AE-1000 - PARTITION TYPES - FINISH SCHEDULE - LEGEND AND DETAILS.pdf

PDF 1 MB Posted

Attached to
Y1DB--552-CSI-176: New MRI Site Prep (VA-20-00027715)
Solicitation number
36C25020B0030
Issued by

About this file

This pre-solicitation notice is for a new MRI site preparation project at the Dayton VA Medical Center in Dayton, Ohio. The project has an estimated value between $2-5 million and is set aside solely for Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification System code for the construction work is 236220. The contractor will be required to perform at least 15% of the construction work and must complete all work within 365 calendar days of receiving the notice to proceed. The solicitation documents will be posted on March 20, 2020 on FBO.gov and proposals will be due approximately 30 days later. A site visit will also be scheduled. The agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLOOR

CPT CARPET TILE

CT CERAMIC TILE

LVT LUXURY VINLY TILE

WSF WELDED VINYL SHEET FLOORING

ROOM FINISH LEGEND

WALL

P PAINT

IRWC (WP) IMPACT RESISTANT WALLCOVERING (WALL PROTECTION)

BASE

RB RUBBER COVE BASE

WSF WELDED SHEET VINYL, INTEGRAL COVE BASE

CEILINGS

ACT ACOUSTICAL CEILING TILE

P PAINT

GENERAL NOTES

1. SEE REFLECTED CEILING PLAN FOR CEILING HEIGHTS.

2. SEE DRAWINGS FOR LOCATION AND ELEVATIONS OF

ARCHITECTURAL WOODWORK.

3. GYPSUM BOARD SOFFITS: UNLESS NOTED, HORIZONTAL SURFACES

SHALL BE SAME AS ANY CONNECTING WALL SURFACE. SEE

REFLECTED CEILING PLAN FOR SOFFIT HEIGHT.

4. PAINT ALL NEW METAL DOORS AND DOOR FRAMES (INCLUDING

VISION PANELS IN DOORS) UNLESS NOTED. SEE PAINT

SPECIFICATIONS FOR FINISH.

5. P&M DENOTES PATCH AND MATCH TO EXISTING ADJACENT

MATERIALS, FINISHES AND COLORS

SUBSTRATE

C CONCRETE

CBB CEMENTITIOUS BACKER BOARD

GWB GYPSUM BOARD

MRGB MOISTURE RESISTANT GYPSUM BOARD

ARCHITECTURAL WOODWORK

PL PLASTIC LAMINATE

SS SOLID SURFACE MATERIAL

SCHEDULE NOTES

1. SEE DRAWINGS FOR LOCATION OF CORNER GUARDS, CRASH RAILS,

AND BUMPER GUARDS.

2. REFER TO FLOOR PATTERN PLANS FOR FLOOR PATTERN

INFORMATION ON DRAWINGS.

3. SEE DRAWINGS FOR WALL ELEVATIONS

EXISTING OR

SCHEDULED

PARTITION

BLOCKING AS

REQUIRED

CONTINUOUS

ALUMINUM

RETAINER

VINYL CRASH RAIL

EDGE OF WALL,

DOOR FRAME, OR

CORNER GUARD

ELEVATION SECTION

2"

S E

E E

L E

V A

T

IO

N S

V A

R

IE

SATTACH PER

MANUFACTURER'S

STANDARDS

METAL STUD

FRAMING, SEE

PARTITION TYPE

VINYL EXTRUSION

BACK-UP SHEET

VINYL ACRYLIC

CORNER GUARD

CONT. ALUM.

RETAINER2

2"

ATTACH PER

MANUFACTURER'S

STANDARDS

METAL STUD

FRAMING, SEE

PARTITION TYPE

VINYL ACRYLIC

CORNER GUARD

3"

" CONT. ALUM.

RETAINER

PARTITION TYPE 'C'

NON-RATED SMOKE PARTITION

(1) LAYER OF 5/8" GYP. BD. ON EACH SIDE

OF 3 5/8" METAL STUDS @ 16" O.C.

PARTITION TYPE 'D'

NON-RATED

(1) LAYER OF 5/8" GYP. BD. ON EACH

SIDE OF 3 5/8" METAL STUD @ 16"O.C.

