S-2-0 ALT 2 - ALTERNATE 2 ROOF FRAMING PLAN.PDF
PDF 171 KB Posted
- Solicitation number
- 36C25020B0030
About this file
This notice is for a pre-solicitation of a federal construction contract opportunity for a New MRI Site Prep project at the Dayton VA Medical Center in Dayton, Ohio. The contractor shall provide all labor, materials, equipment, and supervision to professionally prepare the site for a new building to house MRI equipment, as required by the drawings and specifications. The performance period is 245 calendar days from notice to proceed. The solicitation will be posted on or around March 20, 2020, with proposals due approximately 30 days later. This is a 100% set-aside for service-disabled veteran-owned small businesses, who must be verified and registered in the required systems. The contractor or subcontractor must perform a minimum of 15% of the construction work. Bid, payment and performance bonds will be required.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIM.
R
Q.3
Q
P.8
P.5
O.8
O.7 O.7
6.5 6.86.2
P.81
9.78.87.96.4 6.9
P.9
Q.4
7.3
8'-3" 20'-3" 22'-3" 28'-8"
'-4
/8
'-6
'-4
MFC-1
MFC-2
MFC-1
MFC-2
MFC-2
MFC-1
MFC-1
MFC-2
W
X3
W18X40W18X35W18X40
W18X40W18X35W18X40W18X40
W
X3
K4
KS
P4
KS
P4
KS
P4
KS
P1
KS
P1
KS
P1
KS
P2
KS
P3
KS
P3
KS
P3
(5 EQUAL SPACES) (4 EQUAL SPACES) (5 EQUAL SPACES)
6'-5 3/4" ±
2'-1 1/4" ±
6'-1 3/4" ±
1'-3 1/8" ±
8'-7" ± 7'-4 7/8" ±
'-3
9'
-9
'-2
'-1 0"
'-0
1' -2
/8
J/BRG. = (+15'-10 3/4")
S-5.1
S-5.1
S-5.1
(E ) W
(E) W21
(E) W14
(E ) W
RTU-1
2800#
CU-1
500# CHILLER
4300#
ROOF DRAINS,
SEE ARCH.
W10X22
W
X1
W 8X
K1
2.
5K
K1
K1
K1
K1
(E ) W
(E) W10
(E ) W
(E ) W
(E) W14(E) W14
(E) W14 (E) W14
(E) W21
(E) W21
W12X35
K1
K1
W10X22 W12X14
K1
K1
K1
W
X1
1/ 2"
K1
W
X1
W12X14
W
X1
W 10X12
W8X10
K1
2.
5K
W
X1
1/ 2"
W
X2
W12X26
W
X1
W10X22
W10X12
C-1
C-1
J/BRG. = (+15'-3 1/2")
PROVIDE DUCT FRAMING AT
DUCT OPENING. SEE TYPICAL
DETAIL ON SHEET S5.0 TYPICAL
AT MECH. UNITS. GENERAL
CONTRACTOR TO COORDINATE
EXACT DIMENSIONS &
LOCATIONS OF FRAMING WITH
MECHANICAL CONTRACTOR
K1
K1
K1
H3.6-18 H3.6-18 H3.6-18 H6-18
H 6-
S-5.1
1' -0
/8
J/BRG. = (+15'-3 1/2")
J/BRG. = (+15'-3 1/2")
J/BRG. = (+15'-3 1/2")
H6-16
S-5.1 4
S-5.1
S-5.1
S-5.1
S-5.1
S-5.1
S-5.1
S-5.1
S-5.1
(E) HSS16x8 (LO)
TO BE DEMO'D
0"
0"
(2) CONT. HSS6x6x1/4 GALV. (HI)(2) CONT.
HSS6x6x1/4
GALV. (HI)
(2) CONT.
HSS6x6x1/4
GALV. (HI)
DESIGN JOIST FOR
2k POINT LOAD @
KICKER TYP.
C-1
C-1
C-1
W
X2
1/ 2"
W
X2
1/ 2"
W
X2
1/ 2"
(2) CONT. HSS6x6x1/4 GALV. (HI)
(2 ) C
O N
T.
H
S S6 x6 x1
/4 G
AL
V.
(H I)(2) CONT. HSS6x6x1/4 GALV. (HI)
(2 ) C
O N
T.
