About this file

This document contains a federal contract opportunity notice and related mechanical plans for interior deficiencies corrections at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 will issue a solicitation on or around August 10, 2020 for project number 539-20-211 to correct deficiencies at its Cincinnati VAMC. The project magnitude is between $500,000 and $1,000,000, with a NAICS code of 238220 and business size standard of $16.5 million. This is a 100% set-aside for small businesses with a preference for service-disabled veteran-owned small businesses. Offerors must be registered and verified in VIP and SAM databases. The mechanical plans specify repairs and upgrades to ventilation, cooling equipment, and walk-in coolers/freezers in various rooms. The contract duration shall not exceed 180 calendar days from notice to proceed. Bonds will be required.

View the file

Other files

File Type Posted
ED000A - BASEMENT ELECTRICAL DEMO PLAN- AREA A.pdf PDF
AE111.pdf PDF
FX101 - FIRE PROTECTION BASEMENT PLANS.pdf PDF
Asbestos Survey Report.pdf PDF
114121 Walk-In Coolers and Freezers.pdf PDF
AD112.pdf PDF
Site Visit Sign In Sheet.pdf PDF
EP000A - BASEMENT ELECTRICAL NEW WORK - AREA A.pdf PDF
2nd Sign in Sheet.pdf PDF
230511 Common Work Results for HVAC.pdf PDF
MD101.pdf PDF
AE101.pdf PDF
36C25020B0059 0002.docx DOCX document
AD111.pdf PDF
36C25020B0059 0001.docx DOCX document
Corbin Russwin Locksets Sole Source Justification - Redacted.pdf PDF
S02 RFI Form.docx DOCX document
S02 Contractor EMR Certification Form.docx DOCX document
539-20-211_Specifications (Combined).pdf PDF
100_ CD Drawings_Combined -07202020.pdf PDF
36C25020B0059.docx DOCX document
Wage Determination.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PATIENT

TOILET

SHOWER

ROOM

108A

SUPPLY

106B

AAMS

106A

EF-1

210 CFM

EG-1

100 CFM

EG-1

8"ø EA

"ø

E A

6" ø

EA

L-1

PHARMACY

MENS

RESTROOM

MENS

SHOWER

156A

ELEVATOR

LOBBY

148A

6" ø

EA

8" ø

EA

100 CFM

EG-1

160 CFM

EG-1

EF-2

10"ø EA L-2 1

4 BEDROOM

4 BEDROOM

4 BEDROOM

1 9

MENS

LOCKER

025A

WOMENS

LOCKER

EF-3

CORRIDOR

C*B*3

HAC

L-3

100 CFM

EG-1

225 CFM

EG-1 225 CFM

EG-1

6"ø EA 12"ø EA

TOILET

EMPLOYEE

BREAK ROOM

MENS RR

210 CFM

7270 CFM

RG-1

(E)20"x16" (E)12"x8"RA

8 8

8" ø

8" ø

10"ø

ACCU-010A

ACCU-006

COOLER

COOLER

FREEZER

010A

COOLER

ACCU-008 ACCU-010

DIRTY

CLOTHES

CLEAN

CLOTHES

007A

DIET. STOR.

2 2 2

3 3 3

4 4H.W. TANK

007A

A. NEW WORK IS INDICATED WITH HEAVY LINE WEIGHT.

B. LOCATE VOLUME DAMPERS AS FAR AWAY FROM AIR DEVICES AND AS

CLOSE TO TAKEOFFS FROM MAINS AS POSSIBLE TO PREVENT NOISE

(MINIMUM OF FIVE FEET AWAY FROM AIR DEVICES WHEREVER POSSIBLE).

LOCATE VOLUME DAMPERS SO THEY CAN BE ACCESSED THROUGH LAY-

IN CEILING TILE OR WITH REMOTE VOLUME DAMPER ADJUSTMENT

DEVICE WITH CABLE LOCATED INSIDE THE DUCT AND ADJUSTMENT

DEVICE INSIDE AIR DEVICE COVER. FOR VOLUME DAMPERS ACCESSIBLE

FROM LAY-IN CEILINGS, PROVIDE HANDLE WITH LOCKING QUADRANT AND

INSULATION STAND-OFF DEVICE TO PREVENT HANDLE FROM

CONFLICTING WITH EXTERNAL DUCT INSULATION. SEE VOLUME DAMPER

DETAIL.

