This pre-solicitation notice is for a new MRI site prep project at the Dayton VA Medical Center. The Department of Veterans Affairs Network Contracting Office 10 is seeking proposals from service-disabled veteran owned small businesses to provide all labor, supervision, materials and equipment for site preparation to house new MRI equipment, as required by drawings and specifications. The performance period is no more than 245 calendar days from notice to proceed. Work will be conducted at the Dayton VA Medical Center and must be coordinated with the contracting officer and contracting officer's representative. The solicitation documents will be posted on March 20, 2020 at FBO.gov, with proposals due approximately 30 days later. This is a 100% set-aside for service-disabled veteran-owned small businesses, with a minimum of 15% construction work required to be performed by the service-disabled veteran-owned small business or subcontractor. Bid, payment and performance bonds will be required.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Geotechnical Exploration Report
Dayton VA Medical Center
Addition
Dayton, Ohio
S&ME Project No. 1178-19-018
PREPARED FOR:
CBLH Design, Inc.
7850 Freeway Circle
Cleveland, Ohio 44130
PREPARED BY:
S&ME, Inc.
862 East Crescentville Road
Cincinnati, OH 45246
August 30, 2019
S&ME, Inc. | 862 East Crescentville Road | Cincinnati, OH 45246 | p 513.771.8471 | www.smeinc.com
August 30, 2019
CBLH Design, Inc.
7850 Freeway Circle
Cleveland, Ohio 44130
Attention: Mr. Michael D. Liezert, AIA, ACHA, LEED, EDAC
Reference: Geotechnical Explorations
Dayton VA Medical Center Addition
Dayton, Ohio
S&ME Project No. 1178-19-018
Dear Mr. Liezert:
S&ME, Inc. (S&ME) is pleased to submit the results of our geotechnical exploration and laboratory services completed for the proposed MRI Site Prep Addition at the Dayton VA Medical Center in Dayton, Ohio. The purpose of our project was to explore subsurface conditions at the site, evaluate those conditions, and provide recommendations for site preparation and foundations. We conducted this project in general accordance with our
Proposal No. 11-1900229, dated July 5, 2019, which was authorized by CBLH Design, Inc. (CBLH) on July 11, 2019.
This report presents our understanding of the project, documents our findings, and presents our conclusions and geotechnical engineering recommendations.
S&ME appreciates the opportunity to be of service to you on this project. We look forward to helping you through project completion. If you have any questions, please call us at 513-771-8471.
Sincerely, S&ME, Inc.
Rebecca E. Scherzinger, E.I. Benjamin C. Dusina, P.E.
Staff Professional II Project Engineer
Geotechnical Explorations
Dayton VA Medical Center Addition
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 ii
Table of Contents
1.0 Introduction
2.0 Site and Project Description
3.0 Site Geology
4.0 Exploration and Testing
4.1 Field Exploration
4.2 Laboratory Testing
5.0 Subsurface Conditions
6.0 Geotechnical Considerations
6.1 Geotechnical Evaluation
6.1.1 Existing Fill Material
6.1.2 Existing Utilities
6.1.3 Overexcavations
6.2 Stripping and Site Preparation
6.3 Structural Fill
6.4 Water Management
6.5 Excavation Considerations
6.6 Foundation Recommendations
6.6.1 Shallow Spread Foundations
6.6.2 General Foundation Considerations
6.7 Seismic Site Classification
6.8 Floor Slab Recommendations
7.0 Follow Up Services
8.0 Final Considerations and Report Limitations
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 iii
List of Tables Table 4-1 – Summary of Unconfined Compressive Strength Testing
Table 5-1 – Summary of Subsurface Conditions
Appendices Appendix I – Additional Figures
Appendix II – Soil Boring Logs
Appendix III – Laboratory Testing
Appendix IV – ACI 302.1R-96 Form
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 1
1.0 Introduction
S&ME is pleased to submit the results of our geotechnical exploration and laboratory services completed for the proposed MRI Site Prep Addition at the Dayton VA Medical Center in Dayton, Ohio. The purpose of our project was to explore subsurface conditions at the site, evaluate those conditions, and provide recommendations for site preparation and foundations. This report presents our understanding of the project, documents our findings and presents our conclusions and geotechnical engineering recommendations.
2.0 Site and Project Description
The project site is located at the Dayton Medical Center is Dayton, Ohio, as shown on the vicinity map presented in Appendix I. The location of the proposed building addition is currently a parking lot. A Site Plan was provided by CBLH on July 2, 2019, which indicated the proposed addition will extend south of the existing Building 335.
Concrete slab-on-grade is expected for the building floor. A photograph of the site is provided below.
D a te
: 7 /1
/2
P h o to g ra p h e r:
R e b e cc a E
. S ch e rz in g e r, E I
Location / Orientation South of B-105 / Looking Northeast
Remarks Location of proposed MRI Site Prep Addition
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 2
3.0 Site Geology
Geologic mapping indicates the project site is within the Southern Ohio Loamy Till Plain physiographic region and the soils are loam till from the Wisconsinan age, up to 60 feet thick (Surficial geology of the Ohio portion of the
Dayton 30 x 60-minute quadrangle, Ohio Division of Geological Survey). The bedrock is the Sub-Lockport
Undifferentiated of the Silurian system (Reconnaissance Bedrock Geology of the Miamisburg, Ohio Quadrangle, Ohio Division of Geological Survey). Based on Ohio Department of Natural Resources (ODNR) well records, bedrock in this location is generally 15 to 30 feet below the existing ground surface. Our borings did not encountered bedrock with the planned depths.