H
S S6 x6 x1
/4 G
AL
V.
(H I)
S-5.1
S-5.1
TY
P.
3' -0
TYP.
3'-0"
S-5.1
K1
K1
K1
K1
K1
K1
K1
S-5.1
S-5.1
S-5.1
S-5.1
S-5.1
0"
0"
S-5.1
ECU-1 BELOW, SEE
TYPICAL UNDERHUNG
UNIT SUPPORT DETAIL
2.5K1
2.
5K
2.
5K
2.
5K
SKYLIGHT,
SEE ARCH.
MC6x12 ON TOP OF DECK.
TYPICAL AT MECH. UNITS
SEE DETAIL ON SHEET S5.0
C4x7.25
C4x7.25
JOIST HDR
JOIST HDR
JOIST HDR
JOIST HDR
ANGLE FRAMING FOR
ROOF OPENING. SEE
TYPICAL ROOF OPENING
DETAIL ON S5.0
5"
5"
5"
W8X10
2.
5K
2.5 K2
BOTTOM FLANGE
BRACING, SEE TYPICAL
DETAILS ON S5.1
BOTTOM FLANGE
BRACING, SEE TYPICAL
DETAILS ON S5.1
BOTTOM FLANGE
BRACING, SEE TYPICAL
DETAILS ON S5.1
BOTTOM FLANGE
BRACING, SEE TYPICAL
DETAILS ON S5.1
1' -0
/8
1'-0 5/8"
KNOCK OUT PANEL,
SEE ARCH.
Project Number
Office of Construction and Facilities Management
Building Number
Drawing Number
VA FORM 08-6231
CONSULTANTS: ARCHITECTS/ENGINEERS: ARCHITECTURAL PROJECT #
VA Building th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
F
E
D
C
B
A
F
E
D
C
B
A
987654321
987654321
Project Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
KEY PLAN
Dwg. of
BID & CONSTRUCTION
FULLY SPRINKLERED
PHILIP P. KIRK
CHIEF ENGINEER
:1 :0
A M
C R e vi t Lo c a l Fi le s\
S tr u c t _ R m g ib b o n s@ th o rs o n b a k er .c o m .r vt
ALTERNATE #2 ROOF FRAMING PLAN
S-2.0 ALT #2
Checker Designer
CSI-176
NEW MRI SITE PREP
02/20/2020
4100 WEST THIRD ST, DAYTON, OH 45428
18106
N SCALE: 1/4" = 1'-0"
ALTERNATE #2 ROOF FRAMING PLAN
TYPICAL ROOF DECK CONNECTION SCHEDULE
PERPENDICULAR
TO SUPPORT
MARK ATTACHMENT
PARALLEL
TO SUPPORT
SEAMS
PUDDLE WELD AT 12" O.C.
(36/4 PATTERN)
A PUDDLE WELD AT 12" O.C. (2)-#10 TEK SCREW PER SPAN
NOTES:
• ALL PUDDLE WELDS TO BE 5/8"Ø FUSION TYPE (UNO.).
WELDS TO BE MADE FOLLOWING AWS D1.3 SPECIFICATIONS BY
QUALIFIED WELDING OPERATORS.
• ALL DECK END LAPS TO BE A MINIMUM OF 2".
• SEE SECTIONS AND DETAILS FOR ADDITIONAL WELDS REQUIRED TYP. (UNO)
A
COLUMN SCHEDULE
MARK COLUMN SIZE BASEPLATE TYPE
ANCHOR
RODS
C-1 W8X31 PL3/4"x14"x1'-2" I (4)-3/4"Ø
MFC-1 W10X33 PL.1 1/4"x16"x1'-4" II (4)-3/4"Ø MFC-2 W10X45 PL.1 1/4"x16"x1'-4" III (4)-1"Ø
• MFC-X DENOTES MOMENT FRAME COLUMNS
• SEE SHEET S-5.0 FOR TYPICAL COLUMN BASE PLATES
• SEE SHEET S-3.0 FOR TYPICAL ANCHOR ROD DETAIL
NOTES:
• ROOF CONSTRUCTION: 1 1/2"x22GA. GALVANIZED WIDE RIB DECK (TYPE B) WELDED TO
SUPPORT STEEL, SEE TYPICAL ROOF DECK CONNECTION SCHEDULE. MINIMUM 3-SPAN
CONDITION (UNO).
