This presolicitation notice is for a new MRI site preparation project at the Dayton VA Medical Center in Dayton, Ohio. The Department of Veterans Affairs Network Contracting Office 10 is seeking a Service-Disabled Veteran-Owned Small Business to provide all labor, supervision, materials, and equipment to prepare the site for a new building to house MRI equipment, as outlined in the drawings and specifications. The performance period is 245 calendar days from notice to proceed. The solicitation will be issued on or around March 20, 2020, with proposals due approximately 30 days later. The project value is between $2,000,000 and $5,000,000, and the NAICS code is 236220 with a small business size standard of $39.5 million. The SDVOSB must be registered in various websites and perform a minimum of 15% of the construction work. Bid, payment and performance bonds will be required, along with a site visit. Amendments will be posted on FBO.gov and questions should be emailed to the contracting officer.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLD FORMED METAL STUD WALL SCHEDULE

EXTERIOR STUDS

INTERIOR STUDS

TYPICAL CORNER

6"x18GA. 6"x18GA. SEE ARCHITECTURAL

NOTES:

• HORIZONTAL BRIDGING REQUIRED AT 4'-0" O.C. MAX.

• SEE TYPICAL COLD FORMED METAL STUD WALL ELEVATION ON THIS SHEET FOR

ADDITIONAL INFORMAITON.

• SEE COLD FORMED HEADER SCHEDULE ON THIS SHEET FOR ADDITIONAL INFORMATION.

• SEE TYPICAL COLD FORMED DETAIL ON THIS SHEET FOR ADDITIONAL INFORMATION.

• THE METAL STUD SIZES, GAUGE, AND SPACING SHOWN IN THE METAL STUD SCHEDULE

APPLIES ALL METAL STUDS ON THE PROJECT UNLESS THE SECTIONS OR PLANS INDICATE

DIFFERENT METAL STUD DESIGNS. THE METAL STUD SIZE, GUAGE, & SPACING SHOWN IN

THE SECTIONS ANS PLANS SUPERSEDES THE METAL STUD DESIGNS SHOWN IN THE WALL

SCHEDULE.

1/2"Ø ANCHOR BOLTS

@ 4'-0" O.C. TYP.

1'-0" MAX.

CONT. METAL

TRACK, TYP.

PROVIDE HORIZONTAL STUD

BRIDGING @ 4'-0" O.C. VERT.

MAX. SEE TYP. DETAIL ON

SHEET S-4.0

SEE TYPICAL SILL/JAMB

DETAIL

SEE COLD FORMED WALL

STUD SCHEDULE

HEADER AT OPENINGS

SEE PLAN AND SCHEDULE

WF (BEYOND)

CONT. METAL TRACK

T/PARAPET

JST. BRG.

SIDE OF OPENING

JAMB STUD TO SUPPORT

HEADER - TYPICAL SEACH

SEE TYPICAL BOX HEADER

TO JAMB CONN. DETAIL

ON SHEET S-4.0

TYPICAL COLD FORMED METAL STUD WALL ELEVATION

NOTES:

• AT WALL LOCATIONS WHERE MULTIPLE STUDS ARE REQUIRED TO SUPPORT VERTICAL

LOADS, A CONTINUOUS LOAD PATH SHALL BE PROVIDED TO SUPPORT THOSE LOADS

THROUGH THE STRUCTURE TO THE FOUNDATIONS. THIS MAY BE ACCOMPLISHED

THROUGH THE USE OF RIM JOISTS, SQUASH BLOCKS OR OTHER APPROPRIATE MEANS

BASED ON LOCATION AND DETAILING CONSIDERATIONS.

• SEE COLD FORMED STUD WALL SCHEDULE FOR SIZE AND SPACING OF LIGHT GAUGE

WALL STUDS.

TYPICAL METAL STUD TO

METAL STUD CONNECTION TYPICAL METAL STUD CONNECTION

TYPICAL CONNECTION TO

METAL STUD TRACK

TYPICAL METAL STUD CONNECTION DETAILS

4" METAL

STUD 8" METAL STUD

#10-16 SCREWS @

2'-0" O.C. MAX.

