Environmental Requirements.docx

DOCX document 14 KB Posted

Attached to
Z1DA--Remodel Fort Wayne Chapel 610A4-22-203
Solicitation number
36C25025B0010
Issued by

About this file

This document outlines additional environmental requirements for a chapel remodeling project at the Fort Wayne VA Medical Center. The requirements focus primarily on asbestos abatement procedures and documentation.

Key requirements include submission of waste documentation to the COR for VHA Waste Tracking, separate Industrial Hygiene Asbestos Abatement Services that cannot be subcontracted, and the option to use the Terracon Asbestos Inspection Report as the pre-construction survey. The abatement firm must determine actual quantities of asbestos-containing materials and provide IDEM notification documentation. Environmental impacts were assessed, with Air Quality impacts noted due to asbestos abatement requiring NESHAP regulation compliance, and noise generation expected but not anticipated to exceed thresholds. The document confirms no significant environmental impacts were determined for the overall project.

View the file

Other files

File Type Posted
OF1419 Bid Abstract.xlsx XLSX spreadsheet
Amendment 6 - Conference Call Info.pdf PDF
36C25025B0010 A0005.pdf PDF
D1 - evo6-open.pdf PDF
000110 TABLE OF CONTENTS - Add1 2025-0228.pdf PDF
Ft Wayne VA Chapel - Lead Paint Report.pdf PDF
024120 SELECTIVE DEMOLITION - Add1 2025-0228.pdf PDF
A1 EM - Cove_LED_SPEC.pdf PDF
D1 EM - evo6-open.pdf PDF
RFIs and Responses for Remodel Fort Wayne Chapel.docx DOCX document
Ft Wayne VA Chapel - Asbestos Report.pdf PDF
Ft Wayne VA Chapel - ICRA PCRA.pdf PDF
A1 - Cove_LED_SPEC.pdf PDF
36C25025B0010 Amendment A0004.pdf PDF
D2 - KUZ1862833_specsheet.pdf PDF
A2 - upld.pdf PDF
A3 - Acolyte 1.0 Static White Micro RibbonLyte.pdf PDF
2025-0228 FWVA Chapel DRAWINGS Add1.pdf PDF
013526 SAFETY REQUIREMENTS - Add1 2025-0228.pdf PDF
087100 DOOR HARDWARE - Add1 2025-0228.pdf PDF
X1 - edg-edgr.pdf PDF
Amendment 3 - Bid Due Date Extension.pdf PDF
610A4-22-203 Remodel Fort Wayne Chapel Sign in sheet.pdf PDF
Amendment 36C25025B0010 A0002.docx DOCX document
36C25025B0010 A00001.pdf PDF
610A4-22-203 - BID specs.pdf PDF
36C25025B0010 Solicitation.pdf PDF
Wage Determination.txt TXT text file
Contractor Certification Regarding Safety and Environmental.docx DOCX document
610A4-22-203 - BID Drawings.pdf PDF
610A4-22-203 Basis of design cutsheets.pdf PDF
VHA Directive 1192 01.pdf PDF
RFI Form.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Information Concerning Environmental Requirements

1. All waste documentation to be sent to COR to include in the VHA Waste Tracking system.

1. Separate Industrial Hygiene Asbestos Abatement Services – Cannot be subcontracted by abatement firm.

1. The Terracon Asbestos Inspection Report can be used as the facility’s pre-construction asbestos survey, but the abatement firm can complete their own.

2. This report cannot be used if the scope or area of the work extends beyond concealed walls and ceilings. If this is to occur, a thorough asbestos inspection must be completed prior to commencement of that activity.

1. Based on the abatement firm’s visual inspection, they would need to determine the true quantity of asbestos-containing materials to be removed. Based on this determination, the abatement firm would need to provide the facility a copy of the Notification to IDEM or documentation that Notification is not required/applicable.

1. The GEMS Program Manager reviewed and provided input on the Potential Environment Impact Sections. The following were determined above the NA status:

4. Air Quality – Asbestos Abatement expected, therefore NESHAP regulations are applicable and controls must be in place. (This is outlined in the project specifications).

4. Noise – General noise generation expected. Project does not anticipate for noise thresholds to be exceeded. Project drawings / specifications mention administrative controls to prevent excess noise.

1. No Significant Environmental Impacts determined.

File details come from the government source that posted it. Updated .