PARTITION AT FLOOR PARTITION AT FLOOR

PARTITION AT CEILING

STRUCTURE ABOVE

DEFLECTION JOINT

CONTINUOUS

RUNNER TRACK

CONTINUOUS

ACOUSTICAL

SEALANT

CEILING SYSTEM

CONT. RUNNER

TRACK

CORRIDOR SIDE

INFILL VOID AREAS

W/ SOUND

BLANKET

CONTINUOUS

ACOUSTICAL

SEALANT

CONTINUOUS

RUNNER TRACK

CEILING

STRAP BRIDGING

STRUCTURE ABOVE

EXTEND GYP.

BD. 6" ABOVE

CEILING

DEFLECTION JOINT

CONT. RUNNER TRACK

STRUCTURE ABOVE

SMOKESTOP ALL VOID

AREAS TIGHT TO

UNDERSIDE OF

STRUCTURE W/ SAFING

14 GA. STL PLATE

AS REQ.

EXISTING CONSTR.

OR NEW MASONRY

CONSTR. (SEE PLANS

FOR SPECIFIC

CONDITIONS)

SOUND ATTENUATION

BLANKET

HEAD OF PARTITION

METAL DECK PERPENDICULAR TO FLUTES

HEAD OF PARTITION

METAL DECK PARALLEL TO FLUTES

HEAD OF PARTITION

CONCRETE SLAB

HEAD OF PARTITION

METAL DECK PERPENDICULAR TO FLUTES

HEAD OF PARTITION

METAL DECK PARALLEL TO FLUTES

4 7/8" 4 7/8"

3 1/2" SOUND

ATTENUATION

BLANKET

CONTINUOUS

ACOUSTICAL

SEALANT EACH SIDE

STRUCTURE ABOVE

3 1/2" SOUND

ATTENUATION

BLANKET

CONTINUOUS

RUNNER TRACK

CONTINUOUS

RUNNER

TRACK DEFLECTION JOINT

STRUCTURE ABOVE

CONTINUOUS

RUNNER TRACK

DEFLECTION JOINT

3 1/2" SOUND

ATTENUATION

BLANKET

DEFLECTION JOINT

14 GA. STEEL

PLATE AS

REQUIRED

CONTINUOUS

ACOUSTICAL SEALANT

EACH SIDE

STRUCTURE ABOVE

CONTINUOUS

RUNNER TRACK

3 1/2" SOUND

ATTENUATION

BLANKET

CONTINUOUS

RUNNER TRACK

3 1/2" SOUND

ATTENUATION

BLANKET

EXTEND GYP. BD. 6"

ABOVE CEILING, THIS

SIDE

3 1/2" SOUND

ATTENUATION

BLANKET

CONTINUOUS

ACOUSTICAL SEALANT

EACH SIDE

3 1/2" SOUND

ATTENUATION

BLANKET

3 1/2" SOUND

ATTENUATION

BLANKET

4 1/4"

EXISTING CONSTR.

OR NEW MASONRY

CONSTR. (SEE PLANS

FOR SPECIFIC

CONDITIONS)

PARTITION TYPE 'G'

NON-RATED

(1) LAYER OF 5/8" GYP. BD. ON ONE SIDE OF

3 5/8" METAL STUD FURRING @ 16" O.C.

PARTITION AT FLOOR

PARTITION AT CEILING

HEAD OF PARTITION

4 7/8"

PARTITION TYPE 'A'

ONE HOUR RATED (U.L. #U419)

(1) LAYER OF 5/8" FIRE RESISTIVE GYP. BD. ON

EACH SIDE OF 3 5/8" METAL STUDS @ 16" O.C.

HEAD OF PARTITION

METAL DECK PERPENDICULAR TO FLUTES

HEAD OF PARTITION

METAL DECK PARALLEL TO FLUTES

PARTITION AT FLOOR

HEAD OF PARTITION

CONCRETE SLAB

STRUCTURE ABOVE

CONTINUOUS

RUNNER TRACK

FIRESTOP JOINT

BETWEEN TOP OF FIRE-

RATED PARTITION AND

STRUCTURE ABOVE W/

U.L. OR W.H.I. PPROVED

(1) HR. JOINT FIRESTOP

SYSTEM.

