Ft Wayne VA Chapel - Asbestos Report.pdf
PDF 4 MB Posted
- Attached to
- Z1DA--Remodel Fort Wayne Chapel 610A4-22-203
- Solicitation number
- 36C25025B0010
About this file
This is an asbestos inspection report dated April 10, 2023, prepared by Terracon Consultants, Inc. for FFE, Inc. regarding the planned renovation of the chapel at the VA Northern Indiana Health Care System's Fort Wayne Campus located at 2121 Lake Avenue, Fort Wayne, Indiana.
The inspection identified three asbestos-containing materials (ACMs) in the renovation area: 1) Layered cardboard pipe insulation with tar paper layer containing 2% chrysotile asbestos located above plaster ceilings and within pipe chases (approximately 150 linear feet), classified as Regulated Asbestos-Containing Material (RACM); 2) White pipe fittings containing 65% chrysotile asbestos associated with the pipe insulation (approximately 16 linear feet/16 fittings), classified as RACM; and 3) 12"x12" white with brown streak floor tile and black mastic containing 5% and 2% chrysotile asbestos respectively, located in the office and storage closet (approximately 200 square feet), classified as Category I Non-Friable ACM. The inspection was conducted on March 28, 2023 by a USEPA-accredited and IDEM-licensed asbestos inspector who collected 31 bulk samples from nine homogeneous areas within the approximately 1,400 square foot renovation space.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Inspection Report VA Project: Remodel Fort Wayne Chapel
VA Project No.: 610A4-22-203
VA Northern Indiana Healthcare System
Fort Wayne Campus
2121 Lake Avenue
Fort Wayne, Indiana 46805
April 10, 2023 | Report Number: N1227129
Prepared for:
FFE, INC
Cincinnati, Ohio 45242
611 Lunken Park Drive Cincinnati, OH 45226
P (513) 321-5816 F (513) 321-0294
Terracon.com
Facilities | Environmental | Geotechnical | Materials
April 10, 2023
FFE, Inc.
4445 Lake Forest Drive, Suite 600 Cincinnati, Ohio 45242
Attn: Mr. Clint Weekley President T: (513) 519-5999 E: clint.weekley@ffe-serv.com
Re: Asbestos Inspection Report VA Project: Remodel Fort Wayne Chapel VA Project No. 610A4-22-203 VA Northern Indiana Health Care System Fort Wayne Campus 2121 Lake Avenue Fort Wayne, Indiana 46805 Terracon Project No. N1227129
Dear Mr. Weekley:
Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced site to FFE, Inc. (Client). The purpose of this report is to present the results of an asbestos inspection which was performed on March 28, 2023 regarding the project titled “Remodel Fort Wayne Chapel.” We understand that this inspection was requested for the purpose of a future planned renovation of the chapel located at the VA Northern Indiana Health Care System, Fort Wayne campus.
Materials containing asbestos were identified as a result of the inspection. Please refer to the attached report for further detail.
Terracon appreciates the opportunity to provide this service to FFE, Inc. If you have any questions regarding this report, please contact the undersigned at 513-321-5816.
Sincerely, Terracon Consultants, Inc.
Lem Weyer Josh Vogel Field Scientist Group Manager https://na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAEkFXNoC2mFDIQpXRWUi7X4MA-auhAGs_ https://na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAEkFXNoC2mFDIQpXRWUi7X4MA-auhAGs_
Remodel Fort Wayne Chapel | 2121 Lake Ave., Fort Wayne, IN
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 Project DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Visual Assessment
3.2 Physical Assessment
3.3 Sample Collection
3.4 Sample Analysis
4.0 REGULATORY OVERVIEW
5.0 FINDINGS AND RECOMMENDATIONS
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDICES
APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
APPENDIX B ASBESTOS INSPECTION SAMPLE & RESULTS SUMMARY
APPENDIX C ASBESTOS ANALYTICAL LABORATORY REPORT
APPENDIX D LICENSES AND CERTIFICATIONS
APPENDIX E SAMPLE LOCATION AND ACM LOCATION DIAGRAM
APPENDIX F PHOTO LOG
Facilities | Environmental | Geotechnical | Materials
ASBESTOS INSPECTION REPORT
VA Project: Remodel Fort Wayne Chapel
VA Project No.: 610A4-22-203 VA Northern Indiana Health Care System-Fort Wayne Campus
2121 Lake Avenue Fort Wayne, Indiana
Terracon Project No. N1227129 April 10, 2023
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted an asbestos inspection which was limited to the boundaries of the VA project titled “Remodel Fort Wayne Chapel” at the VA Northern Indiana Health Care System, Fort Wayne Campus. The inspection was performed at the site on March 28, 2023 by a United States Environmental Protection Agency (USEPA)-accredited and Indiana Department of Environmental Management (IDEM) licensed asbestos inspector.
