FX100.pdf

PDF 169 KB Posted

Attached to
Y1DB--552-CSI-176: New MRI Site Prep (VA-20-00027715)
Solicitation number
36C25020B0030
Issued by

About this file

This document contains a pre-solicitation notice and related federal contract opportunity for a new MRI site prep project. The Department of Veterans Affairs Network Contracting Office 10 is seeking proposals for a construction project at the Dayton VA Medical Center in Dayton, Ohio to professionally prepare the site for a new building to house new MRI equipment. Offerors must be verified as a Service-Disabled Veteran-Owned Small Business. The project value is between $2,000,000 and $5,000,000 using NAICS code 236220 with a size standard of $39.5 million. The solicitation will be posted on March 20, 2020 with proposals due approximately 30 days later. The performance period is no more than 245 calendar days from notice to proceed. Bid, payment and performance bonds will be required along with a 15% minimum SDVOSB participation in the construction work.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S.1

R

Q.3

Q

P.8

P.5

O.8

O.7

3.23.3 3.53.6 3.8 4.2 4.5 5.2 6.2 6.5 6.8

6.4 6.9 7.9 8.8 9.7

P.81

P.9

Q.4

A100

A101

A113

A106 A107 A108 A110

A111A112

X130

X127

X126

X125

X124

X129

X128

X112

X110

X114X115X116

X120 X121X119

A102E131

A105

A104

A103

E113

E132

X111

X122

X123

X117

X118

A109

AS

A S

CODED NOTES

1. EXTEND EXISTING AUTOMATIC SPRINKLER SYSTEM TO WITHIN OUTLINE AREA. SYSTEM TO BE

INSTALLED IN ACCORDANCE WITH NFPA 13 (2015 EDITION).

2. ALL MATERIALS INSTALLED BELOW SHIELDING SHALL BE NON-FERROUS. SPRINKLER HEADS IN

MRI ROOM SHALL BE NON-FERROUS CONCEALED HEADS.

3. TIE NEW AS PIPING INTO EXISTING 2" AS PIPING IN CORRIDOR OUTSIDE OF EXISTING

STAIRWELL 335.

WALL SECTION

FURNISH AND INSTALL

FIRESTOP MATERIALS IN

ACCORDANCE WITH

APPROPRIATE U.L. SYSTEMS

TO MAINTAIN FIRE RESISTANCE

RATING

PIPE SLEEVE SEE ARCHITECTURAL

DRAWINGS FOR WALL

CONSTRUCTION AND FIRE

RATING

PIPING WITH FREEZE PROTECTION

SELF-REGULATING HEATING CABLE

(WHERE SPECIFIED)

PIPE INSULATION WITH PVC

JACKET (WHERE SPECIFIED)

NOTES:

1. WHERE PIPES, DUCTS AND OTHER COMPONENTS PASS THROUGH FIRE OR SMOKE RATED WALLS OR FLOORS, PROVIDE NON-ASBESTOS SEAL ASSEMBLIES CLASSIFIED BY U.L. TO PROVIDE FIRE BARRIERS EQUAL TO OR GREATER THAN THE TIME RATING OF THE CONSTRUCTION BEING PENETRATED, WITH APPROPRIATE MATERIALS AND SYSTEMS THAT COMPLY WITH APPLICABLE CODES AND THAT HAVE BEEN

TESTED IN ACCORDANCE WITH U.L. 1479 OR ASTM E814.

2. GROUT, MORTAR OR GYPSUM BASED PRODUCTS SHALL NOT BE INSTALLED IN LIEU OF FIRESTOPPING

MATERIALS AND U.L. SYSTEMS.

3. FOR SLEEVED PENETRATIONS, FIRESTOP ANNULAR SPACE, IF ANY, BETWEEN SLEEVE AND ADJACENT

CONSTRUCTION TO MEET U.L. SYSTEM REQUIREMENTS. SEE NOTE 2 ABOVE.

4. THIS CONTRACTOR SHALL FIRESTOP ALL MISCELLANEOUS OPENINGS IN FIRE-RATED CONSTRUCTION

RESULTING FROM HIS WORK.

5. CONTRACTOR SHALL PROVIDE SUBMITTAL DRAWINGS TO ARCHITECT, INCLUDING U.L. RATED SYSTEM

NUMBER AND DETAIL FOR EACH TYPE OF PENETRATION AND CONFIGURATION.

6. THE FIRESTOPPING SYSTEMS ARE TO BE INSTALLED BY EXPERIENCED, MANUFACTURER TRAINED, AND

UL CERTIFIED OR FM CERTIFIED PERSONNEL.

