This document contains a pre-solicitation notice and related federal contract opportunity for a new MRI site prep project. The Department of Veterans Affairs Network Contracting Office 10 is seeking proposals for a construction project at the Dayton VA Medical Center in Dayton, Ohio to professionally prepare the site for a new building to house new MRI equipment. Offerors must be verified as a Service-Disabled Veteran-Owned Small Business. The project value is between $2,000,000 and $5,000,000 using NAICS code 236220 with a size standard of $39.5 million. The solicitation will be posted on March 20, 2020 with proposals due approximately 30 days later. The performance period is no more than 245 calendar days from notice to proceed. Bid, payment and performance bonds will be required along with a 15% minimum SDVOSB participation in the construction work.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S.1
R
Q.3
Q
P.8
P.5
O.8
O.7
3.23.3 3.53.6 3.8 4.2 4.5 5.2 6.2 6.5 6.8
6.4 6.9 7.9 8.8 9.7
P.81
P.9
Q.4
A100
A101
A113
A106 A107 A108 A110
A111A112
X130
X127
X126
X125
X124
X129
X128
X112
X110
X114X115X116
X120 X121X119
A102E131
A105
A104
A103
E113
E132
X111
X122
X123
X117
X118
A109
AS
A S
CODED NOTES
1. EXTEND EXISTING AUTOMATIC SPRINKLER SYSTEM TO WITHIN OUTLINE AREA. SYSTEM TO BE
INSTALLED IN ACCORDANCE WITH NFPA 13 (2015 EDITION).
2. ALL MATERIALS INSTALLED BELOW SHIELDING SHALL BE NON-FERROUS. SPRINKLER HEADS IN
MRI ROOM SHALL BE NON-FERROUS CONCEALED HEADS.
3. TIE NEW AS PIPING INTO EXISTING 2" AS PIPING IN CORRIDOR OUTSIDE OF EXISTING
STAIRWELL 335.
WALL SECTION
FURNISH AND INSTALL
FIRESTOP MATERIALS IN
ACCORDANCE WITH
APPROPRIATE U.L. SYSTEMS
TO MAINTAIN FIRE RESISTANCE
RATING
PIPE SLEEVE SEE ARCHITECTURAL
DRAWINGS FOR WALL
CONSTRUCTION AND FIRE
RATING
PIPING WITH FREEZE PROTECTION
SELF-REGULATING HEATING CABLE
(WHERE SPECIFIED)
PIPE INSULATION WITH PVC
JACKET (WHERE SPECIFIED)
NOTES:
1. WHERE PIPES, DUCTS AND OTHER COMPONENTS PASS THROUGH FIRE OR SMOKE RATED WALLS OR FLOORS, PROVIDE NON-ASBESTOS SEAL ASSEMBLIES CLASSIFIED BY U.L. TO PROVIDE FIRE BARRIERS EQUAL TO OR GREATER THAN THE TIME RATING OF THE CONSTRUCTION BEING PENETRATED, WITH APPROPRIATE MATERIALS AND SYSTEMS THAT COMPLY WITH APPLICABLE CODES AND THAT HAVE BEEN
TESTED IN ACCORDANCE WITH U.L. 1479 OR ASTM E814.
2. GROUT, MORTAR OR GYPSUM BASED PRODUCTS SHALL NOT BE INSTALLED IN LIEU OF FIRESTOPPING
MATERIALS AND U.L. SYSTEMS.
3. FOR SLEEVED PENETRATIONS, FIRESTOP ANNULAR SPACE, IF ANY, BETWEEN SLEEVE AND ADJACENT
CONSTRUCTION TO MEET U.L. SYSTEM REQUIREMENTS. SEE NOTE 2 ABOVE.
4. THIS CONTRACTOR SHALL FIRESTOP ALL MISCELLANEOUS OPENINGS IN FIRE-RATED CONSTRUCTION
RESULTING FROM HIS WORK.
5. CONTRACTOR SHALL PROVIDE SUBMITTAL DRAWINGS TO ARCHITECT, INCLUDING U.L. RATED SYSTEM
NUMBER AND DETAIL FOR EACH TYPE OF PENETRATION AND CONFIGURATION.
6. THE FIRESTOPPING SYSTEMS ARE TO BE INSTALLED BY EXPERIENCED, MANUFACTURER TRAINED, AND
UL CERTIFIED OR FM CERTIFIED PERSONNEL.
7. ALL FIRESTOPPING MATERIAL IS TO BE PROVIDED FROM A SINGLE MANUFACTURER FOR ALL
APPLICATIONS.