• DENOTES 4" NWC SLAB ON 1 1/2"x20GA GALVANIZED WIDE RIB DECK (TYPE B)
• J/B = ROOF JOIST BEARING ELEVATION REFERENCED FROM SLAB ON GRADE ELEVATION OF
0'-0".
• ROOF BEAM ELEVATION NOTED THUS (±) INDICATE TOP OF BEAM ABOVE OR BELOW J/B
ELEVATION NOTED.
• PROVIDE JOIST BRIDGING IN ACCORDANCE WITH THE STEEL JOIST INSTITUTE (UNO). SEE
TYPICAL DETAIL ON S-5.0.
• PROVIDE ADDITIONAL ROW OF BRIDGING AT 1st PANEL POINT OF ALL JOISTS SUBJECTED TO
NET UPLIFT LOADING--SEE GENERAL NOTES.
• PROVIDE L2 1/2"x2"x1/4 AT ALL CHANGES IN DECK DIRECTION AND ALL LOCATIONS WHERE
DECK IS CUT ON A SKEW (UNO).
• COORDINATE ALL OPENINGS AND EDGE CONDITIONS WITH ARCHITECTURAL AND MECHANICAL
DRAWINGS. SEE SHEET S-5.0 FOR TYPICAL OPENING DETAIL.
• DESIGN JOIST SUBSTITUTES FOR 400 PLF (UNO).
• SEE SHEETS S-0.1, S-0.2, & S-0.3 FOR GENERAL NOTES.
• SEE SHEET S-5.0 FOR TYPICAL DETAILS.
• C-X DENOTES COLUMNS. SEE THIS SHEET FOR SCHEDULE.
• MFC-X DENOTES MOMENT FRAME COLUMNS. SEE THIS SHEET FOR SCHEDULE.
• XXKSPX DENOTES SPECIAL JOISTS. SEE JOIST LOADING DIAGRAMS ON S-2.0.
• DENOTES FLEXIBLE MOMENT CONNECTION. SEE SHEET S-5.0 FOR DETAILS.
• DENOTES MOMENT CONNECTION. SEE SHEET S-5.0 FOR DETAILS.
• JOISTS ARE DESIGNED TO SUPPORT EQUIPMENT INDICATED ON PLAN. IF EQUIPMENT
LOCATION VARIES OR WEIGHT EXCEEDS THAT NOTED THEN NOTIFY ENGINEER.
• (E) DENOTES EXISTING CONSTRUCTION.
• P-1 DENOTES SCREEN WALL POST. SEE DETAIL 7 ON S-5.1.
• HX-XX DENOTES BUILT UP COLD FORMED BOX HEADER, SEE SCHEDULE.
TOTAL PEAK DRIFT LOAD
ROOF PROJECTION,
OBSTRUCTION, ETC.
DRIFT ZONE
ROOF
FLAT/SLOPED SNOW LOAD.
MARK
DRIFT LOADING PARAMETERS
FLAT/SLOPED
SNOW LOAD
PEAK DRIFT
LOAD (PSF)
TOTAL PEAK
LOAD
WIDTH OF
DRIFT NOTES
1 22 PSF 28 PSF 50 PSF 6'-8"
2 51 PSF 12'-1"
3 28 PSF 6'-8"
4 20 PSF 9'-6"
SNOW DRIFT SCHEDULE
DRIFT
WIDTH OF
4 2
NOTES:
• LOADS SHOWN ARE DRIFT AND SNOW LOADS ONLY. LOADING SHOWN DOES NOT INCLUDE DEAD LOADS.
• SLIDING SNOW LOADS AND UNBALANCED SNOW LOADS ARE NOT SHOWN IN THIS SCHEDULE. ANY DELEGATED DESIGN ENGINEER SHALL CONSIDER THE SLIDING SNOW AND UNBALANCED SNOW LOADS IN
THEIR DESIGN ALONG WITH CONSIDERING LOADING SHOWN IN THIS SCHEDULE.
73 PSF
50 PSF
43 PSF
Revisions Date
65% DD SUBMISSION 07/29/2019
95% CD SUBMISSION 10/07/2019
BID & CONSTRUCTION 12/19/2019
CAM REVIEW 02/21/2020
ADDENDUM #1 06/10/2020
File details come from the government source that posted it. Updated .