Accessible building components within the renovation areas were inspected. Homogeneous areas of accessible suspect asbestos-containing materials (ACM) were visually identified and documented. Although reasonable effort was made to inspect for accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids, or in other concealed areas. Bulk samples from suspect ACM were collected in general accordance with the sampling protocols outlined in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA). Collected bulk samples were delivered to an accredited laboratory for analysis by polarized light microscopy (PLM).
1.1 Project Objective
We understand that this inspection was requested for the purpose of a future planned renovation regarding the VA project titled “Remodel Fort Wayne Chapel” at the VA Northern Indiana Health Care System, Fort Wayne Campus. Asbestos inspections are required prior to renovation and demolition activities to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (as well as the state NESHAP equivalent).
1.2 Reliance
This report is for the exclusive use of FFE, Inc. (Client) for the project being discussed.
Reliance by any other party on this report is prohibited without written authorization of Terracon and the Client. Reliance on this report by the Client and all authorized parties will
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials 2 be subject to the terms, conditions, and limitations stated in the proposal and the agreement between Terracon and FFE, Inc.
2.0 PROJECT DESCRIPTION
The subject renovation area is located on the first floor of Building 1 at the Fort Wayne, Indiana VA campus (Rooms 193, 194, 194A, and 194B). The renovation space is approximately 1,400 square foot of interior floor space. The interior walls and ceilings consist of plaster. The floors of the chapel are carpeted, and the office and storage closet have vinyl floor tile. As previously noted, this inspection was limited to the boundaries of the VA project titled “Remodel Fort Wayne Chapel.”
3.0 FIELD ACTIVITIES
The interior inspection was conducted by Mr. Lem Weyer, who is a USEPA-accredited and IDEM-licensed asbestos inspector. A copy of Mr. Weyer’s Indiana asbestos credential is attached as Appendix D. The inspection was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763, Subpart E, Section 763.86, AHERA. A summary of inspection activities is provided below.
3.1 Visual Assessment
Inspection activities were initiated with visual observation of the accessible interior areas of the subject renovation space to identify homogeneous areas of accessible suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.
This inspection did not include knocking holes in walls and removing coverings to look for potentially concealed materials. Additionally, electrical equipment, electrical lines, and active equipment were not included in this inspection as such item present a safety hazard to the inspector.
3.2 Physical Assessment
A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials 3
3.3 Sample Collection
Based on results of the visual observation, bulk samples from interior suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
With respect to this interior inspection, Terracon collected a total of 31 bulk samples from nine (9) homogeneous areas of suspect ACM. A summary table of samples collected from homogenous areas of suspect ACM is included in Appendix B. Sample locations and ACM locations are shown on a diagram included in Appendix E.
3.4 Sample Analysis
Collected bulk samples were submitted under chain of custody to Eurofins CEI, Inc. of Cary, North Carolina for analysis by polarized light microscopy (PLM) with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos by PLM, where applicable, was determined by microscopic visual estimation using PLM. When applicable for friable material samples determined by PLM to have a low asbestos content (<5%), the additional point count (PC) method (400 points) was utilized. Eurofins CEI Inc.
is accredited for bulk asbestos analysis under the National Voluntary Laboratory Accreditation Program (NVLAP), accreditation number 101768-0.
The laboratory analytical report is included in Appendix C. Results are also summarized in the sample summary table included in Appendix B.