8. CONTRACTOR SHALL CONSULT MANUFACTURER'S TECHNICAL EXPERTS FOR ASSISTANCE IN SELECTING
APPROPRIATE FIRESTOPPING SYSTEM FOR EACH APPLICATION.
THROUGH FIRE-RATED CONSTRUCTIONS
N.T.S.
FIRESTOPPING DETAIL FOR PENETRATIONS
FIRE PROTECTION NEW WORK GENERAL NOTES
1. THE GENERAL NOTES LISTED HERE APPLY TO ALL FIRE PROTECTION DRAWINGS IN ADDITION TO ANY
ADDITIONAL DRAWING NOTES ON THE INDIVIDUAL DRAWINGS.
2. SEE CODED NOTES ON INDIVIDUAL DRAWING SHEETS FOR SPECIFIC INSTRUCTIONAL NOTES.
3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.
4. COORDINATE WITH GENERAL TRADES WORK, HVAC WORK, PLUMBING WORK, ELECTRICAL WORK AND
OTHER WORK.
5. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIRE AND SMOKE WALLS AND RATED
STRUCTURES. SEE DETAILS AND SPECIFICATIONS FOR PIPE PENETRATION SEAL REQUIREMENTS.
6. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM DESIGNATIONS INCLUDING ALL STORAGE AREAS.
ALL STORAGE AREAS ARE TO BE SPRINKLERED AS ORDINARY HAZARD PER N.F.P.A.
7. IT IS RECOGNIZED THAT DRAWINGS MAY BE PLOTTED AT DIFFERENT SCALES, SUCH THAT PLOTTED
DRAWINGS MAY VARY FROM ACTUAL OR INTENDED DIMENSIONS. THEREFORE, DRAWINGS ARE
DIAGRAMMATIC AND ARE NOT TO BE SCALED. SBM TAKES NO RESPONSIBILITY FOR ERRORS REGARDING DISCREPANCIES FROM THE ORIGINAL DRAWINGS DRAWN AT THE PROPER SCALE AND THOSE DRAWINGS
THAT HAVE BEEN PLOTTED.
8. THE FIRE PROTECTION DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW EXACT LOCATION OF EQUIPMENT AND PIPING UNLESS DIMENSIONS ARE GIVEN OR OTHERWISE IMPLIED FOR CLEARANCES, ETC. PIPING AND FIRE PROTECTION EQUIPMENT ARE TO BE INSTALLED ALONG THE GENERAL PLANS SHOWN ON THE DRAWINGS, BUT KEEPING IN MIND ACTUAL BUILDING CONDITIONS WHICH MUST BE CONFORMED WITH IN THE ACTUAL WORK. THIS CONTRACTOR TO BE AWARE OF LIMITED
SPACE ABOVE CEILING FOR NEW WORK AND SHOULD MODIFY HIS WORK TO ACCOMMODATE OTHER
TRADES. COORDINATE WORK WITH OTHER TRADES PRIOR TO MAKING THE FINAL INSTALLATION DRAWING OR SYSTEM INSTALLATION. THE CONTRACTORS IN THEIR BIDS ARE REQUIRED TO INCLUDE ALL LABOR
AND MATERIALS AND OTHER RELATED WORK NECESSARY TO PROVIDE MINOR OFFSETS IN FIRE
PROTECTION WORK AS REQUIRED TO AVOID CONFLICT WITH OTHER WORK ON THIS PROJECT, OR AS
REQUIRED IN ORDER TO OBTAIN MAXIMUM HEAD ROOM OR EQUIPMENT ACCESS IN SPACES.
9. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING, PATCHING, REMOVAL, AND RE-INSTALLATION OF WALL, CEILING, FLOORS, ETC. AND NEW MATERIALS FOR THE INSTALLATION OF THEIR RESPECTIVE WORK AS SHOWN ON THE DRAWINGS OR SPECIFICATIONS FOR AREAS OTHERWISE
NOT INVOLVED IN THE GENERAL CONSTRUCTION WORK.
10. ALL SPRINKLER HEADS ARE TO BE QUICK RESPONSE TYPE.
11. ALL FIRE PROTECTION PIPING AND CONDUIT SHALL FOLLOW THE INSTALLATION REQUIREMENTS AS
LISTED BELOW:
A. INSTALL TIGHT AGAINST BOTTOM OF ROOF AND FLOOR STRUCTURE.
B. INSTALL PARALLEL AND PERPENDICULAR TO BUILDING STRUCTURE.
C. INSTALL CONCEALED ABOVE CEILINGS OR INSIDE WALLS, UNLESS OTHERWISE NOTED.
1. SPRINKLER PIPING IS TO AVOID EQUIPMENT IN MECHANICAL ROOM. COORDINATE WITH H.C. AND E.C.
2. USE INTERMEDIATE LEVEL SPRINKLERS BELOW DUCTWORK AND STRUCTURAL MEMBERS, WHERE
APPLICABLE.
