19. Exhibit Q_RLP New Construction (May 2026).docx

DOCX document 39 KB Posted

Attached to
Request for Lease Proposals (RLP) for Olympia, WA CBOC
Solicitation number
36C24W26R0012
Issued by

About this file

This is an exhibit template for a Request for Lease Proposals (RLP) that establishes submittal requirements and documentation standards specific to new construction lease offerings. The exhibit is designed to supplement the GSA Template R100 and applies only when newly constructed buildings represent the sole solution meeting the government's needs and existing buildings are not competing alternatives.

For new construction proposals, offerors must submit a Fire Protection and Life Safety (FPLS) submittal documenting the applicable Building Code edition and commitment to meet mandatory FPLS lease requirements. Projects of 10,000 RSF and above must include either LEED-NC Silver or Green Globes for New Construction (GG-NC) certification documentation, depending on the client agency's selection—with LEED requiring submission of a scorecard, credit achievement statements, and identification of USGBC LEED Accredited Professionals, while Green Globes requires Two Green Globes level documentation and optional identification of GBI Green Globes Professionals. Additionally, when the RLP stipulates a required occupancy date, offerors must provide a detailed construction schedule identifying permitting, design, and construction phase completion dates aligned with the government's required occupancy date and lease milestones. The template was created in February 2026 with updates in May 2026 to modify terminology from "attachment" to "exhibit." This exhibit is specifically tailored for the VA's Olympia, Washington CBOC lease solicitation (36C24W26R0012) requiring 33,992 RSF of leased medical space under a 20-year term with 15 firm and 5 soft years.

View the file

Other files

File Type Posted
05. Exhibit C_VA Security Requirements (FSL Level II) (Oct 2024).pdf PDF
12. Exhibit J_DB wage 260518_Thurston County_VA-Oly.pdf PDF
17. Exhibit O-TICS Template v-Feb2026.pdf for SAM.pdf PDF
18. Exhibit P_Broker Project (May 2026)-RLP.docx DOCX document
20. Exhibit R_New Construction L100 Exhibit (May 2026).docx DOCX document
02. OIympia CBOC RLP 20261013.pdf PDF
21. Exhibit S - Sensitive Information Attachment_VA.pdf PDF
23. Exhibit U_Broker Project L100 Exhibit (May 2026).docx DOCX document
03. ExhA_L100 Olympia 20261013.pdf PDF
04.02 Exhibit B-2 VA-Leased-CBOCDesignNarrative-2026-02-06.pdf PDF
08. Exhibit F - Form 1364 Proposal to Lease Space (Jan. 2023)_VA-GP.pdf PDF
09. Exhibit G - Form 1217 Lessor's Annual Cost Statement (Nov. 2016)_VA-GP.pdf PDF
10. Exhibit H_Form12000 FLS PartA v-Dec2018_VA-GP.docx DOCX document
13. Exhibit K_PastPerf Questionnaire_VA-REV.docx DOCX document
14. Exhibit L GSA 527 - Contractor's Qualifications and Financial Information_VA-GP.pdf PDF
15. Exhibit M - SF330 - Architect-Engineer Qualifications_VA-GP.pdf PDF
16. Exhibit N _VA HANDBOOK H-18-8 Seismic Design Requirements for Leases - Seismic Safety_VA-GP.pdf PDF
04.00 Exhibit B - ASR with Janitorial New Olympia 20260819.pdf PDF
04.01 Exhibit B-1 UPDATED-SEPS_PFD OLYMPIA - 8-29-2025.pdf PDF
04.03 Exhibit B-3 Room Matrix Table Olympia 8.24.26 rev.pdf PDF
06. Exhibit D_GSA FORM 3516 Solicitation Provisions (Mar26).pdf PDF
07. Exhibit E_3517B General Clauses (Apr26).pdf PDF
11. Exhibit I_Seismic Offer Forms A - F with instructions_VA-GP.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RLP EXHIBIT X Q NEW CONSTRUCTION

ACTION REQUIRED: TO BE INCLUDED IN CONJUNCTION WITH LEASE EXHIBIT “NEW CONSTRUCTION.”

ACTION REQUIRED: USE ONLY WHEN A NEWLY CONSTRUCTED BUILDING IS THE ONLY SOLUTION THAT WILL MEET THE CUSTOMER’S NEEDS AND EXISTING BUILDINGS ARE NOT COMPETING.