4.0 REGULATORY OVERVIEW
The federal asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials 4
The asbestos NESHAP regulation classifies material subject to demolition or renovation as either RACM, Category I non-friable ACM, or Category II non-friable ACM. RACM includes all friable ACM (pre-disturbance), along with Category I non-friable ACM that becomes friable (during disturbance), and Category I non-friable ACM subject to sanding, grinding, cutting, or abrading, or Category II non-friable ACM with a high probability of becoming crumbled, pulverized, or reduced to powder by forces expected to act on the material during disturbance. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials (other than Category I non-friable ACM) that contain more than 1% asbestos. Category II non-friable ACM generally includes (but is not limited to) cementitious material such as: cement pipes, cement siding (Transite™), cement panels, glazing, mortar, and grouts.
IDEM implements the asbestos NESHAP regulation as adopted by reference at Indiana Administrative Code Title 326. The owner or operator must provide IDEM with written notification at least 10 working days prior to the commencement of asbestos abatement activities that will disturb RACM in amounts greater than or equal to 160 square feet, 260 linear feet (of pipe insulation) or 35 cubic feet, and prior to demolition projects (even if no ACM is being removed or if no ACM was identified present).
The Indiana Department of Labor enforces the federal Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed 1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
5.0 FINDINGS AND RECOMMENDATIONS
Based on the analytical results for samples collected from the renovation area, the material listed below was identified to contain asbestos.
ACM
Description
Material Location(s)
% & Type Asbestos
Condition/ Friability
EPA NESHAP
Category
Estimated Quantity*
Layered Cardboard Pipe Insulation with Tar Paper Layer
Above Plaster Ceilings and within
Pipe Chases of Renovation Area
2% Chrysotile
Regulated Asbestos- Containing Material
(RACM)
Good/Friable ~ 150 Linear Feet (LF)
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials 5
ACM
Description
Material Location(s)
% & Type Asbestos
Condition/ Friability
EPA NESHAP
Category
Estimated Quantity*
White Fittings
Associated with Layered Cardboard
Pipe Insulation above Plaster
Ceilings and within Pipe Chases throughout the Renovation Area
65% Chrysotile RACM Good/Friable ~ 16 LF or
16 Fittings
12”x12” White with Brown
Streak Floor Tile and Black Mastic
Office and Storage Closet of
Renovation Area
Floor Tile:
5%
Chrysotile, Mastic: 2% Chrysotile
Category I Non-Friable
Good/Non- Friable
~ 200 Square Feet
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are concealed/hidden or located in inaccessible areas that could not be evaluated as part of this inspection. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present.
The above table is reiterated in Appendix A. A bulk sample and analytical results summary table is included in Appendix B, the laboratory analytical report is included in Appendix C, approximate sample locations and ACM locations are shown on a diagram included in Appendix E, and an example photo of the identified ACM is included in Appendix F.
6.0 LIMITATIONS/GENERAL COMMENTS
As previously noted, this inspection was limited to the client provide areas within the renovation project titled “Remodel Fort Wayne Chapel.” Additional suspect materials may exist outside the scope of work. Because the structure was occupied at the time of our inspection, Terracon did not perform sampling which required demolition or destructive activities such as knocking large holes in walls, sampling ceramic flooring materials, dismantling of equipment or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made;
however, confined spaces or areas which may pose a health or safety risk to Terracon personnel were not sampled.
This asbestos inspection was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our interior inspection of the building. The information contained in this report is relevant to the date on which this inspection was performed and may not be representative of conditions at a later date. This report has been prepared on behalf of and exclusively for use by FFE, Inc. for specific
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials 6 application to their project as discussed. This report is not a bidding document.
Contractors or consultants reviewing this report must draw their own conclusions regarding quantities, further investigation or remediation deemed necessary.
Terracon does not warrant the work of regulatory agencies, laboratories, or other third parties supplying information which may have been used in the preparation of this report.
No warranty, express or implied is made.
APPENDIX A
VA Project: Remodel Fort Wayne Chapel VA Project No.: 610A4-22-203
VA Northern Indiana Health Care System-Fort Wayne Campus 2121 Lake Avenue
Fort Wayne, Indiana Terracon Project No. N1227129
April 10, 2023
IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
HA
No’s.
