This document includes construction plans and specifications for a fire protection system upgrade project at a Department of Veterans Affairs medical center, as well as information on a related federal contract opportunity. The project involves installing dry sprinkler branches and heads in coolers and freezers, and reworking existing wet-pipe sprinkler heads and piping to accommodate new floor plans and code requirements. The contract opportunity is a 100% set-aside for small businesses with an SDVOSB preference. Offerors must be registered in the Vendor Information Pages and SAM databases. The project magnitude is between $500,000 and $1,000,000 under NAICS code 238220 with a $16.5 million size standard. The contract duration shall not exceed 180 days from notice to proceed. Bonds will be required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MH111.pdf | ||
| ED000A - BASEMENT ELECTRICAL DEMO PLAN- AREA A.pdf | ||
| AE111.pdf | ||
| Asbestos Survey Report.pdf | ||
| 114121 Walk-In Coolers and Freezers.pdf | ||
| AD112.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| EP000A - BASEMENT ELECTRICAL NEW WORK - AREA A.pdf | ||
| 2nd Sign in Sheet.pdf | ||
| 230511 Common Work Results for HVAC.pdf | ||
| MD101.pdf | ||
| AE101.pdf | ||
| 36C25020B0059 0002.docx | DOCX document | |
| AD111.pdf | ||
| 36C25020B0059 0001.docx | DOCX document | |
| Corbin Russwin Locksets Sole Source Justification - Redacted.pdf | ||
| S02 RFI Form.docx | DOCX document | |
| S02 Contractor EMR Certification Form.docx | DOCX document | |
| 539-20-211_Specifications (Combined).pdf | ||
| 100_ CD Drawings_Combined -07202020.pdf | ||
| 36C25020B0059.docx | DOCX document | |
| Wage Determination.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KITCHEN
DINING ROOM
MENS RR
WOMENS
LOCKER
SOILED
LINEN
018D
MECHANICAL
004C
STAIR#2
S*B*2
COOLER
FREEZER
010A
COOLER
COOLER
STAIR #4
S*B*4
STAIR#6
S*B*6
BOILER
ROOM
FX101
FX101
OFFICE
H.W. TANK
007A
CORRIDOR
C*B*1
STAIR#2
S*B*2
H.W. TANK
007A
COOLER
ELEC.
007B
COOLER
DIET. STOR.
OFFICE
009A
HCMI
OFFICE
FREEZER
010A
COOLER
BLDG
MANAG. OFF
1 1
MENS RR
WOMENS
LOCKER
2 2
MENS
LOCKER
025A
A. THIS AREA OF THE RENOVATION ON THIS FLOOR WILL BE FULLY SPRINKLERED
AT THE COMPLETION OF THE RENOVATION.
B. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN AREAS
SHOWN. DESIGN, INSTALLATION AND TESTING SHALL MEET THE
REQUIREMENTS OF NFPA 13 LATEST EDITION, VA FIRE PROTECTION
MANUAL, AND ALL STATE AND LOCAL CODES.
C. REFER TO SPECIFICATION 21 13 13 FOR SPRINKLER HAZARD
CLASSIFICATION AND REQUIREMENTS.
D. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND
PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT
THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
E. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS
REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE
INTERFERENCE WITH OTHER CONSTRUCTION.
F. REFER TO ARCHITECTURAL DRAWINGS FOR REFLECTED CEILING PLANS AND
CONSTRUCTION COORDINATE SPRINKLER LOCATIONS WITH ALL CEILING
DEVICES (LIGHTING, DIFFUSERS, ETC.)
G. SPRINKLERS IN ALL AREAS WITH FINISHED CEILINGS SHALL BE QUICK
RESPONSE CHROME PLATED RECESSED PENDANT TYPE, SPRINKLERS IN
AREAS WITHOUT CEILINGS SHALL BE QUICK RESPONSE UPRIGHT TYPE WITH
BRASS FINISH AND GUARD.
H. INSTALL QUICK RESPONSE SPRINKLERS IN ALL AREAS, EXCEPT WHERE
SPECIFICALLY PROHIBITED PER NFPA 13
I. PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC CALCULATION.
J. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL
OTHER TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE
PLANS IS TO CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS
AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
K. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM
ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
L. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS
AND SPRINKLER DESIGN.
M. PROVIDE DRAIN VALVES AND PIPING TO ALLOW COMPLETE DRAINAGE OF FIRE
PROTECTION SYSTEM.
N. SPRINKLER HEAD TYPES AT DESIGNATED AREAS. THE INSTALLATION OF
SPRINKLER HEADS IN 2'X2' ACOUSTICAL TILE ARE TO BE CENTERED AND
EITHER CENTERED AT HALFWAY OR QUARTER POINTS IN 2'X4' TILES. IN
GYPSUM AND EXPOSED CEILING, INSTALL SPRINKLER HEADS SYMMETRICALLY
IN A STRAIGHT LINE. MAINTAIN A SYMMETRICAL PATTERN FOR ALL CEILING
TYPES FOR AN AESTHETICALLY PLEASING EFFECT.
O. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING CORE DRILLING
AND PATCHING FOR THEIR WORK. PATCH TO MATCH SURROUNDING
CONDITIONS WITH MATERIALS AND WORKMANSHIP ACCEPTABLE TO THE VA
PROJECT MANAGER.
P. CONTRACTOR SHALL COMPLY WITH ALL OSHA STANDARDS
Q. EXISTING SPRINKLER SYSTEM AND ALL ASSOCIATED EQUIPMENT SHALL BE
MAINTAINED FULLY OPERATIONAL UNTIL THE NEW EQUIPMENT HAS BEEN
TESTED AND ACCEPTED BY THE VA. THE EXISTING SPRINKLER SYSTEM AND
EQUIPMENT CAN BE TAKEN OUT OF SERVICE ONLY DURING CONSTRUCTION
PERIODS IN WHICH THE SPRINKLER SYSTEM IS BEING MODIFIED AND THE
CONTRACTOR IS AT THE WORK SITE. PRIOR TO LEAVING THE WORK SITE
EACH DAY, THE CONTRACTOR SHALL RESTORE THE SPRINKLER SYSTEM TO
SERVICE. ALL AREAS OUTSIDE OF THE PROJECT CONSTRUCTION AREA
SHALL HAVE THEIR EXISTING FIRE PROTECTION SPRINKLER SYSTEM IN FULL
SERVICE PRIOR TO LEAVING THE WORK SITE EACH DAY OR A FIRE WATCH
SHALL BE ESTABLISHED AT THE CONTRACTOR’S EXPENSE UNTIL THE SYSTEM
IS RETURNED TO FULL COVERAGE AND OPERATION. COORDINATE ALL
NECESSARY SYSTEM SHUTDOWNS WITH VA PROPERTY MANAGER.
R. REFER TO SHEET P001 FOR LEGEND AND ABBREVIATIONS.
CODE REFERENCE:
NFPA 101, LIFE SAFETY CODE 2018 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2019
EDITION
NFPA 70, NATIONAL ELECTRIC CODE 2020 EDITION
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE 2019 EDITION
INTERNATIONAL BUILDING CODE 2018 EDITION
VA FIRE PROTECTION DESIGN MANUAL – 7TH EDITION
VA BARRIER FREE DESIGN STANDARD REVISED NOVEMBER 1, 2017
VA MASTER SPECIFICATION, TECHNICAL INFORMATION LIBRARY (TIL)
OCCUPANCY CLASSIFICATION:
BASEMENT – AMBULATORY HEALTH CARE CHAPTER 20 OF NFPA 101
FIRST FLOOR – HEALTH CARE CHAPTER 18 OF NFPA 101
SECOND FLOOR – HEALTH CARE CHAPTER 18 OF NFPA 101
THIRD FLOOR – HEALTH CARE CHAPTER 18 OF NFPA 101
G E N E R A L N O T E S :
LIGHT HAZARD
ORDINARY HAZARD I
ORDINARY HAZARD II
FIRE HAZARD CLASSIFICATION :__
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD
GROUP I
ORDINARY HAZARD
GROUP II
0.10 GPM/SF OVER 1500
SF
0.15 GPM/SF OVER 1500
SF
0.20 GPM/SF OVER 1500
SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FFE INC
110 Boggs Lane, Suite 170 Springdale, OH 45246 513-522-0956
C :\U se rs
\q ui nn \D oc um en ts
\F t T ho m as
(2
9)
_p at ric k.
qu in nF
BN
EU
.rv t 8/
/2
3:
:5
PM
FX101
FIRE PROTECTION BASEMENT
PLANS
CORRECT FCA DEFICIENCIES -
FTD INTERIOR DEFICIENCIES
FT THOMAS, KY 41075
539-20-211
BUILDING 64
05/01/20 GP GP
1/16" = 1'-0"1 BASEMENT FIRE SUPPRESSION PLAN - OVERALL
1/8" = 1'-0"2 BASEMENT FIRE SUPPRESSION PLAN - FREEZERS & COOLERS
1/8" = 1'-0"3 BASEMENT FIRE SUPPRESSION PLAN - RESTROOMS
1 INSTALL DRY SPRINKLER BRANCHES CONNECTED TO EXISTING WET-PIPE FIRE
SUPPRESSION SYSTEM ABOVE COOLER/FREEZER TO NEW PENDANT SPRINKLER
HEADS IN COOLER/FREEZER.
2 THIS AREA IS CURRENTLY PROTECTED WITH AN AUTOMATIC WET-PIPE FIRE
SUPPRESSION SYSTEM. REWORK SPRINKLER HEADS AND PIPING AS NECESSARY TO
ACCOMODATE NEW FLOOR PLAN AND IN ACCORDANCE WITH NFPA 13.
D R A W I N G N O T E S
Revisions: Date:
100% Construction/BID Documents 05/01/2020