This file contains the drawings and construction specifications as part of Amendment 1 for the Fort Wayne VA Medical Center Chapel remodeling project. The drawings detail the renovation requirements for Chapel 610A4-22-203, located at 2121 Lake Ave., Fort Wayne, IN 46805. The project includes both demolition and new construction components, with specific attention to infection control requirements during the renovation process. The contractor should note that while a non-destructive hazardous materials survey was included in the project package, additional hazardous materials like asbestos and lead-based paint may be encountered during demolition work. The Department of Veterans Affairs Veterans Health Administration (VISN 10) requires all work to be completed within 183 calendar days from the notice to proceed.