ACM Description Material Location % and Type
Asbestos
EPA NESHAP
Classification
Condition/ Friability
Estimated Quantity*
Layered Cardboard Pipe
Insulation with Tar Paper Layer
Above Plaster Ceilings and within Pipe Chases of Renovation Area 2% Chrysotile Regulated Asbestos-
Containing Material (RACM) Good/Friable ~ 150 Linear Feet
05 White Fittings
Associated with Layered Cardboard Pipe
Insulation above Plaster Ceilings and within Pipe Chases throughout the
Renovation Area
65% Chrysotile RACM Good/Friable ~ 16 LF or 16 Fittings
12”x12” White with
Brown Streak Floor Tile and Black Mastic
Office and Storage Closet of Renovation
Area
Floor Tile: 5% Chrysotile, Mastic: 2% Chrysotile Category I Non-Friable Good/Non-
Friable ~ 200
Square Feet
See Appendix B for a summary of samples collected with respective analytical results, Appendix C for the laboratory analytical report, Appendix E for a sample location and ACM location diagram, and Appendix F for a photo example of the above-listed material.
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are hidden and/or present in inaccessible areas not evaluated as part of this inspection. This is not a bidding document and contractors would be responsible for drawing their own conclusions regarding quantities present.
APPENDIX B
VA Project: Remodel Fort Wayne Chapel VA Project No.: 610A4-22-203
VA Northern Indiana Health Care System-Fort Wayne Campus 2121 Lake Avenue
Fort Wayne, Indiana Terracon Project No. N1227129
April 10, 2023
ASBESTOS INSPECTION SAMPLE & RESULTS SUMMARY
Sample #
Sample Material Description
Sample Location HA Location(s) Results (% / Type of
Asbestos)HA #
SEQ.
Plaster Walls: Base Coat and Finish Coat
Northeast Corner of Storage Closet
Throughout Renovation Area
Base Coat: None Detected (ND), Finished Coat: ND
Southeast Corner of Storage Closet
Base Coat: ND, Finished Coat: ND
Southeast Corner of Storage Closet
Base Coat: ND, Finished Coat: ND
Northeast Corner
Office Base Coat: ND, Finished Coat: ND
Southwest Corner of Office Base Coat: ND, Finished Coat: ND
Plaster Ceilings: Base Coat and Finish Coat
At Access Hatch in Southeast Corner of Alter Area
Throughout Renovation Area
Base Coat: ND, Finished Coat: ND
At Access Hatch in Southeast Corner of Alter Area
Base Coat: ND, Finished Coat: ND
Southwest Corner of Storage Closet
Base Coat: ND, Finished Coat: ND
At Access Hatch in Northeast Corner of Office
Base Coat: ND, Finished Coat: ND
At Access Hatch in Northeast Corner of Office
Base Coat: ND, Finished Coat: ND
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials
Sample # Sample Material
Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA #
SEQ.
Yellow Carpet Mastic
Northwest Corner of Chapel
Throughout Chapel
ND
Northeast Corner of Chapel
ND
South side of the
Alter
ND
Layered Cardboard Pipe Insulation with Tar Paper
Layer
At Access Hatch in Southeast
Corner of Alter Above Plaster Ceilings and within Pipe Chases of
Renovation Area
Pipe Insulation: 1.5% Chrysotile by Point Count
At Access Hatch in Southeast Corner of Alter
Pipe Insulation: 2% Chrysotile
At Access Hatch in Northeast Corner of Office
Pipe Insulation: 2% Chrysotile, Tar Paper: ND
White Fittings
At Access Hatch in Southeast
Corner of Alter
Associated with Layered
Cardboard Pipe Insulation above Plaster Ceilings and within Pipe
Chases throughout the
Renovation Area
65% Chrysotile
At Access Hatch in Southeast Corner of Alter
65% Chrysotile
At Access Hatch in Southeast Corner of Alter
65% Chrysotile
12”x12” White with Brown Streak Floor Tile and Black
Mastic
Northeast Corner of Storage Closet
Office and Storage Closet of Renovation
Area
Floor Tile: 5% Chrysotile, Mastic: 2% Chrysotile
Northeast Corner of Storage Closet
Floor Tile: 5% Chrysotile, Mastic: 2% Chrysotile
Northeast Corner of Office Floor Tile: 5% Chrysotile, Mastic: 2% Chrysotile
23 Brown/Tan Vinyl Sheet Flooring with
Yellow Mastic
Middle East Side Throughout Congregation Area of Chapel (Under Carpet)
Flooring: ND, Mastic: ND
24 Northeast Corner Flooring: ND, Mastic: ND
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials
Sample # Sample Material
Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA #
SEQ.