7. ALL FIRESTOPPING MATERIAL IS TO BE PROVIDED FROM A SINGLE MANUFACTURER FOR ALL

APPLICATIONS.

8. CONTRACTOR SHALL CONSULT MANUFACTURER'S TECHNICAL EXPERTS FOR ASSISTANCE IN SELECTING

APPROPRIATE FIRESTOPPING SYSTEM FOR EACH APPLICATION.

THROUGH FIRE-RATED CONSTRUCTIONS

N.T.S.

FIRESTOPPING DETAIL FOR PENETRATIONS

FIRE PROTECTION NEW WORK GENERAL NOTES

1. THE GENERAL NOTES LISTED HERE APPLY TO ALL FIRE PROTECTION DRAWINGS IN ADDITION TO ANY

ADDITIONAL DRAWING NOTES ON THE INDIVIDUAL DRAWINGS.

2. SEE CODED NOTES ON INDIVIDUAL DRAWING SHEETS FOR SPECIFIC INSTRUCTIONAL NOTES.

3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.

4. COORDINATE WITH GENERAL TRADES WORK, HVAC WORK, PLUMBING WORK, ELECTRICAL WORK AND

OTHER WORK.

5. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIRE AND SMOKE WALLS AND RATED

STRUCTURES. SEE DETAILS AND SPECIFICATIONS FOR PIPE PENETRATION SEAL REQUIREMENTS.

6. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM DESIGNATIONS INCLUDING ALL STORAGE AREAS.

ALL STORAGE AREAS ARE TO BE SPRINKLERED AS ORDINARY HAZARD PER N.F.P.A.

7. IT IS RECOGNIZED THAT DRAWINGS MAY BE PLOTTED AT DIFFERENT SCALES, SUCH THAT PLOTTED

DRAWINGS MAY VARY FROM ACTUAL OR INTENDED DIMENSIONS. THEREFORE, DRAWINGS ARE

DIAGRAMMATIC AND ARE NOT TO BE SCALED. SBM TAKES NO RESPONSIBILITY FOR ERRORS REGARDING DISCREPANCIES FROM THE ORIGINAL DRAWINGS DRAWN AT THE PROPER SCALE AND THOSE DRAWINGS

THAT HAVE BEEN PLOTTED.

8. THE FIRE PROTECTION DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW EXACT LOCATION OF EQUIPMENT AND PIPING UNLESS DIMENSIONS ARE GIVEN OR OTHERWISE IMPLIED FOR CLEARANCES, ETC. PIPING AND FIRE PROTECTION EQUIPMENT ARE TO BE INSTALLED ALONG THE GENERAL PLANS SHOWN ON THE DRAWINGS, BUT KEEPING IN MIND ACTUAL BUILDING CONDITIONS WHICH MUST BE CONFORMED WITH IN THE ACTUAL WORK. THIS CONTRACTOR TO BE AWARE OF LIMITED

SPACE ABOVE CEILING FOR NEW WORK AND SHOULD MODIFY HIS WORK TO ACCOMMODATE OTHER

TRADES. COORDINATE WORK WITH OTHER TRADES PRIOR TO MAKING THE FINAL INSTALLATION DRAWING OR SYSTEM INSTALLATION. THE CONTRACTORS IN THEIR BIDS ARE REQUIRED TO INCLUDE ALL LABOR

AND MATERIALS AND OTHER RELATED WORK NECESSARY TO PROVIDE MINOR OFFSETS IN FIRE

PROTECTION WORK AS REQUIRED TO AVOID CONFLICT WITH OTHER WORK ON THIS PROJECT, OR AS

REQUIRED IN ORDER TO OBTAIN MAXIMUM HEAD ROOM OR EQUIPMENT ACCESS IN SPACES.

9. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING, PATCHING, REMOVAL, AND RE-INSTALLATION OF WALL, CEILING, FLOORS, ETC. AND NEW MATERIALS FOR THE INSTALLATION OF THEIR RESPECTIVE WORK AS SHOWN ON THE DRAWINGS OR SPECIFICATIONS FOR AREAS OTHERWISE

NOT INVOLVED IN THE GENERAL CONSTRUCTION WORK.

10. ALL SPRINKLER HEADS ARE TO BE QUICK RESPONSE TYPE.

11. ALL FIRE PROTECTION PIPING AND CONDUIT SHALL FOLLOW THE INSTALLATION REQUIREMENTS AS

LISTED BELOW:

A. INSTALL TIGHT AGAINST BOTTOM OF ROOF AND FLOOR STRUCTURE.

B. INSTALL PARALLEL AND PERPENDICULAR TO BUILDING STRUCTURE.

C. INSTALL CONCEALED ABOVE CEILINGS OR INSIDE WALLS, UNLESS OTHERWISE NOTED.

1. SPRINKLER PIPING IS TO AVOID EQUIPMENT IN MECHANICAL ROOM. COORDINATE WITH H.C. AND E.C.

2. USE INTERMEDIATE LEVEL SPRINKLERS BELOW DUCTWORK AND STRUCTURAL MEMBERS, WHERE

APPLICABLE.