4.0 Exploration and Testing
4.1 Field Exploration
On July 27, 2019 S&ME performed five (5) borings designated as B-101 through B-105 to investigate the existing soils for the proposed MRI Prep Addition. The borings were located within the existing parking lot south of
Building 335. Ohio 811 did not mark any utilities within the parking lot area. S&ME was provided a utility plan dated January 31, 2013 showing an unmarked gas line in the vicinity of the borings. Blood Hound was retained to mark found utilities in the vicity of our planned borings. The Blood Hound representative was unable to locate the gas line though. Figure 3 in Appendix I shows the utilities and Ground Penetrating Radar (GPR) annomolies the were located by Blood Hound.
Each of the borings were advanced to 15 feet below the surface. The borings were performed with a Diedrich D-50 track mounted drill rig using a 4-1/4 inch I.D. continuous flight auger to advance the borings between sampling attempts. Disturbed, but representative soil samples were attempted at 2.5 foot intervals. This sampling was done by lowering a 2-inch O.D. split-barrel sampler to the bottom of the boring and then driving the sampler into the soil with blows from a 140-pound hammer freely falling 30 inches (ASTM D1586 - Standard Penetration Test). The hammer system on the drilling rig has been calibrated in accordance with ASTM D 4633 to determine the drill rod energy ratio of 75.5%. SPT samples were examined immediately after recovery and representative portions were preserved in airtight glass jars. Upon completion of each boring, the boreholes were backfilled with soil cuttings. A
Plan of Borings showing the approximate locations of the borings is included as Figure 2 of Appendix I. Locations and ground surface elevations of the boring locations were estimated by S&ME using a hand held GPS (sub-meter horizontal accuracy).
In the field, experienced personnel from S&ME supervised the drilling as well as performed the following specific duties: preserved all recovered samples; prepared a log of each boring; made seepage and groundwater observations; obtained hand-penetrometer measurements in soil samples exhibiting cohesion; and, contacted the
Project Engineer so that the program of explorations could be modified, if necessary, because of unanticipated conditions. All samples were transported to the laboratory of S&ME for further identification and testing.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 3
4.2 Laboratory Testing
The recovered soil samples were returned to our laboratory, and visually classified by a geotechnical engineer in general accordance with the Unified Soil Classification System (ASTM D2487). Natural moisture content determinations, Atterberg limit tests, grain size analysis, and unconfined compression tests were also performed on selected sampled to aid in classification and the evaluation of the engineering properties of the soil.
Based on the results of the laboratory testing program, the soil descriptions on the boring logs were modified, if necessary, and the laboratory-corrected logs of the borings are submitted as Plates 2 through 6 in Appendix II.
The boring logs include: descriptions of the soil stratigraphy encountered; depths at which samples were procured; groundwater observations; and, values of hand-penetrometer measurements made on soil samples exhibiting cohesion.
The obtained laboratory data and descriptions of these tests are included in Appendix III. A summary of the unconfined compressive strength testing is provided in the table below.
Table 4-1 – Summary of Unconfined Compressive Strength Testing
Boring Number Sample Depth (ft) Soil Description
Unconfined
Compressive Strength
(psf)
B-102 11-13 Brown Silty Clay (CL-ML) 5,199
5.0 Subsurface Conditions
Each of the borings were drilled through the existing pavement within the parking area. Asphalt thickness ranged from of 4 to 6 inches and granular base ranged in thickness from 5 to 6 inches. Beneath the granular base, existing fill was encountered in each of the borings which ranged from 5.5 to 8 feet below the existing ground surface. The fill was described as stiff to hard Lean Clay (CL) in most of the borings and medium dense becoming loose Clayey
Sand (SC-SM) in Boring B-102, which may be utility trench backfill.
Natural soils encountered in the borings generally consisted of cohesive soils to the planned depth of 15 feet. The cohesive soils were typically described as stiff to hard Lean Clay (CL), Silty Clay (CL-ML), and Silt (ML). Hand penetrometer test values were typically between 1.0 and 4.5+ tons per square foot (tsf).
Borings B-101 and B-104 also encountered granular soils. Medium dense Poorly Graded Sand (SP) was encountered at the bottom of B-101 and loose Poorly Graded Sand (SP) was encountered below the existing cohesive fill in B-104.
For further detail of subsurface conditions encountered, refer to the individual boring logs presented on in
Appendix II. The stratum lines shown on the boring logs should be considered approximate. The table on the following page summarizes the groundwater conditions and existing fill depths encountered in each boring.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 4
Table 5-1 – Summary of Subsurface Conditions
Boring
Number
Depth
Groundwater
Encountered (ft)
Groundwater at
Completion (ft)
Depth of
Existing Fill
(ft)
B-101 Not Encountered Dry 5.5
B-102 Not Encountered Dry 8
B-103 Not Encountered Dry 5.5
B-104 6.0 11.3 5.5
B-105 11.0 13.1 3
6.0 Geotechnical Considerations
6.1 Geotechnical Evaluation
Our conclusions and recommendations are based on the design information furnished to us by CBLH and our past experience in this area. They do not reflect variations in the subsurface conditions which may exist between our borings and in unexplored areas of the site.