NOTE: PARAGRAPH MUST BE ADDED BACK IN VIA RLP AMENDMENT IF, AT ANY POINT PRIOR TO FPR, THE GOVERNMENT ONLY HAS OFFERS FOR NEW CONSTRUCTION.

NC 1.01 LIST OF RLP DOCUMENTS – NEW CONSTRUCTION (FEB 2026)

The following is added to the RLP paragraph titled: “List of RLP Documents” in the table in sub-paragraph A:

Document Name
No. of Pages
Exhibit
DOL Wage Determination [WHEN INCLUDING “LABOR STANDARDS” LEASE PARAGRAPH. THE OFFICIAL WEBSITE FOR OBTAINING WAGE DETERMINATIONS IS SAM.GOV.]
5
J

NC 1.02 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS – NEW CONSTRUCTION (FEB 2026)

The following is added to the RLP paragraph titled: “Instructions for Offeror and Submittals” as a requirements and additional submittals.

Document Name
Exhibit H: New Construction
FPLS Submittal for New Construction
NC 1.02 A

LEED-NC Silver or Green Globes for New Construction (GG-NC) Certification Documentation

INTENTIONALLY DELETED

NC 1.02 B Comment by Timothy Pavek: Deb - confirm no LEED or GreenGlobes. If we must use one, I recommend Green Globes

Construction Schedule for New Construction
NC 1.02 C

A. Fire Protection and Life Safety (FPLS) Submittal for New Construction. As part of the FPLS Submittal Information, for offers of new construction, documentation indicating the Building Code (including edition) to which the Building is being constructed and a written commitment to meet all of the mandatory FPLS lease requirements in the Lease.

ACTION REQUIRED: OPTIONAL SUB-PARAGRAPH. INCLUDE WHEN CLIENT AGENCIES REQUEST USE OF LEED OR GREEN GLOBES FOR NEW CONSTRUCTION. PRIOR TO ISSUING THE RLP, CONSULT WITH THE CLIENT AGENCY TO DETERMINE WHICH HIGH-PERFORMANCE BUILDING RATING SYSTEM TO USE. DELETE IF NOT APPLICABLE.

ACTION REQUIRED: SELECT THE APPROPRIATE VERSION OF SUB-PARAGRAPH B. DELETE ALTERNATE VERSIONS. CHOICE MUST BE CONSISTENT WITHIN RLP AND LEASE DOCUMENTS.

VERSION 1: USE IF LEED FOR NEW CONSTRUCTION IS SELECTED.

B. LEED-NC Silver for New Construction Certification Documentation. For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Leadership in Energy and Environmental Design® for New Construction (LEED-NC) credits for Silver level certification. For LEED, this documentation is the LEED-NC scorecard. Along with the proposed scorecard or checklist, the Offeror must submit a brief statement outlining how each of the proposed credits will be achieved. If pursuing LEED-NC, the Offeror must identify the U.S. Green Building Council LEED Accredited Professionals as team members, including their roles throughout the project.

VERSION 2: USE IF GREEN GLOBES FOR NEW CONSTRUCTION IS SELECTED.

B. Green Globes for New Construction (GG-NC) Certification Documentation. For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Green Globes for New Construction (GG-NC) credits for Two Green Globes level certification. If pursuing Green Globes-NC, the Offeror may add GBI Green GlobesProfessionals (GGPs) to the project team, but it is not required. If one or more GGPs are added, the Offeror must identify any GGPs as team members, including their roles throughout the project.

ACTION REQUIRED: ONLY INCLUDE WHEN ANTICIPATING OFFERS INVOLVING NEW CONSTRUCTION AND THE RLP STIPULATES A REQUIRED OCCUPANCY DATE.

C. Construction Schedule for New Construction. A construction schedule giving the dates on which the various phases of permitting, design and construction (including principal categories of work) will be completed to coincide with the Government's required occupancy date and the milestones as outlined under the Lease.

Document Change History

Template Date
Description of change
FEB 2026
Newly created exhibit to supplement streamlined changes to R100. Updates to change “shall” to “must.”
MAY 2026
Update ‘attachment’ to ‘exhibit’ in blue text.

RLP NO. XXXXXXX, PAGE 2

GSA TEMPLATE R100, NEW CONSTRUCTION EXHIBIT X (5/26)

File details come from the government source that posted it. Updated .