3. GENERAL CONTRACTOR SHALL PAINT ALL EXPOSED FIRE PROTECTION PIPING INSIDE AND OUTSIDE

BUILDING WITH COLOR AS SELECTED BY ARCHITECT.

4. ALL VALVES, FLOW SWITCHES, AND ETC. ABOVE THE CEILING SHALL BE LABELED WITH ENGRAVED LAMINATE TAG ATTACHED TO CEILING GRID WITH PRESSURE SENSITIVE TAPE. THE (RED) LAMINATE TAG

SHALL BE 1/2" WIDE WITH 1/4" HIGH ENGRAVED (WHITE) LETTERS.

5. FIRE PROTECTION CONTRACTOR TO COORDINATE FINAL PLACEMENT OF SPRINKLER HEADS WITH REFLECTED CEILING PLANS. SPRINKLER HEADS SHALL BE INSTALLED IN STRAIGHT AND PARALLEL LINES CENTERED IN A SYMMETRICAL AND UNIFORM PATTERN IN THE CEILING TILES (TYP ALL HEADS).

6. SPRINKLER HEADS TO BE PROVIDED IN TYPES AND FINISHES TO MATCH EXISTING AREAS.

7. ALL WORK IS TO COMPLY WITH DESIGN AND INSTALLATION REQUIREMENTS PER NATIONAL FIRE PROTECTION AGENCY 13, VA FIRE PROTECTION DESIGN MANUAL, AND THE OWNER'S INSURANCE

COMPANY. THE MOST STRINGENT REQUIREMENTS SHALL APPLY.

8. FIRE PROTECTION CONTRACTOR SHALL PERFORM WATER FLOW TEST PRIOR TO PERFORMING

HYDRAULIC CALCULATIONS AND SPRINKLER LAYOUT. TEST TO MEET N.F.P.A. REQUIREMENTS.

CONTRACTOR SHALL COORDINATE WHEN TEST IS TO BE PERFORMED WITH OWNER AND COPY TEST

RESULTS TO PROJECT ENGINEER AND OWNER.

9. FIRE PROTECTION CONTRACTOR SHALL HYDRAULICALLY CALCULATE AUTOMATIC SPRINKLER SYSTEM AND INSTALL NEW SYSTEM AS REQUIRED BY NEW CALCULATIONS AND DESIGN. THE FIRE PROTECTION

CONTRACTOR SHALL DESIGN THE SYSTEM, SUBMIT AND ETC. AS LISTED BELOW:

A. COMPLETE AND RETURN A/E AND STATE OF OHIO, DEPARTMENT OF INDUSTRIAL RELATIONS A COPY OF

THE AUTOMATIC SPRINKLER SYSTEM SUPPLEMENT FORM FB-13; THE SUBMITTED PLANS AND

CALCULATIONS MUST ALSO INDICATE THE CERTIFIED INDIVIDUAL INSTALLING THE SPRINKLER SYSTEM

WILL COMPLY WITH VA FIRE PROTECTION DESIGN MANUAL.

B. PLANS FOR THE SPRINKLER SYSTEM SHALL CONTAIN THE FOLLOWING INFORMATION RELATIVE TO THE

WATER SUPPLY:

1. THE PLANS SHALL SHOW THE WATER SUPPLY REQUIREMENTS FOR THE HYDRAULICALLY MOST

DEMANDING AREA. THE DESIGN CALCULATIONS SHALL SUBSTANTIATE THAT THE AVAILABLE WATER

SUPPLY WILL FULFILL THE SYSTEM REQUIREMENTS.

2. THE WATER SUPPLY REQUIREMENTS SHALL BE DETERMINED ACCORDING TO HAZARD CLASSIFICATION

AS OUTLINED IN N.F.P.A. 13.