25 Northwest Corner Flooring: ND, Mastic: ND
Gray Duct Mastic
Southeast Corner of Storage Closet
Associated with Duct Work in
Storage Closet of Renovation Area
ND
27 At HVAC Unit ND
28 At HVAC Unit ND
Black Tar Pipe Wrap
At HVAC Unit
Associated with Pipes going to HVAC Unit in
Storage Closet
ND
30 At HVAC Unit ND
31 At HVAC Unit ND
Inspector Signature: _____________________________ Lem Weyer
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials
APPENDIX C
ASBESTOS ANALYTICAL LABORATORY DATA
April 7, 2023
Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
CLIENT PROJECT: Ft. Wayne VAMC - Chapel, N1227129
CEI LAB CODE: B237172
Dear Customer:
Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on March 31, 2023. The samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600 Method.
Sample results containing >1% asbestos are considered asbestos-containing materials (ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1% asbestos by weight as determined by visual estimation.
Thank you for your business and we look forward to continuing good relations.
730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Tianbao Bai, Ph.D., CIH Laboratory Director
Kind Regards, ASBESTOS ANALYTICAL REPORT
By: Polarized Light Microscopy
Prepared for
Terracon Consultants, Inc.
CLIENT PROJECT:
LAB CODE:
TEST METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020
REPORT DATE:
TOTAL SAMPLES ANALYZED:
# SAMPLES >1% ASBESTOS:
Ft. Wayne VAMC - Chapel, N1227129
04/07/23
B237172
730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY
PROJECT: Ft. Wayne VAMC - Chapel, N1227129 LAB CODE: B237172
Client ID Lab ID Color Sample Description
ASBESTOS
%Layer
METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020
01-01 Layer 1 B237172.01 White Plaster Finish Coat None Detected01-01
Layer 2 B237172.01 Gray Plaster Base Coat None Detected
01-02 Layer 1 B237172.02 White Plaster Finish Coat None Detected01-02
Layer 2 B237172.02 Gray Plaster Base Coat None Detected
01-03 Layer 1 B237172.03 White Plaster Finish Coat None Detected01-03
Layer 2 B237172.03 Gray Plaster Base Coat None Detected
01-04 Layer 1 B237172.04 White Plaster Finish Coat None Detected01-04
Layer 2 B237172.04 Gray Plaster Base Coat None Detected
01-05 Layer 1 B237172.05 White Plaster Finish Coat None Detected01-05
Layer 2 B237172.05 Gray Plaster Base Coat None Detected
02-06 Layer 1 B237172.06 White Plaster Finish Coat None Detected02-06
Layer 2 B237172.06 Gray Plaster Base Coat None Detected
02-07 Layer 1 B237172.07 White Plaster Finish Coat None Detected02-07
Layer 2 B237172.07 Gray Plaster Base Coat None Detected
02-08 Layer 1 B237172.08 White Plaster Finish Coat None Detected02-08
Layer 2 B237172.08 Gray Plaster Base Coat None Detected
02-09 Layer 1 B237172.09 White Plaster Finish Coat None Detected02-09
Layer 2 B237172.09 Gray Plaster Base Coat None Detected
02-10 Layer 1 B237172.10 White Plaster Finish Coat None Detected02-10
Layer 2 B237172.10 Gray Plaster Base Coat None Detected
03-11 B237172.11 Yellow Carpet Mastic None Detected03-11
03-12 B237172.12 Yellow Carpet Mastic None Detected03-12
03-13 B237172.13 Yellow Carpet Mastic None Detected03-13
04-14 B237172.14A Brown Pipe Insulation Chrysotile04-14 2% B237172.14B Pipe Insulation (point Count) Chrysotile 1.5%
04-15 B237172.15A Brown Pipe Insulation Chrysotile04-15 2% B237172.15B Sample Not Analyzed per COC
04-16 Layer 1 B237172.16A Brown Pipe Insulation Chrysotile04-16 2% Layer 2 B237172.16A Black Tarpaper None Detected
B237172.16B Sample Not Analyzed per COC
05-17 B237172.17 White Fittings Chrysotile05-17 65%
Page 1 of 2730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Asbestos Report Summary
PROJECT: Ft. Wayne VAMC - Chapel, N1227129 LAB CODE: B237172
Client ID Lab ID Color Sample Description
ASBESTOS
%Layer
METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020
05-18 B237172.18 White Fittings Chrysotile05-18 65% 05-19 B237172.19 White Fittings Chrysotile05-19 65% 06-20 B237172.20A White Floor Tile Chrysotile06-20 5%
B237172.20B Black Mastic Chrysotile 2% 06-21 B237172.21A White Floor Tile Chrysotile06-21 5%
B237172.21B Black Mastic Chrysotile 2% 06-22 B237172.22A White Floor Tile Chrysotile06-22 5%
