 | $ - 0 | Contractor I | $ - 0 | |
| CLIN 09 Lump Sum Price | $ - 0 | $ - 0 | Contractor J | $ - 0 | |
| CLIN 10 Lump Sum Price | $ - 0 | $ - 0 |
| Apparent Lowest Bidder | LOWEST TO HIGHEST | CLIN 1: | CLIN 2: | CLIN 3: | CLIN 4: | CLIN 5: | CLIN 6: | CLIN 7: | CLIN 8: | CLIN 9: | CLIN 10: | |
| Contractor A | $ - 0 | IGCE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor B | $ - 0 | Contractor A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor C | $ - 0 | Contractor B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor D | $ - 0 | Contractor C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor E | $ - 0 | Contractor D | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor F | $ - 0 | Contractor E | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor G | $ - 0 | Contractor F | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor H | $ - 0 | Contractor G | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor I | $ - 0 | Contractor H | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor J | $ - 0 | Contractor I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contractor J | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| NOTES: |
| 514.402-70 Preferred practices for conducting bid openings. |
(a) To ensure that bid opening occurs at the exact time specified, verify the accuracy of the timepiece to be used.
(b) For the information of bidders present, provide an audible announcement approximately one minute prior to bid opening.
(c) Announce audibly when the exact time of opening arrives. In the announcement, identify the invitation(s) scheduled for opening.
(d) For construction contracts that provide for bid alternates, announce the amount of funds available for the award before opening bids.
(e) Open the bids in full view of the parties present.
(f) When practicable and feasible, announce the following information from each bid: the bidder’s name, item and unit price bid, and other pertinent information, such as delivery and discount terms.
(g) For bids submitted in multiple copies, one copy remains in the bid opening room for public examination until the bid abstract is substituted. The contracting activity uses the original. For bids submitted in original only, see FAR 14.402-1(c). The contracting activity retains all supplemental financial forms or other information submitted with a bid. Do not provide supplemental information for public examination.
(h) Forward any negotiable instruments submitted as bid guarantees to the appropriate Finance Office following procedures established by the Chief Financial Officer. After award, cancellation of the solicitation, or rejection of all bids, direct the appropriate Finance Office to refund the amount of the bid guarantee to unsuccessful bidders. The contracting officer may authorize return of a bid guarantee before award when requested by a bidder who is not in contention for the award. Retain other forms of bid guarantees (e.g., bid bonds, letters of credit, corporate and individual sureties, etc.) in the contract file.
(i) Prepare a record of the opening for the contract file. Include the names of persons attending the bid opening and the firms or organizations they represent.
(j) Verify the entries on all copies of a bid. Resolve any suspected mistake(s) following the procedures in FAR 14.407.
(k) Retain the envelopes in which bids and bid modifications are received until all awards are made. After award, retain those with notations concerning abnormal receipt or opening for identification in the solicitation file. The contracting officer may destroy the remainder.
836.580 Notice to bidders—additive or deductive bid line items.
The contracting officer may include the provision 852.236-92, Notice to Bidders—Additive or Deductive Bid Line Items, in invitations for bids when the contracting officer determines that funds may not be available for all the desired construction features at contract award.
852.236-92 Notice to Bidders—Additive or Deductive Bid Line Items.
As prescribed in 836.580, insert the following provision:
NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR 2019)
(a) Additive or deductive line items in the bid schedule shall be evaluated to determine the low offeror and the items to be awarded. The evaluation shall be made as follows—
(1) Prior to the opening of bids, the Government will determine the amount of funds available for the project.
(2) The low bid shall be the Bidder that—
(i) Is otherwise eligible for award; and
(ii) Offers the lowest aggregate amount for the first or base line item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive line items that provide the most features within the funds determined available.
(3) All bids shall be evaluated on the basis of the same additive or deductive line items.
(i) If adding another item from the bid schedule list of priorities would make the award exceed the available funds for all offerors, the Contracting Officer will skip that item and go to the next item from the bid schedule of priorities; and
(ii) Add that next item if an award may be made that includes that line item and is within the available funds.