3. GENERAL CONTRACTOR SHALL PAINT ALL EXPOSED FIRE PROTECTION PIPING INSIDE AND OUTSIDE
BUILDING WITH COLOR AS SELECTED BY ARCHITECT.
4. ALL VALVES, FLOW SWITCHES, AND ETC. ABOVE THE CEILING SHALL BE LABELED WITH ENGRAVED LAMINATE TAG ATTACHED TO CEILING GRID WITH PRESSURE SENSITIVE TAPE. THE (RED) LAMINATE TAG
SHALL BE 1/2" WIDE WITH 1/4" HIGH ENGRAVED (WHITE) LETTERS.
5. FIRE PROTECTION CONTRACTOR TO COORDINATE FINAL PLACEMENT OF SPRINKLER HEADS WITH REFLECTED CEILING PLANS. SPRINKLER HEADS SHALL BE INSTALLED IN STRAIGHT AND PARALLEL LINES CENTERED IN A SYMMETRICAL AND UNIFORM PATTERN IN THE CEILING TILES (TYP ALL HEADS).
6. SPRINKLER HEADS TO BE PROVIDED IN TYPES AND FINISHES TO MATCH EXISTING AREAS.
7. ALL WORK IS TO COMPLY WITH DESIGN AND INSTALLATION REQUIREMENTS PER NATIONAL FIRE PROTECTION AGENCY 13, VA FIRE PROTECTION DESIGN MANUAL, AND THE OWNER'S INSURANCE
COMPANY. THE MOST STRINGENT REQUIREMENTS SHALL APPLY.
8. FIRE PROTECTION CONTRACTOR SHALL PERFORM WATER FLOW TEST PRIOR TO PERFORMING
HYDRAULIC CALCULATIONS AND SPRINKLER LAYOUT. TEST TO MEET N.F.P.A. REQUIREMENTS.
CONTRACTOR SHALL COORDINATE WHEN TEST IS TO BE PERFORMED WITH OWNER AND COPY TEST
RESULTS TO PROJECT ENGINEER AND OWNER.
9. FIRE PROTECTION CONTRACTOR SHALL HYDRAULICALLY CALCULATE AUTOMATIC SPRINKLER SYSTEM AND INSTALL NEW SYSTEM AS REQUIRED BY NEW CALCULATIONS AND DESIGN. THE FIRE PROTECTION
CONTRACTOR SHALL DESIGN THE SYSTEM, SUBMIT AND ETC. AS LISTED BELOW:
A. COMPLETE AND RETURN A/E AND STATE OF OHIO, DEPARTMENT OF INDUSTRIAL RELATIONS A COPY OF
THE AUTOMATIC SPRINKLER SYSTEM SUPPLEMENT FORM FB-13; THE SUBMITTED PLANS AND
CALCULATIONS MUST ALSO INDICATE THE CERTIFIED INDIVIDUAL INSTALLING THE SPRINKLER SYSTEM
WILL COMPLY WITH VA FIRE PROTECTION DESIGN MANUAL.
B. PLANS FOR THE SPRINKLER SYSTEM SHALL CONTAIN THE FOLLOWING INFORMATION RELATIVE TO THE
WATER SUPPLY:
1. THE PLANS SHALL SHOW THE WATER SUPPLY REQUIREMENTS FOR THE HYDRAULICALLY MOST
DEMANDING AREA. THE DESIGN CALCULATIONS SHALL SUBSTANTIATE THAT THE AVAILABLE WATER
SUPPLY WILL FULFILL THE SYSTEM REQUIREMENTS.
2. THE WATER SUPPLY REQUIREMENTS SHALL BE DETERMINED ACCORDING TO HAZARD CLASSIFICATION
AS OUTLINED IN N.F.P.A. 13.