B237172.22B Black Mastic Chrysotile 2% 07-23 B237172.23A Tan Flooring None Detected07-23
B237172.23B Yellow Mastic None Detected
B237172.23C Brown Flooring None Detected
B237172.23D Yellow Mastic None Detected
07-24 B237172.24A Tan Flooring None Detected07-24
B237172.24B Yellow Mastic None Detected
07-25 B237172.25A Brown Flooring None Detected07-25
B237172.25B Yellow Mastic None Detected
08-26 B237172.26 Gray Duct Mastic None Detected08-26
08-27 B237172.27 Gray Duct Mastic None Detected08-27
08-28 B237172.28 Gray Duct Mastic None Detected08-28
09-29 B237172.29 Black Pipe Wrap None Detected09-29
09-30 B237172.30 Black Pipe Wrap None Detected09-30
09-31 B237172.31 Black Pipe Wrap None Detected09-31
Page 2 of 2730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
ASBESTOS BULK ANALYSIS
Lab Code: B237172 Date Received: 03-31-23 Date Analyzed: 04-06-23 Date Reported: 04-07-23
Client ID Lab ID
Lab Attributes
Lab Description
ASBESTOS
ASBESTOS BULK PLM, EPA 600 METHOD
NON-ASBESTOS COMPONENTS
Non-Fibrous
Client: Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
Project: Ft. Wayne VAMC - Chapel, N1227129
Fibrous
White 01-01
B237172.01
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.01 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
White 01-02
B237172.02
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.02 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
White 01-03
B237172.03
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.03 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
White 01-04
B237172.04
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Page 1 of 9730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Lab Code: B237172 Date Received: 03-31-23 Date Analyzed: 04-06-23 Date Reported: 04-07-23
Client ID Lab ID
Lab Attributes
Lab Description
ASBESTOS
ASBESTOS BULK PLM, EPA 600 METHOD
NON-ASBESTOS COMPONENTS
Non-Fibrous
Client: Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
Project: Ft. Wayne VAMC - Chapel, N1227129
Fibrous
Gray Plaster Base Coat
B237172.04 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
White 01-05
B237172.05
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.05 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
White 02-06
B237172.06
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.06 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
White 02-07
B237172.07
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.07 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
Page 2 of 9730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Lab Code: B237172 Date Received: 03-31-23 Date Analyzed: 04-06-23 Date Reported: 04-07-23
Client ID Lab ID
Lab Attributes
Lab Description
ASBESTOS
ASBESTOS BULK PLM, EPA 600 METHOD
NON-ASBESTOS COMPONENTS
Non-Fibrous
Client: Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
Project: Ft. Wayne VAMC - Chapel, N1227129
Fibrous
White 02-08
B237172.08
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.08 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
White 02-09
B237172.09
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.09 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
White 02-10
B237172.10
Heterogeneous
Non-fibrous Bound
65% 35% <1%
Binder Silicates Paint
None Detected Layer 1
Plaster Finish Coat
Gray Plaster Base Coat
B237172.10 <1%Heterogeneous
Non-fibrous Bound
65% 35%
Cellulose Silicates Binder
None DetectedLayer 2
Yellow Carpet Mastic03-11
B237172.11 Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Page 3 of 9730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Lab Code: B237172 Date Received: 03-31-23 Date Analyzed: 04-06-23 Date Reported: 04-07-23
Client ID Lab ID
Lab Attributes
Lab Description
ASBESTOS
ASBESTOS BULK PLM, EPA 600 METHOD
NON-ASBESTOS COMPONENTS
Non-Fibrous
Client: Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
Project: Ft. Wayne VAMC - Chapel, N1227129
Fibrous
Yellow Carpet Mastic03-12
B237172.12 Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Yellow Carpet Mastic03-13
B237172.13 Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Brown Pipe Insulation04-14
B237172.14A 98%Heterogeneous
Fibrous Loosely Bound
No tarpaper present.