(b) The Contracting Officer will use the list of priorities in the bid schedule only to determine the low offeror. After determining the low offeror, an award may be made on any combination of items if—
(1) It is in the best interest of the Government;
(2) Funds are available at the time of award; and
(3) The low offeror's price for the combination to be awarded is less than the price offered by any other responsive, responsible offeror.
(c) Example: “The amount available is $100,000. Offeror A's base bid and four additives (in the order stated in the list of priorities in the bid Schedule) are $85,000, $10,000, $8,000, $6,000, and $4,000. Offeror B's base bid and four additives are $80,000, $16,000, $9,000, $7,000, and $4,000. Offeror A is the low offeror. The aggregate amount of offeror A's bid for purposes of award would be $99,000, which includes a base bid plus the first and fourth additives. The second and third additives were skipped because each of them would cause the aggregate bid to exceed $100,000.”
OF1419 Bid Abstract pg 2
| BIDS WITHOUT Alternative Bids or Additive and Deductive Items | |||||
| ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET | 1. SOLICITATION NUMBER | ||||
| 36C25820B0011 | PAGE 2 OF | ||||
| 36C25025B0010 | 2 | PAGES | |||
| INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed. | |||||
| 2. PROJECT TITLE |
691-18-109WL - GLA - Building
| 500 IV Clean Room Compliance Construction Services | 4. OFFERS (Continued) | |||||||||||
| 610A4-22-203 Remodel Fort Wayne Chapel | NO.: 3 | NO.: 4 | NO.: 5 | NO.: 6 | ||||||||
| A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | |||||||||
| Contractor C | Contractor D | Contractor E | Contractor F | |||||||||
| Louisville | Kentucky | Berlin | Connecticut | Celina | Ohio | Fraser | Michigan | |||||
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | |||||||||
| SF 24 20% | SF 24 20% | SF 24 20% | SF 24 20% | |||||||||
| AACON | AmeriTech | Armcorp Construction | B&B Industries | |||||||||
| 3. CONTRACT ITEMS | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | ||||||||
| A. ITEM NO. | B. ESTIMATED QUANTITY | C. UNIT | Yes | 6 | YES | 6 | YES | 6 | YES | 6 | ||
| D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | |||||
| 1 | 1 | JB | $ 962,000.00 | $ 962,000.00 | $ 590,000.00 | $ 590,000.00 | $ 495,740.00 | $ 495,740.00 | $ 474,015.94 | $ 474,015.94 | ||
| 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | ||
| 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | ||
| 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | ||
| 5 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | ||
| 6 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | ||
| 7 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | ||
| 8 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | ||
| 9 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 | ||
| 10 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ 590,000.00 | $ - 0 | $ 495,740.00 | $ - 0 | $ 474,015.94 |
| OPTIONAL FORM 1419A (11-88) | |
| AUTHORIZED FOR LOCAL REPRODUCTION |
Previous edition is usable
| BIDS WITH Alternative Bids or Additive and Deductive Items | ||||||
| ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET | 1. SOLICITATION NUMBER | |||||
| 36C25820B0011 | PAGE 2 OF | |||||
| 36C25025B0010 | 0 | 2 | PAGES | |||
| INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed. | ||||||
| 2. PROJECT TITLE |
691-18-109WL - GLA - Building
| 500 IV Clean Room Compliance Construction Services | 4. OFFERS (Continued) | |||||||||||
| 610A4-22-203 Remodel Fort Wayne Chapel | NO.: 3 | NO.: 4 | NO.: 5 | NO.: 6 | ||||||||
| A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | |||||||||
| Contractor C | Contractor D | Contractor E | Contractor F | |||||||||
| City | State | City | State | City | State | City | State | |||||
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | |||||||||
| SF24?/20%? | SF24?/20%? | SF24?/20%? | SF24?/20%? | |||||||||
| Bid Company Name | Bid Company Name | Bid Company Name | Bid Company Name | |||||||||
| 3. CONTRACT ITEMS | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | ||||||||
| A. ITEM NO. | B. ESTIMATED QUANTITY | C. UNIT | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | ||
| D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | |||||