In general, the natural stiff to hard cohesive soils encountered at the site are considered suitable for support of the proposed structures provided that the necessary site preparation for foundation and slab support is performed as described in this report. However, it is our opinion that the construction costs for the project will be impacted by the following:
6.1.1 Existing Fill Material
Existing fill was encountered to depths ranging from 3.0 to 8.0 feet beneath the existing ground surface in each of the borings advanced during this exploration. The fill generally consisted of stiff to hard Lean Clay, but medium dense to loose Clayey Sand was encountered in boring B-102. No information was available regarding the history of the placement of the fill and, therefore, it is not known whether the fill was placed with compaction and control.
The existing fill material also varies in strength and density, as identified by the variable standard penetration test resistance N-values and hand-penetrometer measurements. Based on the variable properties of the fill, it is our opinion floor slab constructed on the existing fill will be susceptible to unpredictable total and differential settlements which can lead to cracking in the concrete. Therefore, S&ME recommends one of the following options be considered for the treatment of existing fill exposed within the building addition footprint:
Option 1 - Remove and replace existing fill within and 5-feet beyond the building footprint with newly placed and compacted structural fill to reduce the risk of potential unwanted settlement.
Option 2 - Extend foundations through the existing fill, and then remove and replace the top two (2) feet of existing fill with newly placed and controlled structural fill for floor slab support. The owner must be aware that with this alternative, unwanted settlement of the floor slab may still occur due to variations in the density/strength of the existing uncontrolled fill left in place.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 5
At the discretion of the S&ME Engineer, probing or excavation of shallow test pits may be requested prior to construction. This should be done to further determine the extent of the existing fill material, and properly determine depth of overexcavation and undercutting needed to reach suitable material.
6.1.2 Existing Utilities
Based on the Utility Plan provided, discussions with Dayton VA personnel, and the Blood Hound findings, there are several underground utilities in the vicinity of the planned construction. These utilities may need to be relocated prior to foundation excavations. It is our experience that old utilities are poorly backfilled. Expect that the backfill used around underground utility lines and structures may need to be removed and replaced with compacted soil in accordance with the recommendations presented later in this report. The excavated material may be re-used as structural fill, provided it meets the criteria for structural fill presented Section 6.3 of this report.
6.1.3 Overexcavations
As described above and in subsequent section of this report, existing fill was encountered in each of the borings performed for this exploration. Therefore, during foundation construction, overexcavations to extend shallow spread footings through existing fill or weak soil should be expected. Recommendations for overexcavations are provided in Section 6.6 of this report.
6.2 Stripping and Site Preparation
To prepare the site for construction, strip and remove the gravel and asphalt from the project area. Previously unexplored or unknown conditions could become evident during these operations to assess that adequate (but not excessive) material has been stripped. We must judge whether the recommendations in this report should be modified in view of the conditions encountered.
The existing fill should be removed and replaced from within the limits of the proposed building footprints unless the Dayton VA is willing to accept the risk of long-term settlement occurring beneath the new building slab (see
Section 6.1, Geotechnical Evaluation).
After stripping and removal of existing fill, the exposed soil areas that are to receive structural fill or subbase stone should be evaluated by an S&ME engineer or representative by observing proof-rolling. Proof-rolling consists of applying repeated passes (4 to 5 passes) on the subgrade with a loaded dump truck, or similar rubber tired vehicle. Any materials judged to deflect excessively under the wheel loads should be undercut to more stable soils or remediated as recommended by the S&ME Engineer. If the subgrade is not accessible to a proof-roll, then the subgrade should be visually observed and probed by an experienced Geotechnical Technician to assist in identifying any soft or weak zones. It is recommended that any observed unsuitable materials, or subgrade soils which exhibit significant pumping and/or rutting during proof-rolling, either be scarified, aerated and compacted or completely removed and replaced with newly placed and compacted structural fill in accordance with recommendations presented in this report. Visual observation of the removal of these unsuitable materials by a representative of S&ME may result in at least a partial reduction of the necessary undercutting in these areas.
Once the area has been observed by S&ME, and remediated if necessary, fill material can be placed to the desired grades.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 6
6.3 Structural Fill
S&ME recommends that suitable structural soil fill be defined as inorganic natural soil with a maximum particle size of 3 inches, a maximum dry density of at least 100 pounds per cubic foot (pcf) when tested by the standard
Proctor method (ASTM D698), and a plasticity index (PI) less than 30 percent. The existing fill soils encountered in our borings are generally suitable for re-use as structural fill provided the recommendations in this section are followed, however standard Proctor testing and Atterberg limits testing of reused fill soils is recommended to ensure unsuitable soils are not encountered during overexcavation.
Structural fill placed within three feet of the design subgrade elevation in the building area, should not consist of high plasticity clay. High plasticity clay is general characterized as having a plasticity index greater than 30. Higher plasticity clay may be used when more than three feet below the design subgrade elevation. For example, in the case of a five foot fill within the building footprint, the lower two feet of fill may consist of higher plasticity clay;
however, the upper three feet of new fill below the subgrade should consist of compacted lower plasticity clay or a dense graded aggregate (DGA).
