This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a Mobile Chiller requirement issued by the Department of Veterans Affairs Network Contracting Office 8 (NCO 8) in Tampa, FL. The amendment addresses vendor questions for Solicitation 36C24825Q1093, seeking (1) 1000-ton modular magnetic bearing chiller to be delivered to JAH Hospital, Building 39 Central Energy Plant (CEP). Key details include water connection specifications (Building 39: 12" chilled water, 16" condenser water; Building 100: 12" chilled water, 18" condenser water), electrical requirements (480V, 3-phase, 60 Hz), and delivery expectations.
The solicitation clarifies that the VA will handle building connections, power distribution, and site access. The chiller should remain mobile on its trailer, with VA gray or beige preferred for exterior finish. Delivery will be FOB to JAH Hospital, with the contractor responsible for offloading. Operational checks will be expected during delivery, with power and water availability confirmed upon notification of delivery date. The chiller is intended to provide backup cooling capacity for both Building 39 and Building 100, with the VA managing connections and distribution between the two locations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24825Q1093 0006_1.docx | DOCX document | |
| 36C24825Q1093 0005.pdf | ||
| 36C24825Q1093 0005_1.docx | DOCX document | |
| S02 36C24825Q1093 rev c.pdf | ||
| 36C24825Q1093 0004.pdf | ||
| 36C24825Q1093 0004_1.docx | DOCX document | |
| 36C24825Q1093 0003.pdf | ||
| 36C24825Q1093 0003_1.docx | DOCX document | |
| 36C24825Q1093 0002_1.docx | DOCX document | |
| 36C24825Q1093 0002.pdf | ||
| S02 36C24825Q1093 rev b.pdf | ||
| 36C24825Q1093 0001_1.docx | DOCX document | |
| S06 36C24825Q1093 0001.pdf | ||
| 36C24825Q1093_2.docx | DOCX document | |
| S02 36C24825Q1093.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
9/23/2025
NONE
36C248
Department of Veterans Affairs
Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy Suite 525
Tampa FL 33637
36C248
Department of Veterans Affairs
Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy
Tampa FL 33637
To all Offerors/Bidders
36C24825Q1093
X
X X
The purpose of this amendment is to address the questions asked by vendors regarding this Mobile Chiller requirement.
Please see the next page.
Marcus Lewis
VA-VHA-RPOE-2025-0041
RFI: Questions regarding the Mobile Chiller Solicitation 36C24825Q1093
Question 1: Mechanical RFI – Chilled/Condenser Water Connections: Please confirm the size, type, and location of the water connection points at Building 39 (CEP) and
Building 100 (Bed Tower) for the mobile chiller. Specifically, what are the chilled water and condenser water connection sizes (e.g. 8″ flanged, 6″ cam-lock, etc.) and are matching valves/caps already in place at those buildings? This clarification is needed so we can provide compatible mating connections on the mobile unit. Additionally, confirm if Building 100’s condenser water is tied into Building 39’s cooling towers – i.e., does
B100 have a condenser water loop available or will the mobile chiller at B100 need to be connected via temporary hoses back to the CEP cooling towers? (This affects how we plan the condenser piping setup on the unit.)
Answer: Completely separate buildings, B39 12” chilled water 16” condenser water, B100 12” chilled water 18” condenser water. Building connections VA responsibility
Question 2: Mechanical RFI – Deployability at Bed Tower: If Building 100 lacks a cooling tower connection: does the VA intend for the mobile chiller to still be used at
B100 by running long hoses to Building 39’s cooling tower system, or is an air-cooled capability expected? We assume the mobile chiller will use the existing CEP cooling towers even when positioned at B100 (with quick-connect hoses spanning to B39).
Please confirm this assumption. (This is critical to ensure we do not need to include any ad-hoc cooling provision when at B100.)