| 1 | 1 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 2 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 3 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 4 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 6 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 7 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 8 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 10 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OPTIONAL FORM 1419A (11-88) | |
| AUTHORIZED FOR LOCAL REPRODUCTION |
OF1419 Bid Abstract pg 3
| BIDS WITHOUT Alternative Bids or Additive and Deductive Items | |||||
| ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET | 1. SOLICITATION NUMBER | ||||
| 36C25820B0011 | PAGE 3 OF | ||||
| 36C25025B0010 | 2 | PAGES | |||
| INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed. | |||||
| 2. PROJECT TITLE |
691-18-109WL - GLA - Building
| 500 IV Clean Room Compliance Construction Services | 4. OFFERS (Continued) | ||||||||||
| 610A4-22-203 Remodel Fort Wayne Chapel | NO.: 7 | NO.: 8 | NO.: 9 | NO.: 10 | |||||||
| A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||
| Contractor G | Contractor H | Contractor I | Contractor J | ||||||||
| Marietta | Georgia | Tipp City | Ohio | Sun City Center | Florida | Hampton | Virginia | ||||
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | ||||||||
| SF 24 20% | SF 24 20% | SF 24 20% | SF 24 20% | ||||||||
| B2 Constructors | Calvary Contracting | Beckwith Services | KMC Solutions | ||||||||
| 3. CONTRACT ITEMS | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | |||||||
| A. ITEM NO. | B. ESTIMATED QUANTITY | C. UNIT | YES | 6 | YES | 6 | YES | 6 | YES | 6 | |
| D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | ||||
| 1 | 1 | JB | $ 588,271.00 | $ 588,271.00 | $ 545,343.00 | $ 545,343.00 | $ 549,000.00 | $ 549,000.00 | $ 979,681.00 | $ 979,681.00 | |
| 0 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | |
| 0 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | |
| 0 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | |
| 5 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | |
| 6 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | |
| 7 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | |
| 8 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | |
| 9 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 | |
| 10 | 0 | 0 | $ - 0 | $ 588,271.00 | $ - 0 | $ 545,343.00 | $ - 0 | $ 549,000.00 | $ - 0 | $ 979,681.00 |
| OPTIONAL FORM 1419A (11-88) | |
| AUTHORIZED FOR LOCAL REPRODUCTION |
| BIDS WITH Alternative Bids or Additive and Deductive Items | ||||||
| ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET | 1. SOLICITATION NUMBER | |||||
| 36C25820B0011 | PAGE 3 OF | |||||
| 36C25025B0010 | 0 | 2 | PAGES | |||
| INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed. | ||||||
| 2. PROJECT TITLE |
691-18-109WL - GLA - Building
| 500 IV Clean Room Compliance Construction Services | 4. OFFERS (Continued) | ||||||||||
| 610A4-22-203 Remodel Fort Wayne Chapel | NO.: 7 | NO.: 8 | NO.: 9 | NO.: 10 | |||||||
| A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||
| Contractor G | Contractor H | Contractor I | Contractor J | ||||||||
| City | State | City | State | City | State | City | State | ||||
| B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | B. BID SECURITY (Type and amount) | ||||||||
| SF24?/20%? | SF24?/20%? | SF24?/20%? | SF24?/20%? | ||||||||
| Bid Company Name | Bid Company Name | Bid Company Name | Bid Company Name | ||||||||
| 3. CONTRACT ITEMS | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | C. AMENDMENTS ACKNOWLEDGED | |||||||
| A. ITEM NO. | B. ESTIMATED QUANTITY | C. UNIT | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | YES or NO | # Amdmts Acknowledged | |
| D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | D. UNIT PRICE | E. ESTIMATED AMOUNT | ||||
| 1 | 1 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 3 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 4 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 5 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 6 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 7 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 9 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 10 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OPTIONAL FORM 1419A (11-88) | |
| AUTHORIZED FOR LOCAL REPRODUCTION |
image1.png
File details come from the government source that posted it. Updated .