3. WHEN SPRINKLER SYSTEMS ARE CONNECTED TO CITY WATER MAINS, FLOW TEST RESULTS SHALL BE SUBMITTED. THE PLANS SHALL SHOW THE FOLLOWING INFORMATION ON WATER FLOW DATA WITH

EXISTING OR PROPOSED WATER SUPPLY, DEAD END OR CIRCULATING:

a. LOCATION AND ELEVATION OF STATIC AND RESIDUAL TEST GAGE WITH RELATION TO THE RISER

REFERENCE POINT.

b. FLOW LOCATION.

c. STATIC PRESSURE, PSI

d. RESIDUAL PRESSURE, PSI

e. FLOW, GPM

f. DATE

g. TIME

h. TEST CONDUCTED BY OR INFORMATION SUPPLIED BY

i. PLOTTED GRAPH SHOWING WATER SUPPLY CURVES AND SYSTEM REQUIREMENTS IN ACCORDANCE

WITH SECTIONS 6-3, 6-2.4, AND A-7-2.1 OF N.F.P.A. 13, APPROVED ADDITION.

10. FIRE MAIN TO BE HYDRAULICALLY CALCULATED AND SIZED TO DESIGN INSTALLATION REQUIREMENTS

AS PER N.F.P.A., SECTIONS 13, 14, AND 24.

11. ALL OCCUPIED AREAS OF THE BUILDING ARE TO HAVE A WET PIPE SPRINKLER SYSTEM,

HYDRAULICALLY CALCULATED AND SIZED TO DESIGN INSTALLATION REQUIREMENTS OF N.F.P.A.

SECTIONS 13, 14 AND 24 FOR LIGHT HAZARD OCCUPANCY.

12. IF THE FIRE PROTECTION CONTRACTOR REQUIRES ACCESS PANELS, THE FIRE PROTECTION CONTRACTOR SHALL FURNISH THE ACCESS PANELS WITH INSTALLATION COSTS ASSUMED BY THE FIRE PROTECTION CONTRACTOR, BUT INSTALLED BY THE GENERAL CONTRACTOR. ANY ACCESS PANELS PURCHASED DURING CONSTRUCTION BY THE FIRE PROTECTION CONTRACTOR SHALL MATCH THOSE

ALREADY PURCHASED BY THE GENERAL CONTRACTOR.

13. PROVIDE MINIMUM 15 DAYS NOTICE OF ANY UTILITY IN ADVANCE WITH THE OWNER. ACCOMPLISH

DRAIN DOWN AND RE-FILL OF PIPING SYSTEMS AS REQUIRED.

DATESIGNATURE

SCHOONOVER

C. J.

ST

AT

E OF O

H IO

P R O F E

SS IO N

AL EN

G

IN

E E R

RE G IS T E R

E D

E-62197

Project Number

Office of Construction and Facilities Management

Building Number

Drawing Number

VA FORM 08-6231

CONSULTANTS: ARCHITECTS/ENGINEERS: ARCHITECTURAL PROJECT #

VA Building th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

F

E

D

C

B

A

F

E

D

C

B

A

987654321

987654321

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

KEY PLAN

Dwg. of

FULLY SPRINKLERED

:3 :1

A M

C U se rs

JB

i l in sk i\ D o c u m e n ts M E P C E N

TR

A L

FI

LE

jb il in sk i.

rv t

NEW WORK - FIRST FLOOR PLAN - FIRE

PROTECTION

FX100

CJS JMB

552-CSI-176

NEW MRI SITE PREP

02/21/2020

4100 WEST THIRD STREET, DAYTON, OH 45428

18106

BID & CONSTRUCTION

02/21/2020

N 1/8" = 1'-0"

NEW WORK - FIRST FLOOR PLAN - FIRE PROTECTION

ROOM LEGEND

Number Name

A100 VESTIBULE

A102 ENTRANCE HALL

A103 ENTRANCE

A104 PREP AREA

A105 SUB WAITING

A106 DRESSING

A107 DRESSING

A108 OFFICE

A109 CORRIDOR

A110 EQUIPMENT

A111 MRI ROOM

A112 CONTROL ROOM

A113 TOILET

A113 TOILET

E113 EX. CORRIDOR

E131 EX. CORRIDOR

E132 EX. CORRIDOR

X110 VESTIBULE

X112 RECEPTION

X114 DATA

X115 ELECTRICAL

X116 VIEW/CONSULT

X117 CLEAN SUPPLY

X118 CLEAN SUPPLY

X119 EQUIPMENT

X120 STAFF RADIOLOGIST

X121 PROF. NON-PHYSICIAN

X122 CORRIDOR

X123 CORRIDOR

X124 DRESSING

X125 DRESSING

X126 STAFF WORK

X127 TOILET

X128 SUB WAIT

X129 TOILET

X130 TOILET

Revisions Date

35% SD SUBMISSION 05/22/2019

65% DD SUBMISSION 07/29/2019

95% CD SUBMISSION 10/07/2019

BID & CONSTRUCTION 12/19/2019

CAM REVIEW 02/21/2020

ADDENDUM 1 06/10/2020