20. Exhibit R_New Construction L100 Exhibit (May 2026) PDF.pdf

PDF 142 KB Posted

Attached to
Request for Lease Proposals (RLP) for Olympia, WA CBOC
Solicitation number
36C24W26R0012
Issued by

About this file

This document is a GSA Template L100 for lease agreements involving new construction (Exhibit R), effective February 2026, with one section dated October 2020. It establishes mandatory requirements and standards that lessors must meet when constructing new buildings or substantially rehabilitating existing buildings where the Government will be the sole or predominant tenant.

The document mandates compliance with multiple federal labor standards clauses including Contract Work Hours and Safety Standards Act, Construction Wage Rate Requirements, Copeland Act requirements, and Executive Order 13706 Paid Sick Leave provisions. Security requirements are extensive, requiring lessors to collaborate with the Federal Protective Service to apply Design-Basis Threat protocols and implement blast resistance measures including window glazing specifications, setback distances from potential explosion points, isolated HVAC systems for lobbies and mailrooms, and construction materials with inherent ductility (cast-in-place reinforced concrete or steel). Lessors must provide written certification from licensed structural engineers verifying compliance. Fire protection requires automatic sprinkler systems designed to NFPA 13 standards, secondary power sources for electric fire pumps, and emergency voice/alarm communication systems for buildings meeting specified criteria. Seismic compliance requires certification via Seismic Form F. Building operations must conform to the 2021 International Energy Conservation Code and 2019 ASHRAE Standard 90.1, with lessors encouraged to source at least 50 percent of electricity from renewable sources. Additionally, lessors must submit detailed construction schedules within 10 working days of Notice to Proceed, conduct initial construction meetings, provide written progress reports at 10-working-day intervals with photographs and completion updates, and accommodate Government inspections throughout construction.

View the file

Other files

File Type Posted
19. Exhibit Q_RLP New Construction (May 2026) PDF.pdf PDF
RLP Amd-3 VA-Olympia CBOC dlg.pdf PDF
18. Exhibit P_Broker Project (May 2026)-RLP PDF.pdf PDF
23. Exhibit U_Broker Project L100 Exhibit (May 2026) PDF.pdf PDF
RLP Amd-2 VA-Olympia CBOC dlg.pdf PDF
FAR 52.204-24 Representation (Nov. 2021) with blue text instructions (1).docx DOCX document
RLP Amd-1 VA-Olympia CBOC 261104.pdf PDF
10. Exhibit H_Form12000 FLS PartA v-Dec2018_VA-GP.docx DOCX document
09. Exhibit G - Form 1217 Lessor's Annual Cost Statement (Nov. 2016)_VA-GP.pdf PDF
12. Exhibit J_DB wage 260518_Thurston County_VA-Oly.pdf PDF
07. Exhibit E_3517B General Clauses (Apr26).pdf PDF
04.03 Exhibit B-3 Room Matrix Table Olympia 8.24.26 rev.pdf PDF
04.00 Exhibit B - ASR with Janitorial New Olympia 20260819.pdf PDF
13. Exhibit K_PastPerf Questionnaire_VA-REV.docx DOCX document
15. Exhibit M - SF330 - Architect-Engineer Qualifications_VA-GP.pdf PDF
04.02 Exhibit B-2 VA-Leased-CBOCDesignNarrative-2026-02-06.pdf PDF
14. Exhibit L GSA 527 - Contractor's Qualifications and Financial Information_VA-GP.pdf PDF
04.01 Exhibit B-1 UPDATED-SEPS_PFD OLYMPIA - 8-29-2025.pdf PDF
06. Exhibit D_GSA FORM 3516 Solicitation Provisions (Mar26).pdf PDF
19. Exhibit Q_RLP New Construction (May 2026).docx DOCX document
23. Exhibit U_Broker Project L100 Exhibit (May 2026).docx DOCX document
02. OIympia CBOC RLP 20261013.pdf PDF
03. ExhA_L100 Olympia 20261013.pdf PDF
21. Exhibit S - Sensitive Information Attachment_VA.pdf PDF
11. Exhibit I_Seismic Offer Forms A - F with instructions_VA-GP.docx DOCX document
16. Exhibit N _VA HANDBOOK H-18-8 Seismic Design Requirements for Leases - Seismic Safety_VA-GP.pdf PDF
08. Exhibit F - Form 1364 Proposal to Lease Space (Jan. 2023)_VA-GP.pdf PDF
05. Exhibit C_VA Security Requirements (FSL Level II) (Oct 2024).pdf PDF
20. Exhibit R_New Construction L100 Exhibit (May 2026).docx DOCX document
17. Exhibit O-TICS Template v-Feb2026.pdf for SAM.pdf PDF
18. Exhibit P_Broker Project (May 2026)-RLP.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEASE NO. LSSXXXXX, PAGE 1 LESSOR: ________ GOVERNMENT: ________ GSA TEMPLATE L100, NEW

CONSTRUCTION EXHIBIT X (5/26)

EXHIBIT R NEW CONSTRUCTION

NC 1.01 is added to the Lease, Section 2 General terms, Conditions, and Standards.