During construction, standard Proctor testing and Atterberg limits testing of proposed fill soils should be performed by S&ME for compliance with the project specifications before they are used as fill material. If soils are imported to the site, we recommend that the soils be tested for conformance with the project specifications before being transported to the site. Please realize that the laboratory conformance testing usually takes three to four business days to complete. Therefore, the Contractor should plan accordingly.
Structural fill placement should occur in relatively thin (6 to 8-inch maximum) layers and be compacted to at least
98 percent of the standard Proctor maximum dry density beneath new floor slabs and foundations, and to at least
95 percent of the standard Proctor maximum dry density beneath the proposed pavement areas. The moisture content of the fill should be maintained within 3 percent of the soil’s optimum moisture content even though compaction may be achieved at moisture contents outside the specified range.
In-place density testing must be performed on structural fill to confirm that the recommended compaction criteria have been achieved. This allows our project engineer to monitor the quality of the fill construction and assess that the design criterion is being achieved in the field. We further recommend that these tests be performed on a full-time basis by S&ME. The testing frequency for density tests performed on a full-time basis may then be determined by our personnel based on the area to be tested, the grading equipment used, project specifications, and construction schedule. Tests should be performed at vertical intervals of 8-inches or less (the recommended lift thickness) as the fill is being placed.
6.4 Water Management
The on-site soils (both natural and existing fill) are sensitive to changes in moisture content. If grading operations are performed during periods of wet weather, these materials will not perform satisfactorily with regard to site access and stability. If the site soils become wet during construction, the owner should retain S&ME to send an
Engineer to the site to assess the area and make recommendations for remediation.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 7
The contractor should make provisions to direct water away from the excavations during construction via site grading, drainage ditches, sump pits, etc. Water should never be allowed to pond in or around the foundation and floor slab excavations.
At the discretion of the S&ME Engineer, probing or excavation of shallow test pits may be requested, based on the observed conditions at the time of construction. To reduce, but not eliminate, access problems associated with the on-site soils, we recommend that the earthwork portion of this project be performed during the warm, dry summer months of the year.
For any below grade excavations, subsurface water may seasonally impact the excavations. We recommend the design include provisions such as foundation drains tied to nearby storm sewer systems or sump pits and sump pumps to discharge any water that may infiltrate the below grade portion of the structures. We further recommend the below grade portions of the building be waterproofed.
6.5 Excavation Considerations
All excavations and corresponding construction for the project site must be performed without endangering the construction workers. Therefore, in accordance with OHSA Trench/Excavation Regulations (OSHA 29 CFR Part
1926), any excavations exceeding a depth of four feet for which workers will be entering the excavation/trench, the excavation sides must be sloped to the required maximum inclination or flatter (based on the soil type and strength) or braced.
The existing fill and stiff to very-stiff silty clay soil encountered in the borings at the project site to a maximum depth of 8 feet should be considered as an OSHA Type C soil. Therefore, the maximum slope inclination for Type
C soils should be 1.5 Horizontal to 1 Vertical (1.5H: 1V) unless properly supported. S&ME recommends that the actual excavation slope layback be based upon the soil conditions encountered during the excavation, as evaluated by a "Competent Person" in accordance with OSHA regulations.
6.6 Foundation Recommendations
Existing fill was encountered to depths ranging from 3.0 to 8.0 feet in the borings performed for this exploration within the new building footprint. In general, the existing fill was placed in an unknown manner, was variable in type, consistency, and compressibility, and is not suitable for the support of structures. The planned building foundations will likely encounter existing fill at the planned bearing elevations (designed for typical frost depths).
Overexcavations should be anticipated during foundation construction.
6.6.1 Shallow Spread Foundations
To utilize shallow spread foundations to support to proposed buildings, S&ME recommends that all existing fill material be removed from within the building footprints and 5 feet beyond the footprint until suitable natural material is encountered. Based on the boring data, this will require excavation depths of approximately 3 to 8 feet.
The overexcavation should then be backfilled with controlled, structural fill placed in accordance with Section 6.3 of this report.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 8
After the existing fill has been removed and the overexcavation backfilled with properly compacted structural fill
(see Section 6.3), S&ME recommends that shallow spread foundations bearing in natural stiff to very-stiff cohesive soil or newly placed and compacted structural fill be proportioned based on a maximum allowable bearing pressure of 3,500 pounds per square foot (psf). Exterior foundations should be placed at least 36 inches below finished exterior grades in accordance with local codes for frost penetration while the interior column pads may bear at minimum practical depths. A minimum foundation width of 24 inches for wall foundations and 36 inches for column foundations are recommended, regardless of calculated size. Foundations designed and constructed in accordance with the foregoing recommendations and procedures will have a factor of safety of at least 3 with respect to shearing strength.
If existing fill or weaker soils are present at or just below the proposed bottom of foundation elevation, the material should be overexcavated and the foundation lowered to more suitable soils, or the overexcavation below the plan foundation bearing elevation should be filled with low strength concrete or controlled density fill (CDF) having a minimum 28-day compressive strength of at least 100 psi. The determination of removal of weak foundation bearing soils should be made by an S&ME representative present during foundation excavations.