Cellulose 2% Chrysotile
Pipe Insulation (point Count)
B237172.14B
(7 asbestos points / 400 total) x 100.=1.5%
1.5% Chrysotile
Brown Pipe Insulation04-15
B237172.15A 98%Heterogeneous
Fibrous Loosely Bound
No tarpaper present.
Cellulose 2% Chrysotile
Sample Not Analyzed per COC
B237172.15B
Brown 04-16
B237172.16A
98%Heterogeneous
Fibrous Loosely Bound
Cellulose 2% Chrysotile Layer 1
Pipe Insulation
Black Tarpaper
B237172.16A 60%Heterogeneous
Fibrous Bound
40%Cellulose Tar None DetectedLayer 2
Page 4 of 9730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Lab Code: B237172 Date Received: 03-31-23 Date Analyzed: 04-06-23 Date Reported: 04-07-23
Client ID Lab ID
Lab Attributes
Lab Description
ASBESTOS
ASBESTOS BULK PLM, EPA 600 METHOD
NON-ASBESTOS COMPONENTS
Non-Fibrous
Client: Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
Project: Ft. Wayne VAMC - Chapel, N1227129
Fibrous
Sample Not Analyzed per COC
B237172.16B
White Fittings05-17
B237172.17 35%Heterogeneous
Fibrous Loosely Bound
Cellulose 65% Chrysotile
White Fittings05-18
B237172.18 35%Heterogeneous
Fibrous Loosely Bound
Cellulose 65% Chrysotile
White Fittings05-19
B237172.19 35%Heterogeneous
Fibrous Loosely Bound
Cellulose 65% Chrysotile
White Floor Tile06-20
B237172.20A Heterogeneous
Fibrous Bound
95% Vinyl 5% Chrysotile
Black MasticB237172.20B Homogeneous
Non-fibrous Bound
98% Tar 2% Chrysotile
White Floor Tile06-21
B237172.21A Heterogeneous
Fibrous Bound
95% Vinyl 5% Chrysotile
Black MasticB237172.21B Homogeneous
Non-fibrous Bound
98% Tar 2% Chrysotile
Page 5 of 9730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Lab Code: B237172 Date Received: 03-31-23 Date Analyzed: 04-06-23 Date Reported: 04-07-23
Client ID Lab ID
Lab Attributes
Lab Description
ASBESTOS
ASBESTOS BULK PLM, EPA 600 METHOD
NON-ASBESTOS COMPONENTS
Non-Fibrous
Client: Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
Project: Ft. Wayne VAMC - Chapel, N1227129
Fibrous
White Floor Tile06-22
B237172.22A Heterogeneous
Fibrous Bound
95% Vinyl 5% Chrysotile
Black MasticB237172.22B Homogeneous
Non-fibrous Bound
98% Tar 2% Chrysotile
Tan Flooring07-23
B237172.23A 10%Heterogeneous
Non-fibrous Bound
90%Cellulose Vinyl None Detected
Yellow MasticB237172.23B Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Brown FlooringB237172.23C 10%Heterogeneous
Non-fibrous Bound
90%Cellulose Vinyl None Detected
Yellow MasticB237172.23D Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Tan Flooring07-24
B237172.24A 10%Heterogeneous
Non-fibrous Bound
90%Cellulose Vinyl None Detected
Page 6 of 9730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Lab Code: B237172 Date Received: 03-31-23 Date Analyzed: 04-06-23 Date Reported: 04-07-23
Client ID Lab ID
Lab Attributes
Lab Description
ASBESTOS
ASBESTOS BULK PLM, EPA 600 METHOD
NON-ASBESTOS COMPONENTS
Non-Fibrous
Client: Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
Project: Ft. Wayne VAMC - Chapel, N1227129
Fibrous
Yellow MasticB237172.24B Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Brown Flooring07-25
B237172.25A 10%Heterogeneous
Non-fibrous Bound
90%Cellulose Vinyl None Detected
Yellow MasticB237172.25B Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Gray Duct Mastic08-26
B237172.26 Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Gray Duct Mastic08-27
B237172.27 Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Gray Duct Mastic08-28
B237172.28 Homogeneous
Non-fibrous Bound
100% Mastic None Detected
Black Pipe Wrap09-29
B237172.29 10%Homogeneous
Fibrous Bound
70% 20%
Cellulose Tar Binder
None Detected
Page 7 of 9730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
Lab Code: B237172 Date Received: 03-31-23 Date Analyzed: 04-06-23 Date Reported: 04-07-23
Client ID Lab ID
Lab Attributes
Lab Description
ASBESTOS
ASBESTOS BULK PLM, EPA 600 METHOD
NON-ASBESTOS COMPONENTS
Non-Fibrous
Client: Terracon Consultants, Inc.