SOUND

ATTENUATION

BLANKET

CONTINUOUS

ACOUSTICAL SEALANT

EACH SIDE

CONTINUOUS

ACOUSTICAL

SEALANT

DEFLECTION JOINT

CONTINUOUS

RUNNER TRACK

STRUCTURE ABOVE

STRUCTURE ABOVE

DEFLECTION JOINT

DEFLECTION JOINT

SOUND

ATTENUATION

BLANKET

SOUND

ATTENUATION

BLANKET

CONTINUOUS

RUNNER TRACK

CONTINUOUS RUNNER

TRACK

FIRESTOP JOINT

BETWEEN TOP OF FIRE-

RATED PARTITION AND

STRUCTURE ABOVE W/

U.L. OR W.H.I. PPROVED

(1) HR. JOINT FIRESTOP

SYSTEM.

EXISTING CEILING

EXISTING FLOOR

(SLAB)

METAL TRACK

FOR 3 5/8" STUD

OR 2X TOP PLATE

METAL RUNNER

FOR 3 5/8" METAL

STUD OR 2X SILL

PLATE

5/8" EXTERIOR

GRADE PLYWOOD

OR 5/8" GYP. BD.

WITH LEVEL 4 FINISH

PUBLIC SIDE CONSTRUCTION SIDE

MAX GAP OF 1/4"

BETWEEN EXISTING

CEILING AND TOP OF

WALL

TEMPORARY CONSTRUCTION

BARRIER DETAIL

EXISTING CEILING

EXISTING FLOOR (SLAB)

METAL TRACK FOR 8"

STUD OR 2X TOP PLATE

METAL RUNNER FOR 8" METAL

STUD OR 2X SILL PLATE

5/8" GYP. BD. WITH

LEVEL 4 FINISH

PUBLIC SIDE CONSTRUCTION SIDE

MAX GAP OF 1/4"

BETWEEN EXISTING

CEILING AND TOP OF

WALL

SPRAY APPLIED VAPOR

BARRIER ON EXTERIOR

GRADE PLYWOOD

TEMPORARY CONSTRUCTION BARRIER

WHERE EXPOSED TO ELEMENTS

4 7/8"

TEMPORARY

CONSTRUCTION BARRIER

HEAD OF PARTITION

METAL DECK PARALLEL TO FLUTES

PARTITION AT FLOOR

SOUND ATTENUATION

BLANKET CONTINUOUS ACOUSTICAL

SEALANT EACH SIDE

STRUCTURE ABOVE

DEFLECTION JOINT

SOUND ATTENUATION

BLANKET

CONTINUOUS RUNNER TRACK

CONTINUOUS RUNNER TRACK

FIRESTOP JOINT BETWEEN TOP

OF FIRE-RATED PARTITION AND

STRUCTURE ABOVE W/ U.L. OR

W.H.I. PPROVED (1) HR. JOINT

FIRESTOP SYSTEM.

ONE HOUR RATED (U.L. #U419)

(1) LAYER OF 5/8" FIRE RESISTIVE GYP. BD. ON

EACH SIDE OF 3 5/8" METAL STUDS @ 16" O.C.

PUBLIC SIDE CONSTRUCTION SIDE

5/8" GYP. BD. WITH

LEVEL 4 FINISH

MICHAEL DWAYNE

LIEZERT

S

TATE OF OHIO

R E

G

ISTERED ARCHIT

E C

T9939

Project Number

Office of Construction and Facilities Management

Building Number

Drawing Number

VA FORM 08-6231

CONSULTANTS: ARCHITECTS/ENGINEERS: ARCHITECTURAL PROJECT #

VA Building th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

F

E

D

C

B

A

F

E

D

C

B

A

987654321

987654321

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

KEY PLAN

Dwg. of

FULLY SPRINKLERED

PHILIP P. KIRK

CHIEF ENGINEER

:3 :1

A M

C U s e rs jc h o D o c u m e n ts R

N E W

M R I S

IT

E

P R E P C e n tr a l_ jc h o .r v t

PARTITION TYPES, FINISH SCHEDULE,

LEGEND AND DETAILS

AE-1000

BH Designer

552-CSI-176

NEW MRI SITE PREP

02/21/2020

4100 WEST THIRD STREET, DAYTON, OHIO 45428

18106

BID & CONSTRUCTION

ROOM FINISH SCHEDULE

ROOM FLOOR BASE WALLS CEILING ARCH.