NC 1.01 RELOCATION ASSISTANCE ACT (FEB 2026) INTENTIONALLY DELETED

NC 1.02, 1.03, 1.04, 1.05, and 1.06 are added to the Lease, Section 3 Construction standards and shell components.

NC 1.02 LABOR STANDARDS (FEB 2026)

If the Lessor proposes to satisfy the requirements of this Lease through the construction of a new Building or the complete rehabilitation or reconstruction of an existing Building, and the Government will be the sole or predominant tenant such that any other use of the Building will be functionally or quantitatively incidental to the Government’s use and occupancy, the following FAR clauses must apply to all work (including shell and TIs) performed prior to the Government's acceptance of space as substantially complete. Full text versions of these clauses are available upon request from the LCO.

Full text versions are also available at https://www.acquisition.gov/?q=browsefar.

52.222-4 Contract Work Hours and Safety Standards Act—Overtime Compensation 52.222-5 Construction Wage Rate Requirements - Secondary Site of the Work 52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination–Debarment 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations 52.222-14 Disputes Concerning Labor Standards 52.222-15 Certification of Eligibility.

52.222-62 Paid Sick Leave Under Executive Order 13706.

NC 1.03 SECURITY FOR NEW CONSTRUCTION (FEB 2026)

A. Design-Basis Threat. The Design-Basis Threat (DBT) is the profile and estimate of the threats to a Government facility across a range of specific undesirable events and serves as the basis for determining appropriate security standards. The Lessor’s technical consultant(s) must work in conjunction with the Government, including the Federal Protective Service (FPS), to apply the DBT to the post-award risk assessment. The risk assessment identifies recommended countermeasures and security design features that achieve the minimum baseline level of protection for a particular facility. The baseline level of protection may be further customized to address facility-specific conditions. The Lessor is responsible for providing countermeasure provisions outlined in the attached FSL document, as well as for additional items identified during the post-award risk assessment. Any additional countermeasures identified during this assessment must be priced as BSAC.

B. Prior to occupancy, the Lessor must provide a written certification from a licensed professional engineer with formal training in structural dynamics and experience with accepted blast resistant design, verifying that the Building conforms to a minimum of:

1. Window glazing, with a performance condition appropriate to the identified Facility Security Level.

2. Setback distance, measured from the face of the Building's exterior to the protected/defended perimeter (i.e., any potential point of explosion). This means the distance from the Building to the curb or other boundary protected by bollards, planters or other street furniture. Such potential points of explosion may be, but are not limited to, such areas that could be accessible by any motorized vehicle (i.e., street, alley, sidewalk, driveway, parking lot).

3. Lobbies, mailrooms, and loading docks must not share a return-air system with the remaining areas of the Building. The Lessor must provide lobby, mailroom, and loading dock ventilation systems' outside air intakes and exhausts with low leakage, fast acting, isolation dampers that can be closed to isolate their systems. Dedicated HVAC must be required for mailrooms only when the Government specifically requires a centrally operated mailroom. On Buildings of more than four stories, air intakes must be located on the fourth floor or higher. On Buildings of three stories or less, air intakes must be located on the roof or as high as practical. Locating intakes high on a wall is preferred over a roof location.

4. Blast Resistance Requirements.

a. Façade and Structure. Lessor must use construction materials which have inherent ductility and which are able to respond to load reversals (e.g. cast in place reinforced concrete column construction).

b. Progressive Collapse. Lessor must use construction materials which have inherent ductility and which are able to respond to load reversals (e.g. cast in place reinforced concrete and steel construction).

c. Under Building Parking. Lessor must use construction materials which have inherent ductility and which are able to respond to load reversals (e.g. cast in place reinforced concrete and steel construction).

LEASE NO. LSSXXXXX, PAGE 2 LESSOR: ________ GOVERNMENT: ________ GSA TEMPLATE L100, NEW

CONSTRUCTION EXHIBIT X (5/26)

NC 1.04 SEISMIC SAFETY FOR NEW CONSTRUCTION (OCT 2020)

For leases requiring new construction, the space will not be considered substantially complete until the LCO receives the Seismic Form F, Certificate of Seismic Compliance – New Building. This form must be completed by the civil or structural engineer and certify that the building was designed and constructed in accordance with the appropriate local code.

NC 1.05 FIRE PROTECTION FOR NEW CONSTRUCTION (FEB 2026)

A. The new Building must be protected throughout by an automatic fire sprinkler system designed in accordance with the National Fire Protection

Association (NFPA) 13, Installation of Sprinkler Systems (current as of the Lease Award Date).

B. When an electric fire pump is provided to support the design of the fire sprinkler system, a secondary power source must be provided to the fire pump by a standby emergency generator or another means acceptable to the Government.