Answer: Building connections VA responsibility
Question 3: Mechanical RFI – Quantity of Chillers: Confirm that only one (1) chiller unit is required as the deliverable. The synopsis sometimes refers to “mobile chiller packages” (plural), but our understanding is the intent is a single 1000-ton chiller package (contained in one unit) to serve both locations as needed. There is no requirement for multiple units, correct? We will provide one complete mobile chiller system capable of backup for either building.1 ea 1000 Ton modular magnetic bearing chiller
Answer: (1) ea 1000 Ton modular magnetic bearing chiller
Question 4: Electrical RFI – Power Supply Details: Please provide details on the available electrical service at the connection points. We assume a 480 V, 3-phase, 60
Hz supply is available at both Bldg. 39 and Bldg. 100 for this mobile chiller. What is the ampacity or breaker size dedicated for this connection at each location? (For example, is there a 2000A disconnect already installed at the CEP for a temporary chiller?) Also, confirm the connection method the VA prefers: Will the VA provide a cam-lock receptacle panel for our unit to plug into, or should our scope include cam-lock connectors on the mobile unit and the VA will hard-wire cables each time? Clarity on this will ensure our electrical hookup design matches the VA’s interface.
Answer: Building connections VA responsibility
Question 5: Electrical RFI – Building 100 Power Connection: Related to the above, is there an existing high-voltage tie-in point at Building 100 for a temporary chiller? If not, would the VA plan to run a feeder from Building 39 to Building 100 when needed? (We are assuming B100 has no dedicated chiller tie-in, so power would likely come from the
CEP. We just want to confirm so we don’t, for instance, plan for a secondary connection on the unit.) Essentially, confirm that the mobile unit only needs one power input and the VA will handle any distribution to it at either location.
Answer: One power input confirmed Building connections VA responsibility
Question 6: General RFI – Delivery and Offloading: Clarify the delivery location and offloading responsibilities. The solicitation notes FOB delivery to JAH Hospital, Building
39 CEP. Upon arrival, will the VA provide any assistance or equipment (e.g. an on-site crane or forklift) to unload the unit from our transport, or is the contractor expected to offload and place the unit on their own? Additionally, if the unit is delivered already on its trailer, will it be acceptable to simply park it at the designated spot (e.g. a concrete pad near Bldg. 39) and leave it mounted on the trailer? We want to confirm if the VA expects the container to be removed from the trailer or if it stays on the trailer for use.
This will affect our delivery approach and any rigging plan.
Answer: Chiller should be mobile and left on trailer for use, VA will not provide assistance offloading
Question 7: General RFI – Placement at Building 100: If the chiller is to be deployed at Building 100, where would it sit? Is there a driveway or pad accessible for the 48′ trailer near B100’s chilled water tie-in? Any weight or clearance restrictions for bringing a large trailer to that area of campus? (We will need to know if special maneuvering is required.) This RFI ensures we account for site access in our plan.
Answer: There is space available at both building plants for Mobile Chiller storage next to the emergency connections
Question 8: General RFI – Exterior Finish and Markings: Please confirm if any specific paint color, logos, or markings are required on the exterior of the container/trailer. The spec does not mention any aesthetics or identification requirements. We plan to deliver the container in standard finish (e.g. VA gray or beige if available). If VA requires a certain paint (for example, to match facility or with “VA” lettering), we need to know to include that. (By default, none assumed.)
Answer: VA gray or beige (beige preferred) if available
Question 9: General RFI – Commissioning/Startup Expectations: Is the contractor expected to perform any on-site startup or performance testing of the chiller at the VA site? The scope is delivery-only, so we assume no formal on-site commissioning is required (i.e. VA staff will connect and test the unit when needed). We will of course demonstrate functionality at our factory. Please confirm that on-site startup support is not in scope, aside from perhaps a brief operational checkout during delivery (if power and water are available). This will ensure our proposal aligns with VA’s expectations and we include any required personnel for a site visit if needed at acceptance.
Answer: Power and water will be available upon notification of delivery date and operational checks will be expected during delivery.