METAL STUD

METAL STUD

(4) #10-16 SELF-DRILLING

SHEET METAL SCREWS (UNO)

METAL STUD

TRACK#10-16 SDS EA

STUD FLANGE

JAMB STUDS ATTACHED W/

TRACK ATTACH TRACK TO JAMB W/

(1) #10-16 SCREW @ 16" O.C.

ON EA. LEG, & (2) #10-16 SCREW

INTO WEBS @ 16" O.C.

TYPICAL JAMB STUD DETAIL

OPENING

1 1/2"x1 1/2"x16GA. CLIP

ANGLE FASTEN TO STUD &

CRC W/(2) #10 PER CONN.

METAL STUD

SEE PLAN FOR

SIZE & GA.

1 1/2"x16GA. COLD ROLLED

CHANNEL (CRC). BRIDGING

SPACED @ 4'-0" O.C. MAX.

TYPICAL WALL BRIDGING DETAIL

(3) #12-24 TEKS-5

SD SCREWS

1/2"

PROPRIETARY

SCREWS BY

DIETRICH

3-1/2" FastClip SLIDE CLIPS

FastClip BY DIETRICH INDUSTRIES INC.

1/2"

TRACK EQUAL

TO STUD SIZE

AND GAUGE

(6) #12 TEKS

IF FastClip ID LOCATED AT

STANDARD WEB OPENING IN

METAL STUD

TYPICAL FastClip ATTACHMENT DETAILS

TYPICAL BOX HEADER TO JAMB CONNECTION

8"x18GA. TRACK

W/(6) #10-16 SCREWS

TO JAMB &(3) #10-16

SCREWS TO EA. SIDE

OF HEADER

BOX HEADER

SEE BOX HEADER

FOR ADD'L. INFO.

CONT. TRACK

WALL STUDS

SEE WALL

SCHEDULE

DIETRICH EASYCLIP S-SERIES TOP & BOT.

W/(2) #10-16 SCREWS TO JAMB

& (2) #10-16 SCREWS TO HEADER

8"x18GA. TRACK W/ (6)

#10-16 SCREWS

TO JAMB & (3) #10-16

SCREWS TO EA. SIDE

OF HEADER

HEADER ATTACHMENT

FOR ADD'L INFO

FULL HEIGHT JAMB STUDS.

SEE BOX HEADER SCHEDULE

COLD FORMED 6" HEADER SCHEDULE

FIELD

H6-18 6"x6" (3) 6"x18GA (2)

H3.6-18 6"x3 5/8" (3) 3 5/8"x18GA 6"x18GA (2)

HEADER SIZE METAL STUDS TOP & BOT. TRACK # OF JAMB STUDS AT

EACH END OF HEADER

H6-16 6"x6" (3) 6"x16GA (2)

6"x18GA

6"x16GA

H8-16 6"x8" (2) 8"x16GA (2)6"x16GA

COLD FORMED HEADER PROFILES

6" TRACK

3 5/8" STUD

(10) #10-16 TEKS

@ 16" O.C., TYP

6" TRACK

6" STUD

(10) #10-16 TEKS

@ 16" O.C., TYP

6x3 5/8 6x6

6" TRACK

8" STUD

(8) #10-16 TEKS

@ 16" O.C., TYP

6x8

Project Number

Office of Construction and Facilities Management

Building Number

Drawing Number

VA FORM 08-6231

CONSULTANTS: ARCHITECTS/ENGINEERS: ARCHITECTURAL PROJECT #

VA Building th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

F

E

D

C

B

A

F

E

D

C

B

A

987654321

987654321

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

KEY PLAN

Dwg. of

BID & CONSTRUCTION

FULLY SPRINKLERED

PHILIP P. KIRK

CHIEF ENGINEER

:1 :1

A M

C R e vi t Lo c a l Fi le s\

S tr u c t _ R m g ib b o n s@ th o rs o n b a k er .c o m .r vt

COLD FORMED DETAILS

S-4.0 Checker Designer

CSI-176

NEW MRI SITE PREP

02/20/2020

4100 WEST THIRD ST, DAYTON, OH 45428

18106

Revisions Date

65% DD SUBMISSION 07/29/2019

95% CD SUBMISSION 10/07/2019

BID & CONSTRUCTION 12/19/2019

CAM REVIEW 02/21/2020

ADDENDUM #1 06/10/2020