C. The fire alarm system installed must be an emergency voice/alarm communication system when any one of the following conditions exist:

1. The Building is 2 or more stories in height above the level of exit discharge.

2. The total calculated occupant load of the Building is 300 or more occupants.

3. The Building is subject to 100 or more occupants above or below the level of exit discharge.

The emergency voice/alarm communication system must be designed and installed to meet the requirements of NFPA 72 (current as of the Lease Award Date).

NC 1.06 HIGH-PERFORMANCE BUILDING RATING CERTIFICATION FOR NEW CONSTRUCTION (FEB 2026) INTENTIONALLY DELETED

NC 1.07, NC 1.08, NC. 1.09 and NC 1.10 are added to the Lease, Section 4 Design, Construction, and Post award activities.

NC 1.07 NEW CONSTRUCTION: LEASE SUBMITTALS (FEB 2026) INTENTIONALLY DELETED

NC 1.08 CONSTRUCTION SCHEDULE AND INITIAL CONSTRUCTION MEETING (FEB 2026)

The Lessor must furnish a detailed construction schedule (such as Critical Path Method) to the Government within 10 Working Days of issuance of the NTP. Such schedule must also indicate the dates available for Government contractors to install telephone/data lines or equipment, if needed. Within 10 Working Days of NTP, the Lessor must initiate a construction meeting. This meeting may be held in person or virtually, at the discretion of the Government. The Lessor will have subcontractor representatives including its architects, engineers, general contractor and subcontractors’ representatives in attendance. The Lessor must keep meeting minutes of discussion topics and attendance and must distribute to all parties within 2 Working Days of the meeting.

NC 1.09 PROGRESS REPORTS (FEB 2026)

After start of construction, the Lessor must submit to the LCO or designated representative written progress reports at intervals of 10 Working Days.

Each report must include information as to the percentage of the work completed by phase and trade; along with labeled photographs, a statement as to expected completion and occupancy dates; changes introduced into the work; and general remarks on such items as material shortages, strikes, weather, etc., that may affect timely completion. In addition, at the Government’s discretion, the Lessor must conduct meetings every two weeks to brief Government personnel and/or contractors regarding the progress of design and construction of the Space. These meetings may be held in person or virtually, at the discretion of the Government. The Lessor must be responsible for taking and distributing minutes of these meetings.

NC 1.10 CONSTRUCTION INSPECTIONS (FEB 2026)

A. The LCO or the LCO's designated technical representative may periodically inspect construction work to review compliance with Lease requirements and approved DIDs, if applicable.

B. Periodic reviews, witnessing of tests, and inspections by the Government must not constitute approval of the Lessor's apparent progress toward meeting the Government's objectives but are intended to discover any information which the LCO may be able to call to the Lessor's attention to prevent costly misdirection of effort. The Lessor must remain responsible for designing, constructing, operating, and maintaining the Building in full accordance with the requirements of the Lease. At the discretion of the LCO, minutes from the progress meetings may satisfy the requirement for written progress reports.

NC 1.11 is added to the Lease, Section 6 Utilities, Services, and Obligations during the lease term.

NC 1.11 NEW CONSTRUCTION: UTILITIES (FEB 2026)

A. The Building operating plan must conform with the 2021 International Energy Conservation Code (IECC) and the 2019 ASHRAE Standard

90.1. These standards specify energy conservation requirements for mechanical systems, building envelope efficiency, insulation, and lighting.

More information on this Department of Energy rule can be found at: https://www.energy.gov/.

B. The Lessor is encouraged to purchase at least 50 percent of the Government tenant’s electricity from renewable sources.

https://www.energy.gov/ https://www.energy.gov/

NC 1.01 RELOCATION ASSISTANCE ACT (FEB 2026) INTENTIONALLY DELETED
NC 1.02 LABOR STANDARDS (FEB 2026)
NC 1.03 SECURITY FOR NEW CONSTRUCTION (FEB 2026)
NC 1.04 SEISMIC SAFETY FOR NEW CONSTRUCTION (OCT 2020)
NC 1.05 FIRE PROTECTION FOR NEW CONSTRUCTION (FEB 2026)
NC 1.06 HIGH-PERFORMANCE BUILDING RATING CERTIFICATION FOR NEW CONSTRUCTION (FEB 2026) INTENTIONALLY DELETED
NC 1.07 NEW CONSTRUCTION: LEASE SUBMITTALS (FEB 2026) INTENTIONALLY DELETED
NC 1.08 CONSTRUCTION SCHEDULE AND INITIAL CONSTRUCTION MEETING (FEB 2026)
NC 1.09 PROGRESS REPORTS (FEB 2026)
NC 1.10 CONSTRUCTION INSPECTIONS (FEB 2026)
NC 1.11 NEW CONSTRUCTION: UTILITIES (FEB 2026)