We recommend that foundation excavations be cut neat and the foundation concrete placed directly against the trench sidewalls, whenever possible. The foundation excavations should be free of loose soil and debris, as well as free of water or frozen soil at the time of concrete placement. We recommend that the ground surface adjacent to the foundation excavations be graded to prevent surface water runoff from entering the footing excavations. It should be noted that the on-site cohesive soils, when exposed to standing water, will absorb moisture and result in a decrease in strength and an increase in compressibility. Therefore, these conditions should be prevented from occurring and it is recommended that all foundation excavations be poured the same day as excavated.
As discussed in Section 6.1, Geotechnical Evaluation (Option 2) of this report, spread foundations lowered to penetrate through the unsuitable existing fill and bear on the underlying natural stiff to very-stiff cohesive soil may also be used to support the structure addition. Based on the results of the borings, this may require the foundations to be lowered 3.0 to 8 feet and require sheeting/shoring/bracing of the foundation excavation. As previously, discussed in Section 6.1 (Option 2), this approach would also leave the variable existing fill in place to support the planned floor slab, requiring the Owner to accept the risk of long-term settlement and cracking (see
Section 6.8 of this report).
6.6.2 General Foundation Considerations
Structural loading information was not available at the time of this report; however, for the proposed structures it is anticipated that foundation settlements for the proposed structures will be within tolerable ranges (less than 1-inch of total settlement and differential settlements not exceeding 1/2-inch) provided the site preparation and foundation construction are performed in accordance with the recommendations provided in this report.
All foundation excavations should be observed by an S&ME representative to assess whether suitable bearing soils are present and capable of supporting the foundation loads as designed, and to reduce the amount of overexcavation required during excavation if existing fill or weak soils are encountered.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 9
6.7 Seismic Site Classification
Based on the subsurface stratigraphy encountered within the borings at the project site, the encountered depth to bedrock, and the estimated stratigraphy between the bottoms of the borings and 100 feet below existing grades, it is the opinion of S&ME that the project site is best characterized by the Ohio Building Code site class D.
6.8 Floor Slab Recommendations
As previously recommended in this report, the existing fill is not considered suitable for floor slab support and where encountered within the building footprints, should be removed and replaced with suitable structural fill as described in Sections 6.2 and 6.3 of this report. A less desirable approach for floor slab support would be to remove and replace a minimum two (2) feet of the existing fill with newly placed and compacted structural fill. The
Owner must be aware that with this approach, settlement beneath the floor slab may still occur, resulting in floor slab distress/cracking, where the existing fill is left in place.
It is anticipated that the proposed floor slab will be supported on newly placed and compacted fill comprised of on-site soils. On this basis, concrete floors may be designed as slabs-on-grade utilizing a Modulus of Subgrade
Reaction of 110 pounds per cubic inch (pci).
We recommend that control joints be placed in the slab around columns and along footing supported walls to reduce cracking due to shrinkage during curing. We suggest a layer of compacted dense graded aggregate (DGA) directly beneath the slab to enhance support and provide a working base for construction of the floor slab. The actual DGA thickness should be based on the floor slab design, but our experience suggests a minimum depth of
4 inches. The DGA should be moist, but not wet, as the concrete is placed to reduce curling of the slab as the concrete cures. We recommend that ACI 302.1R-96 “GUIDE FOR CONCRETE FLOOR AND SLAB CONSTRUCTION” be followed for design and placement of concrete floor slabs. A copy of ACI 302.1R-96 is included in Appendix IV of this report for your use.
Between completion of grading and slab construction, floor slab subgrades are often disturbed by weather, footing and utility line installation, and other construction activities. For this reason, the subgrade should be evaluated by an S&ME engineer immediately prior to constructing the slab. It is recommended that final subgrade preparations be performed immediately prior to the placement of the granular base material to minimize damage to the subgrade from repeated construction traffic and/or exposure to weather.
Proofrolling operations should be performed on the final subgrades to expose any soft or unsuitable bearing materials which may have developed during construction as a result of heavy construction traffic. We recommend that the proofrolling operations be performed using a fully-loaded, tandem-axle dump truck. Any soft or unsuitable material exhibiting rutting, yielding, and/or pumping during the proofroll should be either undercut to a firm bearing material and be replaced with engineered fill to re-establish final subgrade. If the subgrade is not evaluated by an S&ME engineer prior to concrete placement, S&ME must be held harmless for any claims due to poor performance of the floor slab.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 10
7.0 Follow Up Services
Our services should not end with the submission of this geotechnical report. S&ME should be kept involved throughout the design and construction process to maintain continuity and to assess whether our recommendations are properly interpreted and implemented. To achieve this, we should be retained to review project plans and specifications with the designers to see that our recommendations are fully incorporated. We also should be retained to observe and test the site preparation, foundation construction, and building construction. If we are not allowed the opportunity to continue our involvement on this project, we cannot be held responsible for the recommendations in this report.
Our familiarity with the site and with the foundation recommendations will make us a valuable part of your construction quality assurance team. In addition, a qualified engineering technician should observe and test all structural concrete and steel. Only experienced, qualified persons trained in geotechnical engineering and familiar with foundation construction should be allowed to evaluate and test foundation excavations. Normally, full-time observation of the site work and foundation installation is appropriate.