WOODWORK NOTESNUMBER NAME SUBSTR. FINISH SUBSTR. FINISH SUBSTR. NORTH SOUTH EAST WEST SUBSTR. FINISH

A100 VESTIBULE C CPT-8 GWB RB-1 GWB - P-2/A - P-2/A* MRGB PT-32/A - *WITHSTONE VENEER

A101 LOBBY/WAITING C LVT-3/LVT-8* GWB RB-1 GWB - P-16/A P-2/A P-2/A - ACT-1 - REWORK EXISTING FLOORING AND CELING TILE WITH NEW TILE AND PATTERN

A102 ENTRANCE HALL C LVT-8 GWB RB-1 GWB - P-2/A P-2/A P-2/A - ACT-1 - *SEE FINISH FLOOR PLAN

A103 ENTRANCE C LVT-8 GWB RB-1 GWB P-2/A - P-2/A P-16/A - ACT-1 -

A104 PREP AREA C LVT-8 GWB RB-1 GWB P-2/A P-2/A* P-2/A P-16/A - ACT-1 SS-2/PL12 *WITH/ IRWC1A WAINSCOT

A105 SUB WAITING C LVT-3/LVT-8* GWB RB-1 GWB P-2/A P-16/A P-2/A P-16/A - ACT-1 - *SEE FINISH FLOOR PLAN

A106 DRESSING C LVT-8 GWB RB-1 GWB P-2/A P-2/A P-16/A P-2/A - ACT-1 SS-2/PL12 WINDOW SILL: SS-2

A107 DRESSING C LVT-8 GWB RB-1 GWB P-2/A P-2/A P-16/A P-2/A - ACT-1 SS-2/PL12 WINDOW SILL: SS-2

A108 OFFICE C LVT-8 GWB RB-1 GWB P-2/A P-2/A P-16/A P-2/A - ACT-1 - WINDOW SILL: SS-2

A109 CORRIDOR C LVT-8 GWB RB-1 GWB P-2/A P-2/A P-2/A - - ACT-1 -

A110 EQUIPMENT C LVT-8 GWB RB-1 GWB P-2/A P-2/A P-2/A P-2/A - ACT-1 -

A111 MRI ROOM C WSF-10 GWB WSF-10 GWB P-2/A P-16/A P-2/A P-16/A - ACT-1 SS-2/PL12

A112 CONTROL ROOM C LVT-8 GWB RB-1 GWB P-2/A P-2/A P-2/A P-16/A - ACT-1 SS-2/PL12

A113 TOILET C CT-1 CBB -- CBB *CT-1 *CT-1 *CT-1 ct-3 - ACT-1 - *WITH PT2/A ABOVE

E113 EX. CORRIDOR C LVT-8 GWB RB-1 ETR P-2/A P-2/A P-2/A P-2/A - GWB* - *PT2/A: SOFFITS

E131 EX. CORRIDOR C LVT-8 GWB RB-1 ETR P-2/A - P-2/A P-2/A - ETR -

E132 EX. CORRIDOR C LVT-8 GWB RB-1 ETR P-2/A P-2/A P-2/A P-2/A - ETR -

WALL PROTECTION LOCATIONCORNER GUARD (CG-2)CORNER GUARD (CG-1)

PARTITION TYPES

Revisions Date

65% DD SUBMISSION 07/29/2019

95% CD SUBMISSION 10/07/2019

BID & CONSTRUCTION 12/19/2019

CAM REVIEW 02/21/2020

ADDENDUM #1 06/08/2020

Sheets
AE-1000 - PARTITION TYPES, FINISH SCHEDULE, LEGEND AND DETAILS

File details come from the government source that posted it. Updated .