3. WHEN SPRINKLER SYSTEMS ARE CONNECTED TO CITY WATER MAINS, FLOW TEST RESULTS SHALL BE SUBMITTED. THE PLANS SHALL SHOW THE FOLLOWING INFORMATION ON WATER FLOW DATA WITH
EXISTING OR PROPOSED WATER SUPPLY, DEAD END OR CIRCULATING:
a. LOCATION AND ELEVATION OF STATIC AND RESIDUAL TEST GAGE WITH RELATION TO THE RISER
REFERENCE POINT.
b. FLOW LOCATION.
c. STATIC PRESSURE, PSI
d. RESIDUAL PRESSURE, PSI
e. FLOW, GPM
f. DATE
g. TIME
h. TEST CONDUCTED BY OR INFORMATION SUPPLIED BY
i. PLOTTED GRAPH SHOWING WATER SUPPLY CURVES AND SYSTEM REQUIREMENTS IN ACCORDANCE
WITH SECTIONS 6-3, 6-2.4, AND A-7-2.1 OF N.F.P.A. 13, APPROVED ADDITION.
10. FIRE MAIN TO BE HYDRAULICALLY CALCULATED AND SIZED TO DESIGN INSTALLATION REQUIREMENTS
AS PER N.F.P.A., SECTIONS 13, 14, AND 24.
11. ALL OCCUPIED AREAS OF THE BUILDING ARE TO HAVE A WET PIPE SPRINKLER SYSTEM,
HYDRAULICALLY CALCULATED AND SIZED TO DESIGN INSTALLATION REQUIREMENTS OF N.F.P.A.
SECTIONS 13, 14 AND 24 FOR LIGHT HAZARD OCCUPANCY.
12. IF THE FIRE PROTECTION CONTRACTOR REQUIRES ACCESS PANELS, THE FIRE PROTECTION CONTRACTOR SHALL FURNISH THE ACCESS PANELS WITH INSTALLATION COSTS ASSUMED BY THE FIRE PROTECTION CONTRACTOR, BUT INSTALLED BY THE GENERAL CONTRACTOR. ANY ACCESS PANELS PURCHASED DURING CONSTRUCTION BY THE FIRE PROTECTION CONTRACTOR SHALL MATCH THOSE
ALREADY PURCHASED BY THE GENERAL CONTRACTOR.
13. PROVIDE MINIMUM 15 DAYS NOTICE OF ANY UTILITY IN ADVANCE WITH THE OWNER. ACCOMPLISH
DRAIN DOWN AND RE-FILL OF PIPING SYSTEMS AS REQUIRED.
DATESIGNATURE
SCHOONOVER
C. J.
ST
AT
E OF O
H IO
P R O F E
SS IO N
AL EN
G
IN
E E R
RE G IS T E R
E D
E-62197
Project Number
Office of Construction and Facilities Management
Building Number
Drawing Number
VA FORM 08-6231
CONSULTANTS: ARCHITECTS/ENGINEERS: ARCHITECTURAL PROJECT #
VA Building th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
F
E
D
C
B
A
F
E
D
C
B
A
987654321
987654321
Project Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
KEY PLAN
Dwg. of
FULLY SPRINKLERED
:3 :1
A M
C U se rs
JB
i l in sk i\ D o c u m e n ts M E P C E N
TR
A L
FI
LE
jb il in sk i.
rv t
NEW WORK - FIRST FLOOR PLAN - FIRE
PROTECTION
FX100
CJS JMB
552-CSI-176
NEW MRI SITE PREP
02/21/2020
4100 WEST THIRD STREET, DAYTON, OH 45428
18106
BID & CONSTRUCTION
02/21/2020
N 1/8" = 1'-0"
NEW WORK - FIRST FLOOR PLAN - FIRE PROTECTION
ROOM LEGEND
Number Name
A100 VESTIBULE
A102 ENTRANCE HALL
A103 ENTRANCE
A104 PREP AREA
A105 SUB WAITING
A106 DRESSING
A107 DRESSING
A108 OFFICE
A109 CORRIDOR
A110 EQUIPMENT
A111 MRI ROOM
A112 CONTROL ROOM
A113 TOILET
A113 TOILET
E113 EX. CORRIDOR
E131 EX. CORRIDOR
E132 EX. CORRIDOR
X110 VESTIBULE
X112 RECEPTION
X114 DATA
X115 ELECTRICAL
X116 VIEW/CONSULT
X117 CLEAN SUPPLY
X118 CLEAN SUPPLY
X119 EQUIPMENT
X120 STAFF RADIOLOGIST
X121 PROF. NON-PHYSICIAN
X122 CORRIDOR
X123 CORRIDOR
X124 DRESSING
X125 DRESSING
X126 STAFF WORK
X127 TOILET
X128 SUB WAIT
X129 TOILET
X130 TOILET
Revisions Date
35% SD SUBMISSION 05/22/2019
65% DD SUBMISSION 07/29/2019
95% CD SUBMISSION 10/07/2019
BID & CONSTRUCTION 12/19/2019
CAM REVIEW 02/21/2020
ADDENDUM 1 06/10/2020