This document includes construction plans and specifications for a fire protection system upgrade project at a Department of Veterans Affairs medical center, as well as information on a related federal contract opportunity. The project involves installing dry sprinkler branches and heads in coolers and freezers, and reworking existing wet-pipe sprinkler heads and piping to accommodate new floor plans and code requirements. The contract opportunity is a 100% set-aside for small businesses with an SDVOSB preference. Offerors must be registered in the Vendor Information Pages and SAM databases. The project magnitude is between $500,000 and $1,000,000 under NAICS code 238220 with a $16.5 million size standard. The contract duration shall not exceed 180 days from notice to proceed. Bonds will be required.

View the file

Other files

File Type Posted
MH111.pdf PDF
ED000A - BASEMENT ELECTRICAL DEMO PLAN- AREA A.pdf PDF
AE111.pdf PDF
Asbestos Survey Report.pdf PDF
114121 Walk-In Coolers and Freezers.pdf PDF
AD112.pdf PDF
Site Visit Sign In Sheet.pdf PDF
EP000A - BASEMENT ELECTRICAL NEW WORK - AREA A.pdf PDF
2nd Sign in Sheet.pdf PDF
230511 Common Work Results for HVAC.pdf PDF
MD101.pdf PDF
AE101.pdf PDF
36C25020B0059 0002.docx DOCX document
AD111.pdf PDF
36C25020B0059 0001.docx DOCX document
Corbin Russwin Locksets Sole Source Justification - Redacted.pdf PDF
S02 RFI Form.docx DOCX document
S02 Contractor EMR Certification Form.docx DOCX document
539-20-211_Specifications (Combined).pdf PDF
100_ CD Drawings_Combined -07202020.pdf PDF
36C25020B0059.docx DOCX document
Wage Determination.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KITCHEN

DINING ROOM

MENS RR

WOMENS

LOCKER

SOILED

LINEN

018D

MECHANICAL

004C

STAIR#2

S*B*2

COOLER

FREEZER

010A

COOLER

COOLER

STAIR #4

S*B*4

STAIR#6

S*B*6

BOILER

ROOM

FX101

FX101

OFFICE

H.W. TANK

007A

CORRIDOR

C*B*1

STAIR#2

S*B*2

H.W. TANK

007A

COOLER

ELEC.

007B

COOLER

DIET. STOR.

OFFICE

009A

HCMI

OFFICE

FREEZER

010A

COOLER

BLDG

MANAG. OFF

1 1

MENS RR

WOMENS

LOCKER

2 2

MENS

LOCKER

025A

A. THIS AREA OF THE RENOVATION ON THIS FLOOR WILL BE FULLY SPRINKLERED

AT THE COMPLETION OF THE RENOVATION.

B. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN AREAS

SHOWN. DESIGN, INSTALLATION AND TESTING SHALL MEET THE

REQUIREMENTS OF NFPA 13 LATEST EDITION, VA FIRE PROTECTION

MANUAL, AND ALL STATE AND LOCAL CODES.

C. REFER TO SPECIFICATION 21 13 13 FOR SPRINKLER HAZARD

CLASSIFICATION AND REQUIREMENTS.

D. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND

PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT

THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

E. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS

REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE

INTERFERENCE WITH OTHER CONSTRUCTION.

F. REFER TO ARCHITECTURAL DRAWINGS FOR REFLECTED CEILING PLANS AND

CONSTRUCTION COORDINATE SPRINKLER LOCATIONS WITH ALL CEILING

DEVICES (LIGHTING, DIFFUSERS, ETC.)

G. SPRINKLERS IN ALL AREAS WITH FINISHED CEILINGS SHALL BE QUICK

RESPONSE CHROME PLATED RECESSED PENDANT TYPE, SPRINKLERS IN

AREAS WITHOUT CEILINGS SHALL BE QUICK RESPONSE UPRIGHT TYPE WITH

BRASS FINISH AND GUARD.

H. INSTALL QUICK RESPONSE SPRINKLERS IN ALL AREAS, EXCEPT WHERE

SPECIFICALLY PROHIBITED PER NFPA 13

I. PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC CALCULATION.

J. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL

OTHER TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE

PLANS IS TO CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS

AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD

CLASSIFICATIONS SHOWN.

K. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM

ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

L. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS

AND SPRINKLER DESIGN.

M. PROVIDE DRAIN VALVES AND PIPING TO ALLOW COMPLETE DRAINAGE OF FIRE

PROTECTION SYSTEM.

N. SPRINKLER HEAD TYPES AT DESIGNATED AREAS. THE INSTALLATION OF

SPRINKLER HEADS IN 2'X2' ACOUSTICAL TILE ARE TO BE CENTERED AND

EITHER CENTERED AT HALFWAY OR QUARTER POINTS IN 2'X4' TILES. IN

GYPSUM AND EXPOSED CEILING, INSTALL SPRINKLER HEADS SYMMETRICALLY

IN A STRAIGHT LINE. MAINTAIN A SYMMETRICAL PATTERN FOR ALL CEILING

TYPES FOR AN AESTHETICALLY PLEASING EFFECT.

O. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING CORE DRILLING

AND PATCHING FOR THEIR WORK. PATCH TO MATCH SURROUNDING

CONDITIONS WITH MATERIALS AND WORKMANSHIP ACCEPTABLE TO THE VA

PROJECT MANAGER.

P. CONTRACTOR SHALL COMPLY WITH ALL OSHA STANDARDS

Q. EXISTING SPRINKLER SYSTEM AND ALL ASSOCIATED EQUIPMENT SHALL BE

MAINTAINED FULLY OPERATIONAL UNTIL THE NEW EQUIPMENT HAS BEEN

TESTED AND ACCEPTED BY THE VA. THE EXISTING SPRINKLER SYSTEM AND

EQUIPMENT CAN BE TAKEN OUT OF SERVICE ONLY DURING CONSTRUCTION

PERIODS IN WHICH THE SPRINKLER SYSTEM IS BEING MODIFIED AND THE

CONTRACTOR IS AT THE WORK SITE. PRIOR TO LEAVING THE WORK SITE

EACH DAY, THE CONTRACTOR SHALL RESTORE THE SPRINKLER SYSTEM TO

SERVICE. ALL AREAS OUTSIDE OF THE PROJECT CONSTRUCTION AREA

SHALL HAVE THEIR EXISTING FIRE PROTECTION SPRINKLER SYSTEM IN FULL

SERVICE PRIOR TO LEAVING THE WORK SITE EACH DAY OR A FIRE WATCH

SHALL BE ESTABLISHED AT THE CONTRACTOR’S EXPENSE UNTIL THE SYSTEM

IS RETURNED TO FULL COVERAGE AND OPERATION. COORDINATE ALL

NECESSARY SYSTEM SHUTDOWNS WITH VA PROPERTY MANAGER.

R. REFER TO SHEET P001 FOR LEGEND AND ABBREVIATIONS.

CODE REFERENCE:

NFPA 101, LIFE SAFETY CODE 2018 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2019

EDITION

NFPA 70, NATIONAL ELECTRIC CODE 2020 EDITION

NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE 2019 EDITION

INTERNATIONAL BUILDING CODE 2018 EDITION

VA FIRE PROTECTION DESIGN MANUAL – 7TH EDITION

VA BARRIER FREE DESIGN STANDARD REVISED NOVEMBER 1, 2017

VA MASTER SPECIFICATION, TECHNICAL INFORMATION LIBRARY (TIL)

OCCUPANCY CLASSIFICATION:

BASEMENT – AMBULATORY HEALTH CARE CHAPTER 20 OF NFPA 101

FIRST FLOOR – HEALTH CARE CHAPTER 18 OF NFPA 101

SECOND FLOOR – HEALTH CARE CHAPTER 18 OF NFPA 101

THIRD FLOOR – HEALTH CARE CHAPTER 18 OF NFPA 101

G E N E R A L N O T E S :

LIGHT HAZARD

ORDINARY HAZARD I

ORDINARY HAZARD II

FIRE HAZARD CLASSIFICATION :__

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD

ORDINARY HAZARD

GROUP I

ORDINARY HAZARD

GROUP II

0.10 GPM/SF OVER 1500

SF

0.15 GPM/SF OVER 1500

SF

0.20 GPM/SF OVER 1500

SF

100 GPM

250 GPM

250 GPM

30 MIN

60 MIN

90 MIN

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

BASE AREA

BASE AREA

BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

1 SPRINKLER PER 130 SF

1 SPRINKLER PER 130 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FFE INC

110 Boggs Lane, Suite 170 Springdale, OH 45246 513-522-0956

C :\U se rs

\q ui nn \D oc um en ts

\F t T ho m as

(2

9)

_p at ric k.

qu in nF

BN

EU

.rv t 8/

/2

3:

:5

PM

FX101

FIRE PROTECTION BASEMENT

PLANS

CORRECT FCA DEFICIENCIES -

FTD INTERIOR DEFICIENCIES

FT THOMAS, KY 41075

539-20-211

BUILDING 64

05/01/20 GP GP

1/16" = 1'-0"1 BASEMENT FIRE SUPPRESSION PLAN - OVERALL

1/8" = 1'-0"2 BASEMENT FIRE SUPPRESSION PLAN - FREEZERS & COOLERS

1/8" = 1'-0"3 BASEMENT FIRE SUPPRESSION PLAN - RESTROOMS

1 INSTALL DRY SPRINKLER BRANCHES CONNECTED TO EXISTING WET-PIPE FIRE

SUPPRESSION SYSTEM ABOVE COOLER/FREEZER TO NEW PENDANT SPRINKLER

HEADS IN COOLER/FREEZER.

2 THIS AREA IS CURRENTLY PROTECTED WITH AN AUTOMATIC WET-PIPE FIRE

SUPPRESSION SYSTEM. REWORK SPRINKLER HEADS AND PIPING AS NECESSARY TO

ACCOMODATE NEW FLOOR PLAN AND IN ACCORDANCE WITH NFPA 13.

D R A W I N G N O T E S

Revisions: Date:

100% Construction/BID Documents 05/01/2020