C. INSTALL ALL EQUIPMENT AND ACCESSORIES IN ACCORDANCE WITH

MANUFACTURERS’ RECOMMENDATIONS, CONTRACT DOCUMENTS,

APPLICABLE CODES, REGULATIONS, AND OWNER STANDARDS.

D. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT,

DUCT AND PIPING INSULATION IS APPLIED.

E. THE LOCATIONS OF ITEMS SHOWN ON THE DRAWINGS OR REQUIRED BY

THE SPECIFICATIONS NOT DEFINITELY FIXED BY DIMENSIONS ARE

APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE

THE BEST RESULTS MUST BE DETERMINED BY THE PROJECT SITE

CONDITIONS AND SHALL HAVE THE APPROVAL OF THE OWNER AND

ENGINEER BEFORE BEING INSTALLED.

F. DO NOT SCALE DRAWINGS.

G. INSTALL EQUIPMENT WITH MINIMUM ACCESS CLEARANCE AS

RECOMMENDED BY CODE AND MANUFACTURERS.

H. SEE PHASING NOTES ON SHEET GI001.

G E N E R A L N O T E S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FFE INC

110 Boggs Lane, Suite 170 Springdale, OH 45246 513-522-0956

C :\U se rs

\q ui nn \D oc um en ts

\F t T ho m as

(2

9)

_p at ric k.

qu in nF

BN

EU

.rv t 8/

/2

2:

:0

PM

MH111

ENLARGED MECHANICAL PLANS CORRECT FCA DEFICIENCIES -

FTD INTERIOR DEFICIENCIES

FT THOMAS, KY 41075

539-20-211

BUILDING 64

05/01/20 GVC CAL

1/4" = 1'-0"1 ROOM 108 & 108A NEW WORK

1/4" = 1'-0"2 ROOM 156 & 156A NEW WORK

1/4" = 1'-0"3 ROOMS 025, 025A, 026 NEW WORK

1/8" = 1'-0"4 ENLARGED BASEMENT MECHANICAL PLAN

1 PROVIDE A NEW DEDICATED EXHAUST FAN, EXHAUST GRILLES, DUCT, DUCT

ACCESSORIES, FITTINGS, AND LOUVER, AND BALANCE TO AIRFLOW SHOWN.

2 PROVIDE A NEW AIR-COOLED CONDENSING UNIT, EVAPORATOR, AND

REFRIGERANT PIPING FOR THE COOLER/FREEZER. PROVIDE A COMPLETELY

NEW WALK-IN COOLER/FREEZER ENCLOSURE SYSTEM THAT FITS EXISTING

ROOM DIMENSIONS – SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS.

3 MOUNT CONDENSING UNIT TO WALL 18" AFG WITH BRACKET MOUNT.

4 CONTRACTOR SHALL COORDINATE INSTALLATION OF COOLERS AND

FREEZER WITH C.O.R. FOR DOMESTIC WATER WORK TO BE COMPLETED

UNDER SEPARATE CONTRACT (BY VA).

5 ROUTE OF REFRIGERANT PIPING WAS BASED ON THE ASHRAE STANDARDS 15

& 34. REROUTING OF PIPING SHALL BE APPROVED BY MECHANICAL ENGINEER

OF RECORD.

6 REBALANCE EXISTING RETURN AIR DEVICES SO ROOM 025A MENS LOCKER

HAS 210 CFM RETURN AIRFLOW.

7 PROVIDE NEW RETURN AIR DEVICE RG-1 AND BALANCE TO AIRFLOW SHOWN.

8 BALANCE SUPPLY IN ROOM 025A TO 310 CFM; SUPPLY IN ROOM 025 TO 470

CFM; SUPPLY IN ROOM 026 TO 320 CFM AND RETURN IN ROOM 026 TO 120

CFM.

9 CONTRACTOR SHALL COORDINATE WITH VA COR ABOUT EXACT CONTROL

TIE-IN LOCATIONS WITHIN CONTROL CLOSETS LISTED IN NOTE B ON MH501.

D R A W I N G N O T E S

Revisions: Date:

100% Construction/BID Documents 05/01/2020 Addendum #2 09/02/2020

Sheets
MH111 - ENLARGED MECHANICAL PLANS

File details come from the government source that posted it. Updated .