About this file

This solicitation package describes a federal construction contract opportunity for interior deficiency corrections at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is seeking bids for project number 539-20-211 to correct FCA deficiencies with interior renovations at the FT Thomas VA campus in Kentucky. The work includes demolition and removal of existing lockers, plumbing fixtures, finishes, and casework in specific basement areas as shown on the enclosed demolition plan. The total project value is estimated between $500,000 to $1,000,000. The NAICS code for the work is 238220 and the size standard is $16.5 million. This is a 100% set-aside opportunity for verified Service-Disabled Veteran Owned Small Businesses. Interested SDVOSBs must be registered in the Vendor Information Pages and SAM.gov databases. The performance period is a maximum of 180 calendar days after notice to proceed. Payment and performance bonds will be required. The bid due date is not provided but the full solicitation will be posted on SAM.gov on or around August 10, 2020.

View the file

Other files

File Type Posted
MH111.pdf PDF
ED000A - BASEMENT ELECTRICAL DEMO PLAN- AREA A.pdf PDF
AE111.pdf PDF
FX101 - FIRE PROTECTION BASEMENT PLANS.pdf PDF
Asbestos Survey Report.pdf PDF
114121 Walk-In Coolers and Freezers.pdf PDF
AD112.pdf PDF
Site Visit Sign In Sheet.pdf PDF
EP000A - BASEMENT ELECTRICAL NEW WORK - AREA A.pdf PDF
2nd Sign in Sheet.pdf PDF
230511 Common Work Results for HVAC.pdf PDF
MD101.pdf PDF
AE101.pdf PDF
36C25020B0059 0002.docx DOCX document
36C25020B0059 0001.docx DOCX document
Corbin Russwin Locksets Sole Source Justification - Redacted.pdf PDF
S02 RFI Form.docx DOCX document
S02 Contractor EMR Certification Form.docx DOCX document
539-20-211_Specifications (Combined).pdf PDF
100_ CD Drawings_Combined -07202020.pdf PDF
36C25020B0059.docx DOCX document
Wage Determination.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MENS

LOCKER

025A

MENS RR

WOMENS

LOCKER

CORRIDOR

C*B*3

EMPLOYEE

BREAK ROOM

TOILET

CORRIDOR

C*B*2

CANTEEN

REC. TEMP

HAC

024 1

TYP.

8 9 10

TYP.

8 9 10

8 9

13 TYP.

13TYP

TYP.

TYP.

15 TYP.

A. ALL WALL HUNG FIXTURES AND ACCESSORIES ARE TO BE REMOVED

UNLESS NOTED OTHERWISE.

G E N E R A L N O T E S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FFE INC

110 Boggs Lane, Suite 170 Springdale, OH 45246 513-522-0956

C :\U se rs

\q ui nn \D oc um en ts

\F t T ho m as

(2

9)

_p at ric k.

qu in nF

BN

EU

.rv t 8/

/2

2:

:0

PM

AD111

ENLARGED BASEMENT

DEMOLITION PLAN

CORRECT FCA DEFICIENCIES -

FTD INTERIOR DEFICIENCIES

FT THOMAS, KY 41075

539-20-211

BUILDING 64

05/01/20 PQ Author

1/4" = 1'-0"1 BASEMENT ENLARGED DEMOLITION

1 REMOVE EXISTING DOOR, FRAME, AND ASSOCIATED HARDWARE SHOWN AS

DASHED.

2 REMOVE EXISTING LOCKER SHOWN AS DASHED.

3 REMOVE EXISTING TOILET PARTITIONS SHOWN AS DASHED AND ALL

ATTACHED ACCESSORIES.

4 REMOVE EXISTING LAVATORIES SHOWN AS DASHED. STORE FOR REUSE IN

NEW WORK. SEE PLUMBING DRAWINGS.

5 REMOVE EXISTING URINAL SHOWN AS DASHED AND ASSOCIATED GRAB

BARS. SEE PLUMBING DRAWINGS.

6 REMOVE EXISTING FLOOR MOUNTED WATER CLOSET SHOWN AS DASHED.

SEE PLUMBING DRAWINGS.

7 EXISTING MIRROR TO REMAIN

8 REMOVE EXISTING FLOOR FINISH IN THIS ROOM. PREPARE SURFACE FOR

NEW FLOOR FINISH. SEE NEW WORK DRAWINGS.

9 REMOVE EXISTING CEILING TILE AND GRID IN THIS ROOM. SEE NEW WORK

DRAWINGS.

10 REMOVE EXISTING WALL TILE IN THIS ROOM. PREPARE TO RECEIVE NEW

WALL FINISH -- SEE NEW WORK DRAWINGS.

11 NO WORK IN THIS AREA.

12 EXISTING LOCKERS TO REMAIN.

13 REMOVE EXISTING MIRROR AT LAVATORY

14 REMOVE WALL MOUNTED SOAP DISPENSER

15 REMOVE EXISTING GRAB BAR.

16 REMOVE EXISTING DOOR AND ASSOCIATED HARDWARE

D E M O L I T I O N N O T E S

Revisions: Date:

100% Construction/BID Documents 05/01/2020 Addendum #2 09/01/2020

Sheets
AD111 - ENLARGED BASEMENT DEMOLITION PLAN

File details come from the government source that posted it. Updated .