This solicitation package describes a federal construction contract opportunity to correct deficiencies at an interior Veterans Affairs medical facility located in Fort Thomas, Kentucky. The contract is set aside for a service-disabled veteran-owned small business and has a value between $500,000 and $1 million. The work includes mechanical demolition plans to remove and cap existing ductwork and equipment in various rooms. The solicitation will be issued by Network Contracting Office 10 of the Veterans Health Administration on August 10, 2020. Offerors must ensure they are properly registered in the Vendor Information Pages and System for Award Management databases. The contract duration is a maximum of 180 calendar days from notice to proceed. Performance and payment bonds are required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MH111.pdf | ||
| ED000A - BASEMENT ELECTRICAL DEMO PLAN- AREA A.pdf | ||
| AE111.pdf | ||
| FX101 - FIRE PROTECTION BASEMENT PLANS.pdf | ||
| Asbestos Survey Report.pdf | ||
| 114121 Walk-In Coolers and Freezers.pdf | ||
| AD112.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| EP000A - BASEMENT ELECTRICAL NEW WORK - AREA A.pdf | ||
| 2nd Sign in Sheet.pdf | ||
| 230511 Common Work Results for HVAC.pdf | ||
| AE101.pdf | ||
| 36C25020B0059 0002.docx | DOCX document | |
| AD111.pdf | ||
| 36C25020B0059 0001.docx | DOCX document | |
| Corbin Russwin Locksets Sole Source Justification - Redacted.pdf | ||
| S02 RFI Form.docx | DOCX document | |
| S02 Contractor EMR Certification Form.docx | DOCX document | |
| 539-20-211_Specifications (Combined).pdf | ||
| 100_ CD Drawings_Combined -07202020.pdf | ||
| 36C25020B0059.docx | DOCX document | |
| Wage Determination.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMENS
LOCKER
MENS RR
MENS
LOCKER
025A
COOLER
COOLER
FREEZER
010A
COOLER
MD101
2 2 2
SHOWER
ROOM
108A
MENS
RESTROOM
MENS
SHOWER
156A
MD101
MD101
MENS
LOCKER
025A
MENS RR
WOMENS
LOCKER
(E)EF
PATIENT
TOILET
SHOWER
ROOM
108A
UP TO (E) EF-2
ON ROOF
(E)14"x6"
4 4
MENS
RESTROOM
MENS
SHOWER
156A
UP
(E)28"x5" EA
TOILET
158A
A. WORK TO BE DEMOLISHED IS INDICATED WITH BOLD DASHED LINE
TYPE.
B. ISOLATE THE FOLLOWING SYSTEMS FROM MAINS SERVING THE
BUILDING PRIOR TO DEMOLITION:
a. DUCTWORK SERVING ZONES BOTH INSIDE AND OUTSIDE WORK
AREAS
b. POWER SERVING ZONES BOTH INSIDE AND OUTSIDE WORK
AREAS
C. SEAL ANY FLOOR PENETRATIONS WHERE DUCT OR PIPES ARE
REMOVED.
D. HOLES IN WALLS AND FLOORS CREATED OR EXPOSED DURING
DEMOLITION SHALL BE REPAIRED TO MATCH EXISTING CONDITIONS.
E. DUCT/PIPING ADJACENT TO DEMOLITION SCOPE SHALL BE LEFT IN
OPERATIONAL CONDITION. REPAIR INSULATION AND VERIFY
SUPPORTS REMAIN AS REQUIRED PER SPECIFICATIONS.
F. REMOVE ALL HANGERS, SUPPORTS, TUBING, AND CONTROL DEVICES
ASSOCIATED WITH EQUIPMENT TO BE REMOVED UNLESS OTHERWISE
NOTED.
G E N E R A L N O T E S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FFE INC
110 Boggs Lane, Suite 170 Springdale, OH 45246 513-522-0956
C :\U se rs
\q ui nn \D oc um en ts
\F t T ho m as
(2
9)
_p at ric k.
qu in nF
BN
EU
.rv t 8/
/2
2:
:5
PM
MD101
MECHANICAL DEMOLITION PLANS CORRECT FCA DEFICIENCIES -
FTD INTERIOR DEFICIENCIES
FT THOMAS, KY 41075
539-20-211
BUILDING 64
05/01/20 GVC CAL
1/16" = 1'-0"1 BASEMENT MECHANICAL PLAN - DEMOLITION
1/16" = 1'-0"2 FIRST FLOOR MECHANICAL PLAN - DEMOLTION
1/8" = 1'-0"3 ROOMS 025, 025A, 026 DEMOLITION
1/8" = 1'-0"4 ROOMS 108 AND 108A DEMOLITION
1/8" = 1'-0"5 ROOMS 156 AND 156A DEMOLITION
1 REMOVE ALL FOUR WATER-COOLED CONDENSING UNITS AND ASSOCIATED
PIPING FOR COOLERS AND FREEZERS IN AND BETWEEN THE CONDENSING
UNIT CLOSET AND IN ROOMS 006, 008, 010, AND 010A.
2 REMOVE COOLER/FREEZER AND ASSOCIATED EQUIPMENT – SEE
ARCHITECTURAL DRAWINGS.
3 REMOVE EXISTING EXHAUST FAN.
4 REMOVE BOLD, DASHED DUCTWORK AND AIR DEVICES. CAP EXISTING
OPENING AFTER REMOVAL OF BRANCH DUCT.
5 EXISTING TO REMAIN.
D R A W I N G N O T E S
Revisions: Date:
100% Construction/BID Documents 05/01/2020 Addendum #2 09/02/2020
| Sheets |