611 Lunken Park Drive Cincinnati, OH 45226
Project: Ft. Wayne VAMC - Chapel, N1227129
Fibrous
Black Pipe Wrap09-30
B237172.30 10%Homogeneous
Fibrous Bound
70% 20%
Cellulose Tar Binder
None Detected
Black Pipe Wrap09-31
B237172.31 10%Homogeneous
Fibrous Bound
70% 20%
Cellulose Tar Binder
None Detected
Page 8 of 9730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
LEGEND: Non-Anth = Non-Asbestiform Anthophyllite Non-Trem = Non-Asbestiform Tremolite Calc Carb = Calcium Carbonate
METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020
REPORTING LIMIT: <1% by visual estimation
REPORTING LIMIT FOR POINT COUNTS: 0.25% by 400 Points or 0.1% by 1,000 Points
REGULATORY LIMIT: >1% by weight
Due to the limitations of the EPA 600 method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. Estimated measurement of uncertainty is available on request.
This report relates only to the samples tested or analyzed and may not be reproduced, except in full, without written approval by Eurofins CEI. Eurofins CEI makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results.
Interpretation of the analytical results is the sole responsibility of the client. Samples were received in acceptable condition unless otherwise noted. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government.
Information provided by customer includes customer sample ID and sample description.
ANALYST: APPROVED BY:
Tianbao Bai, Ph.D., CIH Laboratory Director
Regan Kerns
730 SE Maynard Road • Cary, NC 27511 • 919.481.1413
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials
APPENDIX D
LICENSES AND CERTIFICATIONS
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials
APPENDIX E
SAMPLE LOCATION & ACM LOCATION DIAGRAM
Project No. N1227129
Consulting Engineers and Scientists
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
Sample Location and ACM Location Drawing Exhibit Inspection Date: March 28, 2023 VA Project: Remodel Fort Wayne Chapel
VA Project No.: 610A4-22-203 VA Northern Indiana Health Care System
2121 Lake Avenue Fort Wayne, Indiana 46805
Project Manager: Lem Weyer
APR: Josh Vogel
11 12
Asbestos-Containing 12”x12” White with Brown Streak Floor Tile and Black Mastic (HA 06)
Asbestos-Containing Layered Cardboard Pipe Insulation and
Associated Mudded Fittings (HAs 04 & 05)
April 10, 2023 | Terracon Report No. N1227129
Facilities | Environmental | Geotechnical | Materials
APPENDIX F
PHOTO LOG
Photo #1- HA 04: Asbestos-Containing Layered Cardboard Pipe Insulation
Photo #2- HA 05: Asbestos-Containing Pipe Fittings
Photo #3- HA 06: Asbestos-Containing 12”x12” White with Brown Streak Floor Tile and Black Mastic
| COC B237172 |
| B237172 |
| Indiana Inspector |
| 2023-04-10T07:48:51-0700 | |
| Agreement certified by Adobe Acrobat Sign |
File details come from the government source that posted it. Updated .