8.0 Final Considerations and Report Limitations
The analyses, conclusions and recommendations presented in this report are based on project information provided by CBLH. After the final design plans have been generated, S&ME should be retained to review the final design plans and specifications to verify that the intent of our engineering recommendations have been properly incorporated into the design documents. S&ME cannot assume responsibility or liability for the adequacy of recommendations if S&ME is not retained to review the final plans.
The contents of this report are also based on the subsurface conditions as they existed at the time of our field exploration, and further on the assumption that the exploratory borings are representative of actual subsurface conditions throughout the area investigated. It should be noted that actual subsurface conditions between and beyond the borings might differ from those encountered at the boring locations. If subsurface conditions encountered during construction vary from those discussed in this report, S&ME should be notified immediately so that we may evaluate the effects, if any, on design and construction.
We recommend that the Owner retain S&ME to continue our involvement in the project through the subsequent phases of design and construction. Our firm is not responsible for interpretation of the data contained in this report by others.
For more information on the use and limitations of this report, please read the Geoprofessional Business
Association (GBA) document that follows this page.
Geotechnical-Engineering Report
Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical-engineering study conducted for a civil engineer may not fulfill the needs of a constructor — a construction contractor — or even another civil engineer. Because each geotechnical- engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. No one except you should rely on this geotechnical-engineering report without first conferring with the geotechnical engineer who prepared it. And no one
— not even you — should apply this report for any purpose or project except the one originally contemplated.
Read the Full Report Serious problems have occurred because those relying on a geotechnical-engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only.
Geotechnical Engineers Base Each Report on a Unique Set of Project-Specific Factors Geotechnical engineers consider many unique, project-specific factors when establishing the scope of a study. Typical factors include: the client’s goals, objectives, and risk-management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engineer who conducted the study specifically indicates otherwise, do not rely on a geotechnical-engineering report that was:
• not prepared for you;
• not prepared for your project;
• not prepared for the specific site explored; or
• completed before important project changes were made.
Typical changes that can erode the reliability of an existing geotechnical-engineering report include those that affect:
• the function of the proposed structure, as when it’s changed from a parking garage to an office building, or from a light-industrial plant to a refrigerated warehouse;
• the elevation, configuration, location, orientation, or weight of the proposed structure;
• the composition of the design team; or
• project ownership.
As a general rule, always inform your geotechnical engineer of project changes—even minor ones—and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed.
Subsurface Conditions Can Change A geotechnical-engineering report is based on conditions that existed at the time the geotechnical engineer performed the study. Do not rely on a geotechnical-engineering report whose adequacy may have been affected by: the passage of time;
man-made events, such as construction on or adjacent to the site; or natural events, such as floods, droughts, earthquakes, or groundwater fluctuations. Contact the geotechnical engineer before applying this report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems.
Most Geotechnical Findings Are Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ — sometimes significantly — from those indicated in your report. Retaining the geotechnical engineer who developed your report to provide geotechnical-construction observation is the most effective method of managing the risks associated with unanticipated conditions.
A Report’s Recommendations Are Not Final Do not overrely on the confirmation-dependent recommendations included in your report. Confirmation-dependent recommendations are not final, because geotechnical engineers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engineer who developed your report cannot assume responsibility or liability for the report’s confirmation-dependent recommendations if that engineer does not perform the geotechnical-construction observation required to confirm the recommendations’ applicability.
A Geotechnical-Engineering Report Is Subject to Misinterpretation Other design-team members’ misinterpretation of geotechnical-engineering reports has resulted in costly
Important Information about This
Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes.
While you cannot eliminate all such risks, you can manage them. The following information is provided to help.
problems. Confront that risk by having your geo technical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review pertinent elements of the design team’s plans and specifications. Constructors can also misinterpret a geotechnical-engineering report. Confront that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing geotechnical construction observation.
Do Not Redraw the Engineer’s Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical-engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk.
Give Constructors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make constructors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation.
To help prevent costly problems, give constructors the complete geotechnical-engineering report, but preface it with a clearly written letter of transmittal. In that letter, advise constructors that the report was not prepared for purposes of bid development and that the report’s accuracy is limited;
encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/ or to conduct additional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure constructors have sufficient time to perform additional study. Only then might you be in a position to give constructors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions.
Read Responsibility Provisions Closely Some clients, design professionals, and constructors fail to recognize that geotechnical engineering is far less exact than other engineering disciplines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled “limitations,” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly.
Environmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform an environmental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical-engineering report does not usually relate any environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own environmental information, ask your geotechnical consultant for risk-management guidance. Do not rely on an environmental report prepared for someone else.
Obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, operation, and maintenance to prevent significant amounts of mold from growing on indoor surfaces.
To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a comprehensive plan, and executed with diligent oversight by a professional mold-prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, many mold- prevention strategies focus on keeping building surfaces dry. While groundwater, water infiltration, and similar issues may have been addressed as part of the geotechnical- engineering study whose findings are conveyed in this report, the geotechnical engineer in charge of this project is not a mold prevention consultant;
none of the services performed in connection with the geotechnical engineer’s study were designed or conducted for the purpose of mold prevention. Proper implementation of the recommendations conveyed in this report will not of itself be sufficient to prevent mold from growing in or on the structure involved.
Rely, on Your GBC-Member Geotechnical Engineer for Additional Assistance Membership in the Geotechnical Business Council of the Geoprofessional Business Association exposes geotechnical engineers to a wide array of risk-confrontation techniques that can be of genuine benefit for everyone involved with a construction project. Confer with you GBC-Member geotechnical engineer for more information.
8811 Colesville Road/Suite G106, Silver Spring, MD 20910 Telephone: 301/565-2733 Facsimile: 301/589-2017 e-mail: info@geoprofessional.org www.geoprofessional.org
Copyright 2015 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, or its contents, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document as a complement to or as an element of a geotechnical-engineering report. Any other firm, individual, or other entity that so uses this document without being a GBA member could be commiting negligent or intentional (fraudulent) misrepresentation.
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 1
Appendices
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 2
Appendix I – Additional Figures
N
MRI Site Prep Addition
Dayton VA Medical Center
Dayton, Ohio
1178-19-018
08/21/2019
1" = 3000'
Vicinity Map
SCALE:
DATE:
PROJECT NUMBER
FIGURE NO.
D r a w i n g
P a t h
C
I N
O H
A c t i v e P r o j e c t s G
E O
C
B L H
D a y t o n
V
A
A d d i t i o n G r a p h i c s V m a p
B
L P d w g
SITE
0 3,000 6,000
(IN FEET)GRAPHIC SCALE (IN FEET)GRAPHIC SCALE
Project Location
Montgomery County, Ohio
N
MRI Site Prep Addition
Dayton VA Medical Center
Dayton, Ohio
1178-19-018
08/21/2019
1" = 100'
Plan of Borings
SCALE:
DATE:
PROJECT NUMBER
FIGURE NO.
D r a w i n g
P a t h
C
I N
O H
A c t i v e P r o j e c t s G
E O
C
B L H
D a y t o n
V
A
A d d i t i o n G r a p h i c s V m a p
B
L P d w g
0 100 200
(IN FEET)GRAPHIC SCALE (IN FEET)GRAPHIC SCALE
B-101
Boring Location
B-102
B-105
B-104
B-103
FIGURE NO.
SCALE:
DATE:
PROJECT NUMBER
N
Dayton, Ohio
Dayton VA Medical Center
MRI SitePrep Addition
N.T.S.
08/22/2019
1178-19-018
Utility Map
LEGEND:
Storm Drain
Underground Electric
GPR Anomalies
Area to be cleared around each boring
Utility Sketch provided by Blood Hound
Dayton, Ohio
S&ME Project No. 1178-19-018
August 30, 2019 3
Appendix II – Soil Boring Logs
Core Diameter Inches
BQ 1-7/16
NQ 1-7/8
HQ 2-1/2
TEST BORING RECORD LEGEND
FINE AND COARSE GRAINED SOIL INFORMATION
COARSE GRAINED SOILS
(SANDS & GRAVELS)
FINE GRAINED SOILS
(SILTS & CLAYS)
PARTICLE SIZE
N Relative Density N Consistency Qu, TSF
Estimated Boulders Greater than 300 mm (12 in)
0-0.25
0.25-0.5
0.51
1-2
4+
0-4
5-10
11-30
31-50
Over 50
Very Loose Loose
Medium Dense
Dense
Very Dense
0-1 Very Soft Cobbles 75 mm to 300 mm (3 to 12 in)
2-4 Soft Gravel 4.74 mm to 75 mm (3/16 to 3 in)
5-8 Firm Coarse Sand 2 mm to 4.75 mm
9-15 Stiff Medium Sand 0.425 mm to 2 mm
16-30 Very Stiff Fine Sand 0.075 mm to 0.425 mm
Over 31 Hard Silts & Clays Less than 0.075 mm
The STANDARD PENETRATION TEST as defined by ASTM D 1586 is a method to obtain a disturbed soil sample for examination and testing and to obtain relative density and consistency information. A standard 1.4-inch I.D./2-inch O.D. split-barrel sampler is driven three 6-inch increments with a 140 lb. hammer falling 30 inches. The hammer can either be of a trip, free-fall design, or actuated by a rope and cathead. The blow counts required to drive the sampler the final two increments are added together and designate the N-value defined in the above tables.
ROCK PROPERTIES
ROCK QUALITY DESIGNATION (RQD) ROCK HARDNESS
Percent RQD Quality Very Hard: Rock can be broken by heavy hammer blows.
0-25
25-50
50-75
75-90
90-100
Very Poor
Poor
Fair
Good
Excellent
Hard: Rock cannot be broken by thumb pressure, but can be broken by moderate hammer blows.
Moderately Hard:
Small pieces can be broken off along sharp edges by considerable hard thumb pressure; can be broken with light hammer blows.
Soft: Rock is coherent but breaks very easily with thumb pressure at sharp edges and crumbles with firm hand pressure.
Very Soft: Rock disintegrates or easily compresses when touched; can be hard to very hard soil.
Recovery =
Length of Rock Core Recovered Length of Core Run
X100
63 REC
NQ
43 RQD
RQD = Sum of 4 in. and longer Rock Pieces Recovered Length of Core Run
X100
SYMBOLS
KEY TO MATERIAL TYPES SOIL PROPERTY SYMBOLS
N: Standard Penetration, BPF
M: Moisture Content, %
LL: Liquid Limit, %
PI: Plasticity Index, %
Qp: Pocket Penetrometer Value, TSF
Qu: Unconfined Compressive Strength Estimated Qu, TSF γ D:
Dry Unit Weight, PCF
F: Fines Content
SAMPLING SYMBOLS
Topsoil
Asphalt
Crushed Limestone
Fill Material
Shot-rock Fill
Low Plasticity Inorganic Silt
High Plasticity Inorganic Silt
Low Plasticity Inorganic Clay
High Plasticity Inorganic Clay
Low Plasticity Inorganic Silt or Clay
High Plasticity Inorganic Silt or Clay
Organic Silts/Clays
Well-Graded Gravel
Poorly-Graded Gravel
Silty Gravel
Clayey Gravel
Well-Graded Sand
Poorly-Graded Sand
Silty Sand
Clayey Sand
Peat
Limestone
Sandstone
Siltstone
Claystone
Weathered Rock
Dolomite
Granite
Gneiss
Schist
Amphibolite
Metagraywacke
Phylite
Undisturbed Sample
Split-Spoon
Rock Core
Auger or Bag Sample
No Sample Recovery
Water Level After Drilling
Extended Time Reading
Core Diameter Inches
BQ 1-7/16
NQ 1-7/8
HQ 2-1/2
971.6 971.2
966.5
964.0
959.0
957.5 957.0
ASPHALT - 5 INCHES
GRAVEL BASE - 5 INCHES
FILL: Lean Clay (CL), some sand and gravel, STIFF, grayish-brown, damp to moist.
Lean Clay (CL), little sand and gravel, trace silt, HARD, brown, damp, (GLACIAL TILL).
Lean Clay (CL), silty, little sand, VERY STIFF, brown, moist.
Lean Clay (CL), silty, little sand and gravel, STIFF, gray, moist.
Poorly Graded Sand (SP), MEDIUM DENSE, gray, damp.
- Boring terminated at the planned depth.
4 - 5 - 5
9 - 6 - 7
15 - 11 -
3 - 3 - 4
4 - 8 - 8
4 - 5 - 8
HP = 4.5+
HP = 2.25
HP = 2.75
HP = 1.75
7/27/2019
BORING DIAMETER (IN):
REPORT NO:
RIG TYPE:
Continuous Flight Augers
BORING NO:
DEPTH
(FT.)
BORING COMPLETED:
SHEET
DRILLING METHOD:
BORING STARTED:
1178-19-018
OF
TEST BORING RECORD
Remarks:
PROJECT LOCATION:
ELEVATION:
HAMMER:
Dayton VA Medical Center Addition
AUTOMATIC
JOB NO:PROJECT:
G ro un dw at er
Boring Coordinates: 39.742573, -84.263599
972.0
7/27/2019
MATERIAL DESCRIPTION
Dayton, OH
ELEV.
(FT.)
D-50
DRYGROUNDWATER (ft):
B-101
S
M E
N E
W L
O G
O
-1
-0
.G P
J Q
O R
_C O
R P
.G D
T
8/
/1
300R ec ov er y (in
Li th ol og y
S am pl e
T yp e
STANDARD PENETRATION
RESISTANCE (N)
40 5010R Q
D
BLOWS
/6"
Qu (tsf)
969.7 969.2
962.0
955.0
ASPHALT - 4 INCHES
GRAVEL BASE - 6 INCHES
FILL: Clayey Sand (SC-SM), little gravel, MEDIUM DENSE becoming VERY LOOSE, brown, damp to moist, contains brick fragments.
Silty Clay (CL-ML), some sand, STIFF to HARD, brown, moist.
- Boring terminated at the planned depth.
4 - 6 - 6
13 - 12 -
2 - 2 - 2
5 - 10 - 6
8 - 8 - 7
HP = 4.5+
7/27/2019
BORING DIAMETER (IN):
REPORT NO:
RIG TYPE:
Continuous Flight Augers
BORING NO:
DEPTH
(FT.)
BORING COMPLETED:
SHEET
DRILLING METHOD:
BORING STARTED:
1178-19-018
OF
TEST BORING RECORD
Remarks:
PROJECT LOCATION:
ELEVATION:
HAMMER:
Dayton VA Medical Center Addition
AUTOMATIC
JOB NO:PROJECT:
G ro un dw at er
Boring Coordinates: 39.74263312, -84.26342355
970.0
7/27/2019
MATERIAL DESCRIPTION
Dayton, OH
ELEV.
(FT.)
D-50
DRYGROUNDWATER (ft):
B-102
S
M E
N E
W L
O G
O
-1
-0
.G P
J Q
O R
_C O
R P
.G
/1
300R ec ov er y (in
Li th ol og y
S am pl e
T yp e
STANDARD PENETRATION
RESISTANCE (N)
40 5010R Q
D
BLOWS
/6"
970.6 970.1
968.0
965.5
963.0
959.0
956.0
ASPHALT - 5 INCHES
GRANULAR BASE - 6 INCHES
FILL: Lean Clay (CL), some sand and gravel, VERY STIFF, grayish-brown, damp to moist.
FILL: Lean Clay (CL), silty, with rock fragments, some sand, VERY STIFF, dark gray, damp to moist.
Lean Clay (CL), little sand and gravel, trace silt, HARD, brown, damp, (GLACIAL TILL).
Lean Clay (CL), silty, little